CN203702182U - High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction - Google Patents

High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction Download PDF

Info

Publication number
CN203702182U
CN203702182U CN201420097792.4U CN201420097792U CN203702182U CN 203702182 U CN203702182 U CN 203702182U CN 201420097792 U CN201420097792 U CN 201420097792U CN 203702182 U CN203702182 U CN 203702182U
Authority
CN
China
Prior art keywords
tunnel
grouting device
high pressure
pressure air
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420097792.4U
Other languages
Chinese (zh)
Inventor
崔玉明
孟庆信
宋战平
曲建生
门金锁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN201420097792.4U priority Critical patent/CN203702182U/en
Application granted granted Critical
Publication of CN203702182U publication Critical patent/CN203702182U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a high pressure air grouting device for reinforcing weak surrounding rock of a tunnel and an underground construction. The high pressure air grouting device comprises a grout pot, wherein the grout pot is in threaded connection with an end cap; the end cap is provided with a high pressure air inlet, a material inlet, an additive inlet and an exhaust port; the high pressure air inlet, the material inlet, the additive inlet and the exhaust port are all provided with valves; a flowmeter is arranged in each of the material inlet and the additive inlet; the grout pot is provided with an electronic display; the electronic display is connected with the flowmeter through a wire. According to the high pressure air grouting device for reinforcing the weak surrounding rock of the tunnel and the underground construction, the structure is simple and reasonable, advanced reinforcing effect can be well achieved, the construction efficiency is improved, the construction progress is ensured, the construction cost is lowered, meanwhile, the ratio of the material to the additive can be well controlled, the grout quality is enhanced, and the grout is convenient to clean.

Description

For the high-pressure blast grouting device of tunnel and the reinforcing of underground construction weak surrounding rock
Technical field
The utility model relates to grouting device technical field, refers to especially a kind of high-pressure blast grouting device for tunnel and the reinforcing of underground construction weak surrounding rock.
Background technology
Current domestic shallow buried covered excavation tunnel engineering is in sand and the construction of sandy soil stratum, and the many employings of leading reinforcing set advanced tubule and spray mixes the slip casting of sealing face, use plain edition Double-liquid mud-injection pump when slip casting.This technique is higher to the requirement of strength of face sealing, has increased cost; Moreover the equipment dropping in construction is many, is subject to the restriction of place size; The slurry reaction time is long, tells on slow; While using this kind of equipment, on-the-spot necessary access electrical source of power, increases risk.
Utility model content
The utility model proposes a kind of high-pressure blast grouting device for tunnel and the reinforcing of underground construction weak surrounding rock, solved the problem that in prior art, the common Double-liquid mud-injection pump slurry reaction time is grown, tells on slowly, efficiency of construction is low.
The technical solution of the utility model is achieved in that a kind of high-pressure blast grouting device for tunnel and the reinforcing of underground construction weak surrounding rock, comprise serum pot, end cap has been threaded on described serum pot, described end cap is provided with high-pressure blast import, material inlet, auxiliary agent import and exhaust opening, high-pressure blast import, material inlet, auxiliary agent import and exhaust opening are equipped with valve, in described material inlet and auxiliary agent import, be equipped with flow gauge, described serum pot is provided with electronic display, described electronic display is connected by wire with described flow gauge, described serum pot lower end is provided with discharging opening, described discharging opening connects slurries conduit, between described discharging opening and slurries conduit, be provided with valve I.
As preferably, described serum pot lower end is provided with support.
As preferably, described electronic display is provided with battery case.
The utility model is for the high-pressure blast grouting device of tunnel and the reinforcing of underground construction weak surrounding rock, simple and reasonable, can well reach the effect of leading reinforcing, has improved efficiency of construction, has guaranteed construction speed; Can save face sealing in construction process, abolish two links, saving of work and time, has reduced construction cost, can well control the proportioning of raw material and auxiliary agent simultaneously, has improved the quality of slurries, easy cleaning again simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model for the high-pressure blast grouting device of tunnel and the reinforcing of underground construction weak surrounding rock.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach object and effect is easy to understand, below in conjunction with the specific embodiment, further set forth the utility model.
With reference to Fig. 1, this specific embodiment is by the following technical solutions: a kind of high-pressure blast grouting device of reinforcing for tunnel and underground construction weak surrounding rock, comprise serum pot 1, end cap 12 has been threaded on described serum pot 1, described end cap 12 is provided with high-pressure blast import 2, material inlet 3, auxiliary agent import 10 and exhaust opening 4, high-pressure blast import 2, material inlet 3, auxiliary agent import 10 and exhaust opening 4 are equipped with valve 9, in described material inlet 3 and auxiliary agent import 10, be equipped with flow gauge, described serum pot 1 is provided with electronic display, described electronic display is connected by wire with described flow gauge, described serum pot 1 lower end is provided with discharging opening 6, described discharging opening 6 connects slurries conduit 5, between described discharging opening 6 and slurries conduit 5, be provided with valve I7.
It should be noted that described serum pot 1 lower end is provided with support 8.
In addition, described electronic display is provided with battery case.
When the utility model uses, by flow gauge proportioning raw material and auxiliary agent, improve the quality of slurries, in the time cleaning, only end cap 12 need to have been unloaded by screw thread, just can clean.
This concrete enforcement is simple and reasonable, can well reach the effect of leading reinforcing, has improved efficiency of construction, has guaranteed construction speed; Can save face sealing in construction process, abolish two links, saving of work and time, has reduced construction cost, can well control the proportioning of raw material and auxiliary agent simultaneously, has improved the quality of slurries, easy cleaning again simultaneously
More than show and described basic principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and manual, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (3)

1. the high-pressure blast grouting device for tunnel and the reinforcing of underground construction weak surrounding rock, comprise serum pot (1), it is characterized in that, end cap (12) has been threaded on described serum pot (1), described end cap (12) is provided with high-pressure blast import (2), material inlet (3), auxiliary agent import (10) and exhaust opening (4), high-pressure blast import (2), material inlet (3), auxiliary agent import (10) and exhaust opening (4) are equipped with valve (9), in described material inlet (3) and auxiliary agent import (10), be equipped with flow gauge, described serum pot (1) is provided with electronic display, described electronic display is connected by wire with described flow gauge, described serum pot (1) lower end is provided with discharging opening (6), described discharging opening (6) connects slurries conduits (5), between described discharging opening (6) and slurries conduit (5), be provided with valve I (7).
2. the high-pressure blast grouting device for tunnel and the reinforcing of underground construction weak surrounding rock as claimed in claim 1, is characterized in that, described serum pot (1) lower end is provided with support (8).
3. the high-pressure blast grouting device for tunnel and the reinforcing of underground construction weak surrounding rock as claimed in claim 1, is characterized in that, described electronic display is provided with battery case.
CN201420097792.4U 2014-02-28 2014-02-28 High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction Expired - Fee Related CN203702182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420097792.4U CN203702182U (en) 2014-02-28 2014-02-28 High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420097792.4U CN203702182U (en) 2014-02-28 2014-02-28 High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction

Publications (1)

Publication Number Publication Date
CN203702182U true CN203702182U (en) 2014-07-09

Family

ID=51052637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420097792.4U Expired - Fee Related CN203702182U (en) 2014-02-28 2014-02-28 High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction

Country Status (1)

Country Link
CN (1) CN203702182U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351449A (en) * 2016-11-03 2017-01-25 浙江建设职业技术学院 Automatic grouting construction device with high efficiency

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351449A (en) * 2016-11-03 2017-01-25 浙江建设职业技术学院 Automatic grouting construction device with high efficiency

Similar Documents

Publication Publication Date Title
CN103257219B (en) Novel pouring device for model test and application method
CN204724552U (en) Grouting pipeline for shield machine cleaning plant
CN103470212B (en) Active drilling and hole sealing device and method
CN207484462U (en) A kind of cement-water glass double grouting device
CN204212788U (en) Grouting pipeline for shield machine rinse-system
CN203702182U (en) High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction
CN204476423U (en) A kind of Open TBM inverted arch concrete injection device
CN204320755U (en) The wind power ganged flusher in a kind of mortar delivery pipe road
CN201763349U (en) Double-liquid grouting device
CN203310828U (en) Novel injection device used for model test
CN203925506U (en) Slurry balance pipe-jacking tunneling machine excavation face automatic pressure-balancing device
CN203130098U (en) Measuring system for grouting reinforcement process
CN201554463U (en) Underground laneway grouting equipment
CN203716155U (en) Pneumatic anchor rod grouter
CN203531921U (en) Deep hole grouting device used for strengthening tunnel and underground engineering tunnel face
CN204627898U (en) A kind of combined high-voltage grouting pump
CN204283445U (en) A kind of secondary grouting system for shield-tunneling construction
CN202832561U (en) Oblique type small duct slip-casting apparatus
CN202658598U (en) Variable pressure multi-pipe spraying mixing pile driver
CN203161471U (en) High-pressure high-flow grouting pump for mine
CN103926391A (en) Digital display two-liquid grouting system for model test and operating method of system
CN204627525U (en) Plugging device
CN202577148U (en) An intelligent control instrument for prestress duct slip casting based on dual parameters of pipe capacity and density
CN203702078U (en) Accelerator adding device for ore drawing at subsidence area karst positions
CN204177571U (en) Civil engineering work hydraulic pressure soil box experiment table

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20150228

EXPY Termination of patent right or utility model