CN203796169U - Hole dip angle control device for tunnel engineering drilling-blasting excavation - Google Patents

Hole dip angle control device for tunnel engineering drilling-blasting excavation Download PDF

Info

Publication number
CN203796169U
CN203796169U CN201420215182.XU CN201420215182U CN203796169U CN 203796169 U CN203796169 U CN 203796169U CN 201420215182 U CN201420215182 U CN 201420215182U CN 203796169 U CN203796169 U CN 203796169U
Authority
CN
China
Prior art keywords
side rod
right angle
angle side
control device
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420215182.XU
Other languages
Chinese (zh)
Inventor
王清江
王悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201420215182.XU priority Critical patent/CN203796169U/en
Application granted granted Critical
Publication of CN203796169U publication Critical patent/CN203796169U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

The utility model discloses a hole dip angle control device for tunnel engineering drilling-blasting excavation. The hole dip angle control device comprises a dip angle measuring rack, a plumb bob and a plumb line, the dip angle measuring rack comprises a bevel side bar, a right-angle side bar I and a right-angle side bar II which are connected with one another and form a right triangle, one end of the right-angle side bar II is fixedly connected with the right-angle side bar I and perpendicular to the same, the other end of the right-angle side bar II is hinged to the bevel side bar, the bevel side bar is movably connected with the right-angle side bar I, the upper end of the plumb line is fixed on the center line of the right-angle side bar I, and the lower end of the plumb line is connected with the plumb bob. The defects that in the process of tunnel engineering drilling-blasting excavation, the hole dip angle is difficult to be controlled and is mainly controlled by operating personnel experientially, impact of human factors is large and an excavation face is rugged after blasting as a result of difficulty in construction in subsequent working procedures are overcome. By the hole dip angle control device for tunnel engineering drilling-blasting excavation, the hole angle is controlled more conveniently, rapidly and effectively, and quality of tunnel drilling-blasting excavation is guaranteed.

Description

Construction of tunnel is bored to pop and is dug dip angle of hole control device
Technical field
The utility model belongs to the device field of construction of tunnel, is specifically related to a kind of construction of tunnel and bores to pop and dig dip angle of hole control device.
Background technology
Tunnel excavation construction, adopts Mining Method more, bores and needs before the excavation construction that pops first to bore quick-fried design according to geological conditions etc., and tunnel perimeter light blast hole must have certain camber angle.Afterwards, at tunnel tunnel face measuring bore position, adopt air rock drill boring, while boring perimeter hole, before perforate, first adopt the instruments such as bevel protractor to measure the camber angle of drilling rods or by operator's keyhole outer dip angle by rule of thumb.Due to the non-dip angle of hole special measurement of bevel protractor equipment, while measuring inclination angle, bevel protractor is difficult to coordinate with drilling rod, therefore it is inconvenient to adopt bevel protractor to control in the method actual mechanical process of inclination angle, when holing, tunnel excavation seldom adopts, how by operator's keyhole outer dip angle by rule of thumb.Cause tunnel excavation bore inclining angle defective, after explosion, excavation face is uneven, postorder operation constructional difficulties.
Therefore,, for overcoming the above problems, need a kind of construction of tunnel that can conveniently control brill blast hole camber angle to bore to pop and dig dip angle of hole control device.
Utility model content
In view of this, the purpose of this utility model is the problem existing in existing tunnel drilling and blasting excavation construction, provides a kind of construction of tunnel to bore to pop and digs dip angle of hole control device.Construction of tunnel of the present utility model is bored to pop and is dug dip angle of hole control device and comprise measurement of dip angle frame, plumb bob and cotton rope, measurement of dip angle frame comprises hypotenuse bar, right angle side rod I and the right angle side rod II that interconnects and form right-angled triangle, side rod II one end, right angle is fixedly connected on right angle side rod I mutually vertical with it, the right angle side rod II other end is articulated with hypotenuse bar, hypotenuse bar and right angle side rod I can relative slidings, cotton rope one end is fixed on right angle side rod I center line, and the other end is connected in plumb bob;
Further, on described right angle side rod I and hypotenuse bar, along it, be longitudinally equipped with shifting chute, measurement of dip angle frame is worn movable bolt in also comprising, inside wear movable bolt through right angle side rod I with the shifting chute on hypotenuse bar for right angle side rod I is fixedly connected with hypotenuse bar;
Further, described hypotenuse bar lateral surface is the axis arc surface parallel with hypotenuse bar;
Further, described right angle side rod I is hinged with a folded section and its hinge and is positioned at right angle side rod I and right angle side rod II tie point below;
Further, in described right angle side rod I, along it, be longitudinally provided with center marking line.
The beneficial effects of the utility model are: construction of tunnel of the present utility model is bored to pop and dug dip angle of hole control device, comprise the hypotenuse bar that interconnects and form right-angled triangle, right angle side rod I and right angle side rod II, plumb bob is suspended on right angle side rod by cotton rope, when needs are measured tunnel boring angle of inclination, hypotenuse bar lateral surface and drilling rod can be adjacent to, the right angle side rod I of measurement bay is vertically placed, when cotton rope overlaps with right angle side rod I center line, the angle of hypotenuse bar and right angle side rod I is boring dilling angle, by the control to this angle, can guarantee that dip angle of hole is in prescribed limit, avoid that tunnel excavation bore inclining angle is defective to be caused after explosion, excavation face is uneven, postorder operation constructional difficulties.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, technical solutions of the utility model are further illustrated:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional schematic diagram of hypotenuse bar.
Fig. 3 is the structural representation of right angle side rod I.
The specific embodiment
Fig. 1 is structural representation of the present utility model, and Fig. 2 is the section signal of hypotenuse bar 4, and Fig. 3 is the structural representation of right angle side rod I 2.As shown in the figure, in the present embodiment, construction of tunnel is bored to pop and is dug dip angle of hole control device and comprise measurement of dip angle frame, plumb bob 7 and cotton rope 6, measurement of dip angle frame comprises the hypotenuse bar 4 that interconnects and form right-angled triangle, right angle side rod I 2 and right angle side rod II 3, side rod II 3 one end, right angle are fixedly connected on right angle side rod I 2 mutually vertical with it, right angle side rod II 3 other ends are articulated with hypotenuse bar 4, hypotenuse bar 4 and right angle side rod I 2 can relative slidings, cotton rope 6 one end are fixed on right angle side rod I 2 center lines, the other end is connected in plumb bob 7, in the present embodiment, construction of tunnel is bored to pop and is dug dip angle of hole control device in use, hypotenuse bar 4 lateral surfaces and drilling rod can be adjacent to, the right angle side rod I of measurement bay is vertically placed, while making plumb bob 7 cotton ropes 6 overlap with right angle side rod I 2 center lines simultaneously, hypotenuse bar 4 is boring dilling angle with the angle of right angle side rod I 2.
In the present embodiment, on described right angle side rod I 2 and hypotenuse bar 4, along it, be longitudinally equipped with shifting chute 5, measurement of dip angle frame is worn movable bolt 1 in also comprising, inside wear movable bolt 1 through right angle side rod I 2 with the shifting chute 5 on hypotenuse bar 4 for right angle side rod I 2 is fixedly connected with hypotenuse bar 4, this is interior wears that movable bolt 1 can unclamp or fixedly right angle side rod I 2 and hypotenuse bar 4, when needs are set the bore inclining angle of adjusting brill blast hole, operating personnel can first unclamp this interior movable bolt 1 of wearing, owing to being longitudinally equipped with shifting chute 5 along it on right angle side rod I 2 and hypotenuse bar 4, thereby make operating personnel in the interior slip of shifting chute 5, to regulate right angle side rod I 2 and hypotenuse bar 4 relative positions by wearing movable bolt 1 in making, thereby regulate the angle of right angle side rod I 2 and hypotenuse bar 4, when being adjusted to bore inclining angle design value, in need screwing, wearing movable bolt 1 fixes right angle side rod I 2 and hypotenuse bar 4 link positions, avoid set angle to change, make to bore blast hole inclination angle and occur error.
In the present embodiment, described hypotenuse bar 4 lateral surfaces are the axis arc surface parallel with hypotenuse bar 49, as Fig. 2, the arc top of this arc surface 9 is towards hypotenuse bar 4 inner sides, when needs are measured tunnel boring angle of inclination, hypotenuse bar 4 lateral surfaces and drilling rod need be adjacent to, and hypotenuse bar 4 lateral surfaces are set to arc surface 9, be conducive to hypotenuse bar 4 lateral surfaces and drilling rod surface and fit tightly, improve this construction of tunnel and bore to pop and dig the accuracy of convenience that dip angle of hole control device uses and dip angle of hole control.
In the present embodiment, described right angle side rod I 2 is hinged with a folded section 8 and its hinge is positioned at right angle side rod I 2 and right angle side rod II 3 tie point belows, as Fig. 3, when needs are measured tunnel drill blast hole outer dip angle, the folded section 8 that can open right angle side rod I 2 makes this folded section 8 and right angle side rod I 2 conllinear, be equivalent to make right angle side rod I 2 to extend to lower end, be convenient to the align center line of cotton rope 6 and right angle side rod I 2 of operating personnel; After measurement, this folded section 8 can be packed up, to shorten the length of measurement of dip angle frame, be easy to carry.
In the present embodiment, in described right angle side rod I 2, along it, be longitudinally provided with center marking line 10, folded section 8 is longitudinally also provided with center marking line 10 along it simultaneously, this center line marking line is along the 2 longitudinal centre line settings of right angle side rod I, when needs are measured tunnel drill blast hole outer dip angle, operating personnel can overlap cotton rope 6 Yu Gai center marking lines 10, guarantees that right angle side rod I 2 keeps vertically, guaranteeing the accuracy that tunnel drill blast hole outer dip angle is measured.
For a person skilled in the art; do not departing under the prerequisite of the utility model structure; can also make some distortion and improvement, these also should be considered as protection domain of the present utility model, and these can not affect effect and practical applicability that the utility model is implemented.

Claims (5)

1. construction of tunnel is bored to pop and is dug a dip angle of hole control device, it is characterized in that: comprise measurement of dip angle frame, plumb bob and cotton rope; Described measurement of dip angle frame comprises hypotenuse bar, right angle side rod I and the right angle side rod II that interconnects and form right-angled triangle; Side rod II one end, described right angle is fixedly connected on right angle side rod I mutually vertical with it, and the right angle side rod II other end is articulated with hypotenuse bar; Described hypotenuse bar and right angle side rod I can relative slidings; Described cotton rope upper end is fixed on right angle side rod I center line, and cotton rope lower end is connected in plumb bob.
2. construction of tunnel brill pops and digs dip angle of hole control device as claimed in claim 1, it is characterized in that: on described right angle side rod I and hypotenuse bar, along it, be longitudinally equipped with shifting chute; In also comprising, described measurement of dip angle frame wears movable bolt; In described, wear movable bolt through right angle side rod I with the shifting chute on hypotenuse bar for right angle side rod I is fixedly connected with hypotenuse bar.
3. construction of tunnel brill pops and digs dip angle of hole control device as claimed in claim 1 or 2, it is characterized in that: described hypotenuse bar lateral surface is the axis arc surface parallel with hypotenuse bar.
4. construction of tunnel brill pops and digs dip angle of hole control device as claimed in claim 1 or 2, it is characterized in that: side rod I lower end, described right angle is hinged with a folded section and hinged right angle side rod I and the right angle side rod II tie point below of being centered close to.
5. construction of tunnel brill pops and digs dip angle of hole control device as claimed in claim 1, it is characterized in that: in described right angle side rod I, along it, be longitudinally provided with center marking line.
CN201420215182.XU 2014-04-29 2014-04-29 Hole dip angle control device for tunnel engineering drilling-blasting excavation Expired - Fee Related CN203796169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420215182.XU CN203796169U (en) 2014-04-29 2014-04-29 Hole dip angle control device for tunnel engineering drilling-blasting excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420215182.XU CN203796169U (en) 2014-04-29 2014-04-29 Hole dip angle control device for tunnel engineering drilling-blasting excavation

Publications (1)

Publication Number Publication Date
CN203796169U true CN203796169U (en) 2014-08-27

Family

ID=51378390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420215182.XU Expired - Fee Related CN203796169U (en) 2014-04-29 2014-04-29 Hole dip angle control device for tunnel engineering drilling-blasting excavation

Country Status (1)

Country Link
CN (1) CN203796169U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103968718A (en) * 2014-05-15 2014-08-06 中国矿业大学(北京) Blast hole orientation method for tunnel blasting with angle determined through distance
CN108894750A (en) * 2018-07-17 2018-11-27 四川石油天然气建设工程有限责任公司 A kind of auxiliary directional drills the noose device and method of more drill bit new line
CN109441352A (en) * 2018-12-22 2019-03-08 中铁十八局集团有限公司 A kind of device for bore angle control
CN111336881A (en) * 2020-03-06 2020-06-26 中国矿业大学(北京) Thin coal seam half-coal rock roadway medium-length hole smooth blasting method
CN112878923A (en) * 2021-02-02 2021-06-01 浙江交工金筑交通建设有限公司 Assembled pipe drilling positioner

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103968718A (en) * 2014-05-15 2014-08-06 中国矿业大学(北京) Blast hole orientation method for tunnel blasting with angle determined through distance
CN103968718B (en) * 2014-05-15 2015-09-09 中国矿业大学(北京) Tunnel Blasting distance determines the big gun hole Directional Method of angle
CN108894750A (en) * 2018-07-17 2018-11-27 四川石油天然气建设工程有限责任公司 A kind of auxiliary directional drills the noose device and method of more drill bit new line
CN108894750B (en) * 2018-07-17 2020-05-08 四川石油天然气建设工程有限责任公司 Cable sleeve device and method for assisting directional drill to penetrate through drill bit to raise head
CN109441352A (en) * 2018-12-22 2019-03-08 中铁十八局集团有限公司 A kind of device for bore angle control
CN109441352B (en) * 2018-12-22 2024-04-12 中铁十八局集团有限公司 Device for controlling drilling angle
CN111336881A (en) * 2020-03-06 2020-06-26 中国矿业大学(北京) Thin coal seam half-coal rock roadway medium-length hole smooth blasting method
CN111336881B (en) * 2020-03-06 2021-05-04 中国矿业大学(北京) Thin coal seam half-coal rock roadway medium-length hole smooth blasting method
CN112878923A (en) * 2021-02-02 2021-06-01 浙江交工金筑交通建设有限公司 Assembled pipe drilling positioner

Similar Documents

Publication Publication Date Title
CN203796169U (en) Hole dip angle control device for tunnel engineering drilling-blasting excavation
CN206269791U (en) Mining ground fissure measurement apparatus
CN203752147U (en) Six-freedom-degree mechanical arm and prying trolley with mechanical arm
CN204359308U (en) Underworkings Multifunctional measuring tool
CN211205120U (en) Hydraulic ring geological crack measuring device
CN207215489U (en) A kind of portable sampler of ground detection
CN203422044U (en) Telescopic mining rod ruler for measuring tunnel surface displacement
US11739638B2 (en) Travelling-type tunnel hard-rock micro-damage cutting equipment and construction method associated therewith
CN103776324B (en) A kind of tunnel bores quick-fried cloth hole speedy lofting positioner and method
CN203271739U (en) Support for electric coal drill
CN202431189U (en) Variable-diameter guiding device for drilling holes
CN203978304U (en) Novel angle adjustable guide rail electric rock drill support
CN107989555A (en) Live original position hand-held drill sampling corollary apparatus
CN216477305U (en) Be applied to quick auxiliary device of drill site contained angle reinspection
CN206972295U (en) A kind of stent-type adjustable angle pipe for escaping
CN206192689U (en) Measuring device for civil engineering
CN204402353U (en) Tunnel automation blasthole drilling system
CN211061240U (en) Rock powder sampler for rotary drill rig of surface mine
CN207832188U (en) A kind of borehole punching positioning device
CN210317180U (en) Universal supporting base special for drilling machine supporting frame
CN204666283U (en) A kind of borehole stressmeter special protecting equipment
CN209637764U (en) Three arm rock drilling jumbos stablize rack
CN204492639U (en) Tunnel borehole drilling system
CN208073356U (en) A kind of inclined shaft is combined with helicoid hydraulic motor
CN103670277B (en) A kind of electric power line pole tower composite foundation borehole perpendicularity locator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827

Termination date: 20180429