CN203795455U - Prefabricated standard concrete equipment foundation of transformer substation - Google Patents
Prefabricated standard concrete equipment foundation of transformer substation Download PDFInfo
- Publication number
- CN203795455U CN203795455U CN201420062009.0U CN201420062009U CN203795455U CN 203795455 U CN203795455 U CN 203795455U CN 201420062009 U CN201420062009 U CN 201420062009U CN 203795455 U CN203795455 U CN 203795455U
- Authority
- CN
- China
- Prior art keywords
- foundation
- prefabricated
- standard concrete
- prefabricated standard
- concrete equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003014 reinforcing effect Effects 0.000 claims description 28
- 238000003466 welding Methods 0.000 claims description 6
- 239000000725 suspension Substances 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 10
- 238000009417 prefabrication Methods 0.000 abstract 1
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a prefabricated standard concrete equipment foundation of a transformer substation, and the prefabricated standard concrete equipment foundation is a prefabricated concrete cube with the side length being 1.2 m. The prefabricated standard concrete equipment foundation is poured by C25 concrete (6), the center on the prefabricated standard concrete equipment foundation is provided with a reverse-quadruple-prismatic-table cup used for pouring a rod piece, the two sides of a cup opening are provided with hoisting rings (5), and a small number of rebars are arranged on the periphery of the cup opening and the bottom of the foundation. The rebars (1) with the diameter being 12 are vertically arranged on the periphery of the cup opening. The rebars (2) with the diameter being 10 annularly arranged on a pile foundation of the bottom of the foundation in the two directions are arranged at the bottom of the foundation. According to the prefabricated standard concrete equipment foundation, uniform industry prefabrication is adopted, construction units purchase finished products, templates can be constant for manufactures due to the standard size, and the kinds of the sizes of the templates can be reduced. The prefabricated standard concrete equipment foundation is reasonable in design, safety of equipment is guaranteed, the safety degree of the construction field is improved, the prefabricated standard concrete equipment foundation can be prefabricated, the construction progress is accelerated, the construction period is shortened, and investment is saved. The prefabricated standard concrete equipment foundation is suitable for the transformer substation equipment foundation.
Description
technical field
The utility model relates to a kind of transformer station prefabricated standard concrete equipment Foundations, belongs to transformer substation foundation construction technique field.
background technology
What at present substation equipment all adopted is Cast-in-place concrete single footing. cast-in-place basis needs on-the-spot formwork cast, and after maintenance after a while, can vertical rod, construction period is longer, and at formwork, between curing time, as rainwater weather, the foundation ditch digging is destroyed by rainwater easily.The size disunity of different equipment Foundations designs, also causes template kind more, increases construction complexity.
summary of the invention
The purpose of this utility model is, the problem that the Cast-in-place concrete single footing adopting according to existing substation equipment exists, the utility model proposes a kind of standardized Prefabricated Concrete basis, and this basis is directly prefabricated in the factory, and water at the scene of noting be used in.
The technical solution of the utility model is, a kind of transformer station of the utility model prefabricated standard concrete equipment Foundations are prefabricated cubes of concrete that a length of side is 1.2m, cast by C25 concrete, center has one for pouring into a mould the cup of falling truncated rectangular pyramids of rod member above, rim of a cup both sides arrange suspension ring, and rim of a cup surrounding and foundation bottom arrange a small amount of reinforcing bar.
The reinforcing bar of described rim of a cup surrounding setting is the reinforcing bar that vertical direction is arranged, the reinforcing bar of horizontal arrangement that has been arranged vertically on reinforcing bar uniform welding.
The reinforcing bar of described foundation bottom setting is the two-way reinforcing bar being circular layout of foundation bottom pile foundation, on the two-way reinforcing bar being circular layout uniform welding the reinforcing bar of horizontal arrangement.
The utility model is little for substation equipment weight difference, and all, in 1.5t left and right, it is 1.2m that basic size is unified in to periphery, and weight of equipment adds that basis deadweight can meet ground requirement for bearing capacity completely.
The utility model adopts factory unified prefabricated, and unit in charge of construction buys finished product, and modular size can make producer's fixed form, reduces template size.
Rim of a cup both sides, the utility model basis arrange suspension ring, after excavation of foundation pit puts in place, with loop wheel machine, basis is put in place, soon can vertical rod, backfill foundation ditch.
The beneficial effects of the utility model are that the utility model is reasonable in design, ensures device security, improves the degree of safety of job site, can manufacture in advance, has accelerated construction speed, shortens construction period, saves investment.
The utility model is applicable to substation equipment basis.
brief description of the drawings
Fig. 1 is the utility model transformer station prefabricated standard concrete equipment Foundations profile top view;
Fig. 2 is the utility model transformer station prefabricated standard concrete equipment Foundations sectional view;
Fig. 3 is the utility model transformer station prefabricated standard concrete equipment Foundations scheme of installation;
Picture in picture number: the 1st, vertically arranged reinforcing bar; The 2nd, the two-way reinforcing bar being circular layout of foundation bottom pile foundation; The 3rd, the reinforcing bar of horizontal arrangement; The 4th, bending reinforcing steel bar; The 5th, suspension ring; The 6th, C25 concrete; 7 is 1.2 cement mortar screeding layers; The 8th, C30 concrete back-grouting; The 9th, C10 concrete bed course.
Detailed description of the invention
Detailed description of the invention of the present utility model as shown in Figure 2.
The present embodiment transformer station prefabricated standard concrete equipment Foundations are prefabricated cubes of concrete that a length of side is 1.2m, cast by C25 concrete 6, center has one for pouring into a mould the cup of falling truncated rectangular pyramids of rod member above, rim of a cup both sides arrange suspension ring 5, rim of a cup surrounding and foundation bottom arrange a small amount of reinforcing bar: the two-way reinforcing bar being circular layout 2 of foundation bottom pile foundation, the vertical direction of basis surrounding has been arranged reinforcing bar 1, the reinforcing bar 3 of horizontal arrangement that has been arranged vertically on reinforcing bar 1 uniform welding, on the two-way reinforcing bar being circular layout 2 uniform welding the reinforcing bar of horizontal arrangement.
The present embodiment is in when application, bed course 9 C10 concrete; Cup 1.2 cement mortar screeding layers at the end; After excavation of foundation pit puts in place, with loop wheel machine, basis is put in place, soon can vertical rod, backfill foundation ditch, by C30 concrete back-grouting, fills the eminence to rim of a cup end face 80mm.
The present embodiment transformer station prefabricated standard concrete equipment Foundations according to existing national rule specification GB50007-2011 " Code for design of building " carry out Punching Shear, shearing resistance, bending resistance three aspects: design checking computations are determined.Basis requires to be placed on old soil layer, and bearing capacity of foundation soil is more than or equal to 40kN/m
2.
Claims (3)
1. transformer station's prefabricated standard concrete equipment Foundations, it is characterized in that, described basis is that a length of side is the prefabricated cube of concrete that 1.2m is cast by C25 concrete, above center have one for pouring into a mould the cup of falling truncated rectangular pyramids of rod member, rim of a cup both sides arrange suspension ring, and rim of a cup surrounding and foundation bottom arrange reinforcing bar.
2. a kind of transformer station according to claim 1 prefabricated standard concrete equipment Foundations, is characterized in that, the reinforcing bar of described rim of a cup surrounding setting is 12 reinforcing bars that vertical direction is arranged, 8 reinforcing bars of horizontal arrangement that have been arranged vertically on reinforcing bar uniform welding.
3. a kind of transformer station according to claim 1 prefabricated standard concrete equipment Foundations, it is characterized in that, the reinforcing bar of described foundation bottom setting is two-way 10 reinforcing bars that are circular layout of foundation bottom pile foundation, on two-way 10 reinforcing bars that are circular layout uniform welding 8 reinforcing bars of horizontal arrangement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420062009.0U CN203795455U (en) | 2014-02-12 | 2014-02-12 | Prefabricated standard concrete equipment foundation of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420062009.0U CN203795455U (en) | 2014-02-12 | 2014-02-12 | Prefabricated standard concrete equipment foundation of transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203795455U true CN203795455U (en) | 2014-08-27 |
Family
ID=51377684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420062009.0U Expired - Fee Related CN203795455U (en) | 2014-02-12 | 2014-02-12 | Prefabricated standard concrete equipment foundation of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203795455U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107254885A (en) * | 2017-03-16 | 2017-10-17 | 安徽华电工程咨询设计有限公司 | A kind of assembled main transformer foundation |
CN115522560A (en) * | 2022-10-12 | 2022-12-27 | 国网江苏省电力有限公司南通供电分公司 | Factory prefabricated foundation of cement pole foundation |
-
2014
- 2014-02-12 CN CN201420062009.0U patent/CN203795455U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107254885A (en) * | 2017-03-16 | 2017-10-17 | 安徽华电工程咨询设计有限公司 | A kind of assembled main transformer foundation |
CN115522560A (en) * | 2022-10-12 | 2022-12-27 | 国网江苏省电力有限公司南通供电分公司 | Factory prefabricated foundation of cement pole foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104294753B (en) | A kind of hollow pier stud syndeton of bridge prefabrication and construction | |
CN204385634U (en) | Railway is not stopped transport the overall jacking mechanism of cross-line box culvert | |
CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
CN203625942U (en) | Basement outer wall post-cast strip ahead water stopping structure | |
CN208072705U (en) | A kind of energy-dissipating and shock-absorbing connection structure of coupling beam | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN107326928A (en) | A kind of part is related to the construction method in the deeper subsurface garage of basement | |
CN207047881U (en) | The prefabricated cushion cap of core is filled with joint bar | |
CN203795455U (en) | Prefabricated standard concrete equipment foundation of transformer substation | |
CN103452350A (en) | Fabricated electronic workshop and construction method thereof | |
CN207260378U (en) | A kind of assembled frame-shear structure curved scissors type combines keyway connection structure | |
CN105155575B (en) | Non-excavation cantilever retaining wall with embedded steel pipe and construction method of non-excavation cantilever retaining wall | |
CN106988333A (en) | The prefabricated cushion cap and its construction technology of core are filled with joint bar | |
CN204282399U (en) | A kind of subway space enclosing structure | |
CN109750598A (en) | A kind of readily removable New Jersey safety barrier structure and construction method removed | |
CN108978699B (en) | Land integral prefabricated bearing platform and production and installation method thereof | |
CN109555028B (en) | Large-span culvert for dismantling-free and protection of pipeline and construction method | |
CN204174527U (en) | The hollow pier stud syndeton of a kind of bridge prefabrication | |
CN203755171U (en) | Bridge back-pulling bearing construction support | |
CN203821399U (en) | Deep foundation pit supporting structure | |
CN103898835B (en) | The anti-back of the body of bridge draws load-bearing construction bracket and construction method | |
CN105484260A (en) | Design and construction method for resisting crack, preventing seepage and stopping floating for large-area basement structure bodies | |
CN108193706A (en) | A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure | |
CN103437549B (en) | Preloading structural part for high and large formwork support system | |
CN105839824B (en) | Shed deckhead construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140827 |