CN203797683U - 一种燃煤机组的烟气脱硝系统 - Google Patents
一种燃煤机组的烟气脱硝系统 Download PDFInfo
- Publication number
- CN203797683U CN203797683U CN201420200920.3U CN201420200920U CN203797683U CN 203797683 U CN203797683 U CN 203797683U CN 201420200920 U CN201420200920 U CN 201420200920U CN 203797683 U CN203797683 U CN 203797683U
- Authority
- CN
- China
- Prior art keywords
- economizer
- flue gas
- coal
- fired unit
- flue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Exhaust Gas Treatment By Means Of Catalyst (AREA)
Abstract
本实用新型公开了一种烟气脱硝反应完全的燃煤机组的烟气脱硝系统,包括通过烟道连接在一起的锅炉本体和脱硝反应器、以及省煤器,脱硝反应器内设有脱硝催化剂,所述省煤器包括第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接。
Description
技术领域
本实用新型涉及一种燃煤机组的烟气脱硝系统。
背景技术
目前燃煤机组的烟气脱硝是环保要求的必须项目,为保证烟气脱硝的效果和质量,必须使进入脱硝反应器的烟气温度在一定范围内。一般燃煤机组的烟气脱硝系统,包括锅炉本体、省煤器以及脱硝反应器,省煤器设置在锅炉本体的尾部烟道处,但由于锅炉本体上省煤器换热面积大、换热充分,使得在燃煤机组低负荷状态下,由锅炉本体上的省煤器出来的烟气温度偏低,不能满足脱硝的要求,使脱硝反应系统不能正常投运,因此脱硝反应不完全,仍然会对环境造成污染。
实用新型内容
本实用新型所要解决的技术问题是:提供一种烟气脱硝反应完全的燃煤机组的烟气脱硝系统。
为解决上述技术问题,本实用新型所采用的技术方案为:一种燃煤机组的烟气脱硝系统,包括通过烟道连接在一起的锅炉本体和脱硝反应器、以及省煤器,脱硝反应器内设有脱硝催化剂,所述省煤器包括第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接。
所述脱硝反应器出口处通过烟道设有空气预热器。
所述第二省煤器设置在脱硝反应器内脱硝催化剂的下方。
所述第二省煤器设置在脱硝反应器与空气预热器之间的烟道中。
本实用新型的有益效果是:由于将省煤器分为了第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接,使得即使在燃煤机组低负荷状态下进入脱硝反应器的烟气温度也可以满足脱硝反应要求,从而确保烟气脱硝完全。而且在机组负荷变化时,进入脱硝反应器的烟温范围缩小,有利于保证脱硝的高效率,从而也降低了运行成本,提高了环境质量。
由于脱硝反应器出口处通过烟道设有空气预热器,提高了整个系统的热效率。
由于第二省煤器设置在脱硝反应器内脱硝催化剂的下方,该处安装空间大便于第二省煤器的安装操作,另外该处烟气流速分布较为均匀,对第二省煤器的磨损也较均匀的,可提高第二省煤器的使用寿命。
附图说明
图1是本实用新型的结构示意图。
图1中:1.烟道,2.锅炉本体,3.脱硝反应器,31.脱硝催化剂,4.烟道,5.空气预热器,6.第一省煤器,7.第二省煤器,8.给水管,9.出水管。
具体实施方式
下面结合附图,详细描述本实用新型的具体实施方案。
如图1所示,一种燃煤机组的烟气脱硝系统,包括通过烟道1连接在一起的锅炉本体2和脱硝反应器3、以及省煤器,脱硝反应器3内设有脱硝催化剂31,脱硝反应器3出口处通过烟道4设有空气预热器5。所述省煤器包括第一省煤器6和第二省煤器7。第一省煤器6设置在锅炉本体2上的尾部烟道中,第二省煤器7设置在脱硝反应器3内脱硝催化剂31的下方。第一省煤器6与第二省煤器7串联,且第二省煤器7与给水管8相连接,第一省煤器6与出水管9相连接。
上述的实施例仅例示性说明本发明创造的原理及其功效,以及部分运用的实施例,而非用于限制本实用新型;应当指出,对于本领域的普通技术人员来说,在不脱离本发明创造构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。
Claims (4)
1.一种燃煤机组的烟气脱硝系统,包括通过烟道连接在一起的锅炉本体和脱硝反应器、以及省煤器,脱硝反应器内设有脱硝催化剂,其特征在于:所述省煤器包括第一省煤器和第二省煤器,第一省煤器设置在锅炉本体上的尾部烟道中,第二省煤器设置在烟气流过脱硝催化剂之后经过的位置处,第一省煤器与第二省煤器串联,且第二省煤器与给水管相连接,第一省煤器与出水管相连接。
2.如权利要求1所述的一种燃煤机组的烟气脱硝系统,其特征在于:所述脱硝反应器出口处通过烟道设有空气预热器。
3.如权利要求2所述的一种燃煤机组的烟气脱硝系统,其特征在于:所述第二省煤器设置在脱硝反应器内脱硝催化剂的下方。
4.如权利要求2所述的一种燃煤机组的烟气脱硝系统,其特征在于:所述第二省煤器设置在脱硝反应器与空气预热器之间的烟道中。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420200920.3U CN203797683U (zh) | 2014-04-24 | 2014-04-24 | 一种燃煤机组的烟气脱硝系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420200920.3U CN203797683U (zh) | 2014-04-24 | 2014-04-24 | 一种燃煤机组的烟气脱硝系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203797683U true CN203797683U (zh) | 2014-08-27 |
Family
ID=51379889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420200920.3U Expired - Fee Related CN203797683U (zh) | 2014-04-24 | 2014-04-24 | 一种燃煤机组的烟气脱硝系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203797683U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103968402A (zh) * | 2014-04-24 | 2014-08-06 | 江苏申港锅炉有限公司 | 一种燃煤机组的烟气脱硝系统 |
-
2014
- 2014-04-24 CN CN201420200920.3U patent/CN203797683U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103968402A (zh) * | 2014-04-24 | 2014-08-06 | 江苏申港锅炉有限公司 | 一种燃煤机组的烟气脱硝系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9857125B2 (en) | Denitration and waste heat recovery integrated furnace | |
CN102042605B (zh) | 回转式空气预热器分侧热清灰方法 | |
CN103968402A (zh) | 一种燃煤机组的烟气脱硝系统 | |
CN108786455B (zh) | 一种烧结烟气scr脱硝装置热利用系统及脱硝方法 | |
CN103277788A (zh) | 锅炉的scr调温系统和调节锅炉scr入口烟温的方法 | |
CN104801174A (zh) | 一种活性焦烟气净化系统 | |
CN205627628U (zh) | 一种低温焦炉烟气脱硫脱硝一体化装置 | |
CN105318313A (zh) | 一种基于scr脱硝装置的烟气余热利用系统 | |
CN208599489U (zh) | 一种水泥窑烟气scr脱硝系统 | |
CN203517748U (zh) | 可控温型省煤器 | |
CN205216582U (zh) | 钢铁烧结烟气综合脱硫、脱硝及去除二噁英的装置 | |
CN208786167U (zh) | 一种气水协同实现宽负荷脱硝的系统 | |
CN203364109U (zh) | 锅炉的scr调温系统 | |
CN203797683U (zh) | 一种燃煤机组的烟气脱硝系统 | |
CN202018186U (zh) | 一种利用锅炉烟气余热干燥褐煤的系统 | |
CN202993536U (zh) | 带余热锅炉的燃煤热风炉 | |
CN203316011U (zh) | 提高燃煤锅炉尾部烟气脱硝投入率的结构 | |
CN202057204U (zh) | 炭素煅烧炉废气脱硫除尘装置 | |
CN105889899A (zh) | 一种适用于scr低负荷下投运的过热汽温调节系统及方法 | |
CN203927970U (zh) | 一种锅炉尾气脱硝装置 | |
CN203639436U (zh) | 生物质气体脱氧成套装置 | |
CN207745694U (zh) | 一种烟气脱硝脱硫处理系统 | |
CN202328127U (zh) | 焦炉烟气余热回收装置 | |
CN202675332U (zh) | 烟气除尘及热能回收利用集成系统 | |
CN102721076A (zh) | 带有脱硝装置的锅炉结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140827 Termination date: 20180424 |
|
CF01 | Termination of patent right due to non-payment of annual fee |