CN203705481U - Dedicated live-testing wiring rod for lightning arrester of transformer station - Google Patents

Dedicated live-testing wiring rod for lightning arrester of transformer station Download PDF

Info

Publication number
CN203705481U
CN203705481U CN201320821390.XU CN201320821390U CN203705481U CN 203705481 U CN203705481 U CN 203705481U CN 201320821390 U CN201320821390 U CN 201320821390U CN 203705481 U CN203705481 U CN 203705481U
Authority
CN
China
Prior art keywords
rod
bar
round bar
movable
wiring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320821390.XU
Other languages
Chinese (zh)
Inventor
林富洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320821390.XU priority Critical patent/CN203705481U/en
Application granted granted Critical
Publication of CN203705481U publication Critical patent/CN203705481U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model relates to a live-testing auxiliary wiring tool for power, and specifically relates to a dedicated live-testing wiring rod for a lightning arrester of a transformer station. The structural main points of the wiring rod lie in that the wiring rod comprises a fixed clamp, a movable clamp, an insulating round rod, and a movable rod; the insulating round rod is a circular hollow rod; the movable rod is located in the inner cavity of the insulating round rod, and the head and tail parts of the movable rod are both exposed out of the insulating round rod; the fixed clamp is fixedly connected with the peripheral surface of the heat part of the insulating round rod through a fixed pile; the movable clamp is fixedly connected with the head part of the movable rod; the tail part of the movable rod is connected with a movable buckle; and the peripheral surface of the insulating round rod or the fixed pile is equipped with a wiring ring. The technical effects of the utility model lie in that the wiring rod provided by the utility model is simple in structure, is convenient in operation, can effectively reduce the workload of the live-testing wiring of insulating property of the lightning arrester of the transformer station, greatly improves work efficiency, is in favor of steadily obtaining the leakage current passing through a down conductor of the lightning arrester, and improves the accuracy of live testing of the lightning arrester.

Description

Transformer substation arrester live testing Special wiring bar
Technical field
The utility model relates to electric power live testing auxiliary connection instrument, specifically relates to a kind of transformer substation arrester live testing Special wiring bar.
Background technology
Lightning arrester, due to its through-flow characteristic, obtains widespread use in transformer station.The lightning arrester number that install 110kV and above substation often reaches more than tens.Highly be less than the lightning arrester live-line test of 1.8 meters for lead-in wire, personnel can not need auxiliary connection device, directly directly complete manual wiring by tester and work.And be highly greater than the lightning arrester live-line test of 1.8 meters for lead-in wire, tester need to complete live testing wiring work by aids such as insulating ladders, need the upper and lower insulating ladder of staff respectively once for completing live testing of a lightning arrester, there is huge potential safety hazard, and be that the lightning arrester live-line test task of a 110kV and above transformer station often needs to move Insulation ladder and reaches tens and even up to a hundred times, complex operation, workload is large, inefficiency.
Summary of the invention
The purpose of this utility model be according to the deficiencies in the prior art part provide a kind of simple to operate, workload is little, the transformer substation arrester live testing Special wiring bar that work efficiency is high.
The purpose of this utility model realizes by following approach:
Transformer substation arrester live testing Special wiring bar, its structural feature is, includes fixing mouth pincers, movable nozzle pincers, insulation round bar and motion bar; Insulation round bar is a kind of circular ring type hollow stem, and motion bar is arranged in the inner chamber of insulation round bar, and the head of motion bar and afterbody all expose to outside insulation round bar; Fixing mouth pincers are fixedly connected with the head outer peripheral face of insulation round bar by spud pile, and movable nozzle pincers are fixedly connected with the head of motion bar, are connected with a movable latch closure at the afterbody of motion bar; On the outside surface of insulation round bar or spud pile, connecting ring is installed.
Described motion bar is coaxial concentric loop bar with insulation round bar, motion bar can move forward and backward along axis in the inner chamber of insulation round bar, and drives movable nozzle pincers near fixing mouth pincers, realizes clamped condition, or drive movable nozzle pincers away from fixing mouth pincers, withdraw from clamped condition.Transformer substation arrester live testing Special wiring bar described in the utility model in use, pull movable latch closure, movable nozzle pincers are pulled away to fixing mouth pincers, then arrester ground downlead is put into and clamped and fix mouth by movable nozzle and clamp the jaw forming, now motion bar drives movable nozzle pincers near fixing mouth pincers, closed jaw, clamps down conductor.Finally by insulation round bar, the jaw with down conductor is guided to assigned address, complete the connection of down conductor.Connection operating lever described in the utility model is simple in structure, easy to operate, can alleviate lightning arrester live-line test workload, and work efficiency is improved greatly.
The utility model can further be specially:
Also include spring and spring stop, spring stop is a kind of annulus, it is positioned at the inner chamber of insulation round bar, and be fixed on the inner peripheral surface of insulation round bar, and spring housing is trapped among motion bar and is positioned at the leading section of insulation round bar inner chamber, one end of spring is fixed on motion bar, and the other end is fixed on spring stop.
Under the restriction of spring stop, spring priming motion bar, to the direction activity near fixing mouth pincers, also drives movable nozzle pincers near fixing mouth pincers simultaneously, and when after jaw closure, due to the restriction of fixing mouth pincers, spring cannot stretch again, in Pre strained state.That is to say, under normal conditions, jaw is normally closed under the effect of spring.Only pull movable latch closure ability Compress Spring, drive motion bar and movable nozzle pincers away from fixing mouth pincers, and unclamp after movable latch closure, movable nozzle pincers will drive at spring under the effect of motion bar, automatically revert to the state closing with fixing mouth icarceration.Like this, under the pretension effect of spring, can guarantee the fixed clamp effect of jaw to down conductor, and be conducive to completing smoothly of wiring, therefore be conducive to the stable Leakage Current that obtains the arrester ground lead-in wire of flowing through, improve lightning arrester live-line test data accuracy.
Also include fixing base ring, this fixing base ring by fixed pedestal be arranged on insulation round bar tail end, now loose collar button bit in the inner ring of this fixing base ring, the parallel distribution of the portion of the handle of the two.
Like this, when loose collar is buckled in operation, just can, under the restriction of fixing base ring, there is moving around of control.The parallel distribution of portion of the handle is in the time operating, and can pull movable latch closure for supporting by fixing base ring, realizes one-handed performance, makes to operate more convenient, quick.
In sum, the utility model provides a kind of transformer substation arrester live testing Special wiring bar, simple in structure, easy to operate, can alleviate lightning arrester live-line test workload, work efficiency is improved greatly, be conducive to the stable Leakage Current that obtains the arrester ground lead-in wire of flowing through, improve lightning arrester live-line test data accuracy.
Accompanying drawing explanation
Figure 1 shows that the structural representation of transformer substation arrester live testing Special wiring bar described in the utility model.
Below in conjunction with embodiment, the utility model is described further.
Embodiment
Most preferred embodiment:
With reference to accompanying drawing 1, transformer substation arrester live testing Special wiring bar, it is characterized in that: include fixing mouth pincers 1 and movable nozzle pincers 2, fixing mouth pincers 1 are fixedly connected with spud pile 3, spud pile 3 the right and lefts respectively have two hex screws 4 and hex screw 5, by locking hex screw 4 and hex screw 5, spud pile 3 is sleeved on to insulation round bar 6 head outsides, motion bar 7 is built on insulation round bar 6 axis directions, motion bar 7 one end are fixedly connected with movable nozzle pincers 2 by hex screw 8, motion bar 7 other ends are fixedly connected with movable clasp 9, fixing base ring 10 is fixedly connected with fixed pedestal 11, fixed pedestal 11 is fixedly set in insulation round bar 6 afterbody outsides, spring 12 is enclosed within on motion bar 7 inside surfaces, spring 12 one end are fixed on motion bar 7 inside surfaces, spring 12 other ends are fixedly connected with spring stop 13, spring stop 13 is annulus and is fixed in insulation round bar 6 internal circumference directions, the interior ring diameter of spring stop 13 is slightly larger than motion bar 7 diameters, motion bar 7 is through the interior ring of spring stop 13, connecting ring 14 is fixed on fixing mouth and clamps 1 outside, under spring 12 elastic force effects, when fixing mouth pincers 1 and movable nozzle clamp 2 normality in interlocking pattern, movable clasp 9 can drive motion bar 7 to move and pull open movable nozzle pincers 2 along insulation round bar 6 axis directions.
When transformer substation arrester live testing Special wiring bar uses, External Force Acting is on movable clasp 9, drive motion bar 7 along insulation round bar 6 axis directions, to moving near fixing base ring 10 directions, Compress Spring 12 pull open movable nozzle pincers 2 in moving process, puts arrester ground downlead between fixing mouth pincers 1 and movable nozzle pincers 2 into; Then remove the external force on movable clasp 9, spring 12 returns, under the effect of spring 12 returning elastics, motion bar 7, along insulation round bar 6 axis directions, to moving away from fixing base ring 10 directions, makes movable nozzle pincers 2 and fixing mouth pincers 1 sting tight.
It is same as the prior art that the utility model is not stated part.

Claims (3)

1. transformer substation arrester live testing Special wiring bar, is characterized in that, includes fixing mouth pincers, movable nozzle pincers, insulation round bar and motion bar; Insulation round bar is a kind of circular ring type hollow stem, and motion bar is arranged in the inner chamber of insulation round bar, and the head of motion bar and afterbody all expose to outside insulation round bar; Fixing mouth pincers are fixedly connected with the head outer peripheral face of insulation round bar by spud pile, and movable nozzle pincers are fixedly connected with the head of motion bar, are connected with a movable latch closure at the afterbody of motion bar; On the outside surface of insulation round bar or spud pile, connecting ring is installed.
2. transformer substation arrester live testing Special wiring bar according to claim 1, it is characterized in that, also include spring and spring stop, spring stop is a kind of annulus, it is positioned at the inner chamber of insulation round bar, and is fixed on the inner peripheral surface of insulation round bar, and spring housing is trapped among motion bar and is positioned at the leading section of insulation round bar inner chamber, one end of spring is fixed on motion bar, and the other end is fixed on spring stop.
3. transformer substation arrester live testing Special wiring bar according to claim 1, it is characterized in that, also include fixing base ring, this fixing base ring is arranged on the tail end of insulation round bar by fixed pedestal, now loose collar button bit is in the inner ring of this fixing base ring, the parallel distribution of the portion of the handle of the two.
CN201320821390.XU 2013-12-13 2013-12-13 Dedicated live-testing wiring rod for lightning arrester of transformer station Expired - Fee Related CN203705481U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320821390.XU CN203705481U (en) 2013-12-13 2013-12-13 Dedicated live-testing wiring rod for lightning arrester of transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320821390.XU CN203705481U (en) 2013-12-13 2013-12-13 Dedicated live-testing wiring rod for lightning arrester of transformer station

Publications (1)

Publication Number Publication Date
CN203705481U true CN203705481U (en) 2014-07-09

Family

ID=51055901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320821390.XU Expired - Fee Related CN203705481U (en) 2013-12-13 2013-12-13 Dedicated live-testing wiring rod for lightning arrester of transformer station

Country Status (1)

Country Link
CN (1) CN203705481U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105116172A (en) * 2015-08-18 2015-12-02 国网山西省电力公司检修分公司 A junction pole specially used for live tests of 35kV lighting arrester leakage currents
CN107703337A (en) * 2017-12-06 2018-02-16 李琳君 Arrester live detection experimental rig
CN108075386A (en) * 2016-11-16 2018-05-25 刘伟华 Substation's hot line job assistor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105116172A (en) * 2015-08-18 2015-12-02 国网山西省电力公司检修分公司 A junction pole specially used for live tests of 35kV lighting arrester leakage currents
CN108075386A (en) * 2016-11-16 2018-05-25 刘伟华 Substation's hot line job assistor
CN107703337A (en) * 2017-12-06 2018-02-16 李琳君 Arrester live detection experimental rig

Similar Documents

Publication Publication Date Title
CN202454746U (en) High-altitude wiring pliers with built-in wire
CN203217071U (en) Current transformer experiment wiring device
CN203705481U (en) Dedicated live-testing wiring rod for lightning arrester of transformer station
CN103364529B (en) SF6 micro-water tester joint fixing apparatus and using method thereof
CN203705482U (en) Dedicated wiring clamping tool for testing insulating property of lightning arrester
CN203688601U (en) 110kV-or-above mis-touch-prevention high-altitude high-voltage test bar
CN203732573U (en) General-purpose short-circuit wire device for transformer
CN108132362A (en) Deformation of transformer winding altitude test clamps
CN206387819U (en) A kind of high-altitude automatic deploying and retracting test wire action bars
CN202854208U (en) Clamp current meter
CN203705483U (en) Clamp mouth of lightning arrester live-line test wiring clamp
CN203490107U (en) Insulation oil aloft sampling device
CN203204020U (en) Auxiliary wiring device of electrification test of arrester
CN203324322U (en) Electrical device high voltage test clamp
CN207232198U (en) A kind of Intelligent nuclear phase pen
CN201096817Y (en) Testing tool for distribution transformer load current
CN205183200U (en) A insulator spindle for arrester live test
CN203616353U (en) Adhesive type independent high-voltage test wiring device
CN106018902A (en) Intelligent meter with quick-replaceable and high-insulation wiring device
CN202916387U (en) Wire cable dielectric strength test device
CN102901897B (en) Aerial condutor test method for energy consumption
CN203705472U (en) Self-unlocking apparatus of lightning arrester live-line test wiring clamp
CN204228805U (en) 10kV closes the portable live testing device of high-voltage board
CN204188722U (en) Transforming plant DC power automation balance detection arrester device
CN204732788U (en) A kind of portable ground wire operating lever

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20201213

CF01 Termination of patent right due to non-payment of annual fee