CN203781641U - Fixture specially used for sorting tire assemblies - Google Patents
Fixture specially used for sorting tire assemblies Download PDFInfo
- Publication number
- CN203781641U CN203781641U CN201420192787.1U CN201420192787U CN203781641U CN 203781641 U CN203781641 U CN 203781641U CN 201420192787 U CN201420192787 U CN 201420192787U CN 203781641 U CN203781641 U CN 203781641U
- Authority
- CN
- China
- Prior art keywords
- clip arm
- clamp arm
- arm
- lower clip
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000712 assembly Effects 0.000 title abstract 3
- 238000000429 assembly Methods 0.000 title abstract 3
- 238000005452 bending Methods 0.000 claims abstract description 14
- 239000000725 suspension Substances 0.000 claims description 13
- 230000000694 effects Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000005484 gravity Effects 0.000 description 1
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model provides a fixture specially used for sorting tire assemblies, and relates to the field of a design technology of a fixture used for sorting and stacking the tire assemblies in a tire assembly sorting line. The fixture comprises a hanging ring hung on a lifting arm, a first clamp arm and a second clamp arm, wherein the first clamp arm comprises a first upper clamp arm and a first lower clamp arm; the second clamp arm comprises a second upper clamp arm and a second lower clamp arm; the first lower clamp arm and the second lower clamp arm are arranged in a staggered way, and are articulated with each other by a second pin shaft at the overlapping part; two return springs are respectively arranged between the first upper clamp arm and the first lower clamp arm as well as between the second upper clamp arm and the second lower clamp arm by return spring hooks; the first lower clamp arm and the second lower clamp arm are respectively provided with a bending part; the lower end of each bending part is provided with a clamp plate; the clamping surfaces of the two clamp plates are arranged in an opposite way. The fixture is simple in structure, can be operated by two hands of a worker who stands, is time-saving and labor-saving, can achieve the desired effect, and is in accordance with ergonomics.
Description
Technical field
The utility model relates to the design field of tire assembly sequence stacking use fixture in tire assembly sequence line.
Background technology
In conventional tire assembly sequence line, generally adopt the mode of a dead lift to complete, the action that need to repeatedly repeat to bend over, labour intensity is large, and employee's psoas is easily damaged, and does not meet ergonomics.
Utility model content
The utility model object is for above problem, and a kind of tire assembly sequence unit clamp that reduces labour intensity is provided.
The utility model comprises that described the first jig arm comprises the first upper clip arm, the first lower clip arm for being suspended on suspension ring, the first jig arm, the second jig arm on arm, and described the second jig arm comprises the second upper clip arm, the second lower clip arm; One end of described the first upper clip arm and the second upper clip arm is hinged on suspension ring by same the first bearing pin respectively; One end of the other end of described the first upper clip arm and the first lower clip arm is hinged, and one end of the other end of described the second upper clip arm and the second lower clip arm is hinged; Described the first lower clip arm and the second lower clip arm alternative arrangement, and overlapping is hinged by the second bearing pin; Between described the first upper clip arm and the first lower clip arm, link up with pull back spring be set by pull back spring respectively between the second upper clip arm and the second lower clip arm; Described the first lower clip arm and the second lower clip arm have respectively a bending part, the bending part of the bending part of the first lower clip arm, the second lower clip arm respectively along with the vertical direction of ground level to downward-extension, the lower end of the bending part described in each arranges respectively clamping plate, and the clamping face of the clamping plate described in two is arranged in opposite directions.
The utility model adopts parallelogramming deflection and gravity principle to clamp carrying tire assembly, the company that first suspension ring is suspended on during use is existing can 360 on the arms of rotation, after utilizing the lifting of arm and rotating mechanism tire assembly can be clamped, from bin, be transported on sequence pallet, employee only need to stand and with the hands operate, time saving and energy saving, can be effective again, meet human engineering.
The utility model arranges respectively clamping plate rubber lift on the clamping face of described clamping plate, anti-skidding, makes to clamp better effects if.
The first upper clip arm described in the utility model is comprised of two symmetrically arranged the first connecting panels, one end of two the first connecting panels is hinged on respectively the both sides of suspension ring by the first bearing pin, described the first lower clip arm is hinged between the other end of two the first connecting panels by bearing pin; Described the second upper clip arm is comprised of two symmetrically arranged the second connecting panels, and one end of described two the second connecting panels is hinged on respectively the both sides of suspension ring by the first bearing pin, and described the second lower clip arm is hinged between the other end of two the second connecting panels by bearing pin.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, the utility model comprises that described the first jig arm 2 comprises the first upper clip arm 2-1, the first lower clip arm 2-2 for being suspended on suspension ring 1, the first jig arm 2, the second jig arm 3 on arm, and the second jig arm 3 comprises the second upper clip arm 3-1, the second lower clip arm 3-2; One end of the first upper clip arm 2-1 and the second upper clip arm 3-1 is hinged on suspension ring 1 by same the first bearing pin 4 respectively.
The first upper clip arm 2-1 is comprised of two symmetrically arranged the first connecting panel 2-1-1, one end of two the first connecting panel 2-1-1 is hinged on respectively the both sides of suspension ring 1 by the first bearing pin 4, the first lower clip arm 2-2 is hinged between the other end of two the first connecting panel 2-1-1 by bearing pin; The second upper clip arm 3-1 is comprised of two symmetrically arranged the second connecting panel 3-1-1, one end of two the second connecting panel 3-1-1 is hinged on respectively the both sides of suspension ring 1 by the first bearing pin 4, the second lower clip arm 3-2 is hinged between the other end of two the second connecting panel 3-1-1 by bearing pin.
The first lower clip arm 2-2 and the second lower clip arm 3-2 alternative arrangement, and overlapping is hinged by the second bearing pin 5; Between the first upper clip arm 2-1 and the first lower clip arm 2-2, between the second upper clip arm 3-1 and the second lower clip arm 3-2, by pull back spring, link up with 6 respectively pull back spring 7 be set; The first lower clip arm 2-2 and the second lower clip arm 3-2 have respectively a bending part 2-2-1,3-2-1, the bending part 2-2-1 of the first lower clip arm, the bending part 3-2-1 of the second lower clip arm respectively along with the vertical direction of ground level to downward-extension, in the lower end of each bending part 2-2-1,3-2-1, clamping plate 8 are set respectively, the clamping face of two clamping plate 8 is arranged in opposite directions, and clamping plate rubber lift 9 is set respectively on the clamping face of clamping plate 8.
Claims (3)
1. tire assembly sequence unit clamp, it is characterized in that: comprise for being suspended on suspension ring, the first jig arm, the second jig arm on arm, described the first jig arm comprises the first upper clip arm, the first lower clip arm, and described the second jig arm comprises the second upper clip arm, the second lower clip arm; One end of described the first upper clip arm and the second upper clip arm is hinged on suspension ring by same the first bearing pin respectively; One end of the other end of described the first upper clip arm and the first lower clip arm is hinged, and one end of the other end of described the second upper clip arm and the second lower clip arm is hinged; Described the first lower clip arm and the second lower clip arm alternative arrangement, and overlapping is hinged by the second bearing pin; Between described the first upper clip arm and the first lower clip arm, link up with pull back spring be set by pull back spring respectively between the second upper clip arm and the second lower clip arm; Described the first lower clip arm and the second lower clip arm have respectively a bending part, the bending part of the bending part of the first lower clip arm, the second lower clip arm respectively along with the vertical direction of ground level to downward-extension, the lower end of the bending part described in each arranges respectively clamping plate, and the clamping face of the clamping plate described in two is arranged in opposite directions.
2. tire assembly sequence unit clamp according to claim 1, is characterized in that: clamping plate rubber lift is set respectively on the clamping face of described clamping plate.
3. tire assembly according to claim 1 sequence unit clamp, it is characterized in that: described the first upper clip arm is comprised of two symmetrically arranged the first connecting panels, one end of two the first connecting panels is hinged on respectively the both sides of suspension ring by the first bearing pin, described the first lower clip arm is hinged between the other end of two the first connecting panels by bearing pin; Described the second upper clip arm is comprised of two symmetrically arranged the second connecting panels, and one end of described two the second connecting panels is hinged on respectively the both sides of suspension ring by the first bearing pin, and described the second lower clip arm is hinged between the other end of two the second connecting panels by bearing pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420192787.1U CN203781641U (en) | 2014-04-21 | 2014-04-21 | Fixture specially used for sorting tire assemblies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420192787.1U CN203781641U (en) | 2014-04-21 | 2014-04-21 | Fixture specially used for sorting tire assemblies |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203781641U true CN203781641U (en) | 2014-08-20 |
Family
ID=51317850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420192787.1U Expired - Fee Related CN203781641U (en) | 2014-04-21 | 2014-04-21 | Fixture specially used for sorting tire assemblies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203781641U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104671075A (en) * | 2015-01-08 | 2015-06-03 | 德阳凯达门业有限公司 | Clamping structure with two-in-one clamping point |
CN104860190A (en) * | 2015-03-10 | 2015-08-26 | 中信戴卡股份有限公司 | Connection rod type hanger |
CN104860191A (en) * | 2015-05-04 | 2015-08-26 | 福建亿松机械有限公司 | Mounting fixture of cement roadbed guardrail |
CN105836600A (en) * | 2016-05-21 | 2016-08-10 | 上海闸环北站环境卫生工程有限公司 | Giant tire grabbing and transferring method and giant tire maintenance claw |
CN107398857A (en) * | 2017-08-21 | 2017-11-28 | 大连四达高技术发展有限公司 | A kind of quick tension system for aircraft target ship assembling |
CN107915117A (en) * | 2017-10-23 | 2018-04-17 | 芜湖市长江起重设备制造有限公司 | Special hanger in a kind of water |
CN108160861A (en) * | 2017-12-20 | 2018-06-15 | 成都新诚华创电子有限公司 | For the needle-threading machine of preset potentiometer substrate |
CN108483236A (en) * | 2018-05-07 | 2018-09-04 | 中国重汽集团杭州发动机有限公司 | 360 degree of cylinder head turns round suspender by hand |
KR20190001127U (en) * | 2017-11-02 | 2019-05-10 | 두산중공업 주식회사 | Jig for replacing grinding stone |
-
2014
- 2014-04-21 CN CN201420192787.1U patent/CN203781641U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104671075A (en) * | 2015-01-08 | 2015-06-03 | 德阳凯达门业有限公司 | Clamping structure with two-in-one clamping point |
CN104860190A (en) * | 2015-03-10 | 2015-08-26 | 中信戴卡股份有限公司 | Connection rod type hanger |
CN104860191A (en) * | 2015-05-04 | 2015-08-26 | 福建亿松机械有限公司 | Mounting fixture of cement roadbed guardrail |
CN105836600A (en) * | 2016-05-21 | 2016-08-10 | 上海闸环北站环境卫生工程有限公司 | Giant tire grabbing and transferring method and giant tire maintenance claw |
CN107398857A (en) * | 2017-08-21 | 2017-11-28 | 大连四达高技术发展有限公司 | A kind of quick tension system for aircraft target ship assembling |
CN107915117A (en) * | 2017-10-23 | 2018-04-17 | 芜湖市长江起重设备制造有限公司 | Special hanger in a kind of water |
KR20190001127U (en) * | 2017-11-02 | 2019-05-10 | 두산중공업 주식회사 | Jig for replacing grinding stone |
KR200489646Y1 (en) * | 2017-11-02 | 2019-07-16 | 두산중공업 주식회사 | Jig for replacing grinding stone |
CN108160861A (en) * | 2017-12-20 | 2018-06-15 | 成都新诚华创电子有限公司 | For the needle-threading machine of preset potentiometer substrate |
CN108483236A (en) * | 2018-05-07 | 2018-09-04 | 中国重汽集团杭州发动机有限公司 | 360 degree of cylinder head turns round suspender by hand |
CN108483236B (en) * | 2018-05-07 | 2024-03-19 | 中国重汽集团杭州发动机有限公司 | 360-degree manual rotation lifting appliance for cylinder cover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203781641U (en) | Fixture specially used for sorting tire assemblies | |
CN203419670U (en) | Lamar type externally circular lifting appliance | |
CN105923532A (en) | Oil pipe hoisting device | |
CN201506693U (en) | Large-size manhole cover hoisting device | |
CN205442405U (en) | Anchor clamps play to put in a position | |
CN207276045U (en) | One kind transhipment slab hanging apparatus | |
CN203889888U (en) | Steel plate hoisting clamp | |
CN203846787U (en) | Wallboard assembling machine | |
CN201301167Y (en) | Novel pipe hoisting device | |
CN202864655U (en) | Moveable lifting appliance | |
CN202429868U (en) | Novel hoisting and positioning device for prefabricated part | |
CN201694738U (en) | Hook tongs for forged piece | |
CN202575686U (en) | Self-tightening type lifting appliance | |
CN205255022U (en) | Metallurgical special purpose machinery popularity claw | |
CN203345936U (en) | Multipurpose closed type hydraulic gripper | |
CN203513104U (en) | Hoisting sling for pipeline | |
CN203754232U (en) | Simple steel rail lifting tool | |
CN202808157U (en) | Novel tubular product lifting appliance | |
CN201284186Y (en) | Section steel hoisting clamp | |
CN202643074U (en) | Tail shaft polishing lifting tool | |
CN204221627U (en) | A kind of support changing shot-blasting machine ramming head | |
CN203865850U (en) | Novel three-jaw device for vertical grinding roll | |
CN205170253U (en) | Detachable removal hoist device | |
CN205802755U (en) | A kind of efficient lifting device for changing dust-removal cloth-bag | |
CN103010927A (en) | Rail lifting method of heavy steel rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140820 |
|
CF01 | Termination of patent right due to non-payment of annual fee |