CN203784631U - LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station - Google Patents

LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station Download PDF

Info

Publication number
CN203784631U
CN203784631U CN201420052671.8U CN201420052671U CN203784631U CN 203784631 U CN203784631 U CN 203784631U CN 201420052671 U CN201420052671 U CN 201420052671U CN 203784631 U CN203784631 U CN 203784631U
Authority
CN
China
Prior art keywords
lng
arm
filling station
materials handling
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420052671.8U
Other languages
Chinese (zh)
Inventor
张梅梅
许爱峰
李宁
林敏�
杨晓明
李明
龚坚
陶春辉
刘志仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hai Qi Gang Hua Gas Development Co Ltd
Original Assignee
Jiangsu Hai Qi Gang Hua Gas Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hai Qi Gang Hua Gas Development Co Ltd filed Critical Jiangsu Hai Qi Gang Hua Gas Development Co Ltd
Priority to CN201420052671.8U priority Critical patent/CN203784631U/en
Application granted granted Critical
Publication of CN203784631U publication Critical patent/CN203784631U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model relates to an LNG (Liquefied Natural Gas) loading/unloading device of an overwater natural gas filling station. The LNG loading/unloading device is characterized by comprising an LNG loading/unloading arm, an LNG storage tank, an LNG hose and a power distribution system of the whole device, which are all arranged on a deck, wherein the LNG loading/unloading arm comprises a vertical pole, a rotating shaft box, a support box, an LNG transmission pipeline, an emergency release device, a hydraulic oil cylinder, a three dimensional joint and a rope wheel; rotary joints and rotary supports are arranged at the top of the vertical pole so that the loading/unloading arm can rotate in the horizontal direction; the rotating shaft is arranged between the vertical pole and the support box so that the loading/unloading arm can rotate in the vertical direction; the three dimensional joint comprises three rotary joints and a pipe fitting which are used for the swing and rotation of a ship; and the LNG hose mainly comprises a protection layer, a corrugated inner pipe, a corrugated outer pipe, a vacuum thermal insulating layer and a connecting joint.

Description

A kind of rock gas filling station LNG materials handling equipment waterborne
Technical field
The utility model relates to a kind of LNG materials handling equipment, relates in particular to a kind of rock gas filling station LNG materials handling equipment waterborne, belongs to filling landing stage technical field.
Background technique
Whole world low-carbon (LC) and reduction of discharging trend will, shipping business is pushed the teeth of the storm to, use LNG Liquefied natural gas (LNG) day by day to receive publicity in Europe, the U.S. and Asia as bunker fuel, the progress that Chuan Jian mechanism and R&D institution are devoted to promotion " oil changes gas " wins initial success.As a whole, LNG has become one of the most promising shipping technology as high-efficiency cleaning fuel peculiar to vessel, has good economy and environmental protection effect for ship power system, also contributes at home national energy structural adjustment.Flourish the making of shipping in China economy grown with each passing day to the demand of this clean energy resource of LNG, LNG low temperature materials handling equipment are as the ring in LNG industrial chain, no matter be from its status size, or from the viewpoint of its value, be a very small part in LNG chain link in fact.But at the whole low temperature conveying process of LNG, particularly, on the node of handling transhipment, but having the important function can not be substituted.The key link that LNG handling operation is marine and inland water transport is initial or stop, it uses the sound development that directly affects liquefied natural gas transport cause reliably, and boats and ships are used to the application of LNG fuel, the safe utilization of LNG Liquefied natural gas is played to decisive role.
Along with the rapid growth of the new shipbuilding of domestic LNG fuels and energy and transformation ship, in the Changjiang river, the boats and ships of the inland waterway navigation such as canal, Hangzhoupro, capital are increasing to the demand of LNG filling supply.At present, domestic Duo Jia unit is just preparing at inland harbour harbour newly-built LNG filling landing stage or filling harbour.Compared with the filling of bank base, the uncertainty of filling waterborne landing stage filling operation has increased operating risk.Shore facilities is for relatively maintaining static, and landing stage filling operation is subject to the ectocines such as weather, wave, ocean current, the uncontrollable factor of safety increases greatly, and contingency occurrence probability is corresponding increase also, and LNG filling waterborne landing stage selects reliable, safe, economic materials handling equipment particularly important.According to the market demand, during small-sized LNG cargo ship and LNG filling ship being are also actively are being researched and developed, related specifications and law need further research.After LNG cargo ship alongside harbour, LNG materials handling equipment couple together the handling pipeline of boats and ships and harbour, transmit thereby realize from harbour to ship or to the LNG of harbour.Common each filling station, filling are at least furnished with 2 cover materials handling equipment on landing stage, are respectively used to gas phase and liquid phase transmission, and future 5 years is domestic quite large to the demand of LNG materials handling equipment.The decapacitation of LNG materials handling equipment realizes outside basic conveying function, also has continuously, sealing, feature efficiently.Package unit is high to technological process automation, safety and environmental requirement.Although domestic increasing equipment manufacturer starts to pay close attention to LNG materials handling equipment, the LNG materials handling equipment of current sphere cover bore or all dependence imports.Development course to LNG materials handling equipment peculiar to vessel, application standard, structural feature and correlation technique are launched to summary below., the forms such as LNG handling arm, oil filling riser, flexible pipe and bracket are analyzed.For the fast development of current LNG materials handling equipment, a kind of new technological scheme of exigence solves the problems of the technologies described above.
Summary of the invention
The utility model, just for the technical problem existing in prior art, provides a kind of structural design ingenious, easy to operate rock gas filling station LNG materials handling equipment waterborne, and this technological scheme dismounting is easy to maintenance, and cost is low, uses flexibly.
To achieve these goals, the following a kind of rock gas filling station LNG materials handling equipment waterborne of the technical solution of the utility model, it is characterized in that, described materials handling equipment comprise the electrical distribution system that installation LNG above deck loads and unloads arm, LNG storage tank, LNG flexible pipe, whole equipment.Described LNG handling arm comprises column, rotating shaft case, support box, LNG conveyance conduit, emergency separating device, hydraulic jack, Three dimensional joint and rope sheave; The top of described column is swivel joint and pivoting support, for handling arm provides horizontal rotation motion, described rotating shaft case is arranged between column and support box, being used for making to load and unload arm rotatablely moves to Vertical direction, described Three dimensional joint is contained in the outer arm end of handling arm, described Three dimensional joint comprises three swivel joints and pipe fitting, waving and rotating for boats and ships.
As a kind of improvement of the present utility model, on described Three dimensional joint, be also provided with quick connector, described quick connector is connected with the header flange of being noted on ship or tender.
As a kind of improvement of the present utility model, described handling arm is equipped with three hydraulic driving oil cylinders, is respectively used to drive outer arm, inner arm and horizontally rotates.
As a kind of improvement of the present utility model; described LNG flexible pipe is mainly made up of protective layer, ripple inner tube, corrugated outer tube, vacuum heat-insulating layer, jointing; ripple inner and outer pipes is spirality or annular thin wall corrugated stainless steel tubing, and to be net formed by certain parameter braiding by Stainless Steel Wire or steel band or silk ribbon protective layer.
As a kind of improvement of the present utility model, between described net and bellows, be provided with jointing, described jointing is divided into thread type, flange-type and Quick-action type.
As a kind of improvement of the present utility model, described LNG flexible pipe is provided with urgent Pull breaking ualve on also, and described Pull breaking ualve two ends are provided with dry type cut-off valve.
As a kind of improvement of the present utility model, LNG flexible pipe entirety adopts 1Cr18Ni9Ti stainless steel material to make.
As a kind of improvement of the present utility model, on described LNG storage tank, arrange LNG device for detecting temperature is set in purge system, high liquid level warning and shutoff device, storage tank, level meter is set on storage tank, the liquid level synchronous signal of reporting to the police immediately when high-order feeds back to control room immediately, by control room or be automatically responsible for closing liquid feed valve.
As a kind of improvement of the present utility model, described filling station electrical distribution system is located on landing stage in power distribution station, primary power supply is gas engine power generating source in rock gas, standby power supply is bank electricity, the power receiving equipment sub-power of loading system is subject to electricity and controls power supply to be subject to electric two-part, and power is subject to electricity for goods control chamber adds gas holder, gas holder, handling arm control cabinet are unloaded in control room.
With respect to prior art, the beneficial effects of the utility model are as follows: 1) rock gas filling station LNG materials handling equipment structural design waterborne is ingenious reliable, easy to use, and cost is low; 2) greatly reduce fuel cost; Reduce logistics transportation cost.Rock gas is with the calorific value rate of exchange far below oil, and therefore LNG boats and ships, than using petrol and diesel oil fuel saving expense to exceed 30%, have the stronger market competitiveness.According to statistics, approximately 203.08 yuan/hundred Wan Yingre of annual East China 0# diesel oil average price in 2011, and LNG price is only 113.24 yuan/hundred Wan Yingre, is equivalent to 55.76% of diesel-fuel price.If can calculate by loss-rate 3:7 according to diesel oil and LNG, the fuel cost of LNG mixed power boats and ships, is only that tradition is all used 69% of diesel ship fuel cost; 3) significantly reduce energy consumption; Shipping enterprise all wishes that shiphoard machinery system has the energy use efficiency of good power, the best, to reduce vessel motion cost.Compare diesel oil and other alternative energy sources, the Ship Power Equipment taking rock gas as fuel has the power index substantially equal with diesel engine.Other alternative energy source power plant also cannot become the major impetus of boats and ships at present, can only be as a supplement and auxiliary power.The cost price of natural gas engine unit capacity, lower than diesel engine, cost advantage is obvious.Taking the diesel oil sold at present and LNG Gas Prices as example, current LNG Gas Prices per ton is about 80% of diesel-fuel price per ton.According to the difference of substitute gas diesel oil usage ratio (50~100%), use rock gas than the fuel cost that uses diesel oil saving (15~30%), and combustion of natural gas is thorough, is difficult for carbon distribution, can also reduce maintenance cost.Promote the application of LNG fuel on boats and ships, meet national industrial policies, to optimizing China's field of traffic energy resource structure, promote high efficiency of energy utilization, realize target for energy-saving and emission-reduction and there is important strategic importance and realistic meaning; 4) reducing emission of carbon dioxide, oxygen sulfur compound, oxynitrides, and noise pollution, flue dust, waste oil water discharge etc. also can reduce greatly.The main component of rock gas is methane, is a kind of clean, efficient green energy resource.Development LNG fuels and energy ship, has good positive role to improving urban air-quality, river water quality and shore-environment protection.Adopt LNG fuel can reduce by 10%~20% CO2 discharge amount, 90% NOX discharge amount, 100% sulphide and granular material discharged, the carcinogens such as except conventional pollutant emission significantly reduces, LNG boats and ships are not leaded in discharging, benzene.And LNG fuel main frame does not need lubricant oil cleaning equipment is installed, internal environment is better.Therefore, formula LNG filling in landing stage waterborne is an environment-friendly engineering, along with constantly constructing and implementing of Natural Gas Projects, will reduce widely the discharge amount of flue dust in atmosphere, dust, sulfur dioxide, carbon dioxide, nitrogen oxide, greatly improve local environment pollution situation, improve environmental quality, create good live and work environment, its environmental benefit will be considerable.
Brief description of the drawings
Fig. 1-1 LNG handling arm configuration schematic diagram.
Fig. 1-2 LNG handling arm side structure schematic diagram.
Fig. 2 LNG storage tank for ship plan view.
Fig. 3-1 LNG storage tank for ship side view.
LNG storage tank for ship another side, Fig. 3-2 side view.
Fig. 4 LNG storage tank for ship saddle foundation drawing.
Fig. 5 vacuum metal bellows.
Fig. 6 flexible pipe connection diagram.
Fig. 7 distribution system diagram.
In figure: 1, column, 2, rotating shaft case, 3, support box; 4, LNG conveyance conduit, 5, hydraulic jack 6, emergency separating device, 7, Three dimensional joint; 8, rope sheave, 10, protective layer, 11, corrugated outer tube; 12, ripple inner tube, 13, vacuum heat-insulating layer, 14, jointing; 15, connect short tube, 16, urgent Pull breaking ualve, 17, limiting stopper; 18, thermal baffle, 19, storage tank lower support.
Embodiment
In order to deepen, to understanding and cognition of the present utility model, below in conjunction with the drawings and specific embodiments, the utility model to be made further instructions and introduced.
embodiment 1:referring to Fig. 1-1-Fig. 4, a kind of rock gas filling station LNG materials handling equipment waterborne, described materials handling equipment comprise the electrical distribution system that installation LNG above deck loads and unloads arm, LNG storage tank, LNG flexible pipe, whole equipment, and described LNG handling arm comprises column 1, rotating shaft case 2, support box 3, LNG conveyance conduit 4, emergency separating device 6, hydraulic jack 5, Three dimensional joint 7 and rope sheave 8; Column is the vertical support member of handling arm, be arranged on and on harbour or ship, be used for supporting handling arm and provide and the tie point of on-the-spot pipeline, the top of described column 1 is swivel joint and pivoting support, for handling arm provides horizontal rotation motion, described rotating shaft case 2 is arranged between column 1 and support box 3, being used for making to load and unload arm rotatablely moves to Vertical direction, described Three dimensional joint 7 is contained in the outer arm end of handling arm, described Three dimensional joint 7 comprises three swivel joints and pipe fitting, waving and rotating for boats and ships.LNG conveyance conduit on handling arm is used for carrying LNG, between pipeline and support, adopts cold insulation to support isolation.Emergency separating device makes to load and unload arm and the quick device separating of boats and ships under urgent motion state; can play the effect of protection operator and equipment; be located near on the vertical pipeline between the swivel joint of two of joints, such being provided with is beneficial to the execution that departs from running.Handling arm is equipped with three hydraulic jacks, is respectively used to drive outer arm, inner arm and horizontally rotates.The filler that LNG is noted ship may not mate with the interface of handling arm, need on filling ship, be equipped with the reducer union that is applicable to be noted ship, and the material of reducer union is low temperature resistant; There is suitable pad in case LNG leaks; Joint will adapt to load and unload quick connection and the release of arm.
embodiment 2:referring to Fig. 1-1, Fig. 1-2, as a kind of improvement of the present utility model, on described Three dimensional joint 7, be also provided with quick connector, described quick connector is connected with the header flange of being noted on ship or tender.All the other structures and advantage are identical with embodiment 1.
embodiment 3:referring to Fig. 1-1, Fig. 1-2, as a kind of improvement of the present utility model, described handling arm is equipped with three hydraulic driving oil cylinders 5, is respectively used to drive outer arm, inner arm and horizontally rotates.All the other structures and advantage are identical with embodiment 1.
embodiment 4:referring to Fig. 2-Fig. 4, the cabin type that the landing stage LNG that can be used as annotating stores comprises SPB type cabin, C type cabin and the film type cabin in independent tank type.For multiplex filling landing stage, current China inland river, C type cabin all has advantage technically with in Ji, is optimum selection.Advantage is that voltage endurance capability is strong, design, manufactures ripely, and easy for installation, cost is relatively low, and shortcoming is that to take space, cabin large.LNG storage tank must be taked adiabatic measure, and the one, reduce owing to leaking thermogenetic BOG amount, the 2nd, protect hull structure around to avoid low temperature injury.C type cabin can be divided into two classes according to adiabatic form again: the double-walled storage tank of vacuum insulation type, the single wall storage tank of polystyrene foam heat insulation-type.For being less than 1000m 3c type cabin, because its surface to volume ratio is relatively large, if adopt individual layer tank skin foam insulation, so, reach satisfied relative evaporation requirement if want, the heat insulation layer thickness needing is blocked up, so adopt vacuum insulation comparatively reasonable.Present stage, the single tank capacity on filling landing stage can not exceed 1000m 3so from Security, operability, technical feasibility, relative evaporation, Economy, can reach the aspects such as capacity and consider, vacuum insulation type C type tank is relatively applicable to LNG filling landing stage.The risk control measure of filling landing stage LNG storage tank comprises: tank designs will be considered boats and ships load; May catch tray be set leak position; Storage tank is arranged should be as far as possible away from the impaired position of possibility; Storage tank should arrange the thermal radiation of the isolated outside fire of Water spray projecter system around; Should consider the thermal stress of liquid-phase tube; Emergency separating device or Pull breaking ualve should be set on filler pipe; Storage tank should arrange purge system; Should set and rationally fill the limit, and high liquid level warning and shutoff device are set; Storage tank planted agent arranges LNG device for detecting temperature.All the other structures and advantage are identical with embodiment 1.
embodiment 5:referring to Fig. 5; as a kind of improvement of the present utility model; described LNG flexible pipe is mainly made up of protective layer 10, ripple inner tube 12, corrugated outer tube 11, vacuum heat-insulating layer 13, jointing 14; ripple inner and outer pipes is spirality or annular thin wall corrugated stainless steel tubing, and to be net formed by certain parameter braiding by Stainless Steel Wire or steel band or silk ribbon protective layer.The bellows of flexible pipe is to be processed to form through highi degree of accuracy plastic deformation by seamless or longitudinal seam stainless-steel thin-wall pipe as thin as a wafer, the elastic characteristic of bellows profile has determined flexibility and the fatigue resistance of flexible pipe, metallic hose easily absorbs various motion deformations and cyclic loading, especially can meet compensation that system needs larger displacement motion, thermal expansion absorption, the shock absorption to pipe-line system and play an important role.
Conventionally, bit shift compensation amount bigger than normal use occasion high for motion frequency, recommends to select the flexible pipe of wire sets establishment; The use occasion low for motion frequency, bit shift compensation amount is less than normal, recommends to select the flexible pipe of steel band net braiding, and the length of flexible pipe is determined after can calculating according to the size of its minimum bending radius and required bit shift compensation angle.In addition, for handling frequency higher, drift or draft variable quantity larger, should adopt the flexible pipe of flexible wire sets preferably establishment.Otherwise, can adopt the flexible pipe of the stronger steel band net of rigidity establishment.Although compared with the metallic hose that the metallic hose of net sleeve woven with steel wire is worked out net with steel band, its softness is far better, it also has Some features, drags etc. if not wear-resisting, not resistance to.Produce damage in order to prevent net part and deck hard grind under moving condition, can below flexible pipe, tie the similarly thing such as pad tire, also can the dolly with universal caster wheel be set at that local location of hose movement amount maximum.
Metallic hose can not produce under certain conditions fracture or blast because of aging as rubber pipe, but its fatigue stress exceedes bellows fatigue limit, also may occur causing leakage by crackle.In order to prevent the generation of this class accident, must ensure that, under moving condition, its minimum bending radius must not be less than rating value.Bearing the use occasion that bit shift compensation amount is larger, the flexible member of its joint area and rigid pipe joining place, can arrange and lengthen sleeve pipe or protection spring, if desired, also can consider the special hanging of collecting folk songs.All the other structures and advantage are identical with embodiment 1.
embodiment 6:as a kind of improvement of the present utility model, between described net and bellows, be provided with jointing 14, described jointing is divided into thread type, flange-type and Quick-action type.Jointing guarantee medium is worked normally in pipe-line system.The material of joint is conventionally identical with the material of bellows, net, is main mainly with stainless steel.For reducing production costs, the larger metallic hose of some latus rectums is in the time carrying the strong or non-corrosiveness medium of corrosivity, and joint can be made of carbon steel; For the joint of the metallic hose under Korrosionsmedium working condition, if take corresponding measure in design, avoid and the contacting of medium, also can adopt carbon steel to make.The structural type of joint is divided into thread type, flange-type and Quick-action type three major types substantially: (1) thread type: latus rectum is the joint of 50 millimeters of following metallic hoses, in the situation that bearing compared with high workload pressure, be main mainly with thread type, after threaded together, inside and outside tapering face on two joints closely cooperates, and realizes sealing.This sealing structure is good, but must ensure the concentricity of two interfacing parts while installing.In order to solve the disassemble or assemble repeatedly of often seeing in Practical Project and to be difficult for the problems such as concentric, also joint design can be become to coordinating of the conical surface and bulb.(2) flange-type: latus rectum is the joint of 25 millimeters of above metallic hoses, in the situation that bearing general work pressure, taking flange-type as main, the form that it coordinates with tongue-and-groove seals.Can radially rotate, the lap joint flange dish that also can slide axially links two bodies under the effect of clamping bolt pulling force.This sealing structure is functional, but difficulty of processing is large, and sealing surface is easily damaged.Needing the special occasions of quick-release, scratch in the hole that clamping bolt can be passed through, makes quick-disconnect flange plate.(3) Quick-action type: latus rectum is the joint that 100 millimeters of 100 millimeters of joints with bottom hose or latus rectums load and unload arm above, is requiring, under the service condition of handling fast, generally to adopt Quick-action type.After handgrip is moved certain angle, be equivalent to multiple-threaded pawl and refer to be locked; " O " shape seal ring is pressed tightlyer, and gas sealing ability is better.Within the time of several seconds, do not need any special tool of adapted, just can dock or take apart one group of joint.All the other structures and advantage are identical with embodiment 1.
embodiment 7:referring to Fig. 6, as a kind of improvement of the present utility model, described LNG flexible pipe is provided with urgent Pull breaking ualve on also, and described Pull breaking ualve two ends are provided with dry type cut-off valve.With handling arm emergency separating device function class seemingly, LNG flexible pipe should be furnished with urgent Pull breaking ualve, as shown in Figure 6.Pull breaking ualve can prevent the flexible pipe leakage accident causing that surprisingly ruptures, now be widely applied to and drawn together ship to shore unloading, the groove of highway, railway is canned to be unloaded and other are fixed and the field such as mobile fluid storage device, is also useful on being connected between oil filling riser, fluid conveying arm and transport agent.Pull breaking ualve can farthest have been guaranteed the Security in fluid conveying in LNG transmitting procedure.By a simple and unique design, in the time that flexible pipe has exceeded the capacity rating of operation system, be ultimate tension value, this system just can send report to the police and can be full automatic safety disconnect and without any leakage, ultimate tension value can not produce any damage to flexible pipe body.When its advantage is dangerous generation, guarantee to trigger, moment closure valve, few leakage and the relative little pressure loss.Break when mechanism should ensure " ejection escape ", make equipment can be automatically, depart from fast; Before ensureing again to depart from, there is " phase buffer ", while avoiding normal operation, occur " disengaging " affecting normal handling operation.Safe Pull breaking ualve is two designs, connects by 3 outside special bolts (card), and bolt (card) disconnects under the improper active force in outside, and the poppet valve of Pull breaking ualve inside, for automatically cutting out, ensures that liquid is without leakage.All the other structures and advantage are identical with embodiment 1.
embodiment 8:as a kind of improvement of the present utility model, LNG flexible pipe entirety adopts 1Cr18Ni9Ti stainless steel material to make.LNG flexible pipe major part material is Austenitic Stainless Steel, can ensure like this temperature tolerance and corrosion resistance that flexible pipe is good, the operating temperature range of flexible pipe is-196-600 DEG C, use flexible pipe by pipeline the low temperature properties of logical medium or corrosivity select the stainless steel of the different trades mark, guarantee the applicability of flexible pipe.Flexible pipe entirety adopts 1Cr18Ni9Ti stainless steel material to make, and has stronger corrosion resistance.Hose body is thin-wall stainless steel body fluid pressing formation, has that stronger pliability, stretchability, bending and vibration resistance are strong, the more protection of braiding net sleeve, makes it to have higher bearing capacity.The requirement that flexible pipe should meet manufacture (as being shaped, welding) and use with material.All the other structures and advantage are identical with embodiment 1.
embodiment 9:as a kind of improvement of the present utility model, purge system (not marking in figure), high liquid level warning and shutoff device (not marking in figure), storage tank planted agent are set on described LNG storage tank LNG device for detecting temperature is set, level meter is set on storage tank, the liquid level synchronous signal of reporting to the police immediately when high-order feeds back to control room immediately, by control room or be automatically responsible for closing liquid feed valve.All the other structures and advantage are identical with embodiment 1.
Referring to Fig. 7, as a kind of improvement of the present utility model, described filling station electrical distribution system is located on landing stage in power distribution station, primary power supply is gas engine power generating source in rock gas, standby power supply is bank electricity, the power receiving equipment sub-power of loading system is subject to electricity and controls power supply to be subject to electric two-part, and power is subject to electricity for goods control chamber adds gas holder, gas holder, handling arm control cabinet are unloaded in control room.Room lighting circuit all adopts ZRBV-450/750V to mould copper cash and wears the hard polyethylene pipe of flame retardant type along wall on the bank, ground, and top is dark to be applied or lays in furred ceiling.Cable laying on the bank all adopts ZRYJV-0.6/1kV type cable to wear galvanized welded pipe buried-pipe laying, and buried depth is not less than 0.8m, avoids tank car traffic route while burying underground as far as possible.On ship, cable laying all adopts CJS/SC 0.6/1kV type cable to wear galvanized welded pipe or crane span structure lays.Cable and equipment connecting part adopt wears explosion-proof flexible tube and joins.All the other structures and advantage are identical with embodiment 1.
The utility model can also combine at least one and embodiment 1 in technical characteristics described in embodiment 2,3,4,5,6,7,8,9, forms new mode of execution.
It should be noted that above-described embodiment is only preferred embodiment of the present utility model; be not used for limiting protection domain of the present utility model; being equal to replacement or substituting of having done on the basis of the above all belongs to protection domain of the present utility model, and protection domain of the present utility model is as the criterion with claims.

Claims (9)

1. rock gas filling station LNG materials handling equipment waterborne, it is characterized in that, described materials handling equipment comprise the electrical distribution system that installation LNG above deck loads and unloads arm, LNG storage tank, LNG flexible pipe, whole equipment, and described LNG handling arm comprises column, rotating shaft case, support box, LNG conveyance conduit, emergency separating device, hydraulic jack, Three dimensional joint and rope sheave; The top of described column is swivel joint and pivoting support, for handling arm provides horizontal rotation motion, described rotating shaft case is arranged between column and support box, being used for making to load and unload arm rotatablely moves to Vertical direction, described Three dimensional joint is contained in the outer arm end of handling arm, described Three dimensional joint comprises three swivel joints and pipe fitting, waving and rotating for boats and ships.
2. one according to claim 1 rock gas filling station waterborne LNG materials handling equipment, is characterized in that, are also provided with quick connector on described Three dimensional joint, and described quick connector is connected with the header flange of being noted on ship or tender.
3. one according to claim 1 and 2 rock gas filling station waterborne LNG materials handling equipment, is characterized in that, described handling arm is equipped with three hydraulic driving oil cylinders, is respectively used to drive outer arm, inner arm and horizontally rotates.
4. one according to claim 1 rock gas filling station waterborne LNG materials handling equipment; it is characterized in that; described LNG flexible pipe is mainly made up of protective layer, ripple inner tube, corrugated outer tube, vacuum heat-insulating layer, jointing; ripple inner and outer pipes is spirality or annular thin wall corrugated stainless steel tubing, and to be net formed by certain parameter braiding by Stainless Steel Wire or steel band or silk ribbon protective layer.
5. one according to claim 4 rock gas filling station waterborne LNG materials handling equipment, is characterized in that, between described net and bellows, be provided with jointing, described jointing is divided into thread type, flange-type and Quick-action type.
6. according to the rock gas filling station waterborne of the one described in claim 4 or 5 LNG materials handling equipment, it is characterized in that, described LNG flexible pipe is provided with urgent Pull breaking ualve on also, and described Pull breaking ualve two ends are provided with dry type cut-off valve.
7. one according to claim 4 rock gas filling station waterborne LNG materials handling equipment, is characterized in that, LNG flexible pipe entirety adopts 1Cr18Ni9Ti stainless steel material to make.
8. one according to claim 1 rock gas filling station waterborne LNG materials handling equipment, it is characterized in that, on described LNG storage tank, arrange LNG device for detecting temperature is set in purge system, high liquid level warning and shutoff device, storage tank, level meter is set on storage tank, the liquid level synchronous signal of reporting to the police immediately when high-order feeds back to control room immediately, by control room or be automatically responsible for closing liquid feed valve.
9. one according to claim 1 and 2 rock gas filling station waterborne LNG materials handling equipment, it is characterized in that, described filling station electrical distribution system is located on landing stage in power distribution station, primary power supply is the interior gas engine power generating source of rock gas in landing stage, standby power supply is bank electricity, the power receiving equipment sub-power of loading system is subject to electricity and controls power supply to be subject to electric two-part, and power is subject to electricity for goods control chamber adds gas holder, gas holder, handling arm control cabinet are unloaded in control room.
CN201420052671.8U 2014-01-27 2014-01-27 LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station Expired - Lifetime CN203784631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420052671.8U CN203784631U (en) 2014-01-27 2014-01-27 LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420052671.8U CN203784631U (en) 2014-01-27 2014-01-27 LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station

Publications (1)

Publication Number Publication Date
CN203784631U true CN203784631U (en) 2014-08-20

Family

ID=51320818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420052671.8U Expired - Lifetime CN203784631U (en) 2014-01-27 2014-01-27 LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station

Country Status (1)

Country Link
CN (1) CN203784631U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994320A (en) * 2014-01-27 2014-08-20 江苏海企港华燃气发展有限公司 LNG loading and unloading apparatus of overwater natural gas charging station
CN104806802A (en) * 2015-04-27 2015-07-29 连云港远洋流体装卸设备有限公司 Breaking valve for LNG (Liquefied Natural Gas)
CN107790987A (en) * 2017-11-08 2018-03-13 连云港远洋流体装卸设备有限公司 Suitable for harbour petroleum pipeline loading arm and the automatic butt method and apparatus of ship flange
CN110371256A (en) * 2019-08-08 2019-10-25 苏州瀚隆石化装备有限公司 A kind of ship-to-ship loading arm
CN111664353A (en) * 2020-05-09 2020-09-15 中国船舶重工集团公司第七一六研究所 LNG bank base intelligence loading and unloading arm
WO2021227337A1 (en) 2020-05-09 2021-11-18 中国船舶重工集团公司第七一六研究所 Lng large-caliber shore-based intelligent loading and unloading system
RU2791762C1 (en) * 2020-05-09 2023-03-13 Научно-Исследовательский Институт Автоматизации Цзянсу Heavy cargo onshore intelligent system for lng loading and unloading

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994320A (en) * 2014-01-27 2014-08-20 江苏海企港华燃气发展有限公司 LNG loading and unloading apparatus of overwater natural gas charging station
CN104806802A (en) * 2015-04-27 2015-07-29 连云港远洋流体装卸设备有限公司 Breaking valve for LNG (Liquefied Natural Gas)
CN107790987A (en) * 2017-11-08 2018-03-13 连云港远洋流体装卸设备有限公司 Suitable for harbour petroleum pipeline loading arm and the automatic butt method and apparatus of ship flange
CN107790987B (en) * 2017-11-08 2024-05-28 连云港远洋流体装卸设备有限公司 Automatic butt joint method and equipment suitable for loading and unloading arm of oil delivery pipe of wharf and ship flange
CN110371256A (en) * 2019-08-08 2019-10-25 苏州瀚隆石化装备有限公司 A kind of ship-to-ship loading arm
CN110371256B (en) * 2019-08-08 2024-03-08 苏州瀚隆石化装备有限公司 Ship-to-ship loading and unloading arm
CN111664353A (en) * 2020-05-09 2020-09-15 中国船舶重工集团公司第七一六研究所 LNG bank base intelligence loading and unloading arm
WO2021227337A1 (en) 2020-05-09 2021-11-18 中国船舶重工集团公司第七一六研究所 Lng large-caliber shore-based intelligent loading and unloading system
RU2791762C1 (en) * 2020-05-09 2023-03-13 Научно-Исследовательский Институт Автоматизации Цзянсу Heavy cargo onshore intelligent system for lng loading and unloading

Similar Documents

Publication Publication Date Title
CN203784631U (en) LNG (Liquefied Natural Gas) loading/unloading device of overwater natural gas filling station
CN103994320A (en) LNG loading and unloading apparatus of overwater natural gas charging station
US10197220B2 (en) Integrated storage/offloading facility for an LNG production plant
CN103672392A (en) Barge for filling liquefied natural gas
WO1998013556A1 (en) Method of production of large tank, system using such large tank and submerged tunneling method using the tank
CN203640865U (en) Moveable tank-type fuel supply system for LNG power-driven vessel
AU2014324072A1 (en) Expandable LNG processing plant
CN109969350A (en) Removable floating liquid goods is transferred maritime platform and method of transferring
CN202320725U (en) Liquefied gas transportation ship
CN101435524A (en) Submarine pipeline underwater flange seal protecting device
CN110239674A (en) Removable tandem floating liquid goods is transferred maritime platform and method of transferring
CN101628701B (en) Ship-type movable explosion-proof oiling device
CN202834732U (en) Liquefied natural gas filling wharf boat
CN201651636U (en) Abrasion resistant bent pipe
CN212745373U (en) Offshore oil conveying pipeline
CN103101604A (en) Liquefied gas transport ship
CN207394348U (en) Marine liquefied natural gas (LNG) production, storage, transfer device
WO2013083664A2 (en) Loading-offloading system for cng operations
CN102494207A (en) Novel seafloor water delivery pipe
CN209415033U (en) Marine liquefied natural gas storage platform system
WO2014086417A1 (en) Loading-offloading buoy for cng operations
CN212869357U (en) Double-barrelled loading and unloading arm of LNG
CN207407057U (en) The gas burning system on the multi-functional filling landing stage of aqueous hydrocarbon
CN206929552U (en) A kind of liquefied natural gas holding vessel
CN110239673A (en) Removable floating liquid goods with dynamic positioning device is transferred maritime platform and method of transferring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140820