CN203712847U - Standardization curing chamber - Google Patents

Standardization curing chamber Download PDF

Info

Publication number
CN203712847U
CN203712847U CN201420017442.2U CN201420017442U CN203712847U CN 203712847 U CN203712847 U CN 203712847U CN 201420017442 U CN201420017442 U CN 201420017442U CN 203712847 U CN203712847 U CN 203712847U
Authority
CN
China
Prior art keywords
container
room
maintenance
standardization
curing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420017442.2U
Other languages
Chinese (zh)
Inventor
鲍迪
金睿
钱昀
袁震
王珂
金阚
杜昉威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Engineering Group Co Ltd
Original Assignee
Zhejiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Engineering Group Co Ltd filed Critical Zhejiang Construction Engineering Group Co Ltd
Priority to CN201420017442.2U priority Critical patent/CN203712847U/en
Application granted granted Critical
Publication of CN203712847U publication Critical patent/CN203712847U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a standardization curing chamber. A main body structure is a simple container room. The size is 6*3*2.6m, and a partition wall of a container is made of a polystyrene foam heat insulation material. Groove steel of a base plate of the container is subjected to reinforcing welding, a riffled steel plate is paved on the face layer of the base plate, a heat insulation mortar layer 30mm in thickness is paved on the riffled steel plate, and glazed tiles are paved on the heat insulation mortar layer. The container is provided with a curing room and a recording room. A test block curing goods shelf, an air conditioner and a special curing instrument are arranged in the curing room, and a concrete vibration table is arranged in the recording room. By means of the standardization container curing chamber, the curing chamber setting requirements can be met and standardized effectively, the position of the curing chamber can be adjusted flexibly, and the curing chamber can be used for many years in a recycling mode.

Description

A kind of standardization fog room
Technical field
The invention belongs to the realm of building construction, particularly a kind of for job site test block maintenance one rely on container be carrier, configure the standardization fog room and construction method and the maintenance process that form by repacking.
Background technology
Nowadays in the middle of the quality of engineering itself, test block, as important evidence, plays a part very important in engineering construction and quality control procedure.Therefore how better controlling the maintenance quality of test block the cost-saving requirement of accomplishing sustainable turnover that can be maximum, is a difficult problem in engineering construction.
Fog room is as a markization facility that must configuration in engineering construction, and the situation that cannot arrange not in place in a lot of on-the-spot factors due to place, the on-the-spot frequent appearance of condition.Let alone the finishing and the equipment configuration that fog room are carried out to standard.But meanwhile, fog room is supported the maintenance place of test block as mark, and the fine or not direct relation of its setting the quality of the foster test block of mark.
In prior art, also occur standardization fog room.Consider the green energy conservation construction feature in conjunction with fog room self, the present invention is intended to adopt the fog room of container-type, not only can have enough to meet the need the requirement that utilizes simultaneously but also ensure maintenance, thereby better promote the management of construction quality.
Summary of the invention
In order to overcome the different fog room way of restriction and each building site in site operation place, guarantee the quality of on-the-spot test block maintenance, the invention provides a kind of standardization fog room.
A kind of standardization fog room, is characterized in that, the agent structure of described standardization fog room is a simple and easy container room, is of a size of 6 × 3 × 2.6m, and the partition material of container adopts polystyrene foam heat insulation material; The channel-section steel of container bottom board is reinforced to welding, and bottom plate surface layer is equipped with checkered steel plate, is equipped with after 30mm heat-insulation mortar bedly on checkered steel plate, is equipped with glazed tile on heat-insulation mortar bed; Container is provided with between a maintenance and an interocclusal record chamber; In fog room, dispose test block maintenance shelf, air-conditioning and maintenance instrumentation, maintenance instrumentation comprises humidifier, hot water storgae, controller, thermometer and hygrometer; In recording room, dispose concrete vibrating stand.
Consider that the various different situations of on-the-spot construction and turnover utilize the requirement of green construction, preferred size is that 6 × 3 × 2.6m, partition material adopt the container of polystyrene foam heat insulation material as the agent structure of fog room.This standardized set vanning can business be bought, also can field fabrication.
Container bottom board 8# channel-section steel is reinforced welding, and channel-section steel level and vertical interval are not more than 500mm.Checkered steel plate thickness is 3mm.The heat-insulation mortar bed effect of playing insulation.At thermal insulation mortar surface layer, the flooring of glazed tile as finished product is set, can ensures to mark the clean and tidy clean of foster chamber.
Whole internal container space is cut apart, established altogether two, partition wall adopts polystyrene foam heat insulation material, and one is 4 × 3m between maintenance, and another is recording room 1.8 × 3m.
It is carrier that standardization fog room of the present invention relies on more common container at present, and mutually deserved repacking is carried out in its inside, and the equipment that configures maintenance reaches the standard-required of fog room.
Adopt standardized set vanning fog room of the present invention can effectively ensure the requirement that specification arranges fog room, the position of adjustment fog room that simultaneously also can be flexible, and can have enough to meet the need use for many years.Simultaneously due to internal container has been carried out to dividing processing, except between daily turnover record, generally fog room inlet/outlet is closed for a long time, and this has just greatly reduced scattering and disappearing of indoor temperature, humidity, effectively ensure the condition of maintenance, thereby reached better the maintenance to test block.
The construction method of above-mentioned standardization fog room, comprises the following steps:
(1) the simple and easy container room that makes a standard, is of a size of 6 × 3 × 2.6m, and partition material adopts polystyrene foam heat insulation material;
(2) the channel-section steel of container bottom board is reinforced to welding, the spacing of 8# channel-section steel is not more than 500mm;
(3) container bottom board topping laying checkered steel plate;
(4) on checkered steel plate, lay 30mm heat-insulation mortar bed;
(5) after thermal insulation mortar maintenance completes, laying glazed tile carries out the decoration of ground surface layer;
(6) after firmly installing into, internal container is cut apart to setting, wherein one is between maintenance; Another is recording room;
(7) light fixture, the socket of damp proof protection against the tide selected in fog room inside, and is equipped with water tap, configures test block maintenance shelf, 1.5p air-conditioning simultaneously;
(8) at the special instrument of the maintenance of fog room configuration standard, comprise humidifier, hot water storgae, controller, thermometer, hygrometer;
(9) recording room configuration concrete vibrating stand.
Construction method of the present invention has utilized conventional simple and easy container to be convenient to the feature that moves and recycle, and supports the requirement of chamber for scene mark, and inside has been carried out configuring targetedly and designing.First be the rebuilding construction to simple and easy container, the outsourcing length, width and height of a general conventional container are of a size of 6 × 3 × 2.6m, adopt the Welding Structure framework of channel-section steel and angle steel, and dividing plate adopts the cystosepiment material of polystyrene.According to the requirement of insulation, insulation is carried out in the ground of container and processed, the then waterproof material such as paving face brick, inside has been carried out partition wall and has been set up two blocks separately.Next is the configuration to internal unit, according to the standard-required of fog room, to being equipped with the relevant devices such as test block maintenance support body, humidifier, thermometer, hygrometer, air-conditioning in maintenance region.And finally reach the relevant criterion of marking foster chamber, at building-site, test block is carried out to standard curing.
Utilize above-mentioned standardization fog room to carry out the method for curing test block, comprise the following steps:
(1) according to the position of the selected standardization fog room of on-site actual situations, place and the water flowing of switching on starts curing test block;
(2) in test block maintenance process, open humidifier and ensure that humidity is more than 95%, opening air-conditioning and adjust indoor temperature at 20 ± 2 DEG C;
(3) test block classified and is positioned on nursing frame according to the position date, required censorship pressure testing according to the date etc.
Brief description of the drawings
Fig. 1: container fog room plane.
Fig. 2: container fog room entrance elevation.
Detailed description of the invention
As Figure 1-Figure 2, construction method and the using method of standardized set vanning fog room of the present invention comprise the following steps:
(1) make the simple and easy container room of a standard, size 6 × 3 × 2.6m, goes along with sb. to guard him partition material and adopts polystyrene foam heat insulation material; Wherein container base does not need the ground of finished product, because according to the requirement of maintenance, and the processing that need to be incubated the ground of container.
(2) the channel-section steel of base plate is reinforced to welding, spacing is not more than the latticed of 500mm in length and breadth, and wherein the whole root bead of the channel-section steel of 3m direction connects, and 6m direction channel-section steel cuts off both sides butt welding welding along long to meeting transverse channel steels; Weld rear brushing antirust paint 3 times.
(3) after channel-section steel keel have been laid, carry out bottom plate surface layer and lay 3mm checkered steel plate, checkered steel plate on one side 1.5m is long, and another side carries out cutting along grid, carries out blanking according to on-site actual situations, then adopts rivet anchoring along riffled iron edges of boards and channel-section steel.
(4) on checkered steel plate, lay 30mm thermal insulation mortar;
(5) after thermal insulation mortar maintenance completes, laying 50mm glazed tile carries out the decoration of ground surface layer;
(6) after remaking surface completes, internal container is cut apart to setting, wherein one is that between maintenance, another is recording room, adopts the partition wall of same material to cut apart, and ensures the insulation requirement between maintenance.
(7) between maintenance, light fixture, the socket of damp proof protection against the tide are selected in inside, and are equipped with water tap, configure shelf, 1.5p air-conditioning that test block is placed simultaneously;
(8) configuration BYS-III type negative ion humidification device, hot water storgae, thermometer, hygrometer in maintenance, controller is placed on recording room, personnel monitor outside between maintenance, fog room equipment will once try maintenance after having equipped, and is mainly whether test humidifier can ensure within 24 hours that indoor humidity reaches more than 95%.
(9) recording room configuration concrete vibrating stand, relevant office accommodation;
(10) after the transformation of container fog room configures, should be according to on-site actual situations select location, the water flowing of placing and switch on, after the examination maintenance of a day, can start curing test block.
(11) in test block maintenance process, open humidifier and ensure that humidity is more than 95%, opening air-conditioning according to weather condition and adjust indoor temperature at 20 ± 2 DEG C.
(12) test block classified and is positioned on nursing frame according to the position date, required timely censorship pressure testing according to the date etc.
Adopt container fog room of the present invention can effectively ensure the requirement that specification arranges fog room, the position of adjustment fog room that simultaneously also can be flexible, and can have enough to meet the need use for many years.Simultaneously due to internal container has been carried out to dividing processing, except between daily turnover record, generally fog room inlet/outlet is closed for a long time, and this has just greatly reduced scattering and disappearing of indoor temperature, humidity, effectively ensure the condition of maintenance, thereby reached better the maintenance to test block.

Claims (3)

1. a standardization fog room, is characterized in that, the agent structure of described standardization fog room is a simple and easy container room, is of a size of 6 × 3 × 2.6m, and the partition material of container adopts polystyrene foam heat insulation material; The channel-section steel of container bottom board is reinforced to welding, and bottom plate surface layer is equipped with checkered steel plate, is equipped with after 30mm heat-insulation mortar bedly on checkered steel plate, is equipped with glazed tile on heat-insulation mortar bed; Container is provided with between a maintenance and an interocclusal record chamber; In fog room, dispose test block maintenance shelf, air-conditioning and maintenance instrumentation, maintenance instrumentation comprises humidifier, hot water storgae, controller, thermometer and hygrometer; In recording room, dispose concrete vibrating stand.
2. standardization fog room according to claim 1, is characterized in that, described checkered steel plate thickness is 3mm.
3. standardization fog room according to claim 1, is characterized in that, is 4 × 3m between described maintenance, and recording room is 1.8 × 3m.
CN201420017442.2U 2014-01-10 2014-01-10 Standardization curing chamber Expired - Lifetime CN203712847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420017442.2U CN203712847U (en) 2014-01-10 2014-01-10 Standardization curing chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420017442.2U CN203712847U (en) 2014-01-10 2014-01-10 Standardization curing chamber

Publications (1)

Publication Number Publication Date
CN203712847U true CN203712847U (en) 2014-07-16

Family

ID=51152041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420017442.2U Expired - Lifetime CN203712847U (en) 2014-01-10 2014-01-10 Standardization curing chamber

Country Status (1)

Country Link
CN (1) CN203712847U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103770206A (en) * 2014-01-10 2014-05-07 浙江省建工集团有限责任公司 Standardized maintenance room and construction method and maintenance method thereof
CN104308965A (en) * 2014-10-11 2015-01-28 江苏交科工程检测技术有限公司 Concrete test block curing room
CN110815527A (en) * 2019-11-21 2020-02-21 常熟市江华新型建筑材料有限公司 Maintenance method of pervious concrete colored bricks

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103770206A (en) * 2014-01-10 2014-05-07 浙江省建工集团有限责任公司 Standardized maintenance room and construction method and maintenance method thereof
CN104308965A (en) * 2014-10-11 2015-01-28 江苏交科工程检测技术有限公司 Concrete test block curing room
CN110815527A (en) * 2019-11-21 2020-02-21 常熟市江华新型建筑材料有限公司 Maintenance method of pervious concrete colored bricks

Similar Documents

Publication Publication Date Title
CN103770206A (en) Standardized maintenance room and construction method and maintenance method thereof
CN203712847U (en) Standardization curing chamber
CN106368312B (en) Modularized house
WO2015139430A1 (en) Floor air-conditioning system
CN204844438U (en) Integrated form standard curing room
White et al. Performance evaluation of a mechanically ventilated heat recovery (MVHR) system as part of a series of UK residential energy retrofit measures
CN104389429B (en) Intelligent landscape style spray curing concrete device and curing concrete method thereof
CN207974431U (en) Furring tile cladding system
CN204299102U (en) A kind of wallboard quick-mount system
CN205421836U (en) Hot -water heating heat preservation floor and mounting structure thereof
CN109138423A (en) External wall thermal insulation/decoration integration board construction technology
CN203452302U (en) Double-layer fireproof board with inner cavity capable of containing water
Günther et al. Internal wall insulation with a new aerogel panel: SLENTITE® for energetic retrofit in historic buildings
CN204983133U (en) Balcony ground structure
CN204240455U (en) Geothermal heating assembled block
CN203174648U (en) Structure capable of preventing building ground from penetrating cold and forming dew
CN206591623U (en) Modularized house
EP0977925B1 (en) Method of installing a ventilation system and device therefor
CN208220092U (en) Convenient for the combined floor heating tiles of splicing
CN205935805U (en) Moving as a whole formula standard curing room
CN204438306U (en) A kind of duplex temperature control heating ceramic tile
CN204571048U (en) A kind of intelligent air condition superstructure and building
CN204370719U (en) A kind of flat roof waterproof heat insulation structural
CN212613529U (en) Floor surface layer structure of underground air supply
CN220689245U (en) Elevated warehouse temperature control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140716

CX01 Expiry of patent term