CN203795455U CN201420062009.0U CN201420062009U CN203795455U CN 203795455 U CN203795455 U CN 203795455U CN 201420062009 U CN201420062009 U CN 201420062009U CN 203795455 U CN203795455 U CN 203795455U
Authority
CN
China
Prior art keywords
foundation
prefabricated
standard concrete
prefabricated standard
concrete equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420062009.0U
Other languages
Chinese (zh)
Inventor
曾爱民
黄晓琼
蒋云彩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420062009.0U priority Critical patent/CN203795455U/en
Application granted granted Critical
Publication of CN203795455U publication Critical patent/CN203795455U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a prefabricated standard concrete equipment foundation of a transformer substation, and the prefabricated standard concrete equipment foundation is a prefabricated concrete cube with the side length being 1.2 m. The prefabricated standard concrete equipment foundation is poured by C25 concrete (6), the center on the prefabricated standard concrete equipment foundation is provided with a reverse-quadruple-prismatic-table cup used for pouring a rod piece, the two sides of a cup opening are provided with hoisting rings (5), and a small number of rebars are arranged on the periphery of the cup opening and the bottom of the foundation. The rebars (1) with the diameter being 12 are vertically arranged on the periphery of the cup opening. The rebars (2) with the diameter being 10 annularly arranged on a pile foundation of the bottom of the foundation in the two directions are arranged at the bottom of the foundation. According to the prefabricated standard concrete equipment foundation, uniform industry prefabrication is adopted, construction units purchase finished products, templates can be constant for manufactures due to the standard size, and the kinds of the sizes of the templates can be reduced. The prefabricated standard concrete equipment foundation is reasonable in design, safety of equipment is guaranteed, the safety degree of the construction field is improved, the prefabricated standard concrete equipment foundation can be prefabricated, the construction progress is accelerated, the construction period is shortened, and investment is saved. The prefabricated standard concrete equipment foundation is suitable for the transformer substation equipment foundation.

Description

A kind of transformer station prefabricated standard concrete equipment Foundations
technical field
The utility model relates to a kind of transformer station prefabricated standard concrete equipment Foundations, belongs to transformer substation foundation construction technique field.
background technology
What at present substation equipment all adopted is Cast-in-place concrete single footing. cast-in-place basis needs on-the-spot formwork cast, and after maintenance after a while, can vertical rod, construction period is longer, and at formwork, between curing time, as rainwater weather, the foundation ditch digging is destroyed by rainwater easily.The size disunity of different equipment Foundations designs, also causes template kind more, increases construction complexity.
summary of the invention
The purpose of this utility model is, the problem that the Cast-in-place concrete single footing adopting according to existing substation equipment exists, the utility model proposes a kind of standardized Prefabricated Concrete basis, and this basis is directly prefabricated in the factory, and water at the scene of noting be used in.
The technical solution of the utility model is, a kind of transformer station of the utility model prefabricated standard concrete equipment Foundations are prefabricated cubes of concrete that a length of side is 1.2m, cast by C25 concrete, center has one for pouring into a mould the cup of falling truncated rectangular pyramids of rod member above, rim of a cup both sides arrange suspension ring, and rim of a cup surrounding and foundation bottom arrange a small amount of reinforcing bar.
The reinforcing bar of described rim of a cup surrounding setting is the reinforcing bar that vertical direction is arranged, the reinforcing bar of horizontal arrangement that has been arranged vertically on reinforcing bar uniform welding.
The reinforcing bar of described foundation bottom setting is the two-way reinforcing bar being circular layout of foundation bottom pile foundation, on the two-way reinforcing bar being circular layout uniform welding the reinforcing bar of horizontal arrangement.
The utility model is little for substation equipment weight difference, and all, in 1.5t left and right, it is 1.2m that basic size is unified in to periphery, and weight of equipment adds that basis deadweight can meet ground requirement for bearing capacity completely.
The utility model adopts factory unified prefabricated, and unit in charge of construction buys finished product, and modular size can make producer's fixed form, reduces template size.
Rim of a cup both sides, the utility model basis arrange suspension ring, after excavation of foundation pit puts in place, with loop wheel machine, basis is put in place, soon can vertical rod, backfill foundation ditch.
The beneficial effects of the utility model are that the utility model is reasonable in design, ensures device security, improves the degree of safety of job site, can manufacture in advance, has accelerated construction speed, shortens construction period, saves investment.
The utility model is applicable to substation equipment basis.
brief description of the drawings
Fig. 1 is the utility model transformer station prefabricated standard concrete equipment Foundations profile top view;
Fig. 2 is the utility model transformer station prefabricated standard concrete equipment Foundations sectional view;
Fig. 3 is the utility model transformer station prefabricated standard concrete equipment Foundations scheme of installation;
Picture in picture number: the 1st, vertically arranged reinforcing bar; The 2nd, the two-way reinforcing bar being circular layout of foundation bottom pile foundation; The 3rd, the reinforcing bar of horizontal arrangement; The 4th, bending reinforcing steel bar; The 5th, suspension ring; The 6th, C25 concrete; 7 is 1.2 cement mortar screeding layers; The 8th, C30 concrete back-grouting; The 9th, C10 concrete bed course.
Detailed description of the invention
Detailed description of the invention of the present utility model as shown in Figure 2.
The present embodiment transformer station prefabricated standard concrete equipment Foundations are prefabricated cubes of concrete that a length of side is 1.2m, cast by C25 concrete 6, center has one for pouring into a mould the cup of falling truncated rectangular pyramids of rod member above, rim of a cup both sides arrange suspension ring 5, rim of a cup surrounding and foundation bottom arrange a small amount of reinforcing bar: the two-way reinforcing bar being circular layout 2 of foundation bottom pile foundation, the vertical direction of basis surrounding has been arranged reinforcing bar 1, the reinforcing bar 3 of horizontal arrangement that has been arranged vertically on reinforcing bar 1 uniform welding, on the two-way reinforcing bar being circular layout 2 uniform welding the reinforcing bar of horizontal arrangement.
The present embodiment is in when application, bed course 9 C10 concrete; Cup 1.2 cement mortar screeding layers at the end; After excavation of foundation pit puts in place, with loop wheel machine, basis is put in place, soon can vertical rod, backfill foundation ditch, by C30 concrete back-grouting, fills the eminence to rim of a cup end face 80mm.
The present embodiment transformer station prefabricated standard concrete equipment Foundations according to existing national rule specification GB50007-2011 " Code for design of building " carry out Punching Shear, shearing resistance, bending resistance three aspects: design checking computations are determined.Basis requires to be placed on old soil layer, and bearing capacity of foundation soil is more than or equal to 40kN/m 2.

Claims (3)

1. transformer station's prefabricated standard concrete equipment Foundations, it is characterized in that, described basis is that a length of side is the prefabricated cube of concrete that 1.2m is cast by C25 concrete, above center have one for pouring into a mould the cup of falling truncated rectangular pyramids of rod member, rim of a cup both sides arrange suspension ring, and rim of a cup surrounding and foundation bottom arrange reinforcing bar.
2. a kind of transformer station according to claim 1 prefabricated standard concrete equipment Foundations, is characterized in that, the reinforcing bar of described rim of a cup surrounding setting is 12 reinforcing bars that vertical direction is arranged, 8 reinforcing bars of horizontal arrangement that have been arranged vertically on reinforcing bar uniform welding.
3. a kind of transformer station according to claim 1 prefabricated standard concrete equipment Foundations, it is characterized in that, the reinforcing bar of described foundation bottom setting is two-way 10 reinforcing bars that are circular layout of foundation bottom pile foundation, on two-way 10 reinforcing bars that are circular layout uniform welding 8 reinforcing bars of horizontal arrangement.
CN201420062009.0U 2014-02-12 2014-02-12 Prefabricated standard concrete equipment foundation of transformer substation Expired - Fee Related CN203795455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420062009.0U CN203795455U (en) 2014-02-12 2014-02-12 Prefabricated standard concrete equipment foundation of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420062009.0U CN203795455U (en) 2014-02-12 2014-02-12 Prefabricated standard concrete equipment foundation of transformer substation

Publications (1)

Publication Number Publication Date
CN203795455U true CN203795455U (en) 2014-08-27

Family

ID=51377684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420062009.0U Expired - Fee Related CN203795455U (en) 2014-02-12 2014-02-12 Prefabricated standard concrete equipment foundation of transformer substation

Country Status (1)

Country Link
CN (1) CN203795455U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254885A (en) * 2017-03-16 2017-10-17 安徽华电工程咨询设计有限公司 A kind of assembled main transformer foundation
CN115522560A (en) * 2022-10-12 2022-12-27 国网江苏省电力有限公司南通供电分公司 Factory prefabricated foundation of cement pole foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254885A (en) * 2017-03-16 2017-10-17 安徽华电工程咨询设计有限公司 A kind of assembled main transformer foundation
CN115522560A (en) * 2022-10-12 2022-12-27 国网江苏省电力有限公司南通供电分公司 Factory prefabricated foundation of cement pole foundation

Similar Documents

Publication Publication Date Title
CN104294753B (en) A kind of hollow pier stud syndeton of bridge prefabrication and construction
CN204385634U (en) Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN203625942U (en) Basement outer wall post-cast strip ahead water stopping structure
CN208072705U (en) A kind of energy-dissipating and shock-absorbing connection structure of coupling beam
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN207047881U (en) The prefabricated cushion cap of core is filled with joint bar
CN203795455U (en) Prefabricated standard concrete equipment foundation of transformer substation
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN207260378U (en) A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN105155575B (en) Non-excavation cantilever retaining wall with embedded steel pipe and construction method of non-excavation cantilever retaining wall
CN106988333A (en) The prefabricated cushion cap and its construction technology of core are filled with joint bar
CN204282399U (en) A kind of subway space enclosing structure
CN109750598A (en) A kind of readily removable New Jersey safety barrier structure and construction method removed
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN109555028B (en) Large-span culvert for dismantling-free and protection of pipeline and construction method
CN204174527U (en) The hollow pier stud syndeton of a kind of bridge prefabrication
CN203755171U (en) Bridge back-pulling bearing construction support
CN203821399U (en) Deep foundation pit supporting structure
CN103898835B (en) The anti-back of the body of bridge draws load-bearing construction bracket and construction method
CN105484260A (en) Design and construction method for resisting crack, preventing seepage and stopping floating for large-area basement structure bodies
CN108193706A (en) A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure
CN103437549B (en) Preloading structural part for high and large formwork support system
CN105839824B (en) Shed deckhead construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827