CN202074559U - Membrane wall structure for water tube boiler - Google Patents
Membrane wall structure for water tube boiler Download PDFInfo
- Publication number
- CN202074559U CN202074559U CN2011201032957U CN201120103295U CN202074559U CN 202074559 U CN202074559 U CN 202074559U CN 2011201032957 U CN2011201032957 U CN 2011201032957U CN 201120103295 U CN201120103295 U CN 201120103295U CN 202074559 U CN202074559 U CN 202074559U
- Authority
- CN
- China
- Prior art keywords
- boiler
- tube
- water
- collection case
- wall structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The utility model provides a membrane wall structure for a water tube boiler. The membrane wall structure comprises a chassis, a lower boiler and an upper boiler, wherein a plurality of water cooling wall pipes are arranged around the lower boiler and are fixedly connected with the chassis, and a flat steel is arranged between the water cooling wall pipes and is tightly welded with the water cooling wall pipes; the water cooling wall pipes and the flat steel form the membrane wall structure of the utility model; the lower boiler is fixedly connected with the chassis, the upper boiler is arranged above the lower boiler, a front header tank is arranged in front of the lower boiler, a left header tank is arranged on the left of the lower boiler, a right header tank is arranged on the right of the lower boiler, and the water cooling wall pipes are communicated with the upper boiler, the left header tank and the right header tank; the lower boiler is further provided with a plurality of convection tubes and communicating tubes. The membrane wall structure has a simple structure and is convenient to use, the installation costs and the complexity of the water tube boiler can be effectively reduced, the heat loss of the boiler is avoided, and the heat efficiency of the water tube boiler is improved.
Description
Technical field:
The utility model relates to the improved technical field of boiler plant, particularly a kind of membrane wall structure of water-tube boiler.
Background technology:
So-called water-tube boiler is exactly that water, vapour or steam water interface flow in pipe, and the boiler that flame or flue gas burn and flow outside pipe.The structure of water-tube boiler comprises boiler body and auxiliary equipment two large divisions.Wherein, boiler body comprises burner hearth, drum, burner, water-cooling wall, framework and the furnace wall etc. in the boiler.As shown in Figure 2, be the structural representation of looking up of prior art.Wherein, comprise chassis 1, descend boiler 7 and last boiler, go up the top that boiler is positioned at following boiler 7, be connected by convection tube between last boiler and the following boiler 7, collection case 2 before the place ahead of following boiler is provided with, the left side is provided with left side collection case, the right side is provided with right collection case, and following boiler is by communicating pipe and preceding collection case 2, and left side collection case, right collection case are connected.Preceding collection case 2, left side collection case, the right case that collects are connected with last boiler by down-comer.Following boiler 7 is positioned on the chassis 1, and following boiler 7 both sides are provided with some water screen tubes 3, some water screen tubes 3 constitute water-cooling wall, and following boiler 7 tops are provided with flue interface 6, and the both sides of following boiler 7 also are respectively arranged with blows grey hole 5.The water-tube boiler of prior art need set up thick furnace wall on the boiler side when it is installed, and also will set up heavy refractory material on the furnace wall as shown in Figure 2, uses silicate aluminum board as refractory material usually.So, then the installation cost of the water-tube boiler of prior art and complexity are bigger.In addition, there is the space between the water screen tube of the prior art, poor sealing, space between the direct permeate water cold wall pipe of the heat radiation meeting of boiler, the portion of hot radiation is absorbed by furnace wall and refractory material, and the furnace wall amount of stored heat is big, cause heat loss, the thermal efficiency of water-tube boiler is descended.
In view of above-mentioned technological deficiency, it is a kind of simple in structure, easy to use to press for appearance, can effectively reduce the installation cost and the complexity of water-tube boiler, avoids the boiler hot loss of energy, improves the membrane wall structure of a kind of water-tube boiler of the water-tube boiler thermal efficiency.
Summary of the invention:
The purpose of this utility model is to overcome the shortcoming that exists in the prior art, provide a kind of simple in structure, easy to use, can effectively reduce the installation cost and the complexity of water-tube boiler, avoid the boiler hot loss of energy, improve the membrane wall structure of a kind of water-tube boiler of the water-tube boiler thermal efficiency.
To achieve these goals, the utility model provides a kind of membrane wall structure of water-tube boiler, comprise chassis, following boiler and last boiler, wherein, be provided with some water screen tubes around the described boiler down, be solidly connected between described water screen tube and the described chassis, further be provided with band steel between the described water screen tube, fastening welding between described band steel and the described water screen tube.
Be solidly connected between described boiler down and the described chassis, following boiler top is provided with the described boiler of going up, described the place ahead of boiler down is provided with preceding collection case, the described left of boiler down is provided with left side collection case, the right-hand right side collection case that is provided with of described boiler down, described water screen tube is connected with described upward boiler, described left side collection case, described right side collection case.
An enterprising step of described boiler down is provided with some convection tubes and communicating pipe, and described boiler down is by described communicating pipe and described left side collection case, and described right collection case is connected, and described boiler down is connected by described convection tube with described going up between the boiler.
Described boiler down top is provided with the flue interface, and described boiler both sides down are provided with blows grey hole.
Described water screen tube and described band steel weld together, and some water screen tubes and band steel have constituted membrane wall structure of the present utility model.
Advantage of the present utility model is, and is simple in structure, easy to use, can effectively reduce the installation cost and the complexity of water-tube boiler, avoids the boiler hot loss of energy, improves the water-tube boiler thermal efficiency.Specific as follows:
1, water screen tube of the present utility model and band steel weld together, and some water screen tubes and band steel have constituted membrane wall structure of the present utility model.So, the heat that good airproof performance of the present utility model, boiler heat pass water screen tube arrival furnace wall is little, and the furnace wall accumulation of heat is less; Heat is absorbed by band steel, and band steel is given water screen tube or boiler with heat radiation again, reduces heat-energy losses, improves the thermal efficiency.
2, membrane wall structure of the present utility model causes the furnace wall accumulation of heat less, so, when mounted, can avoid building thick furnace wall, and simultaneously, saving maybe can be less with being provided with without refractory material.Reduce cost, reduce installation cost, reduced the installation complexity.
Description of drawings:
Fig. 1 is the structural representation of looking up of the present utility model.
Fig. 2 is the structural representation of looking up of prior art.
The accompanying drawing sign:
1, chassis 2, preceding collection case 3, water screen tube
4, band steel 5, blow grey hole 6, flue interface
7, following boiler
The specific embodiment:
Below in conjunction with accompanying drawing, the utility model is described.
As shown in Figure 2, Fig. 2 is the structural representation of looking up of prior art.Wherein, comprise chassis 1, descend boiler 7 and last boiler, go up the top that boiler is positioned at following boiler 7, be connected by convection tube between last boiler and the following boiler 7, collection case 2 before the place ahead of following boiler is provided with, the left side is provided with left side collection case, the right side is provided with right collection case, and following boiler is by communicating pipe and preceding collection case 2, and left side collection case, right collection case are connected.Preceding collection case 2, left side collection case, the right case that collects are connected with last boiler by down-comer.Following boiler 7 is positioned on the chassis 1, and following boiler 7 both sides are provided with some water screen tubes 3, some water screen tubes 3 constitute water-cooling wall, and following boiler 7 tops are provided with flue interface 6, and the both sides of following boiler 7 also are respectively arranged with blows grey hole 5.The water-tube boiler of prior art need set up thick furnace wall on the boiler side when it is installed, and also will set up heavy refractory material on the furnace wall as shown in Figure 2, uses silicate aluminum board as refractory material usually.So, then the installation cost of the water-tube boiler of prior art and complexity are bigger.In addition, there is the space between the water screen tube of the prior art, poor sealing, space between the direct permeate water cold wall pipe of the heat radiation meeting of boiler, the portion of hot radiation is absorbed by furnace wall and refractory material, and the furnace wall amount of stored heat is big, cause heat loss, the thermal efficiency of water-tube boiler is descended.
For solving the problems of the technologies described above, the utility model has improved the structure of water-tube boiler, and specifically as shown in Figure 1, Fig. 1 is the structural representation of looking up of the present utility model.Comprise chassis 1, following boiler 7 and last boiler, wherein, be provided with some water screen tubes 3 around the following boiler 7, be solidly connected between water screen tube 3 and the chassis 1, further be provided with band steel 4 between the water screen tube 3, fastening welding between band steel 4 and the water screen tube 3.Water screen tube 3 welds together with band steel 4, and water screen tube 3 has constituted membrane wall structure of the present utility model with band steel 4.Be solidly connected between following boiler 7 and the chassis 1, following boiler 7 tops are provided with boiler, and collection case 2 before the place ahead of following boiler 7 is provided with, the left of following boiler are provided with left side collection case, the right-hand right side collection case that is provided with of following boiler, water screen tube 3 is connected with last boiler, left side collection case, the right case that collects.Further be provided with some convection tubes and communicating pipe on the following boiler 7, following boiler 7 is by communicating pipe and left side collection case, and right collection case is connected, and is connected by convection tube between following boiler 7 and the last boiler.Following boiler 7 tops are provided with flue interface 6, and following boiler 7 both sides are provided with blows grey hole 5.
In sum; membrane wall structure of the present utility model is best to the protection of furnace wall; the weight and the thickness of furnace wall greatly reduce, because the furnace wall of membrane wall structure only needs insulation material, do not need refractory material; thereby can use insulation material outsourcing furnace wall; alleviating of furnace wall can reduce installation cost and complexity, and; do not have refractory material, can reduce the care and maintenance expense of user yet furnace wall.In addition, the membrane wall structure air-tightness is good, has significantly reduced burner hearth and has leaked out, and reduces the boiler hot loss of energy, improves the water-tube boiler thermal efficiency 10%.
Claims (3)
1. the membrane wall structure of a water-tube boiler, comprise chassis, following boiler and last boiler, it is characterized in that, be provided with some water screen tubes around the described boiler down, be solidly connected between described water screen tube and the described chassis, further be provided with band steel between the described water screen tube, fastening welding between described band steel and the described water screen tube.
2. according to the membrane wall structure of the described water-tube boiler of claim 1, it is characterized in that, be solidly connected between described boiler down and the described chassis, following boiler top is provided with the described boiler of going up, described the place ahead of boiler down is provided with preceding collection case, the described left of boiler down is provided with left collection case, the right-hand right side collection case that is provided with of described boiler down, and described water screen tube is connected with described upward boiler, described left side collection case, described right side collection case.
3. according to the membrane wall structure of claim 1 or 2 described water-tube boilers, it is characterized in that, an enterprising step of described boiler down is provided with some convection tubes and communicating pipe, described boiler down is by described communicating pipe and described left side collection case, described right collection case is connected, and described boiler down is connected by described convection tube with described going up between the boiler.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201032957U CN202074559U (en) | 2011-03-31 | 2011-03-31 | Membrane wall structure for water tube boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201032957U CN202074559U (en) | 2011-03-31 | 2011-03-31 | Membrane wall structure for water tube boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202074559U true CN202074559U (en) | 2011-12-14 |
Family
ID=45112660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201032957U Expired - Fee Related CN202074559U (en) | 2011-03-31 | 2011-03-31 | Membrane wall structure for water tube boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202074559U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913889A (en) * | 2012-11-05 | 2013-02-06 | 青岛华泰锅炉热电设备有限公司 | Biomass boiler |
CN103343956A (en) * | 2013-07-12 | 2013-10-09 | 常州联合锅炉容器有限公司 | Water wall heat energy center equipment |
CN106152170A (en) * | 2016-08-20 | 2016-11-23 | 江苏太湖锅炉股份有限公司 | The box-like burner hearth of a kind of circular group is heated the burner hearth of cellular construction and composition thereof |
-
2011
- 2011-03-31 CN CN2011201032957U patent/CN202074559U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913889A (en) * | 2012-11-05 | 2013-02-06 | 青岛华泰锅炉热电设备有限公司 | Biomass boiler |
CN103343956A (en) * | 2013-07-12 | 2013-10-09 | 常州联合锅炉容器有限公司 | Water wall heat energy center equipment |
CN106152170A (en) * | 2016-08-20 | 2016-11-23 | 江苏太湖锅炉股份有限公司 | The box-like burner hearth of a kind of circular group is heated the burner hearth of cellular construction and composition thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202074559U (en) | Membrane wall structure for water tube boiler | |
CN202432493U (en) | Modular afterheat boiler | |
CN103791479B (en) | A kind of novel full tube panel formula high efficiency fuel gas fired-boiler | |
CN201697152U (en) | Novel combined type plate air preheater | |
CN202074560U (en) | Film-type wall boiler | |
CN202692089U (en) | Light type membrane-wall water-cooling air hopper | |
CN103245058B (en) | Micro-positive pressure combustion combined cooling energy-saving boiler | |
CN202403247U (en) | Corner-tube waste heat boiler | |
CN201611090U (en) | Waste-heat boiler superheater | |
CN201706527U (en) | Combination air preheater | |
CN203731369U (en) | Full-tube screen type efficient oil or gas boiler | |
CN211822328U (en) | Double-pressure waste heat boiler | |
CN202734594U (en) | Steam baffle structure in air condensing region of condenser steam chamber | |
CN202868721U (en) | Horizontal coal-fired boiler smoke separating wall structure | |
CN202692002U (en) | L-shaped pyrite waste heat boiler with external fillet weld | |
CN205678650U (en) | A kind of boiler water wall | |
CN206177102U (en) | Gas water heat exchanger | |
CN110822951A (en) | Novel tubular preheater of biomass boiler and preheating method | |
CN102913889A (en) | Biomass boiler | |
CN103574569A (en) | Cement kiln head waste heat boiler | |
CN202915562U (en) | Condensation exchanger of water heater | |
CN203810374U (en) | Tube box structure for low temperature economizer | |
CN221685291U (en) | Sealing device of economizer | |
CN203360524U (en) | Roll steel heating furnace | |
CN204084318U (en) | A kind of sealing device for heated surface at the end of boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111214 Termination date: 20130331 |