CN203722116U - Double-bus-chamber conjoined gas insulation switch equipment bus room - Google Patents

Double-bus-chamber conjoined gas insulation switch equipment bus room Download PDF

Info

Publication number
CN203722116U
CN203722116U CN201420016563.5U CN201420016563U CN203722116U CN 203722116 U CN203722116 U CN 203722116U CN 201420016563 U CN201420016563 U CN 201420016563U CN 203722116 U CN203722116 U CN 203722116U
Authority
CN
China
Prior art keywords
bus
double
bar
gas
contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420016563.5U
Other languages
Chinese (zh)
Inventor
林大喜
阙银中
杜北江
张文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Schweiz AG
Original Assignee
ABB T&D Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB T&D Technology AG filed Critical ABB T&D Technology AG
Priority to CN201420016563.5U priority Critical patent/CN203722116U/en
Application granted granted Critical
Publication of CN203722116U publication Critical patent/CN203722116U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)

Abstract

The utility model provides a double-bus-chamber conjoined gas insulation switch equipment bus room. In the bus room, the two same and independent bus rooms of original adjacent cabinet bodies are designed into one body and an independent operation function of three station mechanisms respectively is maintained. The novel bus room is simple in structure. Material cost of the bus room and material cost needed during cabinet consolidation are greatly saved. On-site cabinet consolidation efficiency is increased. And a gas leakage risk and an insulation risk which are probably caused because cabinet consolidation quality is poor are reduced.

Description

The gas-insulated switchgear bus-bar room that double-bus chamber is conjuncted
Technical field
The utility model belongs to power product technical field, relates to gas-insulated switchgear field, is specifically related to a kind of bus-bar room of gas-insulated switchgear.
Background technology
Generally, SF6 gas insulation switch cabinet, when application, during two adjacent cabinet splicings, need be spliced into one by its bus-bar room by related accessories.
Fig. 1 is the bus-bar room of an existing cabinet.During work, housing 11 connects with next door cabinet housing, and electric current is through bus socket 12, then to contacts 17 in the middle of bus bar copper row 13, branch row 14, fixed contact 15, three station moving contacts 16, three stations, finally to wall bushing 18, receives breaker chamber again; When three station moving contacts 16 are transferred to ground connection position, be connected with grounding contact 19, wall bushing is to the line-to-ground of breaker chamber side.
Shown in Fig. 2 and Fig. 3, be respectively two bus-bar room schematic diagrames after two bus-bar rooms splicing schematic diagrames of the adjacent cabinet of existing gas insulation switch cabinet and adjacent cabinet have spliced.During work, the electric current of two adjacent cabinets 21 is through bus bar copper row 13, the bus socket 12 of a cabinet body, by splicing annex used: connecting copper pipe 23, then to bus socket 12, the bus bar copper row 13 of an other cabinet body, form with the operating characteristic described in Fig. 1.Wherein insulating sleeves 22 plays the insulation protection effect of stitching portion.
In prior art, two adjacent cabinets, when splicing, pay particular attention to owing to spelling the cabinet Leakage Gas risk causing of poor quality and insulation risk.Therefore the splicing of the bus-bar room between cabinet has taken a large amount of time, cost.The utility model proposes a kind of brand-new bus-bar room, by two of original adjacent cabinet independently identical bus-bar room be designed to one, but still keep original three position mechanism function of independent operation separately; It is simple in structure, greatly saved the Material Cost of bus-bar room and when splicing between adjacent cabinet required Material Cost, improved the efficiency of on-the-spot spelling cabinet, reduced the above-mentioned possible risk of mentioning.
Utility model content
It is simple in structure that the purpose of this utility model is to provide, the gas-insulated switchgear bus-bar room that cost-saving double-bus chamber is conjuncted, it comprises housing, bus socket, bus bar copper row, two branch rows, also comprises two three-stations, and described each several part is linked in sequence.
According to most preferred embodiment of the present utility model, each of two three-stations described in the conjuncted gas-insulated switchgear bus-bar room in double-bus chamber includes contact and grounding contacts in the middle of fixed contact, three station moving contacts, three stations.The operating function of two three-stations is separate.
According to most preferred embodiment of the present utility model, in the middle of bus socket, bus bar copper row, the first branch row, the first fixed contact, the one or three station moving contact, the one or three station, contact and the first wall bushing form loop.In the middle of bus socket, bus bar copper row, the second branch row, the second fixed contact, the two or three station moving contact, the two or three station, contact and the second wall bushing form loop.
According to most preferred embodiment of the present utility model, bus bar copper row is directly connected with bus socket in the mode of single long copper bar.Housing outward appearance total length is 800-1600 millimeter.
This novel bus cell structure is simple, greatly saved the Material Cost of bus-bar room and when spelling cabinet required Material Cost, improved the efficiency of on-the-spot spelling cabinet, reduced because spelling the cabinet Leakage Gas risk that may cause of poor quality and insulation risk.
Accompanying drawing explanation
Figure 1 shows that the bus-bar room of existing gas insulation switch cabinet;
Figure 2 shows that two bus-bar room spliced maps of the adjacent cabinet of existing gas insulation switch cabinet;
Figure 3 shows that two bus-bar rooms after the adjacent cabinet of existing gas insulation switch cabinet has spliced;
Figure 4 shows that the gas-insulated switchgear bus-bar room structural representation that double-bus of the present utility model chamber is conjuncted.
Embodiment
Below with reference to accompanying drawing, the specific descriptions of optional execution mode of the present utility model have been provided.
Figure 4 shows that the gas-insulated switchgear bus-bar room structural representation that double-bus chamber is conjuncted, figure comprises housing 41, bus socket 42, bus bar copper row 43, two branch rows 44,54, also comprises two three-stations, and described each several part is linked in sequence.It by two of original adjacent cabinet independently identical bus-bar room be designed to one, but still keep original three position mechanism function of independent operation separately.
Wherein first three-station comprises first fixed contact 45, first three stations moving contact 46, the middle contact 47 of first three station and first grounding contact 49.Second three-station comprises contact 57 and second grounding contact 59 in the middle of first fixed contact 55, second three station moving contacts 56, second three station.
During work, housing 41 (the housing integrators of original two bus-bar rooms) still splices with next door cabinet, electric current is through bus socket 42, arrive again bus bar copper row 43, first branch row 44, first fixed contact 45, first three stations moving contact 46, the middle contact 47 of first three station, finally to wall bushing 48, receive again breaker chamber; When first three stations moving contact 46 is transferred to ground connection position, be connected with first grounding contact 49, wall bushing is to the line-to-ground of breaker chamber side.Wherein, bus bar copper row 43 is that mode with single long copper bar is directly connected with bus socket 42.
Same electric current is through bus socket 42, then to contacts 57 in the middle of bus bar copper row 43, second branch row 54, second fixed contact 55, second three station moving contact 56, second three station, finally to second wall bushing 58, receives breaker chamber again; When second three station moving contact 56 is transferred to ground connection position, be connected with second grounding contact 59, wall bushing 58 is to the line-to-ground of breaker chamber side.
With original two bus-bar rooms, compare, saved the material of 42,3 insulating sleeves 22 of 6 bus sockets and 3 connecting copper pipes 23, greatly saved cost; Meanwhile, whole original three position mechanism function of independent operation separately that still keeps.The conjuncted gas-insulated switchgear bus-bar room outward appearance total length in double-bus of the present utility model chamber is 800-1600 millimeter, preferably 1200 millimeters.
Two adjacent cabinets are when spelling cabinet, and between the bus-bar room of every 4 cabinet bodies, the number of times of splicing is directly reduced to 1 time from 3 times between two, has improved the efficiency of on-the-spot spelling cabinet, has reduced because spelling the cabinet Leakage Gas risk that may cause of poor quality and insulation risk.
Although disclose for the purpose of illustration preferred embodiment of the present utility model and accompanying drawing, person skilled in the art, within not departing from the spirit and scope of the utility model and appended claim, can do various replacements, variation and retouching.Therefore, the utility model should not be limited to preferred embodiment and the disclosed content of accompanying drawing, and protection range of the present utility model is as the criterion with the scope that appending claims was defined.

Claims (7)

1. the conjuncted gas-insulated switchgear bus-bar room in double-bus chamber, is characterized in that: comprise housing (41), bus socket (42), bus bar copper row (43), two branch rows (44,54), also comprise two three-stations; Described each parts are linked in sequence.
2. the conjuncted gas-insulated switchgear bus-bar room in double-bus according to claim 1 chamber, is characterized in that: each of described two three-stations includes fixed contact (45,55), three station moving contacts (46,56), the middle contact (47,57) of three stations and grounding contact (49,59).
3. the conjuncted gas-insulated switchgear bus-bar room in double-bus according to claim 1 chamber, is characterized in that: the operating function of described two three-stations is separate.
4. the gas-insulated switchgear bus-bar room conjuncted according to the double-bus chamber described in claim 2 or 3, is characterized in that: in the middle of bus socket (42), bus bar copper row (43), the first branch row (44), the first fixed contact (45), the one or three station moving contact (46), the one or three station, contact (47), the first wall bushing (48) form loop.
5. the gas-insulated switchgear bus-bar room conjuncted according to the double-bus chamber described in claim 2 or 3, is characterized in that: in the middle of bus socket (42), bus bar copper row (43), the second branch row (54), the second fixed contact (55), the two or three station moving contact (56), the two or three station, contact (57), the second wall bushing (58) form loop.
6. according to the conjuncted gas-insulated switchgear bus-bar room in double-bus chamber described in claim 1-3 any one, it is characterized in that: bus bar copper row (43) is directly connected with bus socket (42) in the mode of single long copper bar.
7. according to the conjuncted gas-insulated switchgear bus-bar room in double-bus chamber described in claim 1-3 any one, it is characterized in that: housing (41) outward appearance total length is 800-1600 millimeter.
CN201420016563.5U 2014-01-10 2014-01-10 Double-bus-chamber conjoined gas insulation switch equipment bus room Expired - Lifetime CN203722116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420016563.5U CN203722116U (en) 2014-01-10 2014-01-10 Double-bus-chamber conjoined gas insulation switch equipment bus room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420016563.5U CN203722116U (en) 2014-01-10 2014-01-10 Double-bus-chamber conjoined gas insulation switch equipment bus room

Publications (1)

Publication Number Publication Date
CN203722116U true CN203722116U (en) 2014-07-16

Family

ID=51161242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420016563.5U Expired - Lifetime CN203722116U (en) 2014-01-10 2014-01-10 Double-bus-chamber conjoined gas insulation switch equipment bus room

Country Status (1)

Country Link
CN (1) CN203722116U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114976982A (en) * 2022-04-25 2022-08-30 北京清畅电力技术股份有限公司 Multi-functional two isolator equipment of environmental protection gas insulation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114976982A (en) * 2022-04-25 2022-08-30 北京清畅电力技术股份有限公司 Multi-functional two isolator equipment of environmental protection gas insulation
CN114976982B (en) * 2022-04-25 2023-01-10 北京清畅电力技术股份有限公司 Multi-functional two isolator equipment of environmental protection gas insulation

Similar Documents

Publication Publication Date Title
CN203225492U (en) Built-in bus connecting structure for combined cabinet
CN203491176U (en) Gas-insulated and metal-enclosed switch equipment
CN205159808U (en) High tension switchgear system
CN202872241U (en) Bus bar chamber with bus bar isolation function and bus bar measuring function
CN203722116U (en) Double-bus-chamber conjoined gas insulation switch equipment bus room
CN202268612U (en) Power distribution system for low-voltage power distribution cabinet
CN201219177Y (en) Low-voltage distribution main konode system
CN204089010U (en) The gas insulation switch cabinet of multiple stage switch cubicle common bus room
CN203645086U (en) Hot plugging copper bar assembly
CN203491177U (en) Built-in isolating device of load switch on outdoor column
CN103855625A (en) Movable branch box
CN202076712U (en) Intelligent high/low-voltage power distribution unit
CN202094512U (en) Mechanism enabling medium pressure side of main transformer to be uninterruptible in overhaul
CN203850641U (en) Optimized 110kV cable wiring structure capable of realizing fault fast isolation
CN202111372U (en) Fixed and sealed type main bus assembly
CN205039406U (en) Cubical switchboard and generating line thereof
CN205050714U (en) Cubical switchboard and bus -bar room and moving contact thereof
CN203951058U (en) A kind of removable feeder pillar
CN204179553U (en) A kind of drawer type solid all-insulated switch
CN103248046A (en) Medium voltage distribution network wiring network
CN203180418U (en) Breaker chamber used for gas insulation switch equipment
CN204809166U (en) Circuit breaker annex fast assembly structure
CN203951065U (en) A kind of 10kV combined-type box becomes wire-outgoing breaker insulated isolated device
CN203871261U (en) ZW20 type vacuum circuit breaker provided with insulation cover
CN203645229U (en) Dual-bus combined electric appliance bus isolating switch gas chamber overhauled in non-fully-stopped state

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180524

Address after: Baden, Switzerland

Patentee after: ABB Switzerland Co.,Ltd.

Address before: Zurich

Patentee before: ABB TECHNOLOGY Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20140716

CX01 Expiry of patent term