CN203781552U - Keeper of elevator operation board - Google Patents

Keeper of elevator operation board Download PDF

Info

Publication number
CN203781552U
CN203781552U CN201320603028.5U CN201320603028U CN203781552U CN 203781552 U CN203781552 U CN 203781552U CN 201320603028 U CN201320603028 U CN 201320603028U CN 203781552 U CN203781552 U CN 203781552U
Authority
CN
China
Prior art keywords
equipment box
operating panel
horizontal frame
elevator
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320603028.5U
Other languages
Chinese (zh)
Inventor
崛祐司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Application granted granted Critical
Publication of CN203781552U publication Critical patent/CN203781552U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model relates to a keeper of an elevator operation board. The keeper is used on the operation board (7) for troubleshooting the elevator. The operation board (7) is provided with a device box (12) and an operation plate (13), wherein the device box (12) is arranged on an elevator landing (1), and the operation plate (13) is arranged on the device box (12) and is connected to a circuit part (15) contained in the device box (12) through a connecting wire (20). The keeper is provided with a holder (35) and a clamping piece (44), wherein the holder (35) is used for holding the device box (12) and the operation plate (13) when the device box (12) is connected to the operation plate (13) disassembled from the device box (12) through the connecting wire (20), and the clamping piece (44) can be clamped to the operation plate (13) and the holder (35) detachably and is used for fixing the device box (12) and the operating plate (13) to the holder (35).

Description

The holding device of elevator operating board
Technical field
Embodiment of the present utility model relates to the holding device of elevator operating board, and it uses in maintenance with while checking the operation board of stop that is arranged on elevator.
Background technology
Be arranged on the stop of elevator of each layer of building and dispose the operation board operating when passenger calls car.This operation board possesses equipment box and is removably supported on the operating panel of this equipment box front side.
In equipment box, contain as various devices such as circuit substrates.Operating panel surface is provided with passenger with pointing the multiple action buttons that operate and the display part that shows the residing floor of car.
As disclosed in Japan's [ JP 2009-227402 communique ], the equipment box of operation board is embedded in the embedded hole in the building walls of side of the gangway that is formed on elevator.Operating panel is arranged on the front side of the equipment box that is embedded in embedded hole, and is connected in the circuit substrate in equipment box by connection lead.
When maintenance with check when operation board, operating personal is first from extraction device case and operating panel inside embedded hole, then from the front side disassembling section plate of equipment box to expose equipment box inner side.In this state the circuit substrate in equipment box etc. is checked.
According to operation board in the past, when check circuit substrate, operating panel is connected with equipment box by connection lead.Therefore, even from the front side disassembling section plate of equipment box, also separation equipment case and operating panel completely.Therefore, the maintenance examination operation of equipment box is had to carry out under equipment box and the interconnective state of operating panel.
But, in the time that equipment box is connected with operating panel by connection lead, in operation process because connection lead or operating panel freely move, likely overslaugh operation.And, when connection lead or operating panel move freely, will cause connection lead or operating panel and parts around collide or tangle, thereby cause the damage of these connection leads or operating panel.
As countermeasure, expect that operator catches operating panel to carry out operation with one hand.If but carrying out operation by this operational method, operating personnel cannot with the hands carry out maintenance examination operation, greatly reduces operating efficiency.
On the other hand, known have a kind of operation board, and its equipment box is connected in operating panel by the connection lead with adaptor union.According to this operation board, by winning adaptor union, from equipment box lock out operation plate.
But when the operating panel separating from equipment box is optionally placed on the surrounding of operation field, operating panel is easy to be blended in the other machines or instrument of operation field.Therefore, while carrying out operation that operating panel is assembled into equipment box, cannot find immediately operating panel, cause operating efficiency to decline.
And, need to win and the operation that is connected adaptor union at every turn, therefore cause taking time and energy, and cause operating efficiency to decline.
The purpose of this utility model is to provide a kind of holding device of elevator operating board, and it can remain attached to the operating panel of equipment box rightly, thereby can carry out efficiently maintenance examination operation.
Utility model content
The holding device of an embodiment of the present utility model, it uses in the time of the operation board of maintenance elevator, and described operation board possesses: equipment box, it is arranged on elevator floor stops; Operating panel, it is arranged on described equipment box, and is connected to by connection lead the circuit block that is contained in described equipment box.
Described holding device possesses: retainer, and it with the state being connected by described connection lead from the described operating panel of described equipment box dismounting, keeps described equipment box and described operating panel at described equipment box; Stopper, is removably limited on described operating panel and described retainer, for described equipment box and described operating panel are fixed on to described retainer.
According to embodiment of the present utility model, described retainer comprises a pair of horizontal frame being mutually arranged at intervals, and described equipment box and described operating panel are fixed between described horizontal frame side by side by described stopper.
According to embodiment of the present utility model, described retainer has across the vertical frame between described horizontal frame one end.
According to embodiment of the present utility model, described horizontal frame has the other end of the opposition side that is positioned at described vertical frame, is provided with the stopper section for the side butt of described equipment box at this other end.
According to this structure, because being kept frame with fixed form jointly, operating panel and equipment box clamp, therefore in the time of maintenance and checkout facility case, can prevent that operating panel or connection lead from moving freely.Thus, can be efficiently and easily carry out maintenance and the Inspection of equipment box.Meanwhile, can there is not connection lead or operating panel by parts collision around or the phenomenon tangling, thereby can prevent the damage of these connection leads or operating panel.
Brief description of the drawings
Fig. 1 is the block diagram that represents the outward appearance of the elevator floor stops of embodiment of the present utility model.
Fig. 2 is arranged on the front view of the operation board on the building walls of elevator floor stops.
Fig. 3 is the section drawing along the F3-F3 line of Fig. 2.
Fig. 4 is the front view representing from the operation board of the state of the front side disassembling section plate of equipment box.
Fig. 5 is the front view of the retainer of embodiment of the present utility model.
Fig. 6 represents that operation board is embedded into the front view of the state of the embedded hole of building walls.
Fig. 7 A is the front view that represents equipment box and operation board to be temporarily fixed at respectively the state of retainer.
Fig. 7 B is the front view that represents equipment box and operation board to be separately fixed at the state of retainer.
Fig. 8 A is the section drawing along the F8A-F8A line of Fig. 7 B.
Fig. 8 B is the section drawing along the F8B-F8B line of Fig. 7 B.
Detailed description of the invention
Referring to brief description of the drawings embodiment of the present utility model.
Fig. 1 represents the outward appearance of elevator floor stops 1.In the face of the building walls 2 of stop 1 is formed with elevator doorway 3.For example, be arranged on gangway 3 to the door gear 4 of both sides opening type.Door gear 4 possesses a pair of door leaf 4a, 4b.Gangway 3 is opened and closed by the sway of door leaf 4a, 4b.
As shown in Figures 2 and 3, on the building walls 2 of 3 sides, gangway, operation board 7 is housed.Fig. 2 is mounted in the front view of the operation board 7 of building walls 2, and Fig. 3 is the section drawing representing respectively along the F3-F3 line of Fig. 2.
Building walls 2 is formed with the embedded hole 8 of accommodating operation board 7.Fixed frame 9 is equipped with in embedded hole 8 inner sides.Operation board 7 possesses equipment box 12 and operating panel 13.Equipment box 12 is fixed on fixed frame 9 and is positioned at the inner side of embedded hole 8.Operating panel 13 is arranged on the front side of equipment box 12 and is positioned at the open end of embedded hole 8.
Fig. 4 represents from the state of the front side disassembling section plate 13 of equipment box 12.As shown in Figure 4, equipment box 12 inner sides contain circuit substrate 15.Circuit substrate 15 is one of circuit block.The upper edge of equipment box 12 has formed the first tongue piece 16a.The first tongue piece 16a is side-prominent from the upper edge of equipment box 12 to equipment box 12, and meanwhile, heart position is formed with through hole 17a therein.Similarly, the lower edge portion of equipment box 12 has formed the second tongue piece 16b.The second tongue piece 16b is side-prominent to equipment box 12 from the lower edge portion of equipment box 12, and meanwhile, heart position is formed with through hole 17b therein.
As shown in Figure 4, operating panel 13 surfaces are provided with a pair of action button 18a, 18b and the position of demonstration car and the display part of moving direction 19 of the car of calling elevator.The action button 18a of one side controls up button, and the button 18b of opposite side controls descending button.Operating panel 13 is connected to the circuit substrate 15 in equipment box 12 by multiple connection leads 20.The middle part of each connection lead 20 is provided with adaptor union 21.
As shown in Figure 4, the upper edge of operating panel 13 has formed the first installation sheet 27a.The first installation sheet 27a is side-prominent from the upper edge of operating panel 13 to operating panel 13, and heart position is formed with through hole 28a therein simultaneously.
The outstanding end of the first installation sheet 27a is formed as, and is wider than the bottom that is connected in operating panel 13 of the first installation sheet 27a.And the outstanding end of the first installation sheet 27a is formed with the first snap-latch piece 29a.The first snap-latch piece 29a is to the inner side right-angled bend of operating panel 13.
Similarly, the lower edge portion of operating panel 13 has formed the second installation sheet 27b.The second installation sheet 27b is side-prominent to operating panel 13 from the lower edge portion of operating panel 13, and heart position is formed with through hole 28b therein simultaneously.
The outstanding end of the second installation sheet 27b is formed as, and is wider than the bottom that is connected in operating panel 13 of the second installation sheet 27b.And the outstanding end of the second installation sheet 27b is formed with the second snap-latch piece 29b.The second snap-latch piece 29b is to the inner side right-angled bend of operating panel 13.
As shown in Figure 3, operation board 7 is housed in the inner side of embedded hole 8 with the state of overlapping operation plate 13 in the front side of equipment box 12, and through hole 28a, the 28b of operating panel 13 and through hole 17a, the 17b of equipment box 12 align mutually.
And, in present embodiment, be inserted with respectively screw 32 is installed to through hole 17a, the 17b of equipment box 12 from through hole 28a, the 28b of operating panel 13.Screw 32 is installed and is screwed into the fixed frame 9 that is arranged on embedded hole 8 inner sides.Like this, be fixed frame 9 of equipment box 12 and operating panel 13 is fixing.
Be fixed under the fixing state of frame 9 at operating panel 13, between the upper edge of operating panel 13 and the opening upper limb of embedded hole 8, and form gap between the lower edge portion of operating panel 13 and the opening lower edge of embedded hole 8.This gap is pressed into respectively the cover of upholstery 33 in gap and blocks.
In addition, the retainer 35 having used when Fig. 5 discloses maintenance and checked operation board 7.Retainer 35 possesses a pair of horizontal frame 36a, 36b and a vertical frame 37.Horizontal frame 36a, 36b extend in parallel to each other across interval.Vertical frame 37, across one end of 36a, 36b, makes horizontal frame 36a and 36b connect to one.
Horizontal frame 36a, 36b have the other end of the opposition side that is positioned at vertical frame 37.The other end of horizontal frame 36a, 36b is formed with respectively stopper section 38a, 38b.Stopper section 38a, 38b extend to opposed facing direction right angle from the other end.
As shown in Figure 5, horizontal frame 36a, 36b have respectively the first mounting hole 40, the second mounting hole 41 and patchhole 42.The first mounting hole 40 and the second mounting hole 41, and the first mounting hole 40 and patchhole 42 are arranged along the length direction of horizontal frame 36a, 36b.
The first mounting hole 40 through hole 17a, 17b of corresponding device case 12 respectively of horizontal frame 36a and 36b, and there is the opening shape that is fully greater than through hole 17a and 17b.The second mounting hole 41 through hole 28a and 28b of respective operations plate 13 respectively of horizontal frame 36a and 36b, and there is the opening shape that is fully greater than through hole 28a and 28b.And the patchhole 42 of horizontal frame 36a and 36b inserts, and has the opening shape that is fully greater than the second snap-latch piece 29a and 29b for the first snap-latch piece 29a, the second snap-latch piece 29b of operating panel 13.
As shown in Figure 5, retainer 35 has 4 holding pieces 44.Holding piece 44 is one of stopper, and for example, each holding piece 44 is by becoming U-shaped to form steel plate bending, has opposed facing flat part 44a, 44b.On flat part 44a, 44b, be formed with respectively through hole 45.The through hole 45 of each holding piece 44 has and is fully greater than through hole 17a, the 17b of equipment box 12 and the through hole 28a of operating panel 13, the opening shape of 28b.
Below, to be arranged on elevator floor stops 1 building walls 2 operation board 7 maintenance and check step describe.
First, worker removes and installs in the upside of operating panel 13 and the cover of upholstery of downside 33 from embedded hole 8.By dismounting cover of upholstery 33, as shown in Figure 6, expose the head that operating panel 13 and equipment box 12 is fixed on to the installation screw 32 of fixed frame 9.
Afterwards, utilize the instruments such as screwdriver to unclamp to install screw 32 extracting, to remove the fixing of operation board 7 on fixed frame 9.Thus, can extract operation board 7 from embedded hole 8.
Afterwards, as shown in Figure 7 A, retainer 35 is inserted into the back side of operation board 7, makes the first tongue piece 16a of equipment box 12 and the second tongue piece 16b be superimposed on respectively the surface of horizontal frame 36a, 36b.A side of equipment box 12 is kept off on the stopper section 38a and 38b of horizontal frame 36a, 36b simultaneously.Thus, make equipment box 12 with respect to horizontal frame 36a and 36b location, through hole 17a, the 17b of the first tongue piece 16a and the second tongue piece 16b and the first mounting hole 40 of horizontal frame 36a, 36b are faced mutually.
Afterwards, from the front side disassembling section plate 13 of equipment box 12 and stagger to equipment box 12 sides.Subsequently, be formed on the first snap-latch piece 29a, the second snap-latch piece 29b on operating panel 13 in the interior insertion of patchhole 42 of horizontal frame 36a, 36b, and operating panel 13 is temporarily fixed to retainer 35.In the time that operating panel 13 is temporarily fixed at retainer 35, through hole 28a, the 28b of the first installation sheet 27a and the second installation sheet 27b and the second mounting hole 41 of horizontal frame 36a, 36b are faced mutually.
Afterwards, as shown in Figure 7 B, embed respectively holding piece 44 in the first tongue piece 16a of equipment box 12 and the superimposed part of horizontal frame 36a and the second tongue piece 16b and the superimposed part of horizontal frame 36b of equipment box 12.
Its result, as shown in the bond sites of the first tongue piece 16a in Fig. 8 A and horizontal frame 36a, embeds and has the first tongue piece 16a and horizontal frame 36a between the flat part 44a of holding piece 44 and 44b.And the through hole 45 being opened on flat part 44a and 44b aligns with the through hole 17a of the first tongue piece 16a and the first mounting hole 40 of horizontal frame 36a.
Subsequently, insert snapping screw 50 across pad 51, make snapping screw 50 connect through hole 45, the through hole 17a of the first tongue piece 16a and the first mounting hole 40 of horizontal frame 36a of flat part 44a, 44b.Further, at the first end of snapping screw 50 fastening nut 52.By fastening nut 52, the first tongue piece 16a and the superimposed part of horizontal frame 36a are mutually combined.The mode of this combination operation is suitable for too at the second tongue piece 16b of equipment box 12 and the bond sites of horizontal frame 36b.
Afterwards, as shown in Figure 7 B, embed respectively holding piece 44 at the second installation sheet 27b of the first installation sheet 27a of operating panel 13 and the superimposed part of horizontal frame 36a and operating panel 13 and the superimposed part of horizontal frame 36b.
Its result as shown in the bond sites of the first installation sheet 27a in Fig. 8 B and horizontal frame 36a, embeds the first installation sheet 27a and horizontal frame 36a between the flat part 44a of holding piece 44 and 44b.And the through hole 45 that makes to be opened on flat part 44a and 44b aligns with the through hole 28a of the first installation sheet 27a and the second mounting hole 41 of horizontal frame 36a.
Subsequently, insert snapping screw 50 across pad 51, make snapping screw 50 connect through hole 45, the through hole 28a of the first installation sheet 27a and the second mounting hole 41 of horizontal frame 36a of flat part 44a, 44b.Further, at the tip fastening nut 52 of snapping screw 50.By fastening nut 52, the first installation sheet 27a and the superimposed part of horizontal frame 36a are mutually combined.The mode of this combination operation is suitable for too at the second installation sheet 27b of operating panel 13 and the bond sites of horizontal frame 36b.
According to present embodiment, take out the state of operation board 7 from the embedded hole 8 of building walls 2, equipment box 12 and operating panel 13 by holding piece 44, snapping screw 50 and nut 52 with and the mode of joining be fixed on retainer 35.Snapping screw 50, pad 51 and nut 52 can use the standing parts of operator, also can use pre-prepd special-purpose member.
As mentioned above, the operation board 7 taking out from embedded hole 8, its with equipment box 12 and operating panel 13 left and right side by side adjacent state to be kept frame 35 fixing, and by this retainer 35, equipment box 12 and operating panel 13 are become one.For example, in this state, when checking the circuit substrate 15 that is housed in equipment box 12, carry out as required maintenance and the replacing of circuit substrate 15.
Now, because operating panel 13 is kept together with equipment box 12, frame 35 is fixing to be kept, and therefore can prevent operating panel 13 or connection lead 20 moving freely with respect to equipment box 12.Thus, can efficiently and easily carry out maintenance and the Inspection to equipment box 12.Meanwhile, there is no connection lead 20 or operating panel 13 by parts collision around or the hidden danger tangling yet, thereby can prevent the damage of these connection leads 20 or operating panel 13.
And, in the time of maintenance and checkout facility case 12, without the operating panel 13 of dismantling from equipment box 12 with singlehanded support.Therefore, operator can carry out with two hands maintenance and the Inspection of equipment box 12, thereby operating efficiency can be provided.
Further, due to without operating panel 13 is separated from equipment box 12, therefore also can not lose or see and lose operating panel 13.
In present embodiment, the first mounting hole 40, the second mounting hole 41 and the patchhole 42 that are formed on retainer 35 have respectively through hole 17a, the 17b, through hole 28a, the 28b of operating panel 13 and the first snap-latch piece 29a of operating panel 13 and the shape of the second snap-latch piece 29b that are greater than equipment box 12, and in size, have surplus.Therefore, retainer 35 also can be used for equipment box 12 or the operating panel 13 of other operation boards 7 that size is different, has good commonality.
After finishing the maintenance and inspection of equipment box 12, extract snapping screw 50, from retainer 35 detaching equipment casees 12 and operating panel 13.Afterwards, in the front side of equipment box 12 overlapping operation plate 13, these equipment boxs 12 and operating panel 13 are embedded in the embedded hole 8 of building walls 2.
Subsequently, with mounting nuts 32, equipment box 12 and operating panel 13 are fixed on to the fixed frame 9 in embedded hole 8.Finally, on the gap between fixing operation plate 13 and embedded hole 8, cover of upholstery is installed, hides screw 32, the first installation sheet 27a and the second installation sheet 27b are installed by cover of upholstery 33.Thus, complete the installation exercise again of the operation board 7 to building walls 2.
Some embodiments of the present utility model are illustrated, but these embodiments are to propose as example, can not limit the scope of utility model.These new embodiments may be implemented with other various forms, in the scope of main idea that does not depart from utility model, can carry out various omissions, displacement, change.These embodiments or its distortion are not only included in the scope or main idea of utility model, and be also contained in that claim records with utility model and its scope being equal in.

Claims (4)

1. a holding device for elevator operating board, it uses in the time of the operation board (7) of maintenance elevator, and described operation board (7) possesses: equipment box (12), it is arranged on elevator floor stops (1); Operating panel (13), it is arranged on described equipment box (12), and is connected to by connection lead (20) circuit block (15) that is contained in described equipment box (12),
It is characterized in that possessing:
Retainer (35), with the state being connected by described connection lead (20) from the described operating panel (13) of described equipment box (12) dismounting, keep described equipment box (12) and described operating panel (13) at described equipment box (12);
Stopper (44), removably be limited to described operating panel (13) and described retainer (35) upper, for described equipment box (12) and described operating panel (13) are fixed on to described retainer (35).
2. the holding device of elevator operating board according to claim 1, is characterized in that,
Described retainer (35) comprises a pair of horizontal frame (36a, 36b) being mutually arranged at intervals,
Described equipment box (12) and described operating panel (13) are fixed between described horizontal frame (36a, 36b) side by side by described stopper (44).
3. the holding device of elevator operating board according to claim 2, is characterized in that,
Described retainer (35) has across the vertical frame (37) between one end of described horizontal frame (36a, 36b).
4. the holding device of elevator operating board according to claim 3, is characterized in that,
Described horizontal frame (36a, 36b) has the other end of the opposition side that is positioned at described vertical frame (37), is provided with the stopper section (38a, 38b) for the side butt of described equipment box (12) at the described other end.
CN201320603028.5U 2012-10-05 2013-09-27 Keeper of elevator operation board Expired - Lifetime CN203781552U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012223464A JP5605859B2 (en) 2012-10-05 2012-10-05 Elevator operation panel holding device
JP2012-223464 2012-10-05

Publications (1)

Publication Number Publication Date
CN203781552U true CN203781552U (en) 2014-08-20

Family

ID=50748382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320603028.5U Expired - Lifetime CN203781552U (en) 2012-10-05 2013-09-27 Keeper of elevator operation board

Country Status (2)

Country Link
JP (1) JP5605859B2 (en)
CN (1) CN203781552U (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002293487A (en) * 2001-03-30 2002-10-09 Hitachi Building Systems Co Ltd Maintenance method and device for elevator
JP2002308540A (en) * 2001-04-12 2002-10-23 Hitachi Building Systems Co Ltd Elevator device
JP2005247570A (en) * 2004-03-08 2005-09-15 Toshiba Elevator Co Ltd Inspection box device of elevator
JP2008087905A (en) * 2006-10-02 2008-04-17 Toshiba Elevator Co Ltd Landing operation panel of elevator
JP5207830B2 (en) * 2008-05-27 2013-06-12 三菱電機株式会社 Elevator operation display device

Also Published As

Publication number Publication date
JP2014073905A (en) 2014-04-24
JP5605859B2 (en) 2014-10-15

Similar Documents

Publication Publication Date Title
US20170144863A1 (en) Elevator car compartment and assembly method for same
US8281951B2 (en) Electrical component enclosure
CN201657591U (en) Electromagnetic screen
ATE479215T1 (en) ANTENNA AND MEANS FOR FIXING THE ANTENNA ON A VEHICLE AND FOR CONNECTING THE ANTENNA TO ONE OR MORE CABLES OF A CABLE HARNESS LAYED IN THE VEHICLE
CN107453264B (en) Rack prefabricated cabin and secondary device integration module
CN2689655Y (en) Extracting connecting-disconnecting guider combination of hard disk box
SG148087A1 (en) Pick and place apparatus
CN203781552U (en) Keeper of elevator operation board
AU2006202377A1 (en) An electronic board device comprising a rack and an electronic board chassis for insertion into the rack
CN103848325A (en) Lighting device of elevator
EP2793335A3 (en) Cable duct, electronic device system, cable duct system, and method for replacing housing in electronic device system
JP5523151B2 (en) Elevator hall lantern equipment
US20090279002A1 (en) Flat panel display
CN204904444U (en) Quick plug -in card device
CN110980463B (en) Overhauling structure and overhauling method of elevator shaft component, car and elevator
CN210558702U (en) Full-color LED display screen convenient to maintain and used for elevator
CN103646614B (en) A kind of LED display module fixing device
CN209250212U (en) Free removal screen cabinet
CN102032505A (en) Elevator lighting device
CN209982852U (en) Drying assembly for developing or etching production line
JP2009215050A (en) Elevator car
CN218154783U (en) Installation component and refrigeration equipment
CN220372468U (en) Light path quick release device of laser marking machine
KR101382298B1 (en) Plug connector for electric equipments checher with extricating functions
CN217930349U (en) Auxiliary installation structure of industrial equipment state monitoring sensor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140820