CN203797677U - Sealing device for tail smoke flue bottom of boiler - Google Patents

Sealing device for tail smoke flue bottom of boiler Download PDF

Info

Publication number
CN203797677U
CN203797677U CN201420144576.0U CN201420144576U CN203797677U CN 203797677 U CN203797677 U CN 203797677U CN 201420144576 U CN201420144576 U CN 201420144576U CN 203797677 U CN203797677 U CN 203797677U
Authority
CN
China
Prior art keywords
sealing
boiler
steel plate
flue
smoke flue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420144576.0U
Other languages
Chinese (zh)
Inventor
任孝明
何雁飞
黄岳军
韦志平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Huaguang Boiler Co Ltd
Original Assignee
Wuxi Huaguang Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Huaguang Boiler Co Ltd filed Critical Wuxi Huaguang Boiler Co Ltd
Priority to CN201420144576.0U priority Critical patent/CN203797677U/en
Application granted granted Critical
Publication of CN203797677U publication Critical patent/CN203797677U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Abstract

The utility model provides a sealing device for a tail smoke flue bottom of a boiler. The sealing device is capable of guaranteeing sealing performance and efficient and safe operation of the boiler, excellent in thermal expansion, simple in structure and convenient to mount. The sealing device for the tail smoke flue bottom of the boiler comprises a water cooling wall, a smoke flue, a tail smoke flue outlet and a bottom header. The tail smoke flue outlet is arranged on the lower portion of the rear wall side of a smoke flue, the bottom header is arranged below an inlet of the bottom smoke flue outlet, and the water cooling wall is arranged on the front wall of the smoke flue. The sealing device is characterized in that a steel sealing plate is paved at the bottom of the smoke flue and is supported on an upper plane of a platform frame formed by supporting box iron, the bottom of the platform is connectively welded with the upper end face of a support rod at the corresponding position, the bottom of the support rod is connectively welded with a bottom frame of the boiler, and the jointed positions of the steel sealing plate and the bottom header are connectively welded.

Description

The sealing device of a kind of boiler back end ductwork bottom
Technical field
The utility model relates to the technical field of boiler structure, is specially the sealing device of a kind of boiler back end ductwork bottom.
Background technology
Because the main heating surface of forced circulation gas-fired water heating boiler is supporting construction, and being designed to wall from boiler, boiler export flue gas draws, this class arrangement need to become hermetically-sealed construction by the bottom design of heated surface at the end of boiler, the hermetically-sealed construction of existing structure does not consider that the overall thermal of boiler expands, it is in boiler running process, emergency case easily occurs, boiler can not normally be moved, maintenance, replacing hermetically-sealed construction are wasted time and energy.
Summary of the invention
For the problems referred to above, the utility model provides the sealing device of a kind of boiler back end ductwork bottom, and it can ensure sealing, has again good thermal expansivity, guarantees high efficiency boiler safe operation, and simple in structure being convenient to installed.
The sealing device of a kind of boiler back end ductwork bottom, its technical scheme is such: it comprises water-cooling wall, flue, back-end ductwork outlet, bottom header, described back-end ductwork outlet is positioned at the bottom of the rear wall side of described flue, described bottom header is positioned at the below of the porch of described bottom flue outlet, described water-cooling wall is positioned at the front wall displacement of described flue, it is characterized in that: mating formation in the bottom of described flue has sealing steel plate, described sealing steel plate is supported on the upper plane of the platform framework that supporting steel is combined to form, the bottom welding of described platform framework connects the upper surface of the support bar of correspondence position, the bottom welding of described support bar connects the under(-)chassis of boiler, the link position place of described sealing steel plate and described bottom header is welded to connect, the top evagination end face of the end face welded joints seal flap towards described flue side of described water-cooling wall, the lower vertical end face of described sealing flap is close to the upper surface of described sealing steel plate, and be welded to connect, gap place plug between described sealing flap and the pipe of described water-cooling wall is equipped with sealing fill block.
It is further characterized in that: described sealing steel plate is provided with manhole door near the position of described bottom header side, and described manhole door is arranged in the lower surface of described sealing steel plate, and described manhole door is opened down;
The horizontal length of described sealing flap is less than its vertical length, and the inner side of described sealing steel plate exceeds the lower vertical face of described sealing flap.
Adopt after structure of the present utility model, because sealing steel plate is equipped with in the bottom of flue, the link position place of sealing steel plate and described bottom header is welded to connect, the top evagination end face of the end face welded joints seal flap towards described flue side of water-cooling wall, the lower vertical end face of sealing flap is close to the upper surface of described sealing steel plate, and be welded to connect, gap place plug between described sealing flap and the pipe of described water-cooling wall is equipped with sealing fill block, it is sealed in flue the flue gas in flue, can flow out from back-end ductwork outlet swimmingly, and because sealing steel plate is supported on the upper plane of the platform framework that supporting steel is combined to form, there is not welding relation in it, sealing steel plate only relies on gravity to be supported on the upper plane of the platform framework that supporting steel is combined to form, in the time there is thermal expansion, between sealing steel plate and its structure being welded to connect, can there is thermal expansion, to sum up, it can ensure sealing, there is again good thermal expansivity, guarantee high efficiency boiler safe operation, and simple in structure being convenient to installed.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model is applied to boiler;
Fig. 2 is front view structural representation of the present utility model;
Fig. 3 is the top view structural representation of Fig. 2;
Fig. 4 is that the A-A of Fig. 3 cuts open structure for amplifying schematic diagram;
Fig. 5 is the local structure for amplifying schematic diagram in the B place of Fig. 3.
Detailed description of the invention
The sealing device of a kind of boiler back end ductwork bottom, see Fig. 1~Fig. 5: it comprises water-cooling wall 1, flue 2, back-end ductwork outlet 3, bottom header 4, back-end ductwork outlet 3 is positioned at the bottom of the rear wall side of flue 2, bottom header 4 is positioned at the below of the porch of bottom flue outlet 3, water-cooling wall 1 is positioned at the front wall displacement of flue 2, mating formation in the bottom of flue 2 has sealing steel plate 5, sealing steel plate 5 is supported on the upper plane of the platform framework 12 that supporting steel 6 is combined to form, the bottom welding of platform framework 12 connects the upper surface of the support bar 7 of correspondence position, the bottom welding of support bar 7 connects the under(-)chassis 8 of boiler, the link position place of sealing steel plate 5 and bottom header 4 is welded to connect, the top evagination end face of the end face welded joints seal flap 9 towards flue 2 sides of water-cooling wall 1, the lower vertical end face of sealing flap 9 is close to the upper surface that seals steel plate 5, and be welded to connect, gap place plug between sealing flap 9 and the pipe of water-cooling wall 1 is equipped with sealing fill block 10.
Sealing steel plate 5 is provided with manhole door 11 near the position of bottom header 4 sides, and manhole door 11 is arranged in the lower surface of sealing steel plate 5, and manhole door 11 is opened down, and manhole door 11 is for maintenance; The horizontal length of sealing flap 9 is less than its vertical length, and the inner side of sealing steel plate 5 exceeds the lower vertical face that seals flap 9.

Claims (3)

1. the sealing device of a boiler back end ductwork bottom, it comprises water-cooling wall, flue, back-end ductwork outlet, bottom header, described back-end ductwork outlet is positioned at the bottom of the rear wall side of described flue, described bottom header is positioned at the below of the porch of described bottom flue outlet, described water-cooling wall is positioned at the front wall displacement of described flue, it is characterized in that: mating formation in the bottom of described flue has sealing steel plate, described sealing steel plate is supported on the upper plane of the platform framework that supporting steel is combined to form, the bottom welding of described platform framework connects the upper surface of the support bar of correspondence position, the bottom welding of described support bar connects the under(-)chassis of boiler, the link position place of described sealing steel plate and described bottom header is welded to connect, the top evagination end face of the end face welded joints seal flap towards described flue side of described water-cooling wall, the lower vertical end face of described sealing flap is close to the upper surface of described sealing steel plate, and be welded to connect, gap place plug between described sealing flap and the pipe of described water-cooling wall is equipped with sealing fill block.
2. the sealing device of a kind of boiler back end ductwork according to claim 1 bottom, it is characterized in that: described sealing steel plate is provided with manhole door near the position of described bottom header side, described manhole door is arranged in the lower surface of described sealing steel plate, and described manhole door is opened down.
3. the sealing device of a kind of boiler back end ductwork according to claim 1 and 2 bottom, is characterized in that: the horizontal length of described sealing flap is less than its vertical length, and the inner side of described sealing steel plate exceeds the lower vertical face of described sealing flap.
CN201420144576.0U 2014-03-28 2014-03-28 Sealing device for tail smoke flue bottom of boiler Withdrawn - After Issue CN203797677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420144576.0U CN203797677U (en) 2014-03-28 2014-03-28 Sealing device for tail smoke flue bottom of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420144576.0U CN203797677U (en) 2014-03-28 2014-03-28 Sealing device for tail smoke flue bottom of boiler

Publications (1)

Publication Number Publication Date
CN203797677U true CN203797677U (en) 2014-08-27

Family

ID=51379884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420144576.0U Withdrawn - After Issue CN203797677U (en) 2014-03-28 2014-03-28 Sealing device for tail smoke flue bottom of boiler

Country Status (1)

Country Link
CN (1) CN203797677U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912888A (en) * 2014-03-28 2014-07-09 无锡华光锅炉股份有限公司 Sealing device at bottom of tail flue of boiler
CN104197349A (en) * 2014-09-18 2014-12-10 无锡市华通电力设备有限公司 Boiler smoke bypass reversing retainer device
CN104654335A (en) * 2014-12-27 2015-05-27 哈尔滨锅炉厂有限责任公司 Heat pipe sealing device and sealing device for flue
CN109469908A (en) * 2018-12-21 2019-03-15 无锡华光锅炉股份有限公司 A kind of waste incinerator water-cooled furnace wall structure
CN110715312A (en) * 2019-10-24 2020-01-21 哈尔滨锅炉厂有限责任公司 Hanging sealing device for tail flue of gas boiler

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912888A (en) * 2014-03-28 2014-07-09 无锡华光锅炉股份有限公司 Sealing device at bottom of tail flue of boiler
CN103912888B (en) * 2014-03-28 2016-08-17 无锡华光锅炉股份有限公司 A kind of sealing device bottom boiler back end ductwork
CN104197349A (en) * 2014-09-18 2014-12-10 无锡市华通电力设备有限公司 Boiler smoke bypass reversing retainer device
CN104654335A (en) * 2014-12-27 2015-05-27 哈尔滨锅炉厂有限责任公司 Heat pipe sealing device and sealing device for flue
CN104654335B (en) * 2014-12-27 2017-06-06 哈尔滨锅炉厂有限责任公司 For the heat pipe seal and encapsulating method of flue
CN109469908A (en) * 2018-12-21 2019-03-15 无锡华光锅炉股份有限公司 A kind of waste incinerator water-cooled furnace wall structure
CN109469908B (en) * 2018-12-21 2024-04-16 无锡华光环保能源集团股份有限公司 Water-cooling furnace wall structure of garbage incinerator
CN110715312A (en) * 2019-10-24 2020-01-21 哈尔滨锅炉厂有限责任公司 Hanging sealing device for tail flue of gas boiler
CN110715312B (en) * 2019-10-24 2021-10-01 哈尔滨锅炉厂有限责任公司 Hanging sealing device for tail flue of gas boiler

Similar Documents

Publication Publication Date Title
CN203797677U (en) Sealing device for tail smoke flue bottom of boiler
CN103912888A (en) Sealing device at bottom of tail flue of boiler
CN203083399U (en) Drawer-type evaporator
CN103994421B (en) The sealed support device at a kind of header place through walls
CN202074559U (en) Membrane wall structure for water tube boiler
CN203869015U (en) Device for sealing support in through-wall position of collection box
CN203797628U (en) Suspension rod support system of horizontal waste heat boiler module and mounting suspension frame structure of system
CN203797626U (en) Header supporting and limiting device in boiler
CN202868721U (en) Horizontal coal-fired boiler smoke separating wall structure
CN204100260U (en) A kind of horizontal rubbish waste heat boiler water-cooling screen guiding only shakes structure
CN202304484U (en) Cooling tower
CN206850299U (en) A kind of Novel distribution box
CN204100257U (en) A kind of gas baffle structure of garbage burning boiler
CN204514075U (en) A kind of mechanical cooler for argon oxygen decarburization refining stove dust pelletizing system
CN204063089U (en) High-temperature flue gas baffle door shell structure
CN204757751U (en) Steam type melts device of solid -state grease
CN203797623U (en) Sealing device between side water-cooling wall and side package wall
CN203223928U (en) Two-stage cooling treatment system
CN204534527U (en) Boiler lower header expansion joint device and boiler lower header jockey
CN203784907U (en) Superheater sealing device and gas boiler with same
CN204573973U (en) The two drum waste heat boiler of a kind of novel horizontal
CN104121588A (en) Horizontal type garbage waste heat boiler water-cooling screen guiding and shaking-stopping structure
CN107795984B (en) Sealing structure for preventing expansion deformation of screen type superheater
CN218723205U (en) Tunnel cave exhaust-heat boiler
CN202692422U (en) Novel coal saving device of coal-fired boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140827

Effective date of abandoning: 20160817

C25 Abandonment of patent right or utility model to avoid double patenting