CN203798359U - Building surveying lead observation point protection device - Google Patents
Building surveying lead observation point protection device Download PDFInfo
- Publication number
- CN203798359U CN203798359U CN201420223544.XU CN201420223544U CN203798359U CN 203798359 U CN203798359 U CN 203798359U CN 201420223544 U CN201420223544 U CN 201420223544U CN 203798359 U CN203798359 U CN 203798359U
- Authority
- CN
- China
- Prior art keywords
- observation point
- pilot measurement
- protection device
- lead observation
- loose tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a building surveying lead observation point protection device comprising a lead observation point mark and further comprising concrete fixing the lead observation point mark, and a brick forming mold for hardening the concrete to be in a specified shape, and a cover board is arranged on the top of the brick forming mold. A lead observation point is arranged on the concrete mortar, the periphery of the lead observation point is retained and fixed through the brick forming mold, and therefore the lead observation point is not prone to displacement under the action of certain mechanical force; meanwhile, the cover board is arranged on the lead observation point and protects the lead observation point, the lead observation point is not prone to being damaged, and the lead observation point can be protected well.
Description
Technical field
The utility model is the fixing measuring point protection device that draws that a kind of construction account is used, and is for protection construction account is with fixing pilot measurement point damaged design not, belongs to the realm of building construction.
Background technology
The fixing pilot measurement point that in engineering construction, construction account is used is the foundation of construction survey, and therefore, construction account is very important with the protection of fixing pilot measurement point apparatus.Existing situation is that pilot measurement point is made of timber, and by timber nail, on ground, surrounding adds nail 4-6 root timber, is entangled in surrounding implements protection with entanglement; Do like this, under rain drop erosion, may cause timber displacement, also may under certain mechanical force, be subjected to displacement, even destroyed.
Summary of the invention
For problem above, the utility model provides a kind of construction account to draw measuring point protection device, can protect pilot measurement point unshift, is difficult for destroyed.
Concrete solution is: a kind of construction account draws measuring point protection device, comprises pilot measurement dot mark, also comprises the concrete of fixing pilot measurement dot mark, by the formalize brick loose tool of shape of concrete hardening established practice, at described brick loose tool top, is provided with cover plate.
As preferably, described pilot measurement dot mark is made by the elongated metallic rod that is difficult for corrosion and wearing and tearing.
As preferably, described cover plate locks it in brick loose tool top with lockset.
As preferably, described brick loose tool is formed by masonry of cement mortar, and its end face exceeds pilot measurement dot mark end face 30-50mm.
Beneficial effect: by pilot measurement point is arranged on concrete mortar; around with brick loose tool enclosing, fix; thereby make pilot measurement point be difficult for being subjected to displacement under certain mechanical force; and; on pilot measurement point, be provided with cover plate; pilot measurement point protection is got up, make pilot measurement point not be subject to destruction, thereby protect well pilot measurement point.
Accompanying drawing explanation
Fig. 1 is for drawing measuring point protection device organigram;
Fig. 2 is for drawing measuring point protection device floor map;
Fig. 3 is pilot measurement point protection device cover plate schematic diagram;
In figure, 1-pilot measurement dot mark; 2-cover plate; 21-cover plate frame; 221-panel frame; 222-plate face; 23-hinge; 3-concrete; 4-brick loose tool.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described.
Certain engineering is protected with fixing pilot measurement point apparatus construction account, and specific practice is as shown in Figure 1, draws measuring point protection device, includes: pilot measurement dot mark 1, cover plate 2, concrete 3, brick loose tool 4; With the fixing pilot measurement dot mark of concrete, with brick loose tool, make in the position of regulation, to become the shape of regulation after concrete hardening, at brick loose tool top, cover plate is set, and cover plate is locked.
The first excavation shape hole degree of depth reaches 1.25 meters, and 600 millimeters of every length of sides, build brick loose tool by laying bricks or stones to ground, and building materials is fired common brick and M5 sand-cement slurry, and building by laying bricks or stones is highly 1.25 meters;
Brick loose tool 4 is built by laying bricks or stones in two steps and is carried out, and builds by laying bricks or stones and highly reaches before 750 millimeters, while build by laying bricks or stones, bankets, and inside and outsidely all tamps; Then carry out the installation of pilot measurement dot mark;
The pilot measurement dot mark 1 of fixing pilot measurement point apparatus, is to be 1 meter by length, and diameter is that the reinforcing bar of 20 millimeters is made, and antirust processing is done in end, is difficult for corrosion and wearing and tearing.
Adjust horizontal level and the vertical height of pilot measurement dot mark, then build ground by laying bricks or stones, horizontal level and the crown level of the pilot measurement of inspecting for acceptance dot mark 1, fix with C20 concreting after correcting.
The concrete of described fixing pilot measurement point apparatus be the position of pilot measurement point and top mark are high determine after, fixedly pilot measurement point is built, concrete end face must be smooth, smooth, and must not hide pilot measurement dot mark, must make pilot measurement dot mark expose concrete surface.
At brick loose tool top, cover plate frame 21 is set again, with 45 bugle steel, is welded into the length of side and is the rectangle frame of 540 millimeters, the steel tie of welding and brick loose tool 4 drawknots in rectangle frame, 6 millimeters of tension rib diameters, 120 millimeters of length, end is provided with crotch; And cover plate frame 21 is embedded in the mortar of brick loose tool top, by top of concrete Troweling press finishing, carry out maintenance, after concrete hardening, lock.
Described cover panels comprises panel frame 221 and plate face 222, and panel frame 221 use angle steel are made, and plate face is made of 3 millimeters of steel plates, between panel frame 221 and plate face 222, adopts and is welded to connect; Between panel 222 and cover plate frame 221, by hinge 23, be connected the opposite installation lockset of hinge on one side.
Described brick loose tool is firm with building block and masonry of cement mortar, can play a protective role to pilot measurement dot mark, and end face must exceed the end face 30-50 millimeter of pilot measurement dot mark.
Claims (4)
1. a construction account draws measuring point protection device; comprise pilot measurement dot mark (1); it is characterized in that, also comprise the fixing concrete of pilot measurement dot mark (3), by the brick loose tool (4) of concrete hardening established practice setting shape, at described brick loose tool top, be provided with cover plate (2).
2. the measuring point protection device that draws according to claim 1, is characterized in that, described pilot measurement dot mark (1) is made by the elongated metallic rod that is difficult for corrosion and wearing and tearing.
3. the measuring point protection device that draws according to claim 1, is characterized in that, described cover plate (2) locks it in brick loose tool top with lockset.
4. the measuring point protection device that draws according to claim 1, is characterized in that, described brick loose tool (4) is formed by masonry of cement mortar, and its end face exceeds pilot measurement dot mark end face 30-50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420223544.XU CN203798359U (en) | 2014-05-05 | 2014-05-05 | Building surveying lead observation point protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420223544.XU CN203798359U (en) | 2014-05-05 | 2014-05-05 | Building surveying lead observation point protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203798359U true CN203798359U (en) | 2014-08-27 |
Family
ID=51380564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420223544.XU Expired - Fee Related CN203798359U (en) | 2014-05-05 | 2014-05-05 | Building surveying lead observation point protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203798359U (en) |
-
2014
- 2014-05-05 CN CN201420223544.XU patent/CN203798359U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106641440A (en) | Underground pipeline jacking construction method capable of transversely passing through railway line | |
CN104179204B (en) | Building contiguous deep foundation ditch basis pile underpinning method | |
CN106013171B (en) | A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall | |
CN103643971B (en) | Tunnel invert sizing end mould rapid constructing method | |
CN103397658A (en) | Single-side support-formwork system backing on brick mixing retaining wall and construction method | |
CN102304927B (en) | Prestress anchor cable buttress-type parapet suitable for rock substrate | |
CN103806451B (en) | A kind of anchorage type foundation ditch strengthening structure and construction method thereof | |
CN103266602A (en) | Diameter-expanding pile for manual hole digging and construction method thereof | |
CN203383508U (en) | One-sided formwork body structure backing onto brick concrete retaining wall | |
CN108330902B (en) | Construction method for cast-in-situ lower cross beam of high-pile wharf | |
CN105369826A (en) | Basement bearing platform side mold construction method | |
CN110080454A (en) | LPM light filling body Construction of Cast-in-situ Concrete Hollow | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN104988884A (en) | Void deformation monitoring device for face rockfill dam and mounting method | |
CN105887948A (en) | Inclination resetting, deviation correction and reinforcement method for anti-slide pile | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN104213708A (en) | Integral construction method of anchor bolt-free fireproof wall | |
CN204112353U (en) | A kind of New Pre brickmaking fetal membrane | |
CN105821895A (en) | Raft board foundation steel reinforcement support frame water-proof treatment construction process | |
CN103726508A (en) | Prefabricated reinforced concrete board molding bed and construction method | |
CN206071096U (en) | The underpinning device of load bearing wall in brick mix structure | |
CN203798359U (en) | Building surveying lead observation point protection device | |
CN204000919U (en) | A kind of novel from drainage type tower-crane foundation structure | |
CN209293045U (en) | The outer anchor head structure reinforced suitable for rock side slope random anchor rod | |
CN205046566U (en) | Flood prevention wall I shape precast concrete pile base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140827 Termination date: 20150505 |
|
EXPY | Termination of patent right or utility model |