CN203782751U - A compound structure combined-type plastic inspection shaft base - Google Patents

A compound structure combined-type plastic inspection shaft base Download PDF

Info

Publication number
CN203782751U
CN203782751U CN201420152275.2U CN201420152275U CN203782751U CN 203782751 U CN203782751 U CN 203782751U CN 201420152275 U CN201420152275 U CN 201420152275U CN 203782751 U CN203782751 U CN 203782751U
Authority
CN
China
Prior art keywords
shaft base
base body
well
pedestal
plastic inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420152275.2U
Other languages
Chinese (zh)
Inventor
武军
程剑
方四明
曹亚敏
蔡文清
张建军
鲜红
严胜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Efeng Die & Mold Co., Ltd.
Original Assignee
WUHAN YIMEITE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN YIMEITE MACHINERY CO Ltd filed Critical WUHAN YIMEITE MACHINERY CO Ltd
Priority to CN201420152275.2U priority Critical patent/CN203782751U/en
Application granted granted Critical
Publication of CN203782751U publication Critical patent/CN203782751U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a compound structure combined-type plastic inspection shaft base comprising a shaft cylinder base, a sealing ring, an upper shaft base body, a sealing tape, nuts, flat washers, bolts, a lower shaft base body, a sealing ring and a drainage pipe. The sealing tape is mounted in a sealing clamping groove of the upper end face of the lower shaft base body, with end faces provided with waterproof glue. The upper shaft base body is placed on the lower shaft base body in an aligned manner and the upper shaft base body and the lower shaft base body are connected and locked through nuts, bolts and flat washers. The sealing ring is mounted in a sealing clamping groove of the upper end face of the upper shaft base body, with end faces provided with waterproof glue. The shaft cylinder base is placed on the upper shaft base body in an aligned manner and the shaft cylinder base and the upper shaft base body are connected and locked through nuts, bolts and flat washers. The compound structure combined-type plastic inspection shaft base has the advantages of simple structure, reliable service performance, relatively low cost, good material adaptability, high function extension capability, simple manufacturing processes, relatively low investment of molding equipment, high production efficiency, and convenience for storage and transport.

Description

A kind of compound structure Assembled plastic inspection well seat
Technical field
The utility model relates to a kind of plastic inspection well seat, particularly a kind of compound structure Assembled plastic inspection well seat.
Background technology
Since entering 21 century along with the development of national economy, China's municipal engineering and residential quarter construction have entered a high speed development stage, continuous expansion and people's improving constantly quality of life requirement along with city size, tradition the thorough manhole of brick (being commonly called as inspection shaft) because of its construction period very long, working area is large, cracky seepage causes underground water secondary pollution, late maintaining expense is high, application life is short, maintenance and renovation difficulty, for producing the main building materials loam brick of the thorough manhole of brick, will consume every year the shortcomings such as a large amount of energy and earth's surface resource is denounced by each side always, especially under the situation of current structure " economy type " " environment-friendly type " society, the shortcoming of the thorough manhole of tradition brick seems and is even more important and gives prominence to, the thorough manhole of tradition brick can not meet the demand of Modern Urban Development.
Plastic inspection well has convenient and quick construction, good seal performance, can effectively prevent seepage, drainage effect is good, the recyclable recycling of material, environmental protection and energy saving and application life general more than 50 years.Because plastic inspection well can effectively make up the above-mentioned deficiency of the thorough manhole of traditional brick, and obtain the support energetically of national policy and various circles of society, just progressively substitute the thorough manhole of traditional brick, along with the awakening of realizing with people of implementing of national relevant policies, plastic inspection well industry can welcome vast potential for future development and the huge market space.On domestic market, plastic inspection well seat kind is more, various materials are as PVC, PP, PE etc., and various moulding process are as injection mo(u)lding; Rotation molding; Die casting, winding parts are welding fabrication again; Glass fiber reinforced plastic coat forming etc., but all ubiquity complex structure, difficult forming, function more single, production equipment is had relatively high expectations and is subject to the weakness such as former size restrictions, disposable input are large, production efficiency is lower, finished product stores, transportation inconvenience.
Utility model content
The purpose of this utility model be to provide a kind of simple in structure, functional performance reliable, cost is lower, adaptability for materials good, functions expanding is strong, manufacturing process simply, be not subject to the restriction of former dimensions, former drop into lower, production efficiency is high, be convenient to store, the compound structure Assembled plastic inspection well seat of transportation.
For achieving the above object, the utility model provides following technical scheme:
A compound structure Assembled plastic inspection well seat, comprising: pit shaft seat, sealing ring, upper well pedestal, band, nut, plain washer, bolt, go into the well pedestal and gutter; Described band is placed in the upper surface sealing draw-in groove of the pedestal of going into the well, and on end face painting water-proof adhesive; Described in described upper well pedestal alignment is placed on, go into the well on pedestal, and be connected locking with nut, bolt and plain washer; Described sealing ring is placed in well pedestal upper surface sealing draw-in groove, and on end face, coats marine glue; Described pit shaft seat alignment is placed on described upper well pedestal, and is connected locking with nut, bolt and plain washer.
The beneficial effects of the utility model: the utility model plastic inspection well holder structure is simple, functional performance is reliable, cost is lower, adaptability for materials good, functions expanding is strong, manufacturing process simply, be not subject to the restriction of former dimensions, former drop into lower, production efficiency is high, be convenient to store, transportation.Can effectively overcome other plastic inspection well holder structure complexity, difficult forming, function singleness, production equipment is had relatively high expectations and is subject to the weakness such as former size restrictions, production efficiency is lower, finished product stores, transportation is inconvenient.
Accompanying drawing explanation
Fig. 1 is the utility model three-way pipe structure schematic diagram;
Fig. 2 is the utility model tee piece splicing schematic diagram;
Fig. 3 is the utility model cross structural representation;
Fig. 4 is the utility model cross splicing schematic diagram;
In figure: 1-pit shaft seat, 2-sealing ring, the upper well pedestal of 3-, 4-band, 5-nut, 6-plain washer, 7-bolt, the 8-pedestal of going into the well, 9-gutter.
The specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Embodiment based in the utility model, those of ordinary skills are not making all other embodiment that obtain under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to figure, wherein Fig. 1 and Fig. 2 are threeway pipe well pedestal; Fig. 3 and Fig. 4 are four-way pipe well pedestal.In the utility model embodiment, the spliced plastic inspection well seat of a kind of novel plug, comprising: pit shaft seat 1, sealing ring 2, upper well pedestal 3, band 4, nut 5, plain washer 6, bolt 7, go into the well pedestal 8 and gutter 9; Described band 4 is placed in the upper surface sealing draw-in groove of the pedestal 8 of going into the well, and on end face painting water-proof adhesive; Described in described upper well pedestal 3 alignment are placed on, go into the well on pedestal 8, and be connected locking with nut 5, bolt 7 and plain washer 6; Described sealing ring 2 is placed in upper well pedestal 3 upper surface sealing draw-in grooves, and on end face, coats marine glue; Described pit shaft seat 1 alignment is placed on described upper well pedestal 3, and is connected locking with nut 5, bolt 7 and plain washer 6.
This compound structure Assembled plastic inspection well holder structure is simple, connects reliably, and easy to use, owing to adopting, its functions expanding of modular interface is high, and cost of production is lower, and production technology is simple, is convenient to store, transport, and is very practical.
To those skilled in the art, obviously the utility model is not limited to the details of above-mentioned one exemplary embodiment, and in the situation that not deviating from spirit of the present utility model or essential characteristic, can realize the utility model with other concrete form.Therefore, no matter from which point, all should regard embodiment as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than above-mentioned explanation, is therefore intended to include in the utility model dropping on the implication that is equal to important document of claim and all changes in scope.Any Reference numeral in claim should be considered as limiting related claim.
In addition, be to be understood that, although this manual is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of manual is only for clarity sake, those skilled in the art should make manual as a whole, and the technical scheme in each embodiment also can, through appropriately combined, form other embodiments that it will be appreciated by those skilled in the art that.

Claims (1)

1. a compound structure Assembled plastic inspection well seat, comprising: pit shaft seat (1), sealing ring (2), upper well pedestal (3), band (4), nut (5), plain washer (6), bolt (7), the pedestal of going into the well (8) and gutter (9); It is characterized in that: described band (4) is placed in the upper surface sealing draw-in groove of the pedestal of going into the well (8), and on end face painting water-proof adhesive; The pedestal (8) of going into the well described in described upper well pedestal (3) alignment is placed on is upper, and is connected locking with nut (5), bolt (7) and plain washer (6); Described sealing ring (2) is placed in well pedestal (3) upper surface sealing draw-in groove, and on end face, coats marine glue; It is upper that described pit shaft seat (1) alignment is placed on described upper well pedestal (3), and be connected locking with nut (5), bolt (7) and plain washer (6).
CN201420152275.2U 2014-04-01 2014-04-01 A compound structure combined-type plastic inspection shaft base Expired - Fee Related CN203782751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420152275.2U CN203782751U (en) 2014-04-01 2014-04-01 A compound structure combined-type plastic inspection shaft base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420152275.2U CN203782751U (en) 2014-04-01 2014-04-01 A compound structure combined-type plastic inspection shaft base

Publications (1)

Publication Number Publication Date
CN203782751U true CN203782751U (en) 2014-08-20

Family

ID=51318953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420152275.2U Expired - Fee Related CN203782751U (en) 2014-04-01 2014-04-01 A compound structure combined-type plastic inspection shaft base

Country Status (1)

Country Link
CN (1) CN203782751U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912018A (en) * 2014-04-01 2014-07-09 武汉亿美特机械有限公司 Composite-structure combined-type plastic inspection well seat
CN110126294A (en) * 2019-05-09 2019-08-16 常州信息职业技术学院 Axial Assembled plastic inspection well well seat, forming processing device and processing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912018A (en) * 2014-04-01 2014-07-09 武汉亿美特机械有限公司 Composite-structure combined-type plastic inspection well seat
CN110126294A (en) * 2019-05-09 2019-08-16 常州信息职业技术学院 Axial Assembled plastic inspection well well seat, forming processing device and processing method

Similar Documents

Publication Publication Date Title
CN201038690Y (en) Cover plate type cable or water drainage groove
CN204898901U (en) Waterproof prefab structure of special effect
CN202190047U (en) Fabricated steel ground cable channel
CN203782751U (en) A compound structure combined-type plastic inspection shaft base
CN201376314Y (en) Prefabricated part forming die
CN103912018A (en) Composite-structure combined-type plastic inspection well seat
CN203769202U (en) Roof board gap waterproof structure
CN201388032Y (en) Cable trench convenient for draining
CN203384508U (en) Compound pipeline lined with glass fiber reinforced plastic concrete
CN203654729U (en) Prefabricated type shear wall sleeve grouting and molding device
CN203716186U (en) Inspection well
CN202169701U (en) Rolling suction system of plastic drainage plate
CN202152539U (en) Plastic building template
CN204254044U (en) A kind of novel building support of pipelines system
CN202767416U (en) Outer wall stone plastic decoration pinch plate
CN203498726U (en) Steel slag water permeable brick
CN203145028U (en) Corrugated pipe water-collecting well
CN101787819A (en) Self-supporting movable fence
CN207794549U (en) A kind of PES mouldings
CN203626034U (en) Glass fiber reinforced plastic die pressing combined inspection well
CN206844810U (en) A kind of environmentally friendly enclosing
CN203901845U (en) Self-adhesive waterproof asphalt coiled material with polypropylene non-woven fabric used as surface layer
CN204640506U (en) A kind of mould preparing ultra-high performance concrete pipeline
CN203213474U (en) Layering-preventing heat-preservation integrated board
CN204982947U (en) Heavy originated well seat of mud

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180913

Address after: 436000 6 Chuang Chuang Road, Ezhou Economic Development Zone, Ezhou, Hubei

Co-patentee after: Wuhan Yimeite Machinery Co., Ltd.

Patentee after: Hubei Efeng Die & Mold Co., Ltd.

Address before: Ezhou City, Hubei Province, Chuangye Avenue, Gedian Development Zone (taking control Huading Industrial Park thirty-first building room 1-2)

Patentee before: Wuhan Yimeite Machinery Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20210401

CF01 Termination of patent right due to non-payment of annual fee