CN203839721U - 12 kV solid-insulation intelligent ring main unit bus connector - Google Patents
12 kV solid-insulation intelligent ring main unit bus connector Download PDFInfo
- Publication number
- CN203839721U CN203839721U CN201420273916.XU CN201420273916U CN203839721U CN 203839721 U CN203839721 U CN 203839721U CN 201420273916 U CN201420273916 U CN 201420273916U CN 203839721 U CN203839721 U CN 203839721U
- Authority
- CN
- China
- Prior art keywords
- bus
- pipe
- tube connector
- insulation
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Installation Of Bus-Bars (AREA)
Abstract
The utility model discloses a 12 kV solid-insulation intelligent ring main unit bus connector which comprises a first connecting pipe. A first bus insulating tube, a second bus insulating tube and a third bus insulating tube are vertically and integratedly arranged on the first connecting pipe. The place, between the first bus insulating tube and the second bus insulating tube, of the first connecting pipe is fixedly provided with a first wire-passing pipe. The left and right sides of the first wire-passing pipe are fixedly provided with a second connecting pipe and a third connecting pipe respectively. The left end of the second connecting pipe is integratedly provided with a second wire-passing pipe. The right end of the third connecting pipe is integratedly provided with a third wire-passing pipe. The third wire-passing pipe is fixedly connected to the place, between the second bus insulating tube and the third bus insulating tube, of the first connecting pipe. With the above technical scheme, three-phase buses can pass through the first bus insulating tube, the second bus insulating tube and the third bus insulating tube respectively; the insulating performance is good; the passing technique method is easy; and the bus connector is convenient to use and high in standardization and normalization.
Description
Technical field
The utility model relates to ring main unit accessory technical field, is specifically related to a kind of 12KV solid insulation intelligent ring main unit bus tie.
Background technology
At present, the most frequently used ring main unit is SF6 gas ring main unit, bus connects employing silicon rubber and is insulated, requirement realizes hermetically sealed design, this is the generally acknowledged difficult problem of solid insulation ring main unit, be A, B, C three-phase bus in a plane time, the bus connectivity problem between different circuit, the insulation distance between busbar becomes the problem that makes design specialist's headache.
Summary of the invention
The deficiency existing for prior art, the purpose of this utility model is to provide a kind of simple in structure, good insulation preformance, 12KV solid insulation intelligent ring main unit bus tie easy to use.
For achieving the above object, the utility model provides following technical scheme: a kind of 12KV solid insulation intelligent ring main unit bus tie, the first tube connector that comprises horizontally set, on described the first tube connector, be vertically wholely set the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube, the first described bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube are parallel to each other, and the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube lower end are through the first tube connector setting, described the first tube connector is fixedly installed the first penetration pipe in position between described the first bus insulation pipe and the second bus insulation pipe, described the first penetration pipe left and right sides is fixedly installed the second tube connector and the 3rd tube connector, described the second tube connector left end has been wholely set the second penetration pipe, described the 3rd tube connector right-hand member has been wholely set the 3rd penetration pipe, and the 3rd penetration pipe is fixedly connected with position between the second bus insulation pipe and triple bus-bar insulated tube with described the first tube connector.
By adopting technique scheme, the bus of three-phase can be located in respectively in three insulated tubes of the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube, good insulation preformance, make the insulation distance between busbar no longer become the problem that makes design specialist's headache, and, this crossing technology method is simple, easy to use, and standardization, standardization degree are high.
The utility model is further set to: described the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube are positioned at same plane, and the center line of the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube is all vertical with the center line of the first tube connector.By this setting, three-phase bus is located in a plane, and the bus between different circuit connects convenient.
The utility model is also further set to: the second described tube connector and the 3rd tube connector are curve bend, and the second tube connector and the 3rd tube connector two ends are crooked towards the first tube connector outside wall surface.By this setting, the second tube connector makes the second penetration pipe be connected convenient with the 3rd penetration pipe with the first tube connector with the 3rd tube connector.
The utility model is also further set to: the second described tube connector, the 3rd tube connector, the first penetration pipe, the second penetration pipe, the 3rd penetration pipe and the first tube connector are structure as a whole.By this setting, between each pipe, connect reliably good insulation preformance.
The utility model is also further set to: described the first penetration pipe, the second penetration pipe and the 3rd penetration pipe are parallel to each other, and are positioned at same plane.By this setting, three penetration pipes arrange rationally, and threading is convenient.
The utility model is also further set to: described the first tube connector, the second tube connector, the 3rd tube connector, the first penetration pipe, the second penetration pipe, the 3rd penetration pipe, the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube are made by silicon rubber insulation material.By this setting, the utility model insulation property are better.
The utility model has the advantages that: compared with prior art, the utility model structure arranges rationally, the bus of three-phase can be located in respectively in three insulated tubes of the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube, good insulation preformance, make the insulation distance between busbar no longer become the problem that makes design specialist's headache, and this crossing technology method is simple, easy to use, standardization, standardization degree are high.
Below in conjunction with Figure of description and specific embodiment, the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment.
Embodiment
Referring to Fig. 1, the disclosed a kind of 12KV solid insulation intelligent ring main unit bus tie of the utility model, the first tube connector 1 that comprises horizontally set, on described the first tube connector 1, be vertically wholely set the first bus insulation pipe 2, the second bus insulation pipe 3 and triple bus-bar insulated tube 4, the first described bus insulation pipe 2, the second bus insulation pipe 3 and triple bus-bar insulated tube 4 are parallel to each other, and the first bus insulation pipe 2, the second bus insulation pipe 3 and triple bus-bar insulated tube 4 lower ends arrange through the first tube connector 1, described the first tube connector 1 is fixedly installed the first penetration pipe 5 in position between described the first bus insulation pipe 1 and the second bus insulation pipe 2, described the first penetration pipe 5 left and right sides are fixedly installed the second tube connector 6 and the 3rd tube connector 7, described the second tube connector 6 left ends have been wholely set the second penetration pipe 8, described the 3rd tube connector 7 right-hand members have been wholely set the 3rd penetration pipe 9, and the 3rd penetration pipe 9 is fixedly connected with position between the second bus insulation pipe 3 and triple bus-bar insulated tube 4 with described the first tube connector 1.
For making the utility model structure more reasonable, as preferably, described in the present embodiment, the first bus insulation pipe 2, the second bus insulation pipe 3 and triple bus-bar insulated tube 4 are positioned at same plane, and the center line of the first bus insulation pipe 2, the second bus insulation pipe 3 and triple bus-bar insulated tube 4 is all vertical with the center line of the first tube connector 1.
Described the second tube connector 6 and the 3rd tube connector 7 are curve bend, and the second tube connector 6 and the 3rd tube connector 7 two ends are crooked towards the first tube connector 1 outside wall surface.
Described the second tube connector 6, the 3rd tube connector 7, the first penetration pipe 5, the second penetration pipe 8, the 3rd penetration pipe 9 and the first tube connector 1 are structure as a whole.And described the first penetration pipe 5, the second penetration pipe 8 and the 3rd penetration pipe 9 are parallel to each other, and are positioned at same plane.
Described the first tube connector 1, the second tube connector 6, the 3rd tube connector 7, the first penetration pipe 5, the second penetration pipe 8, the 3rd penetration pipe 9, the first bus insulation pipe 2, the second bus insulation pipe 3 and triple bus-bar 4 pipes that insulate are made by silicon rubber insulation material.
The utility model structure arranges rationally, the bus of three-phase can be located in respectively in three insulated tubes of the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube, good insulation preformance, and also this crossing technology method is simple, easy to use, standardization, standardization degree are high.The design of the utility model bus tie has thoroughly solved the generally acknowledged difficult problem of solid insulation ring main unit, when A, B, C three-phase bus are in a plane, and the bus connectivity problem between different circuit.This 3 D stereo bus crossing technology, by the good insulation property of silicon rubber, makes the insulation distance between busbar no longer become the problem that makes design specialist's headache.
Above-described embodiment is to specific descriptions of the present utility model; only for the utility model is further described; can not be interpreted as the restriction to the utility model protection range, within the technician of this area makes some nonessential improvement according to the content of above-mentioned utility model to the utility model and adjusts and all to fall into protection range of the present utility model.
Claims (6)
1. a 12kV solid insulation intelligent ring main unit bus tie, it is characterized in that: the first tube connector that comprises horizontally set, on described the first tube connector, be vertically wholely set the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube, the first described bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube are parallel to each other, and the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube lower end are through the first tube connector setting, described the first tube connector is fixedly installed the first penetration pipe in position between described the first bus insulation pipe and the second bus insulation pipe, described the first penetration pipe left and right sides is fixedly installed the second tube connector and the 3rd tube connector, described the second tube connector left end has been wholely set the second penetration pipe, described the 3rd tube connector right-hand member has been wholely set the 3rd penetration pipe, and the 3rd penetration pipe is fixedly connected with position between the second bus insulation pipe and triple bus-bar insulated tube with described the first tube connector.
2. a kind of 12kV solid insulation intelligent ring main unit bus tie according to claim 1, it is characterized in that: described the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube are positioned at same plane, the center line of the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube is all vertical with the center line of the first tube connector.
3. a kind of 12KV solid insulation intelligent ring main unit bus tie according to claim 1 and 2, it is characterized in that: the second described tube connector and the 3rd tube connector are curve bend, and the second tube connector and the 3rd tube connector two ends are crooked towards the first tube connector outside wall surface.
4. a kind of 12kV solid insulation intelligent ring main unit bus tie according to claim 3, is characterized in that: the second described tube connector, the 3rd tube connector, the first penetration pipe, the second penetration pipe, the 3rd penetration pipe and the first tube connector are structure as a whole.
5. a kind of 12kV solid insulation intelligent ring main unit bus tie according to claim 4, is characterized in that: described the first penetration pipe, the second penetration pipe and the 3rd penetration pipe are parallel to each other, and are positioned at same plane.
6. a kind of 12kV solid insulation intelligent ring main unit bus tie according to claim 5, is characterized in that: described the first tube connector, the second tube connector, the 3rd tube connector, the first penetration pipe, the second penetration pipe, the 3rd penetration pipe, the first bus insulation pipe, the second bus insulation pipe and triple bus-bar insulated tube are made by silicon rubber insulation material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420273916.XU CN203839721U (en) | 2014-05-26 | 2014-05-26 | 12 kV solid-insulation intelligent ring main unit bus connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420273916.XU CN203839721U (en) | 2014-05-26 | 2014-05-26 | 12 kV solid-insulation intelligent ring main unit bus connector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203839721U true CN203839721U (en) | 2014-09-17 |
Family
ID=51517520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420273916.XU Expired - Fee Related CN203839721U (en) | 2014-05-26 | 2014-05-26 | 12 kV solid-insulation intelligent ring main unit bus connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203839721U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107565388A (en) * | 2017-11-02 | 2018-01-09 | 北京清畅电力技术股份有限公司 | The bus tie of Intelligent solid insulation ring main unit |
-
2014
- 2014-05-26 CN CN201420273916.XU patent/CN203839721U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107565388A (en) * | 2017-11-02 | 2018-01-09 | 北京清畅电力技术股份有限公司 | The bus tie of Intelligent solid insulation ring main unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203983533U (en) | A kind of jockey | |
CN205015377U (en) | A insulating fixing device for electric energy meter is electrified to be changed | |
CN204424474U (en) | Adjustable conductor ground connection link | |
CN203839721U (en) | 12 kV solid-insulation intelligent ring main unit bus connector | |
CN204167694U (en) | Switch cubicle secondary line routing device | |
CN202721351U (en) | A double-layer outgoing line structure of a 220kV HGIS power distribution unit | |
CN204118570U (en) | Double-bus formula prefabricated cabin formula GIS combination electric appliance and prefabricated cabin formula transformer station | |
CN204731278U (en) | A kind of novel compositions embedded high-voltage electric power metering device | |
CN203839806U (en) | 12kV solid-insulation intelligent ring main unit | |
CN204947332U (en) | A kind of comprehensive distribution box | |
CN203950775U (en) | A kind of high-voltage fuse pipe insulation is installed sheath | |
CN204597311U (en) | A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection | |
CN202217795U (en) | Intermediate head of compound insulation tube bus | |
CN204615167U (en) | Formula of lying prone before GIS combination electric appliance wall bushing | |
CN204243478U (en) | The coupling of connecting breaker in power distribution cabinet | |
CN105610081B (en) | A kind of Chinese character pin-shaped GIS outlets arrangement for being used for 500kV and following voltage class | |
CN204992472U (en) | Cable cabinet of transferring for enclosed bus | |
CN204360857U (en) | A kind of reinforced insulation sleeve pipe of looped network gas-filling cabinet | |
CN203607198U (en) | Novel transformer rack of hard busbar mounting structure | |
CN204464904U (en) | Insulating tube type power transmission busbar | |
CN103022924A (en) | Connector for buses of solid insulating switch cabinets | |
CN203521346U (en) | Fuse | |
CN203607858U (en) | Arrangement mode of 110KV reactive power compensator | |
CN204068144U (en) | Gas insulation electric power line | |
CN206894166U (en) | A kind of attachment means of distribution stand transformer and low-tension distribution box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140917 Termination date: 20170526 |