CN203825181U - Electric-energy-meter production test system - Google Patents

Electric-energy-meter production test system Download PDF

Info

Publication number
CN203825181U
CN203825181U CN201420079422.8U CN201420079422U CN203825181U CN 203825181 U CN203825181 U CN 203825181U CN 201420079422 U CN201420079422 U CN 201420079422U CN 203825181 U CN203825181 U CN 203825181U
Authority
CN
China
Prior art keywords
electric energy
energy meter
workshop
network
test system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420079422.8U
Other languages
Chinese (zh)
Inventor
郑惠全
贺惠良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG ORIENT COMMUNICATION TECH Co Ltd
Original Assignee
GUANGDONG ORIENT COMMUNICATION TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG ORIENT COMMUNICATION TECH Co Ltd filed Critical GUANGDONG ORIENT COMMUNICATION TECH Co Ltd
Priority to CN201420079422.8U priority Critical patent/CN203825181U/en
Application granted granted Critical
Publication of CN203825181U publication Critical patent/CN203825181U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model proposes an electric-energy-meter production test system which includes a backbone-network system and a workshop system. The workshop system is connected to the backbone-network system through an Ethernet or a wireless network. The backbone-network system includes an application server and a database server connected with the application server through a backbone network. The workshop system includes a plurality of production workshops. A plurality of test work stations and an acquisition controller, which are connected through a power-line carrier local-area network, and a data acquisition device connected with the acquisition controller are arranged in the production workshop. The electric-energy-meter production test system has the following beneficial effects: network stationing is easy to carry out and usability is comparatively high.

Description

A kind of electric energy meter production test system
Technical field
The utility model relates to electric energy meter field tests, particularly a kind of electric energy meter production test system.
Background technology
Due to the production technology of electric energy meter, the difference of testing requirement, the test post of electric energy meter often need to be changed at the diverse location of workshop, and the operation of production test system need to have the support (production testing data need to be kept in database) of network.But the way that spider lines is installed at each production station seems unrealistic; If with the wireless network of WiFi802.1, because workshop Area comparison is large, and due to the stopping of the various barriers such as production equipment, the effect of the actual use of wireless network is not fine, so there is the system communication network difficult problem of layouting.Traditional power carrier communication speed is slow, and the data of communication need to be modulated on line of electric force to be transmitted, and this just caused in the time arbitrarily, can only have a data point sending, otherwise will in the bus of line of electric force, cause the conflict of data; The data-signal transmitting on line of electric force, is easily subject to the electric network noise impact that various production equipments cause simultaneously.Therefore the availability of traditional carrier communication is not high.
Utility model content
The technical problems to be solved in the utility model is, for the above-mentioned network of the prior art not high defect of difficulty, availability of layouting, provides a kind of electric energy meter production test system that network is layouted, availability is higher of easily carrying out.
The utility model solves the technical scheme that its technical matters adopts: construct a kind of electric energy meter production test system, comprise backbone network system and workshop system, described workshop system is linked into described backbone network system by Ethernet or wireless network; The database server that described backbone network system comprises application server and is connected by core network with described application server; Described workshop system comprises multiple workshops, is provided with multiple testing workstation, the acquisition controller connecting by power line carrier LAN (Local Area Network) and the data acquisition unit being connected with described acquisition controller in described workshop.
In electric energy meter production test system described in the utility model, described testing workstation comprises PC; Described PC calls the service logic of described application server, and the execution result of described application server is shown.
In electric energy meter production test system described in the utility model, in described workshop, be also provided with and show platform, the described platform of showing is connected, passes to described electric energy meter for reading power meters error in dipping and by relevant information by RS485 interface with described electric energy meter and one of them testing workstation respectively.
In electric energy meter production test system described in the utility model, in described workshop, be also provided with the platform of having good luck, the described platform of having good luck is connected with described electric energy meter and another testing workstation respectively, tests for described electric energy meter being carried out to the switching on test of relay, the test of having good luck, clock test, the test of RS485 interface communication and carrier communication, and test result is kept in database.
In electric energy meter production test system described in the utility model, described data acquisition unit comprises voltage sensor and/or current sensor and/or test fixture and/or test fixture.
In electric energy meter production test system described in the utility model, in described workshop, be also provided with the wireless router of the described power line carrier LAN (Local Area Network) of access.
In electric energy meter production test system described in the utility model, described backbone network system also comprises the first web server that accesses core network, and described the first web server is connected with multiple web access ends by internet.
In electric energy meter production test system described in the utility model, described backbone network system also comprises the second web server that accesses core network, and described the second web server is connected with multiple workstations by corporate intranet.
In electric energy meter production test system described in the utility model, described electric energy meter is hung a RFID electronic tag in process of production on its substrate; Install on the surface of electric energy meter of table cover and posted the bar code that dispatches from the factory; Described acquisition controller is by reading described RFID electronic tag and the bar code that dispatches from the factory, in order to generation detection data and the factory testing data of electric energy meter are carried out to correspondence.
In electric energy meter production test system described in the utility model, described backbone network system also comprises the network printer that accesses described core network.
Implement electric energy meter production test system of the present utility model, there is following beneficial effect: owing to using backbone network system and workshop system, workshop system comprises multiple workshops, in each workshop, testing workstation is connected by power line carrier LAN (Local Area Network) with acquisition controller, like this testing workstation and acquisition controller if in the place of power supply just can and application server, database servers group Netcom interrogate, so easily carry out that network is layouted, availability is higher.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation in embodiment of the utility model electric energy meter production test system.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
In the utility model electric energy meter production test system embodiment, Fig. 1 is the structural representation of electric energy meter production test system, in Fig. 1, this electric energy meter production test system comprises backbone network system 01 and workshop system 02, wherein, workshop system 02 is linked into backbone network system 01 by Ethernet or wireless network; This backbone network system 01 comprises application server 2 and database server 1; Database server 1 is connected by core network (data bus) with application server 2; Workshop system 02 comprises multiple workshops, has only drawn a workshop in Fig. 1, is provided with multiple testing workstation, acquisition controller and data acquisition unit in each workshop; Wherein, testing workstation is connected by power line carrier LAN (Local Area Network) with acquisition controller, and data acquisition unit is connected with acquisition controller.Compare with traditional mode of production test macro, this electric energy meter production test system has been used broadband power line carrier technology, equipment (for example computer) and the acquisition controller of workshop the inside are coupled together by power lead, in workshop, form a power line carrier LAN (Local Area Network), testing workstation and acquisition controller are as long as interrogate with regard to energy and application server, database servers group Netcom in the place of power supply like this, the network difficult problem of layouting effectively solving, so easily carry out that network is layouted, availability is higher.
In the present embodiment, application server 2 is mainly to provide support for testing workstation detects service logic operation.By the mechanism (remote function calls) of RPC, testing workstation is called the service logic of application server 2, and the execution result of application server 2 is showed to user.Database server 1 adopts the data platform of MySQL database as whole system, for whole system provides the support of data storage and access.Simultaneously MySQL increase income, free, stable and reliable for performance, be applicable to very much the application of the production testing system of medium-sized and small enterprises.Testing workstation is moved the required test procedure in each test post, testing workstation is mainly moved two programs, first is servo programe, mainly be responsible for the configuration information of the control center that accepts application server 2 ends, in the time adjusting production task, set the model of produced product in control center, servo programe will configure the test procedure of end automatically, correct post test procedure is provided, enhances productivity.Second is tag end test program, is mainly to decide according to the test request of product.Different end point detection program corresponding to product.
In the present embodiment, communication network mainly contains two parts composition, and first is the core network of building system operation in the machine room inside of server, and application server 2 and database server 1 are coupled together.Workshop adopts broadband power line carrier technology, forms independently power line carrier LAN (Local Area Network) in each workshop.The power line carrier LAN (Local Area Network) in workshop is linked into core network by fixing ethernet line or WiFi802.1 wireless network.Application server 2, database server 1, testing workstation, acquisition controller are shared data by such a hierarchical network.
In the present embodiment, acquisition controller is the end-equipment of a data acquisition, it is descending can articulate data acquisition unit, data acquisition unit can be various checkout equipments, sensor, the testing requirement and the test logic that issue according to the control center of application server 2 ends, gather production testing data automatically.Acquisition controller is up can articulate testing workstation or directly and application server 2 carry out communication.Acquisition controller is made up of flush bonding processor+Embedded Linux of 32bit.Data acquisition unit is articulated in below acquisition controller, can be voltage sensor and/or current sensor and/or test fixture and/or test fixture, can also be checkout equipment.Data are detected on the basis that acquisition controller directly gathers electric energy meter by data acquisition unit.Acquisition controller is mainly used in the control of test automatically, producers are as long as be arranged on electric energy meter in test fixture (fixture) or testing apparatus, acquisition controller can complete test automatically, and test result is showed to producers, and test data is kept in database automatically.In the time need to producing different electric energy meters, Master Control Center can arrange the test logic of testing workstation and acquisition controller by network like this, can complete the production test requirement to different electric energy meters.
In the present embodiment, there are respectively N testing workstation, acquisition controller and data acquisition unit, for convenience of description, by N testing workstation be called the first testing workstation 71 ..., N testing workstation 7N, by N acquisition controller be called the first acquisition controller 101 ..., N acquisition controller 10N, by N data acquisition unit be called the first data acquisition unit 111 ..., N data acquisition unit 11N.
In the present embodiment, testing workstation is mainly used in that testing requirement is relatively concentrated, the application of the batch of test logic more complicated, and tester's use test workstation carries out operation and detection in batches to electric energy meter.Testing workstation comprises PC; This PC calls the service logic of application server, and the execution result of application server 2 is shown, checks for user.Traditional electric energy meter production test system, error checking program normally provides compared with Biao Tai producer, and production testing system is program independently separately, and error-detecting data are difficult to sum up in the point that in production test system.In the present embodiment, in workshop, be also provided with and show platform 8, show platform 8 and be connected, pass to electric energy meter for reading power meters error in dipping and by relevant information by RS485 interface with electric energy meter and one of them testing workstation (the first testing workstation 71) respectively.Specifically, by electric energy meter error calibration procedure with show platform 8 and carry out cooperating, the measuring parameter of check and correction electric energy meter.Compare with traditional ammeter production test system, the electric energy meter production test system in the present embodiment has full automatic ammeter error in dipping proofreading function.Electric energy meter production test system in the present embodiment, by the concept of " driver ", has increased the table platform " driver " of different manufacturers on market; The error collate program of system can be shown platform 8 by showing the control of platform driver, carries out error-tested.Concrete, the program that calibrates for error is first by showing the error in dipping of platform 8 reading power meters, and the information exchanges such as error in dipping, normalized current, voltage, power factor, phase angle are crossed to RS485 interface passes to electric energy meter.Electric energy meter is adjusted measuring parameter according to the error calculating parameter of input.By this close-loop control mode, automatically the error in dipping of electric energy meter is calibrated.
In the present embodiment, in workshop, be also provided with the platform 9 of having good luck, the platform 9 of having good luck is connected with electric energy meter and another testing workstation (N testing workstation 7N) respectively, the utilization test procedure of having good luck carries out the switching on test of relay, the test of having good luck, clock test, the test of RS485 interface communication and carrier communication test to electric energy meter, and test result is kept in database.In the present embodiment, be also provided with wireless router 6 in workshop, wireless router 6 accesses power line carrier LAN (Local Area Network).Can realize wireless connections by wireless router 6 like this.
In the present embodiment, backbone network system also comprises that the first web server 4, the first web servers 4 that access core network are connected with multiple web access ends by internet.In the present embodiment, in Fig. 1, drawn N web access end, be called the first access end 41 ..., N access end 4N.Backbone network system also comprises that the second web server 5, the second web servers 5 that access core network are connected with multiple workstations by corporate intranet.In the present embodiment, in Fig. 1, drawn N workstation, be called the first workstation 51 ..., N workstation 5N.Under the certain situation of the present embodiment, several workstations also can be additionally set, be directly articulated on data bus (access core network).In the present embodiment, backbone network system also comprises the network printer 3, and the network printer 3 also accesses core network, for printing.
Traditional electric energy meter production test system is in the production run of electric energy meter, and how rapidly electric energy meter being carried out to uniqueness, to identify this be a maximum difficult problem, and conventional is to stick bar coded sticker on the substrate of electric energy meter; Or at the inner prefabricated ID of the CPU of electric energy meter, when powering on, electric energy meter reads out.All there is obvious deficiency in these two kinds of methods.The method of sticked bar-code need to be sticked bar coded sticker at substrate before production, reads in bar code in each test post with barcode scanner, and the shortcoming of doing is like this that the intensity of the direct labor's operation time large, bar code recognition is long, at the bottom of production efficiency.In the time of the method reading power meters of the prefabricated electric energy meter numbering of CPU, need to power on to electric energy meter, electric energy meter numbering cannot be read in the post that cannot power on to electric energy meter at some, causes to use to be subject to limitation.In order to address these problems, the electric energy meter in the present embodiment is hung a RFID electronic tag in process of production on its substrate; Install on the surface of electric energy meter of table cover and posted the bar code that dispatches from the factory; Acquisition controller is by reading RFID electronic tag and the bar code that dispatches from the factory, in order to generation detection data and the factory testing data of electric energy meter are carried out to correspondence.
Specifically, electric energy meter, dropping into before assembling procedure production line, is hung a RFID label on substrate, and each RFID label has a unique tag number; Before the electric energy meter of every batch is produced, the batch information that Master Control Center can be produced this electric energy meter is set on the computer or acquisition controller of testing workstation, in the time that the RFID card reader in test post detects RFID label, test procedure (or acquisition controller) can, by unique ID of production batch and RFID tag number composition electric energy meter, carry out retrieval and the storage of electric energy meter test data with this unique ID.In the time that electric energy meter arrives " once packaging ", need to cover table cover, acquisition controller here dispatch from the factory bar code and the RFID label of reading power meters is carried out correspondence, and the production testing data in the information of dispatching from the factory and the factory of electric energy meter have just been mapped like this.In this post, RFID label is taken off, while production for the electric energy meter of follow-up batch.Because reading of RFID is convenient and swift, and need not power on to electric energy meter before using, greatly improve the production efficiency of electric energy meter.
Under the certain situation of the present embodiment, in the time will carrying out the burn-in test of electric energy meter, electric energy meter is put into high-temperature aging room, under the condition of high temperature, energising moves 24 hours continuously, acquisition controller gathered the data of electric energy meter automatically every one hour, and test result is stored in database.
In a word, in the present embodiment, according to predefined production technology, in the time that needs are adjusted production product type, the automatically servo programe of configuration testing workstation, adjusts tag end test program, reaches robotization and turn the effect of line, enhances productivity.Electric energy meter production test system in the present embodiment has adopted the first ZAP of function broadband power, add the technical parameter of bandwidth carrier, and on the basis of the Physical layer of broadband power line carrier, add power line carrier automatic network-building (route) agreement, electric power data signal conflict arbitration agreement, IP agreement, TCP/UDP agreement, make the ability of its composition power line carrier LAN (Local Area Network).Easily receive the noise problem of production equipment for power carrier signal, the electric energy meter production test system in the present embodiment mainly adopts two ways to solve, and the one, automatic route, communication data gets around the bypass of undesired signal automatically; The 2nd, the power supply of all production equipments is added to a trap, do not allow the power noise of production equipment to be sent on electrical network.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (10)

1. an electric energy meter production test system, is characterized in that, comprises backbone network system and workshop system, and described workshop system is linked into described backbone network system by Ethernet or wireless network; The database server that described backbone network system comprises application server and is connected by core network with described application server; Described workshop system comprises multiple workshops, is provided with multiple testing workstation, the acquisition controller connecting by power line carrier LAN (Local Area Network) and the data acquisition unit being connected with described acquisition controller in described workshop.
2. electric energy meter production test system according to claim 1, is characterized in that, described testing workstation comprises PC; Described PC calls the service logic of described application server, and the execution result of described application server is shown.
3. electric energy meter production test system according to claim 1 and 2, it is characterized in that, in described workshop, be also provided with and show platform, the described platform of showing is connected, passes to described electric energy meter for reading power meters error in dipping and by relevant information by RS485 interface with described electric energy meter and one of them testing workstation respectively.
4. electric energy meter production test system according to claim 3, it is characterized in that, in described workshop, be also provided with the platform of having good luck, the described platform of having good luck is connected with described electric energy meter and another testing workstation respectively, tests for described electric energy meter being carried out to the switching on test of relay, the test of having good luck, clock test, the test of RS485 interface communication and carrier communication, and test result is kept in database.
5. electric energy meter production test system according to claim 4, is characterized in that, described data acquisition unit comprises voltage sensor and/or current sensor and/or test fixture and/or test fixture.
6. electric energy meter production test system according to claim 5, is characterized in that, is also provided with the wireless router of the described power line carrier LAN (Local Area Network) of access in described workshop.
7. electric energy meter production test system according to claim 6, is characterized in that, described backbone network system also comprises the first web server that accesses core network, and described the first web server is connected with multiple web access ends by internet.
8. electric energy meter production test system according to claim 7, is characterized in that, described backbone network system also comprises the second web server that accesses core network, and described the second web server is connected with multiple workstations by corporate intranet.
9. electric energy meter production test system according to claim 3, is characterized in that, described electric energy meter is hung a RFID electronic tag in process of production on its substrate; Install on the surface of electric energy meter of table cover and posted the bar code that dispatches from the factory; Described acquisition controller is by reading described RFID electronic tag and the bar code that dispatches from the factory, in order to generation detection data and the factory testing data of electric energy meter are carried out to correspondence.
10. electric energy meter production test system according to claim 8, is characterized in that, described backbone network system also comprises the network printer that accesses described core network.
CN201420079422.8U 2014-02-24 2014-02-24 Electric-energy-meter production test system Expired - Fee Related CN203825181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420079422.8U CN203825181U (en) 2014-02-24 2014-02-24 Electric-energy-meter production test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420079422.8U CN203825181U (en) 2014-02-24 2014-02-24 Electric-energy-meter production test system

Publications (1)

Publication Number Publication Date
CN203825181U true CN203825181U (en) 2014-09-10

Family

ID=51480663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420079422.8U Expired - Fee Related CN203825181U (en) 2014-02-24 2014-02-24 Electric-energy-meter production test system

Country Status (1)

Country Link
CN (1) CN203825181U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104468270A (en) * 2014-12-01 2015-03-25 深圳市友讯达科技发展有限公司 Interconnection and interworking site testing system and method
CN104597426A (en) * 2014-12-17 2015-05-06 浙江涵普电力科技有限公司 Remote online monitoring method of energy measurement device
CN107643506A (en) * 2017-08-28 2018-01-30 广西电网有限责任公司电力科学研究院 A kind of verification system of universal full automatic electric energy meter calibrating installation
CN108931929A (en) * 2017-05-23 2018-12-04 国网江苏省电力公司苏州供电公司 A kind of intelligent power equipment control information collecting method
CN111273212A (en) * 2020-02-24 2020-06-12 国网湖南省电力有限公司 Data-driven electric quantity sensor error online evaluation closed-loop improvement method, system and medium

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104468270A (en) * 2014-12-01 2015-03-25 深圳市友讯达科技发展有限公司 Interconnection and interworking site testing system and method
CN104597426A (en) * 2014-12-17 2015-05-06 浙江涵普电力科技有限公司 Remote online monitoring method of energy measurement device
CN108931929A (en) * 2017-05-23 2018-12-04 国网江苏省电力公司苏州供电公司 A kind of intelligent power equipment control information collecting method
CN108931929B (en) * 2017-05-23 2021-04-30 国网江苏省电力公司苏州供电公司 Intelligent power equipment control information acquisition method
CN107643506A (en) * 2017-08-28 2018-01-30 广西电网有限责任公司电力科学研究院 A kind of verification system of universal full automatic electric energy meter calibrating installation
CN111273212A (en) * 2020-02-24 2020-06-12 国网湖南省电力有限公司 Data-driven electric quantity sensor error online evaluation closed-loop improvement method, system and medium
CN111273212B (en) * 2020-02-24 2022-03-11 国网湖南省电力有限公司 Data-driven electric quantity sensor error online evaluation closed-loop improvement method, system and medium

Similar Documents

Publication Publication Date Title
CN203825181U (en) Electric-energy-meter production test system
CN110492907B (en) Method and device for establishing archive for ammeter
CN102540133B (en) Automatic detecting system and method for intelligent grid data collecting terminal
CN104301406A (en) Mobile operation terminal platform and access method based on marketing system and acquisition system
CN101848042A (en) Method and system for testing radio frequency of mobile phones
US20180234294A1 (en) System and method for configuring iot devices
CN105404284A (en) QT-based cross platform PLC product tool test system and test method thereof
CN104978265A (en) PCBA test method and PCBA test system
CN105635184A (en) Communication protocol conversion method, device and system
CN109240626A (en) label printing method and system
CN104580245A (en) Power distribution terminal 104 message parsing system and parsing method thereof
CN205751223U (en) Power information acquisition system failure diagnosis apparatus
CN104486151A (en) Method and device for carrying out production testing on access terminal product
CN104009882A (en) Equivalent satellite power supply system testing method and system based on distributed architecture
CN104714119B (en) A kind of detecting tool and detecting system
CN110764036A (en) Intelligent distribution transformer terminal test method and system
CN105281837A (en) Intelligent pairing method for optical fiber pigtails based on RFID (radio frequency identification)
CN205427070U (en) Based on many converters of labVIEW aging testing system
CN204287948U (en) Many groups solar cell test supervisory system
López et al. Monitoring system for the local distributed generation infrastructures of the smart grid
CN205281250U (en) Cross -platform PLC product frock test system based on QT
CN204406197U (en) PROFIBUS bus intelligent diagnostics registering instrument
KR101596945B1 (en) TCP/IP-based Wide Use Communication Module for Smart Nano-Grid and Method thereof
CN104749492A (en) Plug and play method for travelling wave fault location system
CN104954203B (en) Support the DSL product automations detecting system and method for IPv6 agreements

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20210224