CN203770839U - FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure - Google Patents

FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure Download PDF

Info

Publication number
CN203770839U
CN203770839U CN201420022321.7U CN201420022321U CN203770839U CN 203770839 U CN203770839 U CN 203770839U CN 201420022321 U CN201420022321 U CN 201420022321U CN 203770839 U CN203770839 U CN 203770839U
Authority
CN
China
Prior art keywords
fpso
overarm
integral installation
installation structure
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420022321.7U
Other languages
Chinese (zh)
Inventor
郑志峰
李玉涛
魏加旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd
Original Assignee
COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd filed Critical COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd
Priority to CN201420022321.7U priority Critical patent/CN203770839U/en
Application granted granted Critical
Publication of CN203770839U publication Critical patent/CN203770839U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure. Steel angles which are 200cm long and are provided with holes are uniformly burned-in at one side of a flat-bulb steel structural member (2) of a hull deck (1); the steel angles can be used for randomly fixing suspension girders (3) and mounting upright posts (6); the mounting mode is that the upright posts (6) which are vertically mounted are erected on the lower sides of the outer ends of the suspension girders (3), hanger rods (4) are vertically mounted at the middles or the lower sides of the suspension girders (3), and a cross beam (7) is connected between the lower ends of the two hanger rods (4). A combined installation mode that multi-type cable brackets or pipe systems are integrally hung or mounted in a hanging bracket structure below a living building strutting piece is adopted, the combined installation mode is attractive, orderly and flexible, the structure is applicable to regions with very dense cable brackets and pipe systems, huge reworking between different types of work, which is caused by later-period fire work is reduced, the cost is reduced, the risk is reduced, the structure is safe and efficient, and the construction period is greatly shortened.

Description

FPSO life building supporting element integral installation structure
Technical field
The utility model relates to life building supporting element integral device auxiliary installation device, especially the FPSO life building supporting element integral installation structure of ocean engineering FPSO boats and ships.
Background technique
In prior art, in the construction of boats and ships and ocean engineering, when pipeline, ventilation, electric and fitting-out, the region that cable bracket and piping are very intensive is seen everywhere in marine engineering product, traditional mode is all to need independent manufacture and welding supporting element separately, can cause like this Rewelding of the multiple weldment of the same area, and the later stage hot work that need to repeat due to various amendments.
At present for avoiding this situation, one of corrective measure is that cable bracket is supported and separates making with piping support, this design is relatively suitable for using in the relatively less situation of boats and ships electromechanical engineering, but, for the large ocean such as N498 and N612 construction project, some region electromechanical engineering is quite complicated, and bracket, piping, light fixture are arranged intensive, in enforcement, still have difficulties.As reason one wherein, because marine engineering product is a huge and complicated project, in building course, be not suitable with a lot of amendments of shipowner, there is unavoidably the situations such as similar electric and turbine collision.
Model utility content
The purpose of this utility model is to provide a kind of FPSO life building supporting element integral installation structure, realizes combination integrated installation, reduces and repeats to install supporting structure, and conserve space, improves work efficiency.
The purpose of this utility model will realize by following technical measures: comprise deck in ship structure, Bulb Steel structural member, overarm, column, hanging stick and crossbeam; Can be used for random fixing overarm at evenly freeze these angle steel of angle steel with holes of 200 centimeter length of Bulb Steel one side of deck in ship structure, column is installed, mounting type is as follows: in the outer end of overarm, downside is erect at right angle setting column, simultaneously, at overarm middle part or downside at right angle setting hanging stick, connecting cross beam between two hanging stick lower ends.
Especially, level connection joint suspension bracket between hanging stick middle part and column.
Especially, connect two adjacent hanging sticks at overarm downside, between these two hanging sticks, at least connect a crossbeam.
Especially, between two hanging sticks of two adjacent overarm downsides, connect a crossbeam.
Advantage of the present utility model and effect: adopt below life building supporting element, with the integrated suspension of hanger structure, polymorphic type cable bracket or piping are installed, combination mounting type is attractive in appearance, neat and flexible, be applicable to the region that cable bracket and piping are very intensive, can reduce later stage huge the doing over again between the each work post causing of getting angry, reduce costs, reduce risks, safe and efficient, can greatly shorten construction period.
Brief description of the drawings
Fig. 1 is the utility model embodiment 1 structural representation.
Fig. 2 is steel angle structure schematic diagram with holes in the utility model embodiment 1.
Reference character comprises: deck in ship structure 1, Bulb Steel structural member 2, overarm 3, hanging stick 4, suspension bracket 5, column 6, crossbeam 7.
Embodiment
The assembling sets such as the utility model principle is, pipeline, bracket and the fitting-out plate that layout that design is installed below deck, FPSO life building is intensive, integral installation quality is relatively light, for employing supporting element integrated installation provides condition.
The utility model comprises: deck in ship structure 1, Bulb Steel structural member 2, overarm 3, column 6, hanging stick 4 and crossbeam 7.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment 1: as shown in Figure 1, at evenly the freeze angle steel with holes of 200 centimeter length of Bulb Steel structural member 2 one sides of deck in ship structure 1, these angle steel can be used for random fixing overarm, column is installed, mounting type is as follows: in the outer end of overarm (3), downside is erect at right angle setting column (6), meanwhile, at overarm (3) middle part or downside at right angle setting hanging stick (4), connecting cross beam (7) between two hanging sticks (4) lower end.
In aforementioned, level connection joint suspension bracket 5 between hanging stick 4 middle parts and column 6.
In aforementioned, connect two adjacent hanging sticks 4 at overarm 3 downsides, between these two hanging sticks 4, at least connect a crossbeam 7.
In aforementioned, between two hanging sticks 4 of two adjacent overarm 3 downsides, connect a crossbeam 7.
In aforementioned, angle steel both wings with holes have fixed hole.
In the utility model, the assembling sets such as pipeline, bracket and the fitting-out plate that employing supporting element integral installation amount is relatively light.On crossbeam, hanging fixed mass weighs or the larger pipeline of volume, on suspension bracket, fixed mass or the facility such as the bracket of small volume, can meet flexibly the installation that horizontal linear, bending and lift in height are laid, on two or more weldments, fixedly mount part with bolt, then by length, support is separately installed on the position needing in each specialty.
The utility model, supporting element welding and flexible for installation, convenient, avoids the fire attack operation that the later stage causes due to amendment, and later stage modify execute-in-place is simple, quick, significantly reduces technical drawing and three-dimensional modeling workload.

Claims (4)

1.FPSO life building supporting element integral installation structure, comprises deck in ship structure (1), Bulb Steel structural member (2), overarm (3), column (6), hanging stick (4) and crossbeam (7); It is characterized in that, at evenly the freeze angle steel with holes of 200 centimeter length of Bulb Steel structural member (2) one sides of deck in ship structure (1), these angle steel can be used for random fixing overarm, column is installed, mounting type is as follows: in the outer end of overarm (3), downside is erect at right angle setting column (6), meanwhile, at overarm (3) middle part or downside at right angle setting hanging stick (4), connecting cross beam (7) between two hanging sticks (4) lower end.
2. FPSO as claimed in claim 1 life building supporting element integral installation structure, is characterized in that, level connection joint suspension bracket (5) between hanging stick (4) middle part and column (6).
3. FPSO as claimed in claim 1 life building supporting element integral installation structure, it is characterized in that, connect adjacent two hanging sticks (4) at overarm (3) downside, between these two hanging sticks (4), at least connect a crossbeam (7).
4. FPSO as claimed in claim 1 life building supporting element integral installation structure, is characterized in that, between two hanging sticks (4) of two adjacent overarm (3) downsides, connects a crossbeam (7).
CN201420022321.7U 2014-01-14 2014-01-14 FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure Expired - Lifetime CN203770839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420022321.7U CN203770839U (en) 2014-01-14 2014-01-14 FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420022321.7U CN203770839U (en) 2014-01-14 2014-01-14 FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure

Publications (1)

Publication Number Publication Date
CN203770839U true CN203770839U (en) 2014-08-13

Family

ID=51288030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420022321.7U Expired - Lifetime CN203770839U (en) 2014-01-14 2014-01-14 FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure

Country Status (1)

Country Link
CN (1) CN203770839U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105605328A (en) * 2015-10-29 2016-05-25 中铁六局集团天津铁路建设有限公司 Integrated pipeline supporting frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105605328A (en) * 2015-10-29 2016-05-25 中铁六局集团天津铁路建设有限公司 Integrated pipeline supporting frame

Similar Documents

Publication Publication Date Title
JP3205385U (en) Solar panel installation platform
CN103075017B (en) Super-long-span cylindrical shell lattice structure construction method
CN203034773U (en) Assembly type operating platform with variable diameter
CN204225337U (en) Fall a grade smallpox crack resistence new structure
CN211523685U (en) Combined three-dimensional adjusting curtain wall system
CN203770839U (en) FPSO (Floating Production Storage and Offloading) living building strutting piece integral installation structure
CN204940662U (en) A kind of hall suspended ceiling mounting structure
CN204254033U (en) A kind of marine water pipe hanger structure
CN207177042U (en) A kind of keel shoe of furred ceiling
CN102767644A (en) Assembly type heavy pipeline hanger
CN204609092U (en) A kind of combined type conversion layer connector
CN202878459U (en) Template for pouring assembling wallboard with mortise
CN202347884U (en) Overhaul platform for water turbine
CN201493664U (en) Adjustable steel wire suspension bracket
CN205206120U (en) Furred ceiling suspended structure
CN204823671U (en) Node grout clamp underwater installation complementary unit
CN204059703U (en) Detachable location and installation connector
CN203571233U (en) Large-span X-shaped spatial arch pipeline support
CN210423968U (en) Assembled support and hanger and building using same
CN203856117U (en) Reverse supporting installation structure
CN102777703A (en) Assembly type light pipeline hanger
CN113027033A (en) Suspended ceiling mounting structure of pipeline dense embedded area and construction method
CN205557825U (en) Novel steel construction bracket and steel structure support structure
CN202790959U (en) Steel pipe truss structure based on aloft lateral support
CN205604456U (en) Covering or awning on a car, boat, etc. room structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zheng Zhifeng

Inventor after: Li Yutao

Inventor after: Wei Jiawang

Inventor after: Zhang Xinhuan

Inventor after: Hong Jian

Inventor after: Qiu Jin

Inventor before: Zheng Zhifeng

Inventor before: Li Yutao

Inventor before: Wei Jiawang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHENG ZHIFENG LI YUTAO WEI JIAWANG TO: ZHENG ZHIFENG LI YUTAO WEI JIAWANG ZHANG XINHUAN HONG JIAN QIU JIN

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140813