CN203729299U - All-recycled prestressed anchor rod - Google Patents
All-recycled prestressed anchor rod Download PDFInfo
- Publication number
- CN203729299U CN203729299U CN201420081316.3U CN201420081316U CN203729299U CN 203729299 U CN203729299 U CN 203729299U CN 201420081316 U CN201420081316 U CN 201420081316U CN 203729299 U CN203729299 U CN 203729299U
- Authority
- CN
- China
- Prior art keywords
- heating wire
- prestressed anchor
- anchoring section
- central tube
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses an all-recycled prestressed anchor rod which comprises the upper end and the lower end. The upper end is a free section, and the lower end is an anchoring section. The all-recycled prestressed anchor rod is characterized in that the anchoring section is a hollow cylinder formed by casting a thermoplastic cold setting material, the hollow part of the hollow cylinder is adaptive with a central pipe extending to the free section, an electric heating wire is fixed on the anchoring section around the central pipe, a plurality of steel strands extending to the free section are evenly distributed in the hollow cylinder in the circumferential direction, one end of each of two steel strands is connected with two stages of the electric heating wire through an electric heating wire wiring terminal, and the other end of each of the two steel strands is externally connected with a power supply. The anchoring section only contains a small amount of metal material except the steel strands; when the power supply is on, the electric heating wire emits heat, an anchoring body is heated and softened, the steel strands are separated from the anchoring body, the steel strands of the anchoring section can be taken out, the goal of completely removing the metal material embedded in earth is achieved, and environmental pollution is reduced.
Description
Technical field
The utility model relates to Soil Anchor Design field, specifically, relates to the full recovery prestressed anchor that a kind of building operations is used.
Background technology
In the process of building foundation pit construction, sometimes adopt to squeezing into soil nailing or anchor pole in the foundation ditch periphery soil body and maintain the stable of the soil body, it is main bearing member that these soil nailings or anchor pole generally adopt steel, complete, after foundation ditch periphery backfilling of earthwork, just no longer need these soil nailings or anchor pole to maintain the stable of the soil body Deng foundation ditch inside subject structure construction.At this moment, soil nailing in the soil body or anchor pole are just ineffective, but most of because of darker in embedding soil, firm with rock-soil layer adhesion, be difficult for taking out, often just abandon in soil, generally can not be corroded, make these soil nailings or anchor pole become underground iron and steel rubbish or become the underground obstacle in adjacent architectural building site.
Now in technology, also there are some anchor recovering technology, if China Patent No. is 201320081687.7, the utility model patent that notification number provides for 203145975U " easily reclaims anchor pole ", its body of rod section is threaded with anchoring section, use advantage is: after finishing using, by rotation body of rod section, it is separated with anchoring section, body of rod section is reusable.Not enough, anchoring section metalwork used but can not reclaim, and makes recovery not thorough, buries in underground, forms metal garbage.
By this, design a kind of can being necessary to metalwork of anchoring section etc. also recoverable full recovery prestressed anchor.
Utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned prior art and the one that provides reclaims prestressed anchor entirely.
The technical scheme that the utility model solution prior art problem adopts is: a kind of full prestressed anchor that reclaims, comprise upper end and lower end, described upper end is free segment, in order to be connected with prop with building operations, described lower end is anchoring section, its improvement is, described anchoring section is to adopt the cold solid material of thermoplastic to pour into a mould the hollow circular cylinder forming, the hollow part adaptation of described hollow circular cylinder has a central tube that extends to described free segment, is fixed with a heating wire in described anchoring section around described central tube; In described hollow circular cylinder, be evenly equipped with the many steel strand that extend to described free segment along its circumferencial direction, wherein described in two, one end of steel strand is connected with the two-stage of described heating wire by a heating wire wiring terminal, other end external power supply.
Below above technical scheme is further elaborated:
Preferably, the cold solid material of described thermoplastic is sulphide mastic.
Preferably, described central tube is heat proof material.
Preferably, the external surface of described central tube wraps up or is coated with one deck insulation materials.
the beneficial effects of the utility model are:
One, one provided by the utility model reclaim prestressed anchor entirely, described anchoring section is except steel strand, only containing a small amount of metal material, and do not need extra wire, switch on power, by the heating of heating wire, anchoring body is subject to after thermal softening, steel strand separate with anchoring body, and then the steel strand of anchoring section can be taken out, reach the object of substantially removing the metal material being buried in the earth completely, make effectively to remove metal garbage in soil, effectively reduce the environment pollution that metal garbage causes.
Two, the utility model is simple in structure, and cost is low, and the required manpower of metal recovery is few and reclaim totally, convenient and swift, has larger environment protection significance and higher application value, can be very welcome, can be used widely.
Brief description of the drawings
Fig. 1 is the vertical section structure schematic diagram that the utility model reclaims prestressed anchor entirely;
Fig. 2 is the cross-sectional structure schematic diagram that the utility model reclaims prestressed anchor entirely;
Fig. 3 is that the utility model reclaims the use state reference map of prestressed anchor in the time of construction entirely;
Realization, functional characteristics and the advantage of the utility model object, in connection with embodiment, are described further with reference to accompanying drawing.
In figure, free segment 10; Anchoring section 20; Central tube 30; Heating wire 40; Steel strand 50; Heating wire wiring terminal 60; Power supply 70; Ground 80; Foundation ditch 90; Prop 100.
Detailed description of the invention
Describe the technical solution of the utility model in detail below with reference to drawings and the specific embodiments, so as clearer, understand utility model essence of the present utility model intuitively.
As shown in Figures 1 and 2, and in conjunction with Fig. 3, one provided by the utility model reclaims prestressed anchor entirely, is mainly used in building foundation pit construction and uses.
Specifically, one provided by the utility model reclaims prestressed anchor entirely, comprises upper end and lower end, and described upper end is free segment 10, in order to be connected with prop 100 with building operations; Described lower end is anchoring section 20, improvement of the present utility model is, described anchoring section 20 is for adopting the cold solid material of thermoplastic to pour into a mould the hollow circular cylinder forming, the center adaptation of described hollow circular cylinder has a central tube 30 that extends to described free segment 10, is fixed with a heating wire 40 in described anchoring section 20 around described central tube 30; In described hollow circular cylinder, be evenly equipped with the many steel strand 50 that extend to described free segment 10 along its circumferencial direction, in the present embodiment, described top and bottom are by the elongated setting of steel strand, just lower end is to be cast with in the appearance of described steel strand the hollow circular cylinder that adopts the cold solid material of thermoplastic to make, and wherein described in two, steel strand 50 are connected with the two-stage of described heating wire 40 by a heating wire wiring terminal 60 near one end of anchoring section, other end external power supply 70.
It should be noted that, in the present embodiment, the cold solid material of described thermoplastic is sulphide mastic, and described central tube 30 is heat proof material, it can be heating resisting metal material or heatproof nonmetal material, the external surface of central tube 30 also wraps up or is coated with one deck insulation materials, and to make in the time utilizing the utility model to carry out operation, central tube is non-conductive.
For ease of more thorough understanding implementation step of the present utility model, elaborate below with reference to Fig. 1, Fig. 2 and Fig. 3.
Concrete construction method of the present utility model, comprises the following steps:
S1, digged pit in construction ground 80, to form foundation ditch 90, construction supporting piling wall or supporting aspect, build pattern foundation pit supporting structure body 100 sidewalls.
S2, prefabricated prestressed anchor as claimed in claim 1;
S3, hole to underground in the inner side of described foundation pit side-wall, to form bolthole, the anchoring section of described prestressed anchor 20 is transferred in described bolthole;
S4, in described bolthole, in the interior injected water mud of described central tube 30, after the cement paste initial set of central tube 30 interior injections, secondary grouting is carried out in the gap between described hollow circular cylinder and bolthole, so that described anchoring section 20 glueds joint and forms anchoring body with underground ground;
S5, on described prop 100, certain position arranges anchor pole base, solidify and meet the requirements of after intensity until described anchoring body, the free segment of described prestressed anchor 10 is fixed on described anchor pole base, so that prestressed anchor and described prop 100 are strained, prestressed anchor enters duty;
S6, foundation ditch 90 have been constructed, and along with underground structure rises, prestressed anchor work completes, and removes the anchor pole base on prop 100, makes many described steel strand 50 in free state;
S7, adopt the fixture of two tape insulation handles to connect respectively wherein two steel strand 50 that connected power supply 70, switch on power 70, so that steel strand 50, power supply 70, heating wire 40 form loop, heating wire 40 heating of switching on, adopt the cold admittedly anchoring section 20 that material is poured into a mould the hollow circuit cylinder body structure forming of thermoplastic because of heating wire 40 heating deliquescing, steel strand 50 get loose;
S8, first choose and do not connect the steel strand 50 of power supply 70 by external force, then 70 the steel strand 50 of switching on power of choosing, steel strand 50 are removed complete, and the described heating wire 40 being connected with steel strand 50 also can be chosen accordingly, and prestressed anchor reclaims complete entirely.
It should be noted that, described central tube 30 also can adopt center bar, in the time that described central tube 30 adopts center bar, need to bind a Grouting Pipe at the sidewall of described anchoring section 20, now, available this Grouting Pipe replaces central tube 30, implements the slip casting operation to anchoring section 20, at this, do not elaborate.
By this, in the utility model embodiment, described anchoring section 20 is except steel strand 50, only containing a small amount of metal material, and do not need extra wire, switch on power 70, by the heating of heating wire 40, anchoring body is subject to after thermal softening, steel strand 50 separate with anchoring body is easy, and then the steel strand of anchoring section 20 50 can be taken out, and reach the object of substantially removing the metal material being buried in the earth completely, make effectively to remove metal garbage in soil, effectively reduce the environment pollution that metal garbage causes.
And the utility model is simple in structure, cost is low, and the required manpower of metal recovery is few and reclaim totally, convenient and swift, has larger environment protection significance and higher application value, can be very welcome, can be used widely.
The foregoing is only preferred embodiment of the present utility model; not thereby limit the scope of the claims of the present utility model; everyly utilize equivalent structure that manual of the present utility model and accompanying drawing content do or the conversion of equivalent flow process; or be directly or indirectly used in other relevant technical fields, within being all in like manner included in scope of patent protection of the present utility model.
Claims (4)
1. the full prestressed anchor that reclaims, comprise upper end and lower end, described upper end is free segment, in order to be connected with prop with building operations, described lower end is anchoring section, it is characterized in that, described anchoring section is to adopt the cold solid material of thermoplastic to pour into a mould the hollow circular cylinder forming, the hollow part adaptation of described hollow circular cylinder has a central tube that extends to described free segment, is fixed with a heating wire in described anchoring section around described central tube; In described hollow circular cylinder, be evenly equipped with the many steel strand that extend to described free segment along its circumferencial direction, wherein described in two, one end of steel strand is connected with the two-stage of described heating wire by a heating wire wiring terminal, other end external power supply.
2. full recovery prestressed anchor according to claim 1, is characterized in that, the cold solid material of described thermoplastic is sulphide mastic.
3. full recovery prestressed anchor according to claim 1, is characterized in that, described central tube is heat proof material.
4. full recovery prestressed anchor according to claim 3, is characterized in that, the external surface of described central tube wraps up or be coated with one deck insulation materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420081316.3U CN203729299U (en) | 2014-02-26 | 2014-02-26 | All-recycled prestressed anchor rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420081316.3U CN203729299U (en) | 2014-02-26 | 2014-02-26 | All-recycled prestressed anchor rod |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203729299U true CN203729299U (en) | 2014-07-23 |
Family
ID=51199384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420081316.3U Expired - Fee Related CN203729299U (en) | 2014-02-26 | 2014-02-26 | All-recycled prestressed anchor rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203729299U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821143A (en) * | 2014-02-26 | 2014-05-28 | 钟景尧 | Total-recovery pre-stressed anchor rod and manufacturing method thereof |
-
2014
- 2014-02-26 CN CN201420081316.3U patent/CN203729299U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821143A (en) * | 2014-02-26 | 2014-05-28 | 钟景尧 | Total-recovery pre-stressed anchor rod and manufacturing method thereof |
CN103821143B (en) * | 2014-02-26 | 2016-01-20 | 钟景尧 | A kind of full recovery prestressed anchor and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203755334U (en) | Single-pipe tower prefabricated spiral steel pipe pile foundation | |
CN103526770A (en) | High-impermeable anti-floating pile raft structure and construction method | |
CN102733385B (en) | Fully-recycled body expanding anchor rod and construction method for anchoring ground using same | |
CN105297704A (en) | Device for reinforcing soft foundation through electroosmosis reinforced piles and construction method | |
CN103774687A (en) | Single-pipe tower prefabricated spiral steel pipe pile foundation | |
CN104153401A (en) | Waterproof construction method for anti-floating anchor rods | |
CN103953036A (en) | Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation | |
CN102839691A (en) | Quick sealing method and device for sandless cement pipe deep well dewatering wellhead | |
CN201809768U (en) | Recyclable pre-stressing anchor rope with U-shaped anchoring head | |
CN104328790A (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN203729299U (en) | All-recycled prestressed anchor rod | |
CN206319334U (en) | A kind of prefabricated stealthy T-shaped floor tubular streetlamp foundation | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN206308707U (en) | A kind of city integrated Pipe rack of prefabricated assembled concrete | |
CN203403431U (en) | Quick installing tower structure with precast foundation | |
CN204690563U (en) | A kind of novel device for promoting concrete plate | |
CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
CN103821143B (en) | A kind of full recovery prestressed anchor and preparation method thereof | |
CN203977451U (en) | Electric power overhaul well | |
CN203403434U (en) | Basement | |
CN211113774U (en) | Assembled PC basement lateral wall post-cast strip structure | |
CN103924614B (en) | A kind of shaft tower split raft foundation fast-assembling basis | |
CN204626473U (en) | Basement roof waterproof construction | |
CN203960813U (en) | Anchorage part for earth work membrane | |
CN204510291U (en) | Reduce pressure under a kind of ultra-deep underground space structure base plate drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140723 Termination date: 20190226 |