CN203795398U - 水库导流洞回填改建泄洪洞的结构 - Google Patents

水库导流洞回填改建泄洪洞的结构 Download PDF

Info

Publication number
CN203795398U
CN203795398U CN201420178159.8U CN201420178159U CN203795398U CN 203795398 U CN203795398 U CN 203795398U CN 201420178159 U CN201420178159 U CN 201420178159U CN 203795398 U CN203795398 U CN 203795398U
Authority
CN
China
Prior art keywords
tunnel
flood discharge
discharge hole
diversion
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420178159.8U
Other languages
English (en)
Inventor
韩秋茸
曹国利
李鑫
刘佳
郑宇�
邢建营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420178159.8U priority Critical patent/CN203795398U/zh
Application granted granted Critical
Publication of CN203795398U publication Critical patent/CN203795398U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型公开了一种水库导流洞回填改建泄洪洞的结构,包括建设在水库坝体上的泄洪洞进口塔架,位于所述泄洪洞进口塔架下游侧的坝体上设置有与泄洪洞进口塔架出水口衔接的导流洞首部隧洞段;位于泄洪洞进口塔架的检修门槽底部设置有封堵闸门,封堵闸门上方的检修门槽内设有检修门槽;导流洞首部隧洞段的底板上浇筑有二期回填混凝土,二期回填混凝土位于泄洪洞进口塔架内腔的高度等于封堵闸门高度;位于导流洞首部隧洞段的二期回填混凝土顶面为朝着下游侧向下倾斜的弧面结构。本实用新型优点在于较传统导流洞改建泄洪洞结构,避免了二次开挖泄洪洞,降低了施工难度和造价,经济易行且缩短了施工工期。

Description

水库导流洞回填改建泄洪洞的结构
技术领域
本实用新型涉及中小型水库泄洪洞的建造方法,尤其是涉及水库导流洞回填改建泄洪洞的结构。
背景技术
在水库建设过程中,常常将施工期临时建筑物导流洞改建为永久泄洪洞,以达到降低投资的目的。目前在改建中,通常是开挖导流洞首段隧洞(俗称 “龙抬头” )并重新布置进口,因此具有一定的施工难度,特别是对于中小型水库来说,永久泄洪洞进口高程与导流洞进口高程高差较小,传统的开挖方式工期长、投资影响较大且施工技术要求高。
发明内容
本实用新型目的在于提供一种水库导流洞回填改建泄洪洞的结构。
为实现上述目的,本实用新型采取下述技术方案:
本实用新型所述水库导流洞回填改建泄洪洞的结构,包括建设在水库坝体上的泄洪洞进口塔架,位于所述泄洪洞进口塔架下游侧的坝体上设置有与泄洪洞进口塔架出水口衔接的导流洞首部隧洞段;位于泄洪洞进口塔架的检修门槽底部设置有封堵闸门,所述封堵闸门上方的检修门槽内设有检修门槽;所述导流洞首部隧洞段的底板上浇筑有二期回填混凝土,所述二期回填混凝土位于泄洪洞进口塔架内腔的高度等于所述封堵闸门的高度;位于导流洞首部隧洞段的二期回填混凝土顶面为朝着下游侧向下倾斜的弧面结构。
本实用新型优点在于较传统导流洞改建泄洪洞结构,避免了二次开挖泄洪洞,降低了施工难度和造价,经济易行且缩短了施工工期。尤其适用于中小型水库泄洪洞进口高程与导流洞进口高程高差较小的情况。
附图说明
图1是本实用新型的结构示意图。
具体实施方式
如图1所示,本实用新型所述水库导流洞回填改建泄洪洞的结构,包括建设在水库坝体1上的泄洪洞进口塔架2,位于所述泄洪洞进口塔架2下游侧的坝体1上设置有与泄洪洞进口塔架2出水口衔接的导流洞首部隧洞段3;位于泄洪洞进口塔架2的检修门槽4底部设置有封堵闸门5,所述封堵闸门5上方的检修门槽4内设有检修门槽6;所述导流洞首部隧洞段3的底板上浇筑有二期回填混凝土7,所述二期回填混凝土7位于泄洪洞进口塔架2内腔的高度等于所述封堵闸门5的高度;位于导流洞首部隧洞段3内的二期回填混凝土7的顶面为朝着下游侧向下倾斜的弧面结构8。

Claims (1)

1.一种水库导流洞回填改建泄洪洞的结构,包括建设在水库坝体上的泄洪洞进口塔架,其特征在于:位于所述泄洪洞进口塔架下游侧的坝体上设置有与泄洪洞进口塔架出水口衔接的导流洞首部隧洞段;位于泄洪洞进口塔架的检修门槽底部设置有封堵闸门,所述封堵闸门上方的检修门槽内设有检修门槽;所述导流洞首部隧洞段的底板上浇筑有二期回填混凝土,所述二期回填混凝土位于泄洪洞进口塔架内腔的高度等于所述封堵闸门的高度;位于导流洞首部隧洞段的二期回填混凝土顶面为朝着下游侧向下倾斜的弧面结构。
CN201420178159.8U 2014-04-14 2014-04-14 水库导流洞回填改建泄洪洞的结构 Expired - Lifetime CN203795398U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420178159.8U CN203795398U (zh) 2014-04-14 2014-04-14 水库导流洞回填改建泄洪洞的结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420178159.8U CN203795398U (zh) 2014-04-14 2014-04-14 水库导流洞回填改建泄洪洞的结构

Publications (1)

Publication Number Publication Date
CN203795398U true CN203795398U (zh) 2014-08-27

Family

ID=51377627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420178159.8U Expired - Lifetime CN203795398U (zh) 2014-04-14 2014-04-14 水库导流洞回填改建泄洪洞的结构

Country Status (1)

Country Link
CN (1) CN203795398U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317027A (zh) * 2015-04-28 2016-02-10 贵州省水利水电勘测设计研究院 一种组合式泄洪取水方法及其结构
CN105696528A (zh) * 2015-06-26 2016-06-22 孙孝仁 一种自动排洪排水淤泥坝的建筑方法
CN108560511A (zh) * 2018-06-15 2018-09-21 中国电建集团成都勘测设计研究院有限公司 放空洞与引水管结合布置结构
CN109440744A (zh) * 2018-12-24 2019-03-08 中国三峡建设管理有限公司 一种快速安全的自稳式导流洞临时封堵结构和方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317027A (zh) * 2015-04-28 2016-02-10 贵州省水利水电勘测设计研究院 一种组合式泄洪取水方法及其结构
CN105696528A (zh) * 2015-06-26 2016-06-22 孙孝仁 一种自动排洪排水淤泥坝的建筑方法
CN108560511A (zh) * 2018-06-15 2018-09-21 中国电建集团成都勘测设计研究院有限公司 放空洞与引水管结合布置结构
CN108560511B (zh) * 2018-06-15 2023-09-08 中国电建集团成都勘测设计研究院有限公司 放空洞与引水管结合布置结构
CN109440744A (zh) * 2018-12-24 2019-03-08 中国三峡建设管理有限公司 一种快速安全的自稳式导流洞临时封堵结构和方法
CN109440744B (zh) * 2018-12-24 2023-12-19 中国三峡建工(集团)有限公司 一种快速安全的自稳式导流洞临时封堵结构和方法

Similar Documents

Publication Publication Date Title
CN203795398U (zh) 水库导流洞回填改建泄洪洞的结构
CN205205793U (zh) 一种利用导流隧洞改建的输水兼放空洞进口结构
CN110130394A (zh) 一种具有绿化功能的混凝土挡墙及其施工方法
CN212077859U (zh) 一种可用于导流、泄洪和放空的隧洞结构
CN204876019U (zh) 一种新老管线沟通的逆作法井
CN205399733U (zh) 一种装配剪力墙钢筋套筒连接两点同时注浆结构
CN105638383A (zh) 一种农田分段浇灌装置
CN204212168U (zh) 一种利用溶洞联合筑坝的大坝挡水结构
CN204401563U (zh) 一种低水头导流洞封堵挡水结构
CN204000874U (zh) 一种混凝土堵头回填灌浆的结构
CN205152918U (zh) 一种导流洞和泄洪洞结合的结构
CN105178268A (zh) 一种导流洞和泄洪洞结合的施工方法及结构
CN104164858B (zh) 实现高拱坝蓄水期下游不断流的导流隧洞分序封堵方法
CN103898880B (zh) 水库导流洞回填改建泄洪洞的方法
CN203729280U (zh) 一种低水头导流洞封堵下闸挡水结构
CN205062764U (zh) 一种用于泄放高水头大流量隧洞的双闸门结构
CN109371914B (zh) 一种便于后期改建的泄水渠结构
CN210263095U (zh) 初中期导流洞全洞段检修围堰结构
CN209482271U (zh) 一种由导流洞改建的泄洪洞进水口结构
CN108677892B (zh) 导流洞施工支洞用作生态供水洞的改造结构
CN205088684U (zh) 河床部位地质缺陷处临时灌浆廊道
CN205314091U (zh) 一种治理浅层滑坡的压力注浆集束式微型钢管桩结构
CN109469027A (zh) 一种由导流洞改建的泄洪洞进水口结构
CN105484274A (zh) 高压旋喷桩与集束式微型钢管桩相结合的浅层滑坡治理方法
CN110080180B (zh) 与永久堵头结合的改建生态放水洞结构及其布置方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827