CN102901897B - Aerial condutor test method for energy consumption - Google Patents

Aerial condutor test method for energy consumption Download PDF

Info

Publication number
CN102901897B
CN102901897B CN201210392234.6A CN201210392234A CN102901897B CN 102901897 B CN102901897 B CN 102901897B CN 201210392234 A CN201210392234 A CN 201210392234A CN 102901897 B CN102901897 B CN 102901897B
Authority
CN
China
Prior art keywords
test
energy consumption
temperature
current
test lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210392234.6A
Other languages
Chinese (zh)
Other versions
CN102901897A (en
Inventor
余虹云
柯定芳
潘伟健
叶成
崔利兵
任凯
章益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zhejiang Huadian Equipment Inspection Institute
Original Assignee
State Grid Corp of China SGCC
Zhejiang Huadian Equipment Inspection Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zhejiang Huadian Equipment Inspection Institute filed Critical State Grid Corp of China SGCC
Priority to CN201210392234.6A priority Critical patent/CN102901897B/en
Publication of CN102901897A publication Critical patent/CN102901897A/en
Application granted granted Critical
Publication of CN102901897B publication Critical patent/CN102901897B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The invention discloses a kind of aerial condutor test method for energy consumption, it is characterized in that comprising the following steps: 1) Selection experiment wire; 2) temperature probe is fastened on test lead; 3) at potential test point, copper single line is installed; 4) current transformer and reometer is connect; 5) tested wire to be arranged on tension tester and to load; 6) be electrically connected; 7) be energized to test loop; 8) measure and record the energy consumption P of test current, conductor temperature and conductor l; 9) power-off cooling, revision test twice; The mean value of 10 calculating test lead energy consumption 3 secondary data.Test method of the present invention, can be deep into quantitative aspect by the energy consumption characteristics research of aerial condutor, can provide necessary reference data for the type selecting of aerial condutor in the optimal design of the aerial condutor of manufacturing enterprise and electrical network.

Description

Aerial condutor test method for energy consumption
Technical field
The present invention relates to technical field of measurement and test, particularly relate to the electric energy loss field tests of electric energy transfer unit, specifically the integrated test facility of a kind of electric current of aerial condutor, temperature and energy consumption.
Background technology
Aerial condutor in electric line is main power equipment, is responsible for the important mission of safe power transmission.
The main artery that aerial condutor is carried as grid power, adopts steel-cored aluminium strand existing century more than one.Along with the development of material science, various types of aerial condutor arises at the historic moment, and how to evaluate the energy loss of various wire, is the problem that design and running personnel pay special attention to.Mostly pay close attention to both at home and abroad at present the analysis of experiments of its resistance, temperature rise and current-carrying capacity, the less experimental study carried out its energy consumption.
Current aerial condutor energy consumption research Problems existing is mainly reflected in: China lacks corresponding national standard in this respect, there is no the measurement mechanism of sizing and effective method of testing, energy consumption characteristics research rests in the aspect of qualitative analysis mostly, do not carry out system and comprehensively energy consumption testing fundamental research, necessary reference data cannot be provided for the optimal design of aerial condutor and type selecting, cannot comparatively objectively for electrical network provides operating cost data.
Summary of the invention
The present invention is to solve prior art Problems existing, aim to provide a kind of can accurate quantitative analysis, the ground testing jig hollow wire that gears to actual circumstances the method for testing of energy consumption.
For solving the problem, the present invention by the following technical solutions: aerial condutor test method for energy consumption, is characterized in that comprising the following steps:
1) select any surface finish, undamaged new line as test lead, the length of test lead is not less than 100 times of diameter of wire, and controls between 4m ~ 8m;
2) temperature probe is fastened on test lead;
3) two diameters are that 0.8mm ± 0.2mm copper single line is tight respectively by the potential test point position at test lead two ends pricks 3 ~ 4 circles, makes it and described test lead close contact;
4) test lead is passed punching current transformer, suitable no-load voltage ratio selected by current transformer, at the testing current end of Current Transformer Secondary side joint power meter; Described power counts integrated form, can show electric current, voltage, power factor and power simultaneously;
5) be arranged on tension tester by the two ends of test lead by supporting strain clamp, imposed load reaches 20% of traverse calculation pull-off force as pretension;
6) drainage plate of strain clamp is connected by copper conductor with the High-current output end of test unit;
7) test current allowing test unit send, by test loop, makes test lead temperature reach steady state (SS), constant temperature 30min;
8), after constant temperature 30min terminates, measure and record the test current of test lead, conductor temperature and conductor energy consumption P l;
9) open test electric current, when the conductor temperature of wire to be tested is down within laboratory temperature+5 DEG C, repeats step 7) and step 8) twice;
10), after 3 circulations, the mean value of conductor energy consumption 3 secondary data of test lead is calculated;
In whole process of the test, the temperature that controls environment is between 15 DEG C ~ 25 DEG C, and during as regulated laboratory temperature with air-conditioning, the blast velocity control in laboratory is within 0.1m/s, and laboratory is without direct sunlight; Meanwhile, the impact that other magnetisable materials should be avoided test is arranged in test.
Test method of the present invention, can be deep into quantitative aspect by the energy consumption characteristics research of aerial condutor, can provide necessary reference data for the type selecting of aerial condutor in the optimal design of the aerial condutor of manufacturing enterprise and electrical network.
Therefore, under the overall situation advocating saving energy and decreasing loss, for building " resource-conserving, environmentally friendly " country, research aerial condutor method for testing energy consumption, seems very necessary and important.
As a further improvement on the present invention, in step 2) in, temperature probe teflon is coated on test lead from glutinous band, makes both combine firmly.
Further improve as of the present invention, in step 7) in, the initial stage electric current that test unit sends is 1 ~ 1.5 of test current, to reach the object be rapidly heated, accelerates experiment process.
Further improve as of the present invention, in step 9) in adopt force cooling method to make the conductor temperature of test lead be down to laboratory temperature+5 DEG C within, to shorten temperature fall time.
Accompanying drawing explanation
Fig. 1 is test lead installation diagram of the present invention.
Fig. 2 is the arrangenent diagram that current transformer is positioned at the embodiment on strain clamp.
In figure, 1-steel anchor, the 2-wire clamp of resistance to line, 3-copper single line, 4-current transformer, 5-test lead, 6-temperature probe, 7-copper single line, the 8-wire clamp of resistance to line, 9-steel anchor, 10-drainage plate, 11-drainage plate.
Embodiment
With reference to Fig. 1, aerial condutor test method for energy consumption of the present invention, carry out according to the following steps:
1) select any surface finish, undamaged new line as test lead, the length of test lead is not less than 100 times of diameter of wire, and controls between 4m ~ 8m;
2) temperature probe 6 is fastened on test lead 5;
3) in the potential test point position at test lead 5 two ends, being that 0.8mm ± 0.2mm copper single line 3,7 is tight respectively by two diameters pricks 3 ~ 4 circles, makes it and described test lead 5 close contact;
4) test lead 1 is passed punching current transformer 4, suitable no-load voltage ratio selected by current transformer 4, at the testing current end of Current Transformer Secondary side joint power meter; Described power counts integrated form, can show electric current, voltage, power factor and power simultaneously;
5) adopted at the two ends of test lead supporting strain clamp 2,8 to crimp, and be arranged on tension tester by steel anchor 1,9, imposed load reaches 20% of traverse calculation pull-off force as pretension;
6) drainage plate 10,11 of strain clamp is connected by copper conductor with the High-current output end of test unit;
7) test current allowing test unit send is by test loop, and make test lead temperature reach steady state (SS), such as in 15min, its temperature fluctuation is not more than 2 DEG C, then constant temperature 30min;
8), after constant temperature 30min terminates, measure and record the test current of test lead, conductor temperature and conductor energy consumption P l;
9) open test electric current, when the conductor temperature of wire to be tested is down within laboratory temperature+5 DEG C, repeats step 7) and step 8) twice;
10), after 3 circulations, the mean value of conductor energy consumption 3 secondary data of test lead is calculated;
In whole process of the test, the temperature that controls environment is between 15 DEG C ~ 25 DEG C, and during as regulated laboratory temperature with air-conditioning, the blast velocity control in laboratory is within 0.1m/s, and laboratory is without direct sunlight; Meanwhile, the impact that other magnetisable materials should be avoided test is arranged in test.
With reference to Fig. 2, described current transformer 4 also can move on to strain clamp 2,8 from test lead 5 and fix, too can acquisition test current signal.
It is understood that above-described embodiment is just to explanation of the present invention, instead of limitation of the present invention, any innovation and creation do not exceeded in spirit of the present invention, all fall within protection scope of the present invention.

Claims (4)

1. aerial condutor test method for energy consumption, is characterized in that comprising the following steps:
1) select any surface finish, undamaged new line as test lead, the length of test lead is not less than 100 times of diameter of wire, and controls between 4m ~ 8m;
2) temperature probe is fastened on test lead;
3) two diameters are that 0.8mm ± 0.2mm copper single line is tight respectively by the potential test point position at test lead two ends pricks 3 ~ 4 circles, makes it and described test lead close contact;
4) test lead is passed punching current transformer, suitable no-load voltage ratio selected by current transformer, at the testing current end of Current Transformer Secondary side joint power meter; Described power counts integrated form, can show electric current, voltage, power factor and power simultaneously;
5) be arranged on tension tester by the two ends of test lead by supporting strain clamp, imposed load reaches 20% of traverse calculation pull-off force as pretension;
6) drainage plate of strain clamp is connected by copper conductor with the High-current output end of test unit;
7) test current allowing test unit send, by test loop, makes test lead temperature reach steady state (SS), constant temperature 30min;
8), after constant temperature 30min terminates, measure and record the test current of test lead, conductor temperature and conductor energy consumption;
9) open test electric current, when the conductor temperature of wire to be tested is down within laboratory temperature+5 DEG C, repeats step 7) and step 8) twice;
10), after 3 circulations, the mean value of conductor energy consumption 3 secondary data of test lead is calculated;
In whole process of the test, the temperature that controls environment is between 15 DEG C ~ 25 DEG C, and during as regulated laboratory temperature with air-conditioning, the blast velocity control in laboratory is within 0.1m/s, and laboratory is without direct sunlight; Meanwhile, the impact that other magnetisable materials should be avoided test is arranged in test.
2. aerial condutor test method for energy consumption as claimed in claim 1, is characterized in that in step 2) in, temperature probe teflon is coated on test lead from glutinous band.
3. aerial condutor test method for energy consumption as claimed in claim 1, is characterized in that in step 7) in, the initial stage electric current that test unit sends is 1 ~ 1.5 times of test current.
4., as any one aerial condutor test method for energy consumption of claim 1-3, it is characterized in that in step 9) in adopt force cooling method to make the conductor temperature of test lead be down to laboratory temperature+5 DEG C within.
CN201210392234.6A 2012-10-16 2012-10-16 Aerial condutor test method for energy consumption Active CN102901897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210392234.6A CN102901897B (en) 2012-10-16 2012-10-16 Aerial condutor test method for energy consumption

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210392234.6A CN102901897B (en) 2012-10-16 2012-10-16 Aerial condutor test method for energy consumption

Publications (2)

Publication Number Publication Date
CN102901897A CN102901897A (en) 2013-01-30
CN102901897B true CN102901897B (en) 2015-11-18

Family

ID=47574243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210392234.6A Active CN102901897B (en) 2012-10-16 2012-10-16 Aerial condutor test method for energy consumption

Country Status (1)

Country Link
CN (1) CN102901897B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994931A (en) * 2014-04-10 2014-08-20 李�禾 Grip force and breaking force test method for heat resistance conducting wire and fitting combination body at high temperature
CN109085435A (en) * 2016-07-08 2018-12-25 蓝龙飞 A kind of electric system detection communication system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6441603B1 (en) * 2001-05-03 2002-08-27 Shaw Intellectual Property Holdings, Inc. Overhead line rating monitor
CN102118881A (en) * 2009-12-31 2011-07-06 深圳先进技术研究院 Monitoring device of overhead transmission lines and monitoring method
CN102564493A (en) * 2011-10-28 2012-07-11 江苏省电力公司连云港供电公司 Online monitoring system for galloping of overhead power transmission line

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0618602A (en) * 1992-07-01 1994-01-28 Ngk Insulators Ltd Fault-section orienting apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6441603B1 (en) * 2001-05-03 2002-08-27 Shaw Intellectual Property Holdings, Inc. Overhead line rating monitor
CN102118881A (en) * 2009-12-31 2011-07-06 深圳先进技术研究院 Monitoring device of overhead transmission lines and monitoring method
CN102564493A (en) * 2011-10-28 2012-07-11 江苏省电力公司连云港供电公司 Online monitoring system for galloping of overhead power transmission line

Also Published As

Publication number Publication date
CN102901897A (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN105182126B (en) Improved distribution transformer energy efficiency metering detection method
CN103336179B (en) The low-temperature resistance of CICC superconducting joint measures making and the measuring method of system
Yan et al. Research on measurement technology of transformer no-load loss based on Internet of Things
CN102901897B (en) Aerial condutor test method for energy consumption
CN201177641Y (en) Secondary circuit wiring checking system
CN201251622Y (en) Heavy current up-flow aggregate unit for field test of 750v current transformator
CN108931715A (en) A kind of test method that reactor turn-to-turn insulation is influenced by temperature changing stress and device
CN203607237U (en) Current transformer test device of generator wire outlet casing
CN110716111B (en) Ultrahigh voltage XLPE cable insulation on-line monitoring device and monitoring method based on vector method
CN204945265U (en) A kind of cable current circulating-heating tests energy-saving pilot system
CN205139307U (en) 500kV high pressure parallel reactor interturn insulation capability test device
CN204251094U (en) Large-sized cable puts take-up and proving installation
CN201697974U (en) Cable and wireless integral nuclear phase instrument
CN103176048B (en) A kind of method of quick measuring transformer delta connection mode winding D.C. resistance
CN207336219U (en) A kind of tension test fixture applied to cable
CN103424672A (en) Large wind turbine generator stator insulation discharge starting and extinction voltage test method
CN203204903U (en) Visual practical training model used for accurate measurement of transformer wire outlet sleeve
CN203365519U (en) Sampling device for high-voltage bushing electrified detection test
CN105319478A (en) Un-disassembly polarity and transformation ratio testing method for transformer bushing
CN102890212B (en) Method for testing energy consumption of electrical splicing fittings
CN103995190A (en) Current carrying capacity test method for overhead conductor
CN207396706U (en) A kind of 10kV and more than current transformer rapid testing apparatus
CN103994931A (en) Grip force and breaking force test method for heat resistance conducting wire and fitting combination body at high temperature
CN107329061B (en) Submarine cable high-voltage insulation performance test system and determination method
CN205786988U (en) Low-voltage cable ac voltage withstanding equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 310015 Taizhou Road, Zhejiang, China, No. 217, No.

Co-patentee after: State Grid Corporation of China

Patentee after: Zhejiang Huadian inspection and Research Institute Co., Ltd.

Address before: 310015 Taizhou Road, Zhejiang, China, No. 217, No.

Co-patentee before: State Grid Corporation of China

Patentee before: Zhejiang Huadian Equipment Inspection Institute

CP01 Change in the name or title of a patent holder