CN203716304U - Flat-plate type embedded part - Google Patents
Flat-plate type embedded part Download PDFInfo
- Publication number
- CN203716304U CN203716304U CN201320509830.8U CN201320509830U CN203716304U CN 203716304 U CN203716304 U CN 203716304U CN 201320509830 U CN201320509830 U CN 201320509830U CN 203716304 U CN203716304 U CN 203716304U
- Authority
- CN
- China
- Prior art keywords
- dowel
- fitting
- flat
- built
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model mainly discloses a flat-plate type embedded part which comprises an anchor plate, a plurality of anchor ribs and a plurality of anchoring mechanisms, wherein the multiple anchor ribs are welded on the anchor plate; the anchoring mechanisms are formed at the tail ends of the anchor ribs. Under a condition that the anchoring lengths of the anchor ribs are limited by the thickness of a concrete structural member, the flat-plate type embedded part can reasonably shorten the anchoring lengths of the anchor ribs and also can avoid a contradiction of cross construction between a steel structure industry and a concrete industry, so as to reduce the difficulty of the construction mounting of the embedded part.
Description
Technical field
The utility model relates to building engineering field, particularly about the improvement of flat built-in fitting conventional in a kind of construction steel structure.
Background technology
The flat built-in fitting that welds dowel on a block plate is a kind of primary structure member that building engineering field is conventional, has the plurality of advantages such as stress performance is good, easy construction.Since 21 century, construction steel structure fast development, in the connected node of the reinforced concrete members such as steel member and reinforced concrete foundation, reinforced concrete shear wall, the application of flat built-in fitting is very general.
In construction steel structure, flat built-in fitting is played the part of the power transmission medium of important component often, suffered counter-force is larger, dowel quantity is more, diameter is thicker, according to " Code for design of concrete structures " (GB50010-2010) relevant regulations the anchorage length that is subject to stretching dowel is calculated, often occur that concrete component thickness cannot meet the situation of the least anchorage length of dowel, the way that the general employing of this structure design teacher is established to 90 degree crotches (12 times of dowel diameters of crotch length) at dowel end is strengthened anchoring, as shown in Figure 1, in existing design, built-in fitting 10 comprises anchor slab 30, dowel 40, be embedded in reinforced concrete beam 20 tops, the plug welding of boring a hole of dowel 40 and anchor slab 30 is connected, reinforced concrete beam 20 is highly 1000mm, concrete material is C30.
According to code requirement, it is 1000mm that dowel 40 calculates anchorage length, and built-in fitting 10 overall heights reach 1036mm, exceed the height of reinforced concrete beam 20.To this, the way that adds 90 degree crotches 50 with regard to adopting in dowel 40 bottoms is strengthened anchoring, wherein straight section length 600mm, crotch length 400mm.Construction stage, because of construction period contradiction between two specialties, before built-in fitting 10 is marched into the arena, the reinforcing cage of reinforced concrete beam 20 colligation completes, and job site reflects that former design built-in fitting 10 cannot construct.
Because steel work and concrete structure adhere to Liang Zhi professional construction troop separately, the built-in fitting of steel work is generally transported to on-the-spot installation again making in factory after integral manufacturing, and the construction continuity of concrete specialty is very strong.Once there is contradiction on the duration, its result often built-in fitting 10 place's reinforced concrete members reinforcing cage colligation complete, the built-in fitting 10 of steel work is marched into the arena just now, now in face of thickly dotted reinforcing bar, the crotch 50 of dowel 40 bottoms just becomes the great obstacle of installation of embedded parts, way specification, the reinforcing bar of concrete specialty is prized curved one by one, reinforcing bar gap in increase reinforcing cage is to meet dowel interpolation, time-consuming self-evident, way is nonstandard, directly the crotch of dowel bottom is cut off, and buries on the spot potential safety hazard.
Therefore, in the situation that dowel anchorage length is subject to reinforced concrete member thickness limits, the flat built-in fitting of construction steel structure specialty needs one more reasonably to construct, can rationally shorten the anchorage length of dowel, can evade again two crossed construction contradictions between specialty, reduce the construction and installation difficulty of built-in fitting, prevent barbarous construction, therefore this case produces.
Utility model content
The purpose of this utility model is a kind of flat built-in fitting, in the situation that dowel anchorage length is subject to concrete component thickness limits, can rationally shorten the anchorage length of dowel, can evade again crossed construction contradiction between steel work specialty and concrete specialty, reduce the construction and installation difficulty of built-in fitting.
In order to achieve the above object, technical solution of the present utility model is:
A kind of flat built-in fitting, comprises anchor slab, some dowels, some anchoring mechanisms; On anchor slab, weld some dowels, dowel end forms anchoring mechanism.
Described anchoring mechanism pastes at least one section of reinforcing bar of weldering at dowel end.
Described anchoring mechanism is that welding steel muscle is pasted in dowel end both sides.
Described reinforcing bar length is 3 times of dowel diameter.
Described reinforcing bar is with the same material of dowel, with the reinforcing bar of diameter.
Described dowel is hot rolled ribbed steel bar, and diameter is not more than 25mm.
Compared with the prior art the utility model, has the following advantages and good effect:
1, save material, convenient making, owing to having adopted rational anchoring mechanism, has effectively strengthened the anchoring effect of dowel in reinforced concrete member, and the anchorage length of dowel can shorten 30% by more theoretical least anchorage length, plays material-saving effect.The improvement of anchoring structure, means the input without extra reinforcing bar bending equipment to structure steel fabrication enterprise, can reduce the cost of manufacture of built-in fitting, and its manufacture craft is also more convenient.
2, convenient construction, due to projected scale's little (only 3 times of dowel diameters) of dowel anchored end structure, even if built-in fitting position reinforcing cage in advance colligation completes, reinforcing bar gap in reinforcing cage all can meet this dowel interpolation requirement in the ordinary course of things, thereby has greatly reduced built-in fitting construction and installation difficulty.
Brief description of the drawings
Fig. 1 is the structural representation of built-in fitting in existing design;
Fig. 2 is the utility model preferred embodiment floor map;
Fig. 3 is the utility model preferred embodiment schematic three dimensional views;
Fig. 4 is the utility model preferred embodiment built-in fitting anchoring mechanism enlarged diagram;
Fig. 5 is that A-A in Fig. 4 is to generalized section.
Detailed description of the invention
By reference to the accompanying drawings, to the utility model, preferred embodiment is described in further details.
As shown in Fig. 2~Fig. 5, a kind of flat built-in fitting 6, comprises anchor slab 3, dowel 7, anchoring mechanism 8.
Built-in fitting 6 is placed in reinforced concrete beam 2 tops, the Q345B steel plate that in the present embodiment, anchor slab 3 is thick 36mm, dowel 4 is the HRB400 hot rolled ribbed steel bar of diameter 25mm, is connected with anchor slab 3 plug welding of boring a hole, reinforced concrete beam 2 is highly 1000mm, and concrete material is C30.Wherein, dowel 4 diameters, according to calculative determination, are generally not more than 25mm, and the spacing between dowel 4 should meet code requirement.When dowel 4 diameters are not more than 20mm, dowel 4 adopts pressure submerged arc welding with the T shape welding of anchor slab 3, adopts perforation plug welding when diameter is greater than 20mm.
The specific practice of anchoring mechanism 8 is: paste two sections of welderings and the reinforcing bar 9 of dowel 7 same specifications, same to material, long 75mm in dowel 7 two bottom sides, as shown in Figure 4, Figure 5, Weld quality level is three grades to subsides welding line 10.
In the situation that not taking anchoring mechanism 8, dowel 7 is identical with the theoretical anchorage length of dowel 4, be 1000mm, because anchoring mechanism 8 has effectively strengthened the anchoring effect of dowel 7, the anchorage length of dowel 7 can more theoretical anchorage length shorten 30%, get 700mm, played and saved material, convenient effect of making.In addition, the projected scale of dowel 7 anchored end structures is contracted to 25 × 75mm, anchored end yardstick compared with dowel 4 dwindles more than 80%, and reinforcing bar gap minimum in reinforced concrete beam 2 is 80 × 88mm, even very narrow and small, but still can meet the interpolation requirement of dowel 7, and do not need extra manual intervention, thereby be very easy to the installation of built-in fitting 6.
Above-described embodiment is only for the inventive concept of the present utility model of explaining, but not restriction to the utility model rights protection, allly utilizes this design to carry out the change of unsubstantiality to the utility model, all should fall into protection domain of the present utility model.
Claims (5)
1. a flat built-in fitting, is characterized in that: comprise anchor slab, some dowels, some anchoring mechanisms; On anchor slab, weld some dowels, dowel end forms anchoring mechanism; Described anchoring mechanism is to paste at least one section of reinforcing bar of weldering at dowel end.
2. the flat built-in fitting of one as claimed in claim 1, is characterized in that: described anchoring mechanism is that welding steel muscle is pasted in dowel end both sides.
3. the flat built-in fitting of one as claimed in claim 1, is characterized in that: described reinforcing bar length is 3 times of dowel diameter.
4. the flat built-in fitting of one as claimed in claim 1, is characterized in that: described reinforcing bar is with the same material of dowel, with the reinforcing bar of diameter.
5. the flat built-in fitting of one as claimed in claim 1, is characterized in that: described dowel is hot rolled ribbed steel bar, and diameter is not more than 25mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320509830.8U CN203716304U (en) | 2013-08-20 | 2013-08-20 | Flat-plate type embedded part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320509830.8U CN203716304U (en) | 2013-08-20 | 2013-08-20 | Flat-plate type embedded part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203716304U true CN203716304U (en) | 2014-07-16 |
Family
ID=51155472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320509830.8U Expired - Fee Related CN203716304U (en) | 2013-08-20 | 2013-08-20 | Flat-plate type embedded part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203716304U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040880A (en) * | 2015-08-06 | 2015-11-11 | 中国华西企业股份有限公司 | Roof steel structure and construction method thereof |
CN105040855A (en) * | 2015-07-10 | 2015-11-11 | 华南理工大学建筑设计研究院 | Assembled prefabricated shear wall welding end plate and horizontal steel combination connecting device |
CN105649214A (en) * | 2016-03-21 | 2016-06-08 | 上海核工程研究设计院 | Embedded parts for steel plate-concrete structures |
CN105839786A (en) * | 2016-03-18 | 2016-08-10 | 中国建筑第八工程局有限公司 | Air-supported membrane building concrete anchor bolt pre-buried structure and construction method thereof |
CN106894834A (en) * | 2017-03-13 | 2017-06-27 | 北京市轨道交通设计研究院有限公司 | A kind of leading screw branch ejection device and subsidence control method |
CN107470867A (en) * | 2017-08-31 | 2017-12-15 | 中建三局第二建设工程有限责任公司 | A kind of processing method of curtain wall built-in fitting |
CN108487462A (en) * | 2018-03-26 | 2018-09-04 | 詹焕辉 | Reinforcing bar in a kind of concrete frame node(Antidetonation)Anchoring process |
CN113136964A (en) * | 2021-04-25 | 2021-07-20 | 广州市伍柳建材装饰工程有限公司 | Green building assembly type steel structure embedded fastener and forming method |
CN113802697A (en) * | 2021-08-31 | 2021-12-17 | 中冶(上海)钢结构科技有限公司 | Machining and embedding method for steel structure embedded part in dense steel bar area |
-
2013
- 2013-08-20 CN CN201320509830.8U patent/CN203716304U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040855A (en) * | 2015-07-10 | 2015-11-11 | 华南理工大学建筑设计研究院 | Assembled prefabricated shear wall welding end plate and horizontal steel combination connecting device |
CN105040855B (en) * | 2015-07-10 | 2017-11-03 | 华南理工大学建筑设计研究院 | Prefabricated shear wall welded end plate and horizontal section steel combined connection apparatus |
CN105040880A (en) * | 2015-08-06 | 2015-11-11 | 中国华西企业股份有限公司 | Roof steel structure and construction method thereof |
CN105839786A (en) * | 2016-03-18 | 2016-08-10 | 中国建筑第八工程局有限公司 | Air-supported membrane building concrete anchor bolt pre-buried structure and construction method thereof |
CN105649214A (en) * | 2016-03-21 | 2016-06-08 | 上海核工程研究设计院 | Embedded parts for steel plate-concrete structures |
CN106894834A (en) * | 2017-03-13 | 2017-06-27 | 北京市轨道交通设计研究院有限公司 | A kind of leading screw branch ejection device and subsidence control method |
CN107470867A (en) * | 2017-08-31 | 2017-12-15 | 中建三局第二建设工程有限责任公司 | A kind of processing method of curtain wall built-in fitting |
CN108487462A (en) * | 2018-03-26 | 2018-09-04 | 詹焕辉 | Reinforcing bar in a kind of concrete frame node(Antidetonation)Anchoring process |
CN113136964A (en) * | 2021-04-25 | 2021-07-20 | 广州市伍柳建材装饰工程有限公司 | Green building assembly type steel structure embedded fastener and forming method |
CN113802697A (en) * | 2021-08-31 | 2021-12-17 | 中冶(上海)钢结构科技有限公司 | Machining and embedding method for steel structure embedded part in dense steel bar area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203716304U (en) | Flat-plate type embedded part | |
CN205742613U (en) | A kind of prefabricated assembled overlapped shear wall structure connected by high-strength bolt | |
CN109707104B (en) | Concrete-filled steel tube casting body with tie bars and construction method | |
KR101178381B1 (en) | Steel-concrete hybrid column using square shaped steel pipe and manufacturing method thereof | |
CN108678218B (en) | Assembly type concrete shear wall based on multipurpose thin-wall steel pipe and construction method thereof | |
CN104532997A (en) | Assembly type floor system and construction method thereof | |
CN103485443B (en) | A kind of window shape steel plate concrete shear wall and preparation method thereof | |
CN103615071A (en) | Concrete-filled square steel tubular column with built-in spiral stirrup | |
CN104831818A (en) | Connection node of precast reinforced concrete beam and laminated column | |
CN211499378U (en) | Closely piece together two-way rib superimposed sheet node structure that does not go out | |
CN203347203U (en) | Multi-functional super-thick bulked concrete steel tube support system | |
CN108571169B (en) | Construction method for factory prefabricated steel concrete superposed shear wall assembly type building | |
KR101274994B1 (en) | Concrete filled double steel tube and concrete filled tubular column | |
CN107237453B (en) | Steel pipe concrete composite column | |
CN103469902A (en) | Full-rigidity steel pipe concrete column connecting node | |
CN202227585U (en) | Steel plate concrete shear wall coupling beam with studs arranged at anchor ends | |
CN205242675U (en) | Prefabricated assembled shear force wall horizontal bolt joint construction | |
CN204781443U (en) | Device for connecting precast shear wall concatenation about being used for | |
CN204081090U (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post | |
CN212053307U (en) | Steel wire net frame cement light composite heat insulation wall | |
CN209907689U (en) | Prefabricated member of floor member unit assembly | |
CN211714362U (en) | Multicavity steel core concrete column and connection structure thereof | |
CN203583782U (en) | Concrete single-layer reinforcing steel bar mesh | |
WO2016187933A1 (en) | Cellular concrete structure having structure-reinforcing mesh member and construction method thereof | |
CN111962953A (en) | Steel tube concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined side column middle node and manufacturing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140716 Termination date: 20180820 |