CN203838900U - Rail transit IBP disk integrated control training device - Google Patents

Rail transit IBP disk integrated control training device Download PDF

Info

Publication number
CN203838900U
CN203838900U CN201420208400.7U CN201420208400U CN203838900U CN 203838900 U CN203838900 U CN 203838900U CN 201420208400 U CN201420208400 U CN 201420208400U CN 203838900 U CN203838900 U CN 203838900U
Authority
CN
China
Prior art keywords
integrated control
ibp
psd
station
emergency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420208400.7U
Other languages
Chinese (zh)
Inventor
杨启超
唐春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Emulator Of Track Traffic From All Directions Co Ltd
Original Assignee
Hunan Emulator Of Track Traffic From All Directions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Emulator Of Track Traffic From All Directions Co Ltd filed Critical Hunan Emulator Of Track Traffic From All Directions Co Ltd
Priority to CN201420208400.7U priority Critical patent/CN203838900U/en
Application granted granted Critical
Publication of CN203838900U publication Critical patent/CN203838900U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a rail transit IBP disk integrated control training device which comprises a power supply device, an elevator device, an integrated control device, a station emergency device, a tunnel emergency device, a PSD device, an ATS device, a passenger service device, a PIS device and an AFC device. The power supply device, the elevator device, the integrated control device, the station emergency device, the tunnel emergency device and the PSD device are sequentially arranged from left to right. The passenger service device, the PIS device and the AFC device are arranged on the lower side of the power supply device. The ATS device is located on the lower side of the PSD device. The rail transit IBP disk integrated control training device provided by the utility model demonstrates the principle of an IBP integrated control device, effectively conveys the constitution of a variety of components, and is convenient for teaching and learning.

Description

A kind of track traffic IBP dish Comprehensive Control Practical training equipment
Technical field
The utility model relates to teaching equipment, is specially a kind of track traffic IBP dish Comprehensive Control Practical training equipment.
Background technology
The IBP dish composite control apparatus teaching equipment of track traffic is to make student be familiar with the operating process of station control and shield door, and towards the platform chamber attendant of track traffic company, Comprehensive Control personnel give training.Existing form of teaching can only, by the explanation of the word in books and figure sheet devices, very significantly reduce quality of instruction and teaching speed thereby cannot allow students ' actual situation rehearsal operate.
Summary of the invention
The utility model is to provide a kind of track traffic IBP dish Comprehensive Control Practical training equipment, to solve the shortcoming and deficiency in above-mentioned background technology.
The technical matters that the utility model solves realizes by the following technical solutions:
A kind of track traffic IBP dish Comprehensive Control Practical training equipment, comprise electric supply installation, lift appliance, composite control apparatus, station emergency set, tunnel emergency set, PSD device, ATS device, passenger services device, PIS device, AFC device, described electric supply installation, lift appliance, composite control apparatus, station emergency set, tunnel emergency set, the PSD device layout that arrays from left to right, described passenger services device, PIS device, AFC device are positioned at electric supply installation downside, and described ATS device is positioned at PSD device downside.
In the utility model, the IBP dish composite control apparatus teaching equipment of described track traffic can check by computing machine the information that each sub-device produces by student, check equipment and supervisor status thereof in each sub-device, can control these equipment simultaneously, this software operation platform can play the functions such as monitoring, normal demonstration, fault alarm, operation statistics, every vehicling operation that can real simulation station.The software of each functional areas should link one by one with other software and hardwares of Training Room.
In the utility model, major function comprises: BAS ring control device, for environment is monitored, is reported to the police; To the supervision of staircase, escalator, warning; Supervision, the warning of the supervision emergency power pack of drainage equipment; Control station completely and interval ring control and other electromechanical equipments safety, efficient, the operation coordinated, ajust the well comfortable of subway station and interval environment, produce best energy-saving effect, and commander ring control equipment turns to AD HOC when accident (as fire), for the subway environment of riding provides safety assurance; Show the operation of station ventilation, air-conditioning equipment, water-cooling device equipment, and control;
Can circuit running tunnel ventilation ruuning situation, and control; Show station electromechanical equipment fault alarm situation and show working time; Show station environmental parameter (temperature, humidity) and water device operational factor; The running status that shows several point devices such as water supply and drainage system, escalator, elevator; Under fire condition, control loop control equipment carries out disaster operational mode; Demonstration, by the situation of feeling the condition of a fire sensors such as smoke sensor and temperature sensing sensor, is monitored the on-the-spot condition of a fire; Show fire alarm, carry out manual confirmation, to BAS device, send Fire Mode instruction;
Can realize the emergency backup operation of each device of station complex control room; Forbid that train enters platform; Emergency start main drain pump, fire pump; Emergency start smoke exhaust fan; Emergency cut-off conductor rail power supply; Emergency opening station gate; Emergency opening screen door; Traction power set; Lifts and escalators; Station emergency ventilation; Tunnel emergency ventilation device is controlled; Safe gate.
Beneficial effect: the utility model has been shown the principle of IBP composite control apparatus, has effectively passed on the formation of various parts, convenient teaching and study.
Accompanying drawing explanation
Fig. 1 is structural principle schematic diagram of the present utility model.
Embodiment
For technological means, creation characteristic that the utility model is realized, reach object and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
Referring to Fig. 1, a kind of track traffic IBP dish Comprehensive Control Practical training equipment, comprise electric supply installation 1, lift appliance 2, composite control apparatus 3, station emergency set 4, tunnel emergency set 5, PSD device 6, ATS device 7, passenger services device 8, PIS device 9, AFC device 10, described electric supply installation 1, lift appliance 2, composite control apparatus 3, station emergency set 4, tunnel emergency set 5, PSD device 6 layout that arrays from left to right, described passenger services device 8, PIS device 9, AFC device 10 is positioned at electric supply installation 1 downside, described ATS device 7 is positioned at PSD device 6 downsides.
In the utility model, the IBP dish composite control apparatus teaching equipment of described track traffic can check by computing machine the information that each sub-device produces by student, check equipment and supervisor status thereof in each sub-device, can control these equipment simultaneously, this software operation platform can play the functions such as monitoring, normal demonstration, fault alarm, operation statistics, every vehicling operation that can real simulation station.The software of each functional areas should link one by one with other software and hardwares of Training Room.
In the utility model, major function comprises: BAS ring control device, for environment is monitored, is reported to the police; To the supervision of staircase, escalator, warning; Supervision, the warning of the supervision emergency power pack of drainage equipment; Control station completely and interval ring control and other electromechanical equipments safety, efficient, the operation coordinated, ajust the well comfortable of subway station and interval environment, produce best energy-saving effect, and commander ring control equipment turns to AD HOC when accident (as fire), for the subway environment of riding provides safety assurance;
Show the operation of station ventilation, air-conditioning equipment, water-cooling device equipment, and control;
Circuit running tunnel ventilation ruuning situation, and control;
Show station electromechanical equipment fault alarm situation and show working time;
Show station environmental parameter (temperature, humidity) and water device operational factor;
The running status that shows several point devices such as water supply and drainage system, escalator, elevator; Under fire condition, control loop control equipment carries out disaster operational mode;
Demonstration, by the situation of feeling the condition of a fire sensors such as smoke sensor and temperature sensing sensor, is monitored the on-the-spot condition of a fire;
Show fire alarm, carry out manual confirmation, to BAS device, send Fire Mode instruction;
Carry out the emergency backup operation of each device of station complex control room; Forbid that train enters platform; Emergency start main drain pump, fire pump; Emergency start smoke exhaust fan; Emergency cut-off conductor rail power supply; Emergency opening station gate; Emergency opening screen door; Traction power set; Lifts and escalators; Station emergency ventilation; Tunnel emergency ventilation device is controlled; Safe gate.
More than show and described ultimate principle of the present utility model and principal character and advantage of the present utility model, the technician of the industry should understand, the utility model is not restricted to the described embodiments, that in above-described embodiment and instructions, describes just illustrates principle of the present utility model, do not departing under the prerequisite of the utility model spirit and scope, the utility model also has various changes and modifications, these changes and improvements all fall within the scope of claimed the utility model, the claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (3)

1. a track traffic IBP coils Comprehensive Control Practical training equipment, it is characterized in that, comprise electric supply installation, lift appliance, composite control apparatus, station emergency set, tunnel emergency set, PSD device, ATS device, passenger services device, PIS device, AFC device; Described electric supply installation, lift appliance, composite control apparatus, station emergency set, tunnel emergency set, the PSD device layout that arrays from left to right.
2. a kind of track traffic IBP dish Comprehensive Control Practical training equipment according to claim 1, is characterized in that, described ATS device is positioned at PSD device downside.
3. a kind of track traffic IBP dish Comprehensive Control Practical training equipment according to claim 1, is characterized in that, described passenger services device, PIS device, AFC device are positioned at electric supply installation downside.
CN201420208400.7U 2014-04-28 2014-04-28 Rail transit IBP disk integrated control training device Expired - Fee Related CN203838900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420208400.7U CN203838900U (en) 2014-04-28 2014-04-28 Rail transit IBP disk integrated control training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420208400.7U CN203838900U (en) 2014-04-28 2014-04-28 Rail transit IBP disk integrated control training device

Publications (1)

Publication Number Publication Date
CN203838900U true CN203838900U (en) 2014-09-17

Family

ID=51516715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420208400.7U Expired - Fee Related CN203838900U (en) 2014-04-28 2014-04-28 Rail transit IBP disk integrated control training device

Country Status (1)

Country Link
CN (1) CN203838900U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104634554A (en) * 2014-12-24 2015-05-20 中国铁道科学研究院电子计算技术研究所 Track traffic safety shielding door simulation test system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104634554A (en) * 2014-12-24 2015-05-20 中国铁道科学研究院电子计算技术研究所 Track traffic safety shielding door simulation test system
CN104634554B (en) * 2014-12-24 2017-12-01 中国铁道科学研究院电子计算技术研究所 Track traffic security mask door simulation experiment system

Similar Documents

Publication Publication Date Title
CN103745624B (en) Track traffic simulation system
CN104299475A (en) Simulator used for automatic monitoring system of train
CN106448312A (en) Control method for simulating escape teaching truck working system
CN104392268A (en) People stream monitoring and guide system and method for tourist attraction
CN103218947A (en) Simulative elevator electrical installation and adjustment evaluation training system for teaching
CN101962029A (en) Axle counting automatic interpost block system
CN203838900U (en) Rail transit IBP disk integrated control training device
CN203858802U (en) Elevator operation and monitoring platform
CN209991585U (en) Subway station smoke discharge control system
CN202183181U (en) Comprehensive monitoring dynamic demonstration model system of subway station
CN203614131U (en) Fire control device for expressway tunnel
CN209496498U (en) A kind of training system for rail traffic automatic fire alarm system
CN203013117U (en) Training system for checking and evaluating electric installation and adjustment of simulation elevator in teaching
CN103295441B (en) Fire disaster working condition simulation system for urban railway traffic vehicle station
CN206757997U (en) A kind of actual training device of screen door in rail transit
CN203925580U (en) A kind of highway tunnel fire-fighting control device
CN203825459U (en) Highway tunnel fire-fighting controller
CN203616638U (en) Expressway tunnel fire fighting system
CN204884389U (en) But device fault's elevator electrical control structures for teaching
BR112019006983A2 (en) security system for buildings with elevator facilities
RU82048U1 (en) STRUCTURED MONITORING AND MANAGEMENT SYSTEM FOR BUILDING AND STRUCTURE ENGINEERING SYSTEMS - SMIS
CN203825460U (en) Highway tunnel fire-fighting system
CN206039941U (en) Work circuit system of teaching car of fleing simulates
CN206370190U (en) Real device of instructing of comprehensive reserve of track traffic IBP
CN211403684U (en) Platform emergency exit teaching training device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wan Lichao

Inventor after: Tang Jia

Inventor before: Yang Qichao

Inventor before: Tang Chunlin

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

CF01 Termination of patent right due to non-payment of annual fee