CN203846498U CN201420176593.2U CN201420176593U CN203846498U CN 203846498 U CN203846498 U CN 203846498U CN 201420176593 U CN201420176593 U CN 201420176593U CN 203846498 U CN203846498 U CN 203846498U
Authority
CN
China
Prior art keywords
grouting
concrete
slurry
supervisor
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420176593.2U
Other languages
Chinese (zh)
Inventor
周建华
韩炳兰
任崇峰
张金山
李茜
陈祥伟
李维
谭祖万
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN201420176593.2U priority Critical patent/CN203846498U/en
Application granted granted Critical
Publication of CN203846498U publication Critical patent/CN203846498U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A concrete combination face secondary grouting device comprises a grouting main pipe and a slurry returning main pipe which form a U-shaped loop which is embedded in late pouring block concrete, and a plurality of grouting branch pipes are arranged on the slurry returning main pipe. One end of each grouting branch pipe is connected with the pipe wall of the grouting main pipe in a sealing mode, the other end is the outlet end inserted into a slurry collecting hole, and a plastic film wraps the outlet end. The slurry collecting hole is a hole formed in the early pouring block concrete and penetrates the concrete combination face to stretch into the early pouring block concrete, and a plurality of slurry discharging grooves are engraved in the pipe wall of each grouting branch pipe at the outlet end. Secondary grouting can be conducted successfully in the embedded grouting pipes in the concrete. The grouting device is simple in structure, convenient to operate and capable of effectively guaranteeing construction quality.

Description

A kind of concrete joint surface back-grouting device
Technical field
The utility model relates to a kind of concrete joint surface provisions for grouting, and being applicable to needs to carry out the back-grouting device that secondary is filled with again between concrete in mass bonding surface.
Background technology
Bonding surface between concrete in mass, after backfill grouting, joint grouting etc. finish, is subject to the various factors such as differential settlement, variations in temperature, and the bonding surface after grouting likely can open again, now needs that bonding surface is carried out to secondary and fills with again.During due to once grouting, easily make slurries be filled into and be close in the pre-buried back-grouting system of bonding surface along bonding surface, cause back-grouting pipeline blockage; Therefore, conventional construction method is: the grouting pipeline that secondary is filled with again is not embedded in inside concrete in advance, but holes to bonding surface in the gallery arranging at structural concrete, utilizes the aperture grouting being drilled with.Adopt in this way construction, not only difficulty of construction is large, and grout hole is difficult to evenly accurately lay, and grouting effect is undesirable, and also easily destroys the functional structure such as cable, the pipeline part that is embedded in inside concrete when bore operation.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of concrete joint surface back-grouting device, and this device is embedded in concrete, can meets the needs of bonding surface back-grouting.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of concrete joint surface back-grouting device, comprise grouting supervisor and overfall supervisor, after grouting supervisor and overfall supervisor composition " U " shape loop are embedded in, water in block concrete, overfall supervisor is provided with multiple grouting arms; One end of grouting arm and overfall supervisor's tube wall is tightly connected, and the other end is the port of export, and the port of export is inserted in poly-slurry hole, and at this port of export place parcel plastic foil; Poly-slurry hole is that the boring of formerly watering on block concrete is set, and it extend into and first water in block concrete through concrete joint surface; On grouting arm, be carved with many slurry outlet grooves, slurry outlet groove one end is positioned at the port of export of grouting arm, and the other end extends to outside poly-slurry aperture, hole.
The port of export of described grouting arm leaves gap with at the bottom of poly-slurry hole, hole.Poly-slurry hole forms by adopting rig formerly to water the mode of holing on block concrete.
Gap between outer wall and the concrete joint surface of described grouting arm adopts cement paste sealing, and while avoiding being in the milk for the first time, slurries enter in grouting arm, guarantee that the pipeline of this device is unobstructed.
The degree of depth in described poly-slurry hole is 8-12cm.This poly-slurry hole depth is moderate, neither can be because of too deeply affecting pulp and occurring plug-hole, and also can when being built, concrete not come off by collision grouting arm because of too shallow.
Slurry outlet groove on described grouting arm is 4, and is evenly distributed on grouting arm, and the length of slurry outlet groove is exposed poly-slurry aperture, hole 2-5cm.The general grout cell that adopts in traditional method, while being in the milk for the first time, grout cell is stopped up, after seam face opens again, if grout cell is not to be on the seam face opening, grouting pipeline just cancels, so can not carry out back-grouting, the utility model is by setting out stock tank, can ensure that seam face opens again time, between grouting pipeline and concrete seam face, there is passage.
The length of described grouting arm is 25-35cm; And the distance between two grouting arms is 1.2m left and right.
Grouting supervisor and overfall supervisor are the supervisor who adopts DN32 steel pipe to make, and grouting arm is the grouting arm that adopts DN25 steel pipe to make.
The method that adopts above-mentioned concrete joint surface back-grouting device to construct, concrete operating procedure is: be responsible for into slurry by grouting, slurries enter respectively each grouting arm along overfall supervisor, slurries in grouting arm break through plastic foil, the slurry outlet groove of slurries from grouting branch pipe wall flows out, be filled to concrete joint surface to be in the milk, reach the object of back-grouting.
A kind of concrete joint surface back-grouting device that the utility model provides, by above-mentioned structure, can successfully realize on inside concrete pre-embedment grouting pipe road and carry out back-grouting, the problem that the grouting effect of avoiding the mode that adopts well cementing to bring is undesirable, easily destroy inside concrete built-in fitting.This apparatus structure is simple, easy and simple to handle, can effective guarantee construction quality.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is the utility model structural representation.
Fig. 2 is the A-A face sectional view of Fig. 1.
Detailed description of the invention
As shown in Figure 1-2, the utility model is a kind of concrete joint surface back-grouting device, comprise grouting supervisor 1 and overfall supervisor 2, after grouting supervisor 1 and overfall supervisor 2 composition " U " shape loops are embedded in, water in block concrete 3, overfall supervisor 2 is provided with multiple grouting arms 4; One end of grouting arm 4 and overfall supervisor's 2 tube wall is tightly connected, and the other end is the port of export, and the port of export is inserted in poly-slurry hole 6, and at this port of export place parcel plastic foil 7; Poly-slurry hole 6 is for arranging the boring of formerly watering on block concrete 5, and it extend into and first water in block concrete 5 through concrete joint surface 8; On grouting arm 4, be carved with many slurry outlet grooves 10, slurry outlet groove 10 one end are positioned at the port of export of grouting arm 4, and the other end extends to outside poly-slurry 6 apertures, hole.The port of export of described grouting arm 4 leaves gap with at the bottom of poly-slurry 6 holes, hole; Leave the space of back-grouting; This gap is generally 3cm left and right.Gap between described grouting arm 4 and concrete joint surface 8 adopts cement paste 9 to seal; While preventing that after-pouring block concrete 3 from building, concrete slurry stops up poly-slurry hole 6 and the grouting arm 4 of this device; Slurry outlet groove 10 on described grouting arm is 4, and is evenly distributed on grouting arm, and the length of slurry outlet groove 10 is exposed poly-slurry aperture, hole 2-5cm.
The degree of depth in described poly-slurry hole 6 is 8-12cm.
In the present embodiment, described grouting supervisor 1 and overfall supervisor 2 are the supervisor who adopts DN32 steel pipe to make, and grouting arm 4 is the grouting arms that adopt DN25 steel pipe to make.
Implementation step: first water block concrete 5 and constructed, adopt rig to bore poly-slurry hole 6, the mode that poly-slurry hole 6 adopts rig formerly to water boring on block concrete 6 forms, and poly-slurry hole 6 extend into and first waters the interior 10cm of block concrete 5 through concrete joint surface 8; This installs other structure member installation in position, waters block concrete 3 after building.Utilize the once grouting system of burying underground to be separately in the milk for the first time to bonding surface, while being in the milk for the first time, sealing cement paste 9 between grouting arm 4 and concrete joint surface 8 stops slurries to enter in grouting arm 4 with the plastic foil 7 that is wrapped in grouting arm 4 ports of export, ensures that this device grouting pipeline is unobstructed.
Bonding surface after once grouting opens again, now needs that bonding surface is carried out to secondary and fills with again; The method that adopts above-mentioned concrete joint surface back-grouting device to construct, concrete operating procedure is: be responsible for 1 by grouting and enter slurry, slurries enter respectively each grouting arm 4 along overfall supervisor 2, slurries in grouting arm 4 break through plastic foil 7, the slurry outlet groove 10 of slurries from grouting arm 4 tube walls flows out, be filled to concrete joint surface to be in the milk 8, reach the object of back-grouting.

Claims (7)

1. a concrete joint surface back-grouting device, comprise grouting supervisor (1) and overfall supervisor (2), it is characterized in that: after grouting supervisor (1) and overfall supervisor (2) composition " U " shape loop are embedded in, water in block concrete (3), overfall supervisor (2) is provided with multiple grouting arms (4); One end of grouting arm (4) and overfall supervisor's (2) tube wall is tightly connected, and the other end is the port of export, and the port of export is inserted in poly-slurry hole (6), and at this port of export place parcel plastic foil (7); Poly-slurry hole (6) is for arranging the boring of formerly watering on block concrete (5), and it extend into and first water in block concrete (5) through concrete joint surface (8); On grouting arm (4), be carved with many slurry outlet grooves (10), slurry outlet groove (10) one end is positioned at the port of export of grouting arm (4), and the other end extends to outside poly-slurry aperture, hole (6).
2. concrete joint surface back-grouting device according to claim 1, is characterized in that: the port of export of described grouting arm (4) leaves gap with at the bottom of poly-slurry hole, hole (6).
3. concrete joint surface back-grouting device according to claim 1, is characterized in that: the gap between the outer wall of described grouting arm (4) and concrete joint surface (8) adopts cement paste (9) sealing.
4. concrete joint surface back-grouting device according to claim 1, is characterized in that: the degree of depth in described poly-slurry hole (6) is 8-12cm.
5. concrete joint surface back-grouting device according to claim 1, is characterized in that: the slurry outlet groove (10) on described grouting arm is 4, and is evenly distributed on grouting arm, and the length of slurry outlet groove (10) is exposed poly-slurry aperture, hole 2-5cm.
6. concrete joint surface back-grouting device according to claim 1, is characterized in that: the length of described grouting arm (4) is 25-35cm.
7. according to the concrete joint surface back-grouting device one of claim 1-6 Suo Shu, it is characterized in that: grouting supervisor (1) and overfall supervisor (2) are the supervisor who adopts DN32 steel pipe to make, grouting arm (4) is the grouting arm that adopts DN25 steel pipe to make.
CN201420176593.2U 2014-04-14 2014-04-14 Concrete combination face secondary grouting device Withdrawn - After Issue CN203846498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420176593.2U CN203846498U (en) 2014-04-14 2014-04-14 Concrete combination face secondary grouting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420176593.2U CN203846498U (en) 2014-04-14 2014-04-14 Concrete combination face secondary grouting device

Publications (1)

Publication Number Publication Date
CN203846498U true CN203846498U (en) 2014-09-24

Family

ID=51559535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420176593.2U Withdrawn - After Issue CN203846498U (en) 2014-04-14 2014-04-14 Concrete combination face secondary grouting device

Country Status (1)

Country Link
CN (1) CN203846498U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953050A (en) * 2014-04-14 2014-07-30 中国葛洲坝集团三峡建设工程有限公司 Concrete bonding surface secondary grouting device and concrete bonding surface secondary grouting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953050A (en) * 2014-04-14 2014-07-30 中国葛洲坝集团三峡建设工程有限公司 Concrete bonding surface secondary grouting device and concrete bonding surface secondary grouting method

Similar Documents

Publication Publication Date Title
CN104389623B (en) Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN102561992B (en) Grouting plugging process adopting deformation water stopper
CN106320353B (en) A kind of construction method of basement construction Yield rainfall relation device
CN206346209U (en) A kind of quick solution dewatering well piping plugging structure
CN209369066U (en) Concrete structure split bolt hole anti-leakage structure
CN107288658A (en) Underground concrete water-proof engineering connects the casting method of stubble seam
CN109184750A (en) A kind of tunnel radial grouting device and method
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN203846498U (en) Concrete combination face secondary grouting device
CN103953050A (en) Concrete bonding surface secondary grouting device and concrete bonding surface secondary grouting method
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN204960882U (en) Coal mine underground hydraulic fracturing drilling and hole sealing device
CN104564105B (en) A kind of apparatus and method of two grades of sleeve pipes of seat earth grouting and reinforcing
CN206174965U (en) Double entry slip casting pipe slip casting device
CN109667586A (en) A kind of double-layer wall of well grouting system and grouting method
CN109854814A (en) A kind of jacking pipe structure and the method for jacking pipe structure periphery lubrication slip casting
CN106284303B (en) A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector
CN108412431B (en) A kind of device and method that artesian water stratum automatic water seal grouting behind shaft or drift lining blocks
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN203247588U (en) Simple grout discharging box device of concrete joint grouting system
CN202559321U (en) Diversion tunnel plug concrete drainage pipe device
CN207080240U (en) The quick grouting device of hollow bolt in the range of applicable 360 °
CN202519628U (en) Inlet plugging device for temporary buried pipe in dense dam body
CN202970614U (en) Water burst drilling and water sealing device
CN205259200U (en) Foundation ditch confined aquifer precipitation well plugging device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140924

Effective date of abandoning: 20160615

C25 Abandonment of patent right or utility model to avoid double patenting