CN203806984U - Double-remote-controller control equipment for crane - Google Patents
Double-remote-controller control equipment for crane Download PDFInfo
- Publication number
- CN203806984U CN203806984U CN201420249855.3U CN201420249855U CN203806984U CN 203806984 U CN203806984 U CN 203806984U CN 201420249855 U CN201420249855 U CN 201420249855U CN 203806984 U CN203806984 U CN 203806984U
- Authority
- CN
- China
- Prior art keywords
- remote controller
- hoisting crane
- receiver
- remote
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Selective Calling Equipment (AREA)
Abstract
The utility model discloses double-remote-controller control equipment for a crane. The equipment comprises a crane programmable logic controller (PLC), a first remote controller transmitter, a first remote controller receiver, a second remote controller transmitter and a second remote controller receiver, wherein the first remote controller transmitter is connected with the first remote controller receiver through a wireless mode; the second remote controller transmitter is connected with the second remote controller receiver through a wireless mode; the first remote controller receiver, the second remote controller receiver and the crane PLC are connected with one another; control permission selection switches are arranged on two remote controllers. According to the equipment, command and liaison time in an original production mode is eliminated, the crane inching in-place operating frequency is reduced, the lifting cycle time of the equipment is shortened, the labor productivity is improved, the service life of the equipment is prolonged, and the cost of operators is reduced.
Description
Technical field
The utility model belongs to technical field of automatic control, relates to the two remote controller control devices of a kind of hoisting crane.
Background technology
Hoisting crane has a very wide range of applications in iron and steel enterprise, owing to being that steel product is produced line and storehouse is all the long span of hundreds of rice conventionally, mode of operation is generally driver's cab operation, and every hoisting crane need configure 4 operating personnels, comprises that 1 crane driver, 2 extensions refer to work, 1 tally work.Extension refers to that work is responsible for hanging fortune equipment, and be responsible for getting in touch with commander with operative employee, operative employee is responsible for operating and drives a vehicle, tally work is responsible for Inspection equipment quality, is carried out the record of data.Crane operation work is in driver's cab, can not accurately see distance between equipment and on-station position clearly, equipment is in place mainly refers to work commander by extension, for the sake of security, when equipment is in place, operative employee can take repeatedly slowly installation method of crawl, hangs and refers to that between work and operative employee, contact can take the more time.When extension refers to that work is hung fortune equipment, operative employee is in wait state, during driving operation, hangs and refers to that work is in wait state, when equipment is in place, hangs and refers to that work and operative employee in fact still do something simultaneously.So under this traditional work pattern, labor productivity is very low.
Utility model content
In order to address the above problem, the utility model provides a kind of hoisting crane two remote controller control devices.
The utility model solves the technical scheme that its technical matters adopts:
The two remote controller control devices of this hoisting crane comprise hoisting crane PLC, 1# remote controller projector, 1# remote controller receiver, 2# remote controller projector, 2# remote controller receiver; 1# remote controller projector is connected by wireless mode with 1# remote controller receiver; 2# remote controller projector is connected by wireless mode with 2# remote controller receiver; 1# remote controller launcher signal can only be received by 1# remote controller receiver, and 2# remote controller launcher signal can only be received by 2# remote controller receiver; 1# remote controller receiver, 2# remote controller receiver are connected with hoisting crane PLC.Two remote controller projectors all arrange a control authority select switch, and when 1# side is in " releasing authority " state, 2# side is when " work authority " state, and 2# remote controller, by obtaining the operating right of hoisting crane, can be realized the control to hoisting crane; When 2# side is in " releasing authority " state, 1# side is when " work authority " state, and 1# remote controller, by obtaining the operating right of hoisting crane, can be realized the control to hoisting crane.And under other states, two remote controllers will all cannot be controlled hoisting crane, hoisting crane is also standby simultaneously, will can not move.
Operating process is, two extensions refer to that work is responsible for the operation of remote controller, two ends in hoisting crane work region respectively, when hoisting crane is during near the operation of 1# side, the extension of 2# side refers to that work chooses its remote controller " releasing authority " position, and the extension of 1# side refers to that work chooses its remote controller " work authority " position, at this moment 2# remote controller is the remote manipulation discharging hoisting crane, and 1# remote controller is taken over the remote manipulation to hoisting crane.Otherwise, if hoisting crane is during near the operation of 2# side, the extension of 1# side refers to that work chooses its remote controller " releasing authority " position, and referring to work, the extension of 2# side its remote controller is chosen to " work authority " position, at this moment 1# remote controller remote manipulation to hoisting crane by release, and 2# remote controller is taken over the remote manipulation to hoisting crane.
The beneficial effects of the utility model are after adopting the utility model, only need 2 extensions to refer to work hold concurrently remote controller, 1 tally work, extension refers to that work is at terrestrial operation hoisting crane, the commander who has eliminated under original production pattern gets in touch with the time, reduce hoisting crane crawl number of operations in place, compressed equipment handling period, improved labor efficiency, extend equipment life, also reduced personnel cost simultaneously.
Accompanying drawing explanation
Fig. 1 is system pie graph of the present utility model.
Fig. 2 is the utility model remote controller authority handing-over schematic diagram.
In figure: A hoisting crane PLC; B1# remote controller projector; C1# remote controller receiver;
D2# remote controller projector; E2# remote controller receiver.
The specific embodiment
Below in conjunction with technical scheme and accompanying drawing, describe specific embodiment of the utility model in detail.
Embodiment:
System of the present utility model forms as shown in Figure 1,1# remote controller projector B and 1# remote controller receiver C pairing are used, 2# remote controller projector D and 1# remote controller receiver E pairing are used, these two pairs of remote controllers are independent mutually, 1# remote controller launcher signal can only be received by 1# remote controller receiver, and 2# remote controller launcher signal can only be received by 2# remote controller receiver.1# remote controller receiver and 2# remote controller receiver are passed to the signal of its acceptance respectively hoisting crane PLC A, by hoisting crane PLC more respectively according to the run action of signal control hoisting crane.The switching of two remote controllers as shown in Figure 2 circuit completes.Wherein L+ and M are 24V direct supplys.K11 is from 1# remote controller receiver, represents the serviceability of 1# remote controller, and K11 adhesive represents that 1# remote controller is in " work authority " position, and K11 during adhesive, does not represent " releasing authority " position.K21 is from 2# remote controller receiver, represents the serviceability of 2# remote controller, and K21 adhesive represents that 2# remote controller is in " work authority " position, and K21 during adhesive, does not represent " releasing authority " position.K001 is 1# remote controller mode of operation relay, and this relay, only in K11 adhesive and K21 could adhesive during adhesive, represents that 1# remote controller has control, otherwise represents that 1# remote controller does not have control.K002 is 2# remote controller mode of operation relay, and this relay, only in K21 adhesive and K11 could adhesive during adhesive, represents that 2# remote controller has control, otherwise represents that 2# remote controller does not have control.K003 is alarm relay, represents 1#, 2# remote controller condition selecting mistake when this relay adhesive, two remote controllers may be all in " work authority " position, or two remote controllers are all in " releasing authority " position, and at this moment K003 adhesive is reported to the police, and hoisting crane is by out of service.K001, K002, K003 input at hoisting crane PLC, by PLC, according to the state of these three relays, selected by 1# or 2# remote controller, hoisting crane to be controlled again, during if there is wrong (being K003 adhesive), stop immediately the operation of hoisting crane, guarantee system safety operation.
Claims (1)
1. the two remote controller control devices of hoisting crane, is characterized in that: the two remote controller control devices of this hoisting crane comprise hoisting crane PLC, 1# remote controller projector, 1# remote controller receiver, 2# remote controller projector and 2# remote controller receiver; 1# remote controller projector is connected by wireless mode with 1# remote controller receiver, 2# remote controller projector is connected by wireless mode with 2# remote controller receiver, 1# remote controller launcher signal can only be received by 1# remote controller receiver, and 2# remote controller launcher signal can only be received by 2# remote controller receiver; 1# remote controller receiver, 2# remote controller receiver are connected with hoisting crane PLC;
Two remote controller projectors all arrange a control authority select switch, and when 1# side is in " releasing authority " state, 2# side is when " work authority " state, and 2# remote controller will obtain the operating right of hoisting crane, realize the control to hoisting crane; When 2# side is in " releasing authority " state, 2# side is when " work authority " state, and 1# remote controller will obtain the operating right of hoisting crane, realizes the control to hoisting crane; Under other states, two remote controllers will all cannot be controlled hoisting crane, and hoisting crane is also standby simultaneously, will can not move.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420249855.3U CN203806984U (en) | 2014-05-15 | 2014-05-15 | Double-remote-controller control equipment for crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420249855.3U CN203806984U (en) | 2014-05-15 | 2014-05-15 | Double-remote-controller control equipment for crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203806984U true CN203806984U (en) | 2014-09-03 |
Family
ID=51445770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420249855.3U Expired - Fee Related CN203806984U (en) | 2014-05-15 | 2014-05-15 | Double-remote-controller control equipment for crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203806984U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108285094A (en) * | 2018-03-21 | 2018-07-17 | 中船第九设计研究院工程有限公司 | A kind of double long-distance remote control cargo handling system of gantry crane |
CN112573376A (en) * | 2019-09-30 | 2021-03-30 | 上海梅山钢铁股份有限公司 | Electric control method for double-remote-controller relay operation of wharf shore crane |
-
2014
- 2014-05-15 CN CN201420249855.3U patent/CN203806984U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108285094A (en) * | 2018-03-21 | 2018-07-17 | 中船第九设计研究院工程有限公司 | A kind of double long-distance remote control cargo handling system of gantry crane |
CN112573376A (en) * | 2019-09-30 | 2021-03-30 | 上海梅山钢铁股份有限公司 | Electric control method for double-remote-controller relay operation of wharf shore crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203806984U (en) | Double-remote-controller control equipment for crane | |
CN205275052U (en) | Hoist intelligence remote control unit | |
CN104575642A (en) | Control system of nuclear fuel loading and unloading machine | |
CN103848343A (en) | Overhead travelling crane movement control method for carrying system with turnout switch | |
US11634305B2 (en) | Coordinated safety interlocking systems and methods | |
CN203976292U (en) | A kind of Intelligent brake device for crane hoisting mechanism | |
WO2013063999A1 (en) | Assembling and disassembling control system and assembling and disassembling remote control device for engineering machinery | |
CN201892851U (en) | Remote control device for dual-beam traveling crane | |
CN105739470A (en) | Maintenance house maintenance state control system and control method of precast concrete slab production line | |
CN202245782U (en) | Automatic control system of crane for acid cleaning workshop | |
CN110356433A (en) | A kind of computer interlock system | |
CN210825154U (en) | Crane control system based on autonomous control | |
CN203901892U (en) | Automatic application equipment of refrigerator evaporator | |
CN209866357U (en) | Centrifuge remote control system | |
CN203792777U (en) | Dual-valve safety control system of press machine | |
KR20180078679A (en) | Manufacturing process management system | |
CN201850015U (en) | Electric control system based on IPC (industrial personal computer) for mine elevator | |
KR20100123476A (en) | Control panel with centralized control | |
CN111100966B (en) | Converter sublance lifting control system and method | |
CN203419678U (en) | Automatic carrying equipment for steel bars and square steel | |
CN108153253A (en) | Track controller applied to automatic production line and application method thereof | |
CN102141790A (en) | Remote control device of twin beam overhead crane | |
CN202028929U (en) | PLC (Programmable Logic Controller) controlled automatic rotary worktable | |
CN203209442U (en) | Automatic haulage equipment for hot rolling factories | |
CN218968692U (en) | Crown block controller with zero indication function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140903 Termination date: 20180515 |
|
CF01 | Termination of patent right due to non-payment of annual fee |