CN203716496U - Side formwork fixing frame for concrete floor construction - Google Patents

Side formwork fixing frame for concrete floor construction Download PDF

Info

Publication number
CN203716496U
CN203716496U CN201420073537.6U CN201420073537U CN203716496U CN 203716496 U CN203716496 U CN 203716496U CN 201420073537 U CN201420073537 U CN 201420073537U CN 203716496 U CN203716496 U CN 203716496U
Authority
CN
China
Prior art keywords
sleeve pipe
arm
side template
tripod
fixed mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420073537.6U
Other languages
Chinese (zh)
Inventor
王慧春
克斌
吴新坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang 20 Smelter Construction Co ltd
China MCC20 Group Corp Ltd
Original Assignee
NINGBO MCC20 CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO MCC20 CONSTRUCTION CO Ltd filed Critical NINGBO MCC20 CONSTRUCTION CO Ltd
Priority to CN201420073537.6U priority Critical patent/CN203716496U/en
Application granted granted Critical
Publication of CN203716496U publication Critical patent/CN203716496U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a side formwork fixing frame for concrete floor construction. The side formwork fixing frame comprises a steel channel, a tripod, a first casing pipe, a second casing pipe, a bearing and a ground anchor rebar, wherein the tripod is arranged in the steel channel in the length direction of the steel channel; the steel channel comprises a first cross plate, a vertical plate and a second cross plate which are sequentially connected; the tripod comprises a vertical arm, a cross arm and an inclined arm which are connected sequentially end to end; the bearing penetrates through the first casing pipe, the top and the bottom of the bearing are connected with the top and the bottom of the vertical arm respectively, and the first casing pipe is connected with the vertical plate; the ground anchor rebar penetrates through the second casing pipe, and the bottom of the ground anchor rebar is inserted into a ground soil layer; and the second casing pipe is connected with connecting ends of the cross arm and the inclined arm. The side formwork fixing frame for concrete floor construction is simple in structure, labor-saving, high in construction speed, low in material loss, low in construction cost and long in service life.

Description

A kind of concrete terrace construction side template fixed mount
Technical field
The utility model relates to technical field of building construction, relates in particular to a kind of concrete terrace construction side template fixed mount.
Background technology
In concrete floor and road construction process, all to use side template fixed mount, but existing side template fixed rack structure is complicated, in mold process, need a large amount of artificial participations, speed of application is slow, and spillage of material is large, and construction cost is greatly increased.In addition, the application life of existing side template is short, can not meet growing demand.
Summary of the invention
The technical problems to be solved in the utility model is, complicated for side template fixed rack structure in prior art, need manually to participate in a large number, the above-mentioned defect such as speed of application is slow, spillage of material is large, construction cost is large and application life is short, provide a kind of simple in structure, less manpower, speed of application is fast, spillage of material is little, construction cost is little and the concrete terrace construction side template fixed mount of long service life.
The utility model solves the technical scheme that its technical problem adopts: a kind of concrete terrace construction side template fixed mount, comprise channel-section steel, tripod, the first sleeve pipe, the second sleeve pipe, bearing and earth anchor reinforcing bar, and tripod is arranged in channel-section steel along the length direction of channel-section steel;
Channel-section steel comprises the first transverse slat, riser and the second transverse slat being connected successively;
Tripod comprises end to end perpendicular arm, transverse arm and oblique arm successively;
Bearing is located in the first sleeve pipe, and its top is connected with bottom with the top of perpendicular arm respectively with bottom, and the first sleeve pipe is connected with riser;
Earth anchor reinforcing bar is located in the second sleeve pipe, and insert in layer of ground soil its bottom; The second sleeve pipe is connected with the link of transverse arm and oblique arm.
In technical scheme described in the utility model, described concrete terrace construction side template fixed mount comprises channel-section steel, tripod, the first sleeve pipe, the second sleeve pipe, bearing and earth anchor reinforcing bar, and tripod is arranged in channel-section steel along the length direction of channel-section steel; Channel-section steel comprises the first transverse slat, riser and the second transverse slat, and tripod comprises perpendicular arm, transverse arm and oblique arm; Bearing is located in the first sleeve pipe, and its top is connected with bottom with the top board of perpendicular arm respectively with bottom, and the first sleeve pipe is connected with riser; Earth anchor reinforcing bar is located in the second sleeve pipe, and insert in layer of ground soil its bottom; The second sleeve pipe is connected with the link of transverse arm and oblique arm.Hence one can see that, and concrete terrace construction side template fixed mount described in the utility model is not only simple in structure, and without a large amount of artificial constructions that participate in, saved manually, and speed of application is fast, spillage of material is little, greatly reduce construction cost, and its long service life, the number of turnover is many.
As a kind of improvement to technical scheme described in the utility model, the distance between adjacent two tripods is 1200mm.In technical scheme described in the utility model, the distance between adjacent two tripods, namely the visual concrete condition of distance between adjacent 2 perpendicular arms is set as other value.
As a kind of improvement to technical scheme described in the utility model, the diameter of bearing is 20mm.
As a kind of improvement to technical scheme described in the utility model, the internal diameter of the first sleeve pipe and the second sleeve pipe is 22mm.The internal diameter of the first sleeve pipe is larger than the diameter of bearing, is convenient to the installation of bearing and the first sleeve pipe.
As a kind of improvement to technical scheme described in the utility model, the length of transverse arm is 500-600mm.
As a kind of improvement to technical scheme described in the utility model, the length of earth anchor reinforcing bar is 600mm.
In addition, in the technical scheme described in the utility model, all being not specifically noted, all can be by adopting the conventional means in this area realize the technical program.
Therefore, the utility model provides a kind of concrete terrace construction side template fixed mount, and this side template fixed rack structure is simple, less manpower, and speed of application is fast, and spillage of material is little, the low and long service life of construction cost.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the structural representation of the utility model concrete terrace construction side template fixed mount;
Now that the label declaration in accompanying drawing is as follows: 1 is the first transverse slat, 2 is riser, and 3 is the second transverse slat, and 4 is transverse arm, and 5 is oblique arm, and 6 is bearing, and 7 is the first sleeve pipe, and 8 is earth anchor reinforcing bar, and 9 is the second sleeve pipe, and 10 is layer of ground soil.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
In the utility model preferred embodiment, a kind of concrete terrace construction side template fixed mount, comprises channel-section steel, tripod, the first sleeve pipe 7, the second sleeve pipe 9, bearing 6 and earth anchor reinforcing bar 8, and this tripod is arranged in channel-section steel along the length direction of channel-section steel.
As shown in Figure 1, above-mentioned channel-section steel comprises the first transverse slat 1, riser 2 and the second transverse slat 3 being connected successively, and above-mentioned tripod comprises end to end perpendicular arm, transverse arm 4 and oblique arm 5 successively.
Above-mentioned bearing 6 is located in the first sleeve pipe 7, and its top is connected with bottom with the top of above-mentioned perpendicular arm respectively with bottom, and this first sleeve pipe 7 is connected with riser 2.
And above-mentioned earth anchor reinforcing bar 8 is located in the second sleeve pipe 9, and insert in layer of ground soil 10 its bottom; Above-mentioned the second sleeve pipe 9 is connected with the link of oblique arm 5 with transverse arm 4.
In the present embodiment, the distance between adjacent two tripods is 1200mm, and the length of transverse arm 4 is 500-600mm, and the length of earth anchor reinforcing bar 8 is 600mm.
In addition, in the present embodiment, the diameter of bearing 6, earth anchor reinforcing bar 8, perpendicular arm, transverse arm 4 and oblique arm 5 is 20mm, and the internal diameter of the first sleeve pipe 7 and the second sleeve pipe 9 is 22mm.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improvement and conversion all should belong to the protection domain of the utility model claims.

Claims (6)

1. a concrete terrace construction side template fixed mount, it is characterized in that, comprise channel-section steel, tripod, the first sleeve pipe (7), the second sleeve pipe (9), bearing (6) and earth anchor reinforcing bar (8), and described tripod is arranged in described channel-section steel along the length direction of described channel-section steel;
Described channel-section steel comprises the first transverse slat (1), riser (2) and the second transverse slat (3) being connected successively;
Described tripod comprises end to end perpendicular arm, transverse arm (4) and oblique arm (5) successively;
Described bearing (6) is located in the first sleeve pipe (7), and its top is connected with bottom with the top of described perpendicular arm respectively with bottom, and described the first sleeve pipe (7) is connected with described riser (2);
Described earth anchor reinforcing bar (8) is located in described the second sleeve pipe (9), and insert in layer of ground soil (10) its bottom; Described the second sleeve pipe (9) is connected with the link of oblique arm (5) with described transverse arm (4).
2. concrete terrace construction side template fixed mount according to claim 1, is characterized in that, the distance between described adjacent two tripods is 1200mm.
3. concrete terrace construction side template fixed mount according to claim 1, is characterized in that, the diameter of described bearing (6) is 20mm.
4. concrete terrace construction side template fixed mount according to claim 1, is characterized in that, the internal diameter of described the first sleeve pipe (7) and the second sleeve pipe (9) is 22mm.
5. concrete terrace construction side template fixed mount according to claim 1, is characterized in that, the length of described transverse arm (4) is 500-600mm.
6. concrete terrace construction side template fixed mount according to claim 1, is characterized in that, the length of described earth anchor reinforcing bar (8) is 600mm.
CN201420073537.6U 2014-02-20 2014-02-20 Side formwork fixing frame for concrete floor construction Expired - Lifetime CN203716496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420073537.6U CN203716496U (en) 2014-02-20 2014-02-20 Side formwork fixing frame for concrete floor construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420073537.6U CN203716496U (en) 2014-02-20 2014-02-20 Side formwork fixing frame for concrete floor construction

Publications (1)

Publication Number Publication Date
CN203716496U true CN203716496U (en) 2014-07-16

Family

ID=51155662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420073537.6U Expired - Lifetime CN203716496U (en) 2014-02-20 2014-02-20 Side formwork fixing frame for concrete floor construction

Country Status (1)

Country Link
CN (1) CN203716496U (en)

Similar Documents

Publication Publication Date Title
CN204298824U (en) Foundation ditch concreting pipeline buffering structure
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN205776339U (en) Both arms Retaining Wall
CN203021899U (en) Quick-assembling template device for concrete ground construction
CN204717144U (en) A kind of concrete pump pipe setting tool cribbing
CN204040515U (en) Cat ladder
CN203716496U (en) Side formwork fixing frame for concrete floor construction
CN102926537B (en) Device for fixing root of external wall formwork
CN204801846U (en) Civil engineering pipe fitting rack
CN204401627U (en) To pull-type prestressed pipe pile pit supporting construction
CN102877859A (en) End mould structure for tunnel secondary lining and mounting method thereof
CN205839812U (en) A kind of post-cast strip pretreatment unit
CN207776302U (en) A kind of pitched roof bar planting welding levelling constructing device of zinc-plated square tube
CN203926599U (en) Screw pull rod
CN203977996U (en) Bulk cargo stockyard, a kind of regularization job site fence
CN204212302U (en) A kind of hollowcore slab light pipe float Structure
CN104453017A (en) Module wall for house building
CN202900287U (en) Secondary lining end mold structure of tunnel
CN202914109U (en) Integral type lining system of light-section cable tunnel
CN202187602U (en) PX pump house inlet channel heat preservation greenhouse
CN205116017U (en) Catwalk device
CN206385709U (en) A kind of mud insulating brick
CN205206351U (en) Special split heads of big terrace
CN204238247U (en) Cable shaft structure
CN201763013U (en) Summerhouse with flat top

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Patentee after: Zhejiang 20 Smelter Construction Co.,Ltd.

Address before: 315300 Pearl River Road 429, Beilun District, Ningbo City, Zhejiang Province

Patentee before: NINGBO MCC 20 CONSTRUCTION Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20190604

Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: Zhejiang 20 Smelter Construction Co.,Ltd.

Address before: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Patentee before: Zhejiang 20 Smelter Construction Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20140716

CX01 Expiry of patent term