CN203790633U - Composite regulation and storage pre-sedimentation tank - Google Patents

Composite regulation and storage pre-sedimentation tank Download PDF

Info

Publication number
CN203790633U
CN203790633U CN201420196122.8U CN201420196122U CN203790633U CN 203790633 U CN203790633 U CN 203790633U CN 201420196122 U CN201420196122 U CN 201420196122U CN 203790633 U CN203790633 U CN 203790633U
Authority
CN
China
Prior art keywords
region
water
regulation
sedimentation
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420196122.8U
Other languages
Chinese (zh)
Inventor
高小涛
赵富旺
马会珍
刘建红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420196122.8U priority Critical patent/CN203790633U/en
Application granted granted Critical
Publication of CN203790633U publication Critical patent/CN203790633U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a composite regulation and storage pre-sedimentation tank which comprises a tank body. The tank body sequentially comprises a sedimentation region, a water distribution region, a regulation and storage region and a flow-out region from left to right, the sedimentation region, the water distribution region, the regulation and storage region and the flow-out region are communicated with one another, the sedimentation region is communicated with a raw water inlet pipe, and the flow-out region is communicated with a water outlet pipe. A flow guide wall is arranged between the sedimentation region and the water distribution region, a water distribution perforated wall is arranged between the water distribution region and the regulation and storage region, and an overflow wall is arranged between the regulation and storage region and the flow-out region. A trussed sludge scraping and sucking machine is arranged at the bottom inside the sedimentation region, a sludge discharging groove is formed in one end of the sedimentation region, a sludge discharging pipe communicated with the external is arranged at the bottom of the sludge discharging groove, and a sludge discharging pump is arranged on the sludge discharging pipe. The composite regulation and storage pre-sedimentation tank has the advantages that the composite regulation and storage pre-sedimentation tank has good sedimentation, regulation and storage functions and can deal with poor working conditions such as high-turbidity water or sand peaks and maintenance outage of a water intake pumping station; due to the good regulation and storage functions, the composite regulation and storage pre-sedimentation tank meets the requirements for continuous water supply, fully guarantees the water supply guarantee rate of water purification plants, and enhances water safety of users.

Description

The compound preliminary sedimentation tank of regulating and storing
Technical field
The utility model relates to water treatment facilities technical field, especially relates to a kind of compound preliminary sedimentation tank of regulating and storing.
Background technology
When former cement bonded sand content is higher or turbidity is higher, adopt conventional primary sedimentation to be often difficult to meet precipitation water outlet requirement.Process that ultra is general adopts two kinds of methods, a kind of is to arrange to regulate structures (regulating reservoir), with avoid high turbid during water intaking; Another kind is to adopt two-stage precipitation, sets up preliminary sedimentation tank, to remove most of silt particle before conventional sedimentation basin more.The mode of regulating reservoir is set, often needs to rely on natural landform, in Practical Project, be usually restricted.The form of preformed precipitate structures is set, and the application in Practical Project is comparatively general.Common preformed precipitate structures have flat flow preliminary sedimentation tank, swash plate (pipe) preliminary sedimentation tank, water-power whirling clarifier, setting pot etc., these several preliminary sedimentation structures all have common deficiency, the effect of not regulating and storing, when sand peak or turbidity easily occur to stop up and alluvial during higher than design water inlet value, again the cycle of coming into operation after having an accident is longer, affects water supply security.For the larger ultra of sand content, often, in sand content sharp increase in flood season, the oncoming force is violent, variation is fast, and the husky peak duration is long.Water factory is in order to meet the water supply fraction of the 90%-97% of < < Code for design of outdoor water supply engineering > > (GB 50013-2006) requirement, conventionally need to store certain water yield, to solve under husky peak phase or water plant accident such as cut off the water at the bad condition, the problem of water supply fraction.The volume that the common pond of regulating and storing needs is larger, can be by quiet heavy removal part silt or impurity, but sedimentation effect is undesirable, and need to have larger deposition volume and reliable spoil disposal facility.In Practical Project, conventional sludge discharge way is for regularly stopping transport storage pond, and emptying, carries out labor cleaning's bed mud, and this mode need to expend a large amount of manpowers, and the operational reliability of engineering is had to larger harmful effect.
Summary of the invention
The utility model object is to provide a kind of can give full play to the compound preliminary sedimentation tank of regulating and storing of regulating and storing and precipitating function.
For achieving the above object, the utility model can be taked following technical proposals:
The compound preliminary sedimentation tank of regulating and storing described in the utility model, comprises pond body; Described pond body comprises settling zone, the water distributing area being interconnected, the He Chuliu district, district that regulates and stores from left to right successively, and described settling zone is connected with former water water inlet pipe, and described Chu Liu district is connected with outlet pipe; Between described settling zone and water distributing area, be provided with training wall, in water distributing area with regulate and store and be provided with water distribution tracery wall between district, between He Chuliu district, district, be provided with overflow wall regulating and storing; At described settling zone inner bottom part, be provided with purlin car formula scraping and sucking machine, in one end, settling zone, be provided with mud drainage slot, described mud drainage slot bottom is provided with the discharge pipeline being connected with outside, on described discharge pipeline, is provided with sludge pump.
On described mud drainage slot top, offer spout hole, described spout hole with described in the district that regulates and stores be connected.
The utility model advantage is to have good precipitation and the effect of regulating and storing, and can tackle ultra or sand peak and water intake pumping station and shut down the bad operating modes such as maintenance; The effect of regulating and storing that it is good, has not only met the requirement of continuous water supply, and fully guarantees the water supply fraction of water treatment plant, has increased user's water safety.
At settling zone configuration training wall, improve hydraulic flow state, reduce settling zone load, improve deposition efficiency; In the district that regulates and stores, adopt overflow water distribution, stationary flow, the regulate and store precipitation in district of strengthening, arranges overflow wall at the district's end of regulating and storing and blocks mud, effectively reduces the generation that mud phenomenon is run in bottom.
By purlin car formula scraping and sucking machine, mud drainage slot and sludge pump are set, can carry out effectively collecting and automation eliminating to the bed mud of body mud accumulation area, pond, when making it possess good sludge discharge effects, also the harmful effect of having avoided pond body emptying to cause engineering operation fraction, and the artificial spent a large amount of manpowers of periodic cleaning bed mud.
By the spout hole of offering on mud drainage slot top, can effectively recycle spoil disposal clear liquid waterborne, reach the object of saving water resource, there is important economic implications.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is that the A-A of Fig. 1 is to cutaway view.
The specific embodiment
As shown in Figure 1, 2, the compound preliminary sedimentation tank of regulating and storing described in the utility model, comprises pond body; Described pond body comprises settling zone 1, the water distributing area 2 being interconnected, the 3 He Chuliu districts 4, district that regulate and store from left to right successively, and described settling zone 1 is connected with former water water inlet pipe 5, and described Chu Liu district 4 is connected with outlet pipe 6; Between described settling zone 1 and water distributing area 2, be provided with training wall 7, in water distributing area 2 with regulate and store and be provided with water distribution tracery wall 8 between district 3, between 3 He Chuliu districts 4, district, be provided with overflow wall 9 regulating and storing; At described settling zone 1 inner bottom part, be provided with purlin car formula scraping and sucking machine 10, in settling zone, 1 one end is provided with mud drainage slot 11, and described mud drainage slot 11 bottoms are provided with the discharge pipeline 12 being connected with outside, on described discharge pipeline 12, are provided with sludge pump 13; On described mud drainage slot 11 tops, offer spout hole 14, described spout hole 14 with described in the district 3 that regulates and stores be connected.
Its operation principle is: former water is entering settling zone 1 through former water water inlet pipe 5, and the water conservancy diversion through training wall 7, enters water distributing area 2, and then the current stabilization effect through water distribution tracery wall 8 enters the district 3 that regulates and stores, then passes through overflow wall 9 Zhi Chuliu districts 4, finally by outlet pipe 6, is flowed out; Former water enters behind settling zone 1, the impurity particle Gai districts such as the silt in water are precipitated to body bottom, pond, then by purlin car formula scraping and sucking machine 10, bed mud is collected and is delivered to mud drainage slot 11, spoil disposal water in mud drainage slot 11 quiet heavy after, after sludge pump 13 extractions of bed mud by mud drainage slot 11 bottoms, through discharge pipeline 12, discharge pond body, supernatant is back to through spout hole 14 district 3 that regulates and stores again.

Claims (2)

1. the compound preliminary sedimentation tank of regulating and storing, comprises pond body; It is characterized in that: described pond body comprises settling zone (1), water distributing area (2), the district that regulates and stores (3) He Chuliu district (4) that are interconnected from left to right successively, described settling zone (1) is connected with former water water inlet pipe (5), and described Chu Liu district (4) is connected with outlet pipe (6); Between described settling zone (1) and water distributing area (2), be provided with training wall (7), between water distributing area (2) and the district that regulates and stores (3), be provided with water distribution tracery wall (8), between the district that regulates and stores (3) He Chuliu district (4), be provided with overflow wall (9); In described settling zone (1), inner bottom part is provided with purlin car formula scraping and sucking machine (10), in settling zone, (1) one end is provided with mud drainage slot (11), described mud drainage slot (11) bottom is provided with the discharge pipeline (12) being connected with outside, is provided with sludge pump (13) on described discharge pipeline (12).
2. the compound preliminary sedimentation tank of regulating and storing according to claim 1, is characterized in that: on described mud drainage slot (11) top, offer spout hole (14), described spout hole (14) with described in the district (3) that regulates and stores be connected.
CN201420196122.8U 2014-04-22 2014-04-22 Composite regulation and storage pre-sedimentation tank Expired - Lifetime CN203790633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420196122.8U CN203790633U (en) 2014-04-22 2014-04-22 Composite regulation and storage pre-sedimentation tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420196122.8U CN203790633U (en) 2014-04-22 2014-04-22 Composite regulation and storage pre-sedimentation tank

Publications (1)

Publication Number Publication Date
CN203790633U true CN203790633U (en) 2014-08-27

Family

ID=51372908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420196122.8U Expired - Lifetime CN203790633U (en) 2014-04-22 2014-04-22 Composite regulation and storage pre-sedimentation tank

Country Status (1)

Country Link
CN (1) CN203790633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106975252A (en) * 2017-05-10 2017-07-25 扬州大学 The diamond-shaped perforations water distribution tracery wall and its method for rectifying of a kind of water intake pumping station preliminary sedimentation aeration tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106975252A (en) * 2017-05-10 2017-07-25 扬州大学 The diamond-shaped perforations water distribution tracery wall and its method for rectifying of a kind of water intake pumping station preliminary sedimentation aeration tank
CN106975252B (en) * 2017-05-10 2022-05-17 扬州大学 Rhombic perforated water distribution tracery wall of pre-settling aeration tank of water intake pump station and rectification method thereof

Similar Documents

Publication Publication Date Title
CN101564609B (en) Vortex grid clarifying pool and clarifying method for enhancing clarifying effect of coagulation reaction in water treatment
CN104174191A (en) Integrated grit chamber for treating rainwater and treatment method
CN102424488B (en) Integrated-process rural water purifier based on micro-eddy flocculation
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN203878648U (en) Multifunctional rainwater collecting system
CN107352592A (en) Marble sewage disposal production line
CN203790633U (en) Composite regulation and storage pre-sedimentation tank
CN204275574U (en) A kind of anti-sewage precipitation device turning over mud
CN204609935U (en) A kind of overflow is from the tailings oar sand storehouse of process
CN204569607U (en) A kind of quick dewatering machine and the Sewage treatment systems based on quick dewatering machine
CN219751997U (en) Novel reverse osmosis wisdom operation high-efficient recovery device
CN204134279U (en) The sludge drainage system of efficient concentration sedimentation basin
CN203989972U (en) Integrated grit chamber for treating rainwater
CN109162342A (en) Intelligent more lattice rain dirt Vatch basins
CN205421384U (en) Groundwater mining of sports field job site and cyclic utilization system
CN205188014U (en) Wet flue gas desulfurization effluent treatment plant of thermal power plant
CN204474470U (en) A kind of plating industry sewage treatment unit
CN204676634U (en) A kind of rainwater stores up recycling device
CN204224348U (en) Tandem type double-layer horizontal sedimentation tank
CN204251376U (en) A kind of small-sized air-floating apparatus
CN203976527U (en) Deleading equipment for lead storage battery waste water
CN202666572U (en) Settling tank with running mode capable of being changed
CN206735895U (en) The precipitation return-flow structure of activated sludge in a kind of sewage disposal system
CN203701248U (en) Comprehensive recycling device for waste water resource of thermal power plant
CN101940855A (en) Dehydration method of high magnetic ore pulp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827