CN203795450U - Raft foundation steel bar binding supporting structure - Google Patents

Raft foundation steel bar binding supporting structure Download PDF

Info

Publication number
CN203795450U
CN203795450U CN201420226961.XU CN201420226961U CN203795450U CN 203795450 U CN203795450 U CN 203795450U CN 201420226961 U CN201420226961 U CN 201420226961U CN 203795450 U CN203795450 U CN 203795450U
Authority
CN
China
Prior art keywords
longitudinal steel
steel pipe
raft
reinforcing bar
bar binding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420226961.XU
Other languages
Chinese (zh)
Inventor
李宪民
杨韬
李喆骁
郑西佩
李坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Greenland Construction Group Co Ltd filed Critical Shanghai Greenland Construction Group Co Ltd
Priority to CN201420226961.XU priority Critical patent/CN203795450U/en
Application granted granted Critical
Publication of CN203795450U publication Critical patent/CN203795450U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to the technical field of building pouring, and particularly discloses a raft foundation steel bar binding supporting structure. The raft foundation steel bar binding supporting structure comprises a plurality of longitudinal steel pipes arranged inside a raft, wherein one end of each longitudinal steel pipe makes contact with the bottom surface of the raft, the other end of each longitudinal steel pipe extends outside the raft to form an extending portion, and the longitudinal steel pipes are provided with a plurality of horizontal steel pipes and provided with a plurality of steel bar meshes in a welded mode. The raft foundation steel bar binding supporting structure has the advantages that the longitudinal steel pipes are adopted to replace split heads in the prior art to support upper mesh steel bars. As the longitudinal steel pipes are hollow, heat in concrete can be exhausted through the longitudinal steel pipes staying in the concrete, internal temperature of the concrete is reduced, and the cooling effect is achieved.

Description

Raft foundation reinforcing bar binding braced structures
Technical field
The utility model relates to building pouring technique field, refers to especially a kind of raft foundation reinforcing bar binding braced structures.
Background technology
Along with the continuous increase of highrise building, super highrise building is also in continuous increase, and Raft Foundation Design is also in continuous variation, plank thickness is increasing, the continuous overstriking of bar gauge, and reinforcing bar designs also from originally only having bottom and top layer to become multilayer, bring very large difficulty to the support of reinforcing bar
At present, made supporting steel bar for the reinforcing bar that raft foundation is identical, weld horizontal reinforcing bar on supporting steel bar, relies on the fixing supporting steel bar of horizontal reinforcement, supports upper wire sheet reinforcing bar, then colligation upper wire sheet reinforcing bar on horizontal reinforcement by supporting steel bar.Raft foundation reinforcing bar binding supports and adopts reinforcing bar Site Welding to make split heads, but the support of super raft foundation reinforcing bar, due to reinforcing bar poor stability, it is stable that very difficult guarantee is made, and can not meet the stability of super raft foundation reinforced bar support.
Utility model content
The purpose of this utility model is to provide a kind of raft foundation reinforcing bar binding braced structures, adopts longitudinal steel pipe to replace supporting steel bar of the prior art to support upper wire sheet reinforcing bar, and longitudinally steel duct is hollow, and its thermal conductivity is good, and construction quality is high.
To achieve these goals, the utility model has adopted following technical scheme: a kind of raft foundation reinforcing bar binding braced structures, comprise the multiple longitudinal steel pipe being placed in raft plate, this Yu Faban bottom surface, longitudinal steel pipe one end contact, the other end extends to the outer extension that forms of raft plate, described longitudinal steel pipe is provided with multiple horizontal steel tubes, on described longitudinal steel pipe, is also welded with multiple reinforced mesh.
Further, be welded with the reinforcing bar pawl corresponding with reinforced mesh quantity on described longitudinal steel pipe, described reinforced mesh is fixed on longitudinal steel pipe by this reinforcing bar pawl.
Further, described longitudinal steel pipe is connected by buckle with horizontal steel tube.
Further, described longitudinal steel pipe bottom welding has a supporting steel plate, and this supporting steel plate is placed in raft plate bottom surface.
Further, described longitudinal steel pipe is provided with seal ring.
Further, described extension length is 20mm.
Further, described seal ring is fixed on longitudinal steel pipe by full weld mode.
The beneficial effects of the utility model are: adopt after said structure, adopt longitudinal steel pipe to replace supporting steel bar of the prior art to support upper wire sheet reinforcing bar.Because longitudinally steel duct is hollow, longitudinal steel pipe of staying in concrete can be discharged the heat in concrete, reduces internal temperature in concrete, plays thermolysis.
This braced structures forms a stable entirety with reinforcing bar in raft plated construction, provides a stable operating platform in structure construction simultaneously, has reduced construction cost, saves the duration of on-the-spot interim processing split heads, improves construction quality.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment technical scheme, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only that this practicality is in order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
A kind of raft foundation reinforcing bar binding braced structures as shown in Figure 1, comprises the multiple longitudinal steel pipe being placed in raft plate, and this longitudinal steel pipe (1) external diameter is 48mm, and wall thickness is 2mm; Adopt longitudinal steel pipe (1) to replace supporting steel bar of the prior art to support upper wire sheet reinforcing bar.Due to longitudinal steel pipe (1) boring, longitudinal steel pipe (1) of staying in concrete can be discharged the heat in concrete, reduces internal temperature in concrete, plays thermolysis.
This Yu Faban bottom surface, longitudinal steel pipe (1) one end contact, the other end extends to the outer extension that forms of raft plate.Concrete, described longitudinal steel pipe (1) bottom welding has a supporting steel plate (5), and this supporting steel plate (5) is placed in raft plate bottom surface, and described extension length is 20mm.Supporting steel pipe prevents that concrete from entering the problem that longitudinal steel pipe (1) causes its congestion affects heat radiation.
Described longitudinal steel pipe (1) is provided with multiple horizontal steel tubes (2), and described longitudinal steel pipe (1) is connected by buckle with horizontal steel tube (2), facilitates the installation and removal of horizontal steel tube (2).
On described longitudinal steel pipe (1), be welded with the reinforcing bar pawl (3) corresponding with reinforced mesh quantity, it is upper that described reinforced mesh is fixed on longitudinal steel pipe (1) by this reinforcing bar pawl (3), and reinforced mesh is welded on longitudinal steel pipe (1) equally.
Described longitudinal steel pipe (1) is provided with seal ring (4), and is fixed on longitudinal steel pipe (1) by full weld mode.It has prevented the generation of infiltration situation.
This braced structures forms a stable entirety with reinforcing bar in raft plated construction, provides a stable operating platform in structure construction simultaneously, has reduced construction cost, saves the duration of on-the-spot interim processing split heads, improves construction quality.
In when construction, with adhesive tape by longitudinal steel pipe (1) upper end shutoff, to prevent that concrete from entering longitudinal steel pipe (1); After having constructed, remove adhesive tape, so that its heat radiation.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (7)

1. a raft foundation reinforcing bar binding braced structures, it is characterized in that, comprise the multiple longitudinal steel pipe (1) being placed in raft plate, this Yu Faban bottom surface, longitudinal steel pipe (1) one end contact, the other end extends to the outer extension that forms of raft plate, described longitudinal steel pipe (1) is provided with multiple horizontal steel tubes (2), on described longitudinal steel pipe (1), is also welded with multiple reinforced mesh.
2. raft foundation reinforcing bar binding braced structures according to claim 1, it is characterized in that: on described longitudinal steel pipe (1), be welded with the reinforcing bar pawl (3) corresponding with reinforced mesh quantity, described reinforced mesh is fixed on longitudinal steel pipe (1) by this reinforcing bar pawl (3).
3. raft foundation reinforcing bar binding braced structures according to claim 1, is characterized in that: described longitudinal steel pipe (1) is connected by buckle with horizontal steel tube (2).
4. raft foundation reinforcing bar binding braced structures according to claim 1, is characterized in that: described longitudinal steel pipe (1) bottom welding has a supporting steel plate (5), and this supporting steel plate (5) is placed in raft plate bottom surface.
5. raft foundation reinforcing bar binding braced structures according to claim 1, is characterized in that: described longitudinal steel pipe (1) is provided with seal ring (4).
6. according to the raft foundation reinforcing bar binding braced structures described in claim 1~5 any one, it is characterized in that: described extension length is 20mm.
7. raft foundation reinforcing bar binding braced structures according to claim 5, is characterized in that: described seal ring (4) is fixed on longitudinal steel pipe (1) by full weld mode.
CN201420226961.XU 2014-05-05 2014-05-05 Raft foundation steel bar binding supporting structure Expired - Fee Related CN203795450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420226961.XU CN203795450U (en) 2014-05-05 2014-05-05 Raft foundation steel bar binding supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420226961.XU CN203795450U (en) 2014-05-05 2014-05-05 Raft foundation steel bar binding supporting structure

Publications (1)

Publication Number Publication Date
CN203795450U true CN203795450U (en) 2014-08-27

Family

ID=51377679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420226961.XU Expired - Fee Related CN203795450U (en) 2014-05-05 2014-05-05 Raft foundation steel bar binding supporting structure

Country Status (1)

Country Link
CN (1) CN203795450U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421476A (en) * 2015-11-30 2016-03-23 中国建筑第八工程局有限公司 Construction method for installing tower crane embedded parts on raft foundation and installation structure
CN109049323A (en) * 2018-09-04 2018-12-21 广东蕉岭建筑工程集团有限公司 Plate bar frame production method
CN112323835A (en) * 2020-11-13 2021-02-05 中建八局天津建设工程有限公司 Construction method of raft plate split heads of foundation
CN115075284A (en) * 2022-06-28 2022-09-20 中国二十二冶集团有限公司 Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation
CN116163331A (en) * 2023-03-23 2023-05-26 中国建筑第二工程局有限公司 Construction process of large-thickness variable-section raft foundation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421476A (en) * 2015-11-30 2016-03-23 中国建筑第八工程局有限公司 Construction method for installing tower crane embedded parts on raft foundation and installation structure
CN109049323A (en) * 2018-09-04 2018-12-21 广东蕉岭建筑工程集团有限公司 Plate bar frame production method
CN112323835A (en) * 2020-11-13 2021-02-05 中建八局天津建设工程有限公司 Construction method of raft plate split heads of foundation
CN115075284A (en) * 2022-06-28 2022-09-20 中国二十二冶集团有限公司 Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation
CN115075284B (en) * 2022-06-28 2023-07-07 中国二十二冶集团有限公司 No-split heads construction method for adding waterproof plate steel bars to independent column bases in frame structure foundation
CN116163331A (en) * 2023-03-23 2023-05-26 中国建筑第二工程局有限公司 Construction process of large-thickness variable-section raft foundation
CN116163331B (en) * 2023-03-23 2024-05-14 中国建筑第二工程局有限公司 Construction process of large-thickness variable-section raft foundation

Similar Documents

Publication Publication Date Title
CN203795450U (en) Raft foundation steel bar binding supporting structure
CN104358356B (en) Inside set high strengthening regenerative mixed steel pipe concrete anti-earthquake and the construction technology of local restriction
CN107035143A (en) Heat insulation formwork integrated board installation form support and its reinforcement means at the luffer boards that float
JP2007303159A (en) Method of preventing cracks in concrete structure
CN202755656U (en) Split bolt fixing structure for double-layer steel plate shearing wall
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN105421473A (en) Double-wall opening-sealed steel sleeve box cofferdam and construction method
CN203834702U (en) Heat insulation structure of high temperature fused salt heat accumulation tank for solar thermal power generation
CN201865245U (en) Steel pipe concrete column with transverse and longitudinal stiffening plates
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN206876021U (en) A kind of cooling copper tube for being easy to connection
CN203347203U (en) Multi-functional super-thick bulked concrete steel tube support system
CN203684467U (en) Through-wall pipe for cast-in-situ light heat preservation wall without form removal
CN202369931U (en) Arch ring bracket
CN202280152U (en) Structure for arranging embedded part at bottom of reinforced concrete plate
CN204174937U (en) The construction equipment of recyclable wire rope draw ring
CN208777720U (en) Detachable straight thread steel bar base of wall hanging mould inclined strut
CN204174820U (en) The building block of a kind of constructional column template
CN205116568U (en) Can have enough to meet need and adjust reinforcing bar stirrup
CN205189237U (en) Big footpath steel core concrete column of built -in longitudinal baffle
CN104652837B (en) A kind of method and structure for increasing steel pipe frame newly on former concrete pipe support
CN203891449U (en) Wall connecting piece for wall connection of scaffold
CN206844650U (en) A kind of heat insulation formwork integrated board installation form support at the luffer boards that float
CN210800465U (en) Fixed pipe bracket for prefabricated finished product heat-insulating pipe
CN202090847U (en) Strengthening riser combination structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827

CF01 Termination of patent right due to non-payment of annual fee