CN203626034U - Glass fiber reinforced plastic die pressing combined inspection well - Google Patents

Glass fiber reinforced plastic die pressing combined inspection well Download PDF

Info

Publication number
CN203626034U
CN203626034U CN201320836307.6U CN201320836307U CN203626034U CN 203626034 U CN203626034 U CN 203626034U CN 201320836307 U CN201320836307 U CN 201320836307U CN 203626034 U CN203626034 U CN 203626034U
Authority
CN
China
Prior art keywords
well body
glass steel
arc glass
lobe
fiber reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320836307.6U
Other languages
Chinese (zh)
Inventor
姚博
陈希
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Wilson Water Treatment Equipment Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320836307.6U priority Critical patent/CN203626034U/en
Application granted granted Critical
Publication of CN203626034U publication Critical patent/CN203626034U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A glass fiber reinforced plastic die pressing combined inspection well comprises a well body and a base, wherein a lower end base of the well body is arranged in the base, the lower end base and the base are fixedly connected into a whole through a plurality of screws, the well body is formed by connecting a first arc-shaped glass fiber reinforced plastic well body petal, a second arc-shaped glass fiber reinforced plastic well body petal, a third arc-shaped glass fiber reinforced plastic well body petal and a fourth arc-shaped glass fiber reinforced plastic well body petal in a butt joint mode, the well body is of a cylindrical structure, at least one socket butt joint hole is formed in the well body, and the socket butt joint holes are connected with glass fiber reinforced plastic sockets through a plurality of bolts. The glass fiber reinforced plastic die pressing combined inspection well is suitable for drainage pipeline networks in construction communities, public buildings, factories and other places, and is convenient to produce, transport and install. The well body is formed by connecting four one-fourth circular pieces end to end and is in a cylindrical shape. The well body is then connected to the well bottom to form the integral well body. The whole glass fiber reinforced plastic die pressing combined inspection well is made of SMC glass fiber reinforced plastic materials and produced and formed through the sheet die pressing process, and is good in product structure, high in strength, resistant to impact, and good in low-temperature resistance performance.

Description

A kind of moulded glass steel combined inspection shaft
Technical field
The utility model relates to the manhole using in a kind of drainage pipeline networks, particularly relates to a kind of moulded glass steel combined inspection shaft.
Background technology
Manhole is mainly used in one residential, Gongjian's project, factory and urban road drainage pipe network, and the manhole using at present mainly contains brick and precast concrete manhole, PE and HDPE plastic inspection well and square glass steel manhole.Brick and the precast concrete manhole construction period is long, and seasonal strong, be not suitable for winter construction.Particularly service time of a specified duration there will be sedimentation or crack, cause seepage, contaminated environment.Plastic inspection well cold tolerance is poor, uses in the north, easy to crack to winter, occurs seepage, contaminated environment, and it is lower that square glass steel manhole bears lateral wall pressure, and in well, current are smooth and easy not simultaneously, the accumulations such as easy precipitated mud and sand.
Utility model content
The purpose of this utility model, is to provide the horizontal pressure group of a kind of glass fiber reinforced plastic formula and closes manhole, and this manhole is core structure, by moulded glass steel assembling moulding, easy to make, sturdy and durable, there will not be seepage, is particularly suitable for the north and uses.
The technical scheme adopting is:
A kind of moulded glass steel combined inspection shaft, comprises well body and base, and well body lower end seat is located in base, is fixedly connected into an overall structure by multiple screws, it is characterized in that:
Well body is made up of the first arc glass steel well body lobe, the second arc glass steel well body lobe, the 3rd arc glass steel well body lobe and the docking of the 4th arc glass steel well body lobe, and is cylinder mode.On well body, at least offer a birdsmouth butt hole, birdsmouth butt hole place is connected with glass fiber reinforced plastic birdsmouth by multiple bolts.
On one side end face of the first arc glass steel well body lobe, there is the first male end, in the first inner raised edge of corresponding the first male end, have multiple bolts hole; On the opposite side end face of the first arc glass steel well body lobe, there is the first female end, the first reinforcement gusset has been sticked on the outer wall of the first outer chimb of corresponding the first female end, it is one-time formed overall structure that the first outer chimb and first is strengthened gusset, and has multiple built-in bolts hole.
The second arc glass steel well body lobe, the 3rd arc glass steel well body lobe and the 4th arc glass steel well body lobe are structurally identical with the first arc glass steel well body lobe.
The second evagination edge lap of the first inner raised edge of the first arc glass steel well body lobe and the second arc glass steel well body lobe, and be fixedly connected with by multiple bolts.The second inner raised edge overlap joint of the first outer chimb of the first arc glass steel well body lobe and the 4th arc glass steel well body lobe, and be fixedly connected with by multiple bolts.The 3rd evagination edge lap of the 3rd inner raised edge of the second arc glass steel well body lobe and the 3rd arc glass steel well body lobe, and be fixedly connected with by multiple bolts, the the chimb overlap joint all round of the 4th chimb of the 3rd arc glass steel well body lobe and the 4th arc glass steel well body lobe, and be fixedly connected with by multiple bolts.
On well body, offer birdsmouth butt hole, on the well body wall corresponding with birdsmouth butt hole, along the circumferential direction equidistantly offer multiple screws; On the interior connecting plate of birdsmouth, be connected with multiple reinforcing rib posts, on the interior connecting plate of birdsmouth, the position of corresponding reinforcing rib post offers built-in bolt hole, the position of the multiple bolts hole on multiple built-in bolts hole well body corresponding with birdsmouth butt hole is corresponding respectively, and is fixedly connected with by multiple bolts.
Well body lower end seat is located in glass fiber reinforced plastic base, and is fixedly connected with in aggregates by multiple bolts.
Advantage of the present utility model:
1, the utility model is applicable to one residential, public building, in the drainage pipeline networks on the ground such as factory.
2, produce, transportation, install convenient, well body by four head and the tail be mutually connected, the sidewall of quadrant connects, and forms column type.Well body is connected in shaft bottom again, forms complete well body.In four sidewalls, have at least a slice to be connected with horizontal branch pipe.
3, whole entirety is by SMC glass steel material, and through mould pressing process production moulding, product structure is good, and intensity is high, shock-resistant, and low temperature resistivity can be good.
4, the various models of well, have met all kinds of specifications that contain in national building standard 08SS523 substantially.
Accompanying drawing explanation
Fig. 1 is the manhole surface structure schematic diagram of first birdsmouth.
Fig. 2 is the manhole surface structure schematic diagram of second birdsmouth.
Fig. 3 is the manhole surface structure schematic diagram of the 4th birdsmouth.
The specific embodiment
A kind of moulded glass steel combined inspection shaft, comprises well body 1 and glass fiber reinforced plastic birdsmouth 6, it is characterized in that:
Well body 1 connects into core structure by the first arc glass steel well body lobe 2, the second arc glass steel well body lobe 3, the 3rd arc glass steel well body lobe 4 and the 4th arc glass steel well body lobe 5, on one side end face of the first arc glass steel well body lobe 2, there is the first male end, in the first inner raised edge 7 of corresponding the first male end, have multiple bolts hole; On the opposite side end face of the first arc glass steel well body lobe 2, there is the first female end, the outer wall of the first outer chimb 9 of corresponding the first female end is provided with the first reinforcement gusset 10, it is one-time formed overall structure that the first outer chimb 9 and first is strengthened gusset 10, and has multiple built-in bolts hole.
The second arc glass steel well body lobe 3, the 3rd arc glass steel well body lobe 4 and the 4th arc glass steel well body lobe 5 are structurally identical with the first arc glass steel well body lobe 2.
The second outer chimb 11 of the first inner raised edge 7 of the first arc glass steel well body lobe 2 and the second arc glass steel well body lobe 3 overlaps, and is fixedly connected with by multiple bolts.The second inner raised edge 12 of the first outer chimb 9 of the first arc glass steel well body lobe 2 and the 4th arc glass steel well body lobe 5 overlaps, and is fixedly connected with by multiple bolts.The 3rd outer chimb 14 of the 3rd inner raised edge 13 of the second arc glass steel well body lobe 3 and the 3rd arc glass steel well body lobe 4 overlaps, and be fixedly connected with by multiple bolts, the 4th inner raised edge 15 of the 3rd arc glass steel well body lobe 4 and the 4th arc glass steel well body lobe 5 all round chimb 16 overlap, and be fixedly connected with by multiple bolts.
On well body 1, offer birdsmouth butt hole 17, on the well body wall corresponding with birdsmouth butt hole 17, along the circumferential direction equidistantly offer multiple screws; On the interior connecting plate 18 of birdsmouth 6, be connected with multiple reinforcing rib posts 19, on the interior connecting plate 18 of birdsmouth 6, the position of corresponding reinforcing rib post 19 offers built-in bolt hole, the position of the multiple stud bolt holes on multiple built-in bolts hole well body corresponding with birdsmouth butt hole 17 is corresponding respectively, and is fixedly connected with by multiple bolts.
Well body 1 lower end seat is located in glass fiber reinforced plastic base 8, and is fixedly connected with in aggregates by multiple bolts.

Claims (2)

1. a moulded glass steel combined inspection shaft, comprises well body and base, and well body lower end seat is located in base, is fixedly connected into an overall structure by multiple screws, it is characterized in that:
Well body is made up of the first arc glass steel well body lobe, the second arc glass steel well body lobe, the 3rd arc glass steel well body lobe and the docking of the 4th arc glass steel well body lobe, and be cylinder mode, on well body, at least offer a birdsmouth butt hole, birdsmouth butt hole place is connected with glass fiber reinforced plastic birdsmouth by multiple bolts.
2. a kind of moulded glass steel combined inspection shaft according to claim 1, has the first male end on a side end face of the first arc glass steel well body lobe described in it is characterized in that, in the first inner raised edge of corresponding the first male end, has multiple bolts hole; On the opposite side end face of the first arc glass steel well body lobe, there is the first female end, the outer wall of the first outer chimb of corresponding the first female end is provided with the first reinforcement gusset, it is one-time formed overall structure that the first outer chimb and first is strengthened gusset, and has multiple built-in bolts hole;
The second arc glass steel well body lobe, the 3rd arc glass steel well body lobe and the 4th arc glass steel well body lobe are structurally identical with the first arc glass steel well body lobe;
The second evagination edge lap of the first inner raised edge of the first arc glass steel well body lobe and the second arc glass steel well body lobe, and be fixedly connected with by multiple bolts, the second inner raised edge overlap joint of the first outer chimb of the first arc glass steel well body lobe and the 4th arc glass steel well body lobe, and be fixedly connected with by multiple bolts; The 3rd evagination edge lap of the 3rd inner raised edge of the second arc glass steel well body lobe and the 3rd arc glass steel well body lobe, and be fixedly connected with by multiple bolts, the the chimb overlap joint all round of the 4th chimb of the 3rd arc glass steel well body lobe and the 4th arc glass steel well body lobe, and be fixedly connected with by multiple bolts;
On well body, offer birdsmouth butt hole, on the well body wall corresponding with birdsmouth butt hole, along the circumferential direction equidistantly offer multiple screws; On the interior connecting plate of birdsmouth, be connected with multiple reinforcing rib posts, on the interior connecting plate of birdsmouth, on the position of corresponding reinforcing rib post, offer built-in bolt hole, the position of the multiple bolts hole on multiple built-in bolts hole well body corresponding with birdsmouth butt hole is corresponding respectively, and is fixedly connected with by multiple bolts.
CN201320836307.6U 2013-12-18 2013-12-18 Glass fiber reinforced plastic die pressing combined inspection well Expired - Fee Related CN203626034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320836307.6U CN203626034U (en) 2013-12-18 2013-12-18 Glass fiber reinforced plastic die pressing combined inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320836307.6U CN203626034U (en) 2013-12-18 2013-12-18 Glass fiber reinforced plastic die pressing combined inspection well

Publications (1)

Publication Number Publication Date
CN203626034U true CN203626034U (en) 2014-06-04

Family

ID=50812526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320836307.6U Expired - Fee Related CN203626034U (en) 2013-12-18 2013-12-18 Glass fiber reinforced plastic die pressing combined inspection well

Country Status (1)

Country Link
CN (1) CN203626034U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669552A (en) * 2013-12-18 2014-03-26 姚博 Glass fiber reinforced plastic moulding pressing combined type inspection shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669552A (en) * 2013-12-18 2014-03-26 姚博 Glass fiber reinforced plastic moulding pressing combined type inspection shaft

Similar Documents

Publication Publication Date Title
CN203269739U (en) Inner ripple glass fiber reinforced plastics environment-friendly digestion tank
CN203626034U (en) Glass fiber reinforced plastic die pressing combined inspection well
CN202543014U (en) Integral type septic tank with high-pressure-resistance intensive wave peak structural wall
CN201502826U (en) Spigot-and-socket type fusing plastic pipeline
CN103603424B (en) A kind of large glass steel inspection shaft with cat ladder
CN203716186U (en) Inspection well
CN202081434U (en) Prefabricated pipe shaft
CN103669552A (en) Glass fiber reinforced plastic moulding pressing combined type inspection shaft
CN201180869Y (en) Polythene steel strip reinforced hollow winding structure wall pipes
CN202227461U (en) Inspection well component capable of being combined rapidly
CN205077594U (en) Enhancement mode five -way plastic check well
CN203498234U (en) Top-and-bottom combined type plastic septic tank
CN103588371A (en) Up-down combined type plastic septic tank
CN202829793U (en) End cover assembly part for septic tank
CN203625214U (en) Septic tank
CN203145028U (en) Corrugated pipe water-collecting well
CN204058205U (en) upper and lower combined plastic septic tank assembly
CN201764128U (en) Plastic underground water drainage pipe with reinforcing ribs
CN206654828U (en) A kind of environment-friendly type is molded septic tank
CN204112366U (en) A kind of plug-in type on-site consolidation manhole body
CN203284298U (en) Combined round platform-shaped septic tank assembly part
CN203729422U (en) Spliced type polyester round glass reinforced plastic inspection well/catch basin formed in compression molding mode
CN211849599U (en) Anti-settling ring mould for reinforced concrete inspection well base
CN205314128U (en) Plastic power communication well of integral type
CN201916607U (en) Underground pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200508

Address after: Shenjingzi Zhen Kang Hong Cun, Dongling District, Shenyang City, Liaoning Province

Patentee after: Liaoning Wilson water treatment equipment Co.,Ltd.

Address before: 110003, building 708, building 13, metallurgical building, Heping Road, Heping District, Liaoning, Shenyang

Patentee before: Yao Bo

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604