CN203701273U - Spherical prefabricated house - Google Patents

Spherical prefabricated house Download PDF

Info

Publication number
CN203701273U
CN203701273U CN201420016838.5U CN201420016838U CN203701273U CN 203701273 U CN203701273 U CN 203701273U CN 201420016838 U CN201420016838 U CN 201420016838U CN 203701273 U CN203701273 U CN 203701273U
Authority
CN
China
Prior art keywords
wallboard
link
underframe
spherical
intermediate plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420016838.5U
Other languages
Chinese (zh)
Inventor
赵志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420016838.5U priority Critical patent/CN203701273U/en
Application granted granted Critical
Publication of CN203701273U publication Critical patent/CN203701273U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a spherical prefabricated house which is convenient to assemble and disassemble and attractive in appearance. The technical scheme is that the spherical prefabricated house comprises a bottom frame (1), wall boards (2), connection frames (3) and connection structures (4). The bottom frame is an arc framework which is arranged on the ground, the wall boards and the connection frames are connected with the bottom frame, the connection frames are arc H-shaped frames, the connection structures are arranged at the junction positions of the different connection frames to enable the wall boards to be connected with the connection frames adjacent to the wall boards, and the wall boards are spliced through the connection frames to form partial spherical space as the space of the prefabricated house. Compared with the prior art, the spherical prefabricated house uses concave parts and buckle structures of the connection structures to enable the wall boards and the connection frames adjacent to the wall boards to be connected with each other fixedly. Thus, the spherical prefabricated house is simple in structure, convenient to assemble and disassemble, favorable of reuse and unique and attractive in appearance. In addition, the spherical prefabricated house is made of PC engineer plastic and is high in transparency, good in corrosion resistance and high in impact resistance.

Description

Spherical movable board house
Technical field
The utility model relates to building field, particularly a kind of spherical movable board house.
Background technology
Movable plank house is mainly used in the strong place of the provisional demand such as job site, disaster relief placement, and this just requires movable plank house can be convenient to installation and removal.In order to reduce the wasting of resources, also need it to have very high recycling rate of waterused.Need to first set up integral house framework and movable plank house is installed at present, construction period is longer.In addition, the structure species of board house composition is many, and the connected mode complexity between structure is various, cause installation and removal inconvenience, ordinary person can not understand its mounting means easily, often needs professional to install, and complicated structure makes holistic cost larger, and recycling rate of waterused is lower.Movable plank house also has certain applications in the interim leisure villa of tourist district, chalet, but the aesthetic measure of the movable plank house of prior art is not high, therefore the utmost point need improve its aesthetic measure, meets people's instructions for use.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of spherical movable board house, and this movable plank house is convenient to installation and removal, can improve recycling rate of waterused, thereby reduces the wasting of resources, and beautiful.
For solving the problems of the technologies described above, the utility model by the following technical solutions: a kind of spherical movable board house, it is characterized in that, comprise underframe, multiple wallboard, multiple link and multiple syndeton; Described underframe, for can be arranged on ground bent frame, is connecting wallboard and link on underframe; Described wallboard is the polygonal panel with radian; Described link is the arc cap ned that can embed for panel edges; The space that the part diameter of Spherical Volume that multiple described wallboards are spliced to form by link is movable plank house, adjacent wallboard and link couple together by described syndeton at the concourse of different links; Above described underframe opening, be provided with door.
Further, described door cuts remaining clout by the wallboard of movable plank house relevant position and link and is spliced; Described door is hinged by installation site height hinge and the movable plank house consistent with centre of sphere height.
Further, described wallboard is divided into two kinds of pentagon wallboard and hexagon wallboards, and described pentagon wallboard and hexagon wallboard are stitched together according to the connecting method of the pentagon fabric of football and hexagon fabric.
Further, described link is the arc cap ned that both sides are respectively equipped with groove, and adjacent described wallboard embeds respectively in the groove of arc cap ned both sides.
Further, described underframe is provided with the groove that can supply wallboard and link to embed; Described underframe is by end to end the forming of multistage arc truss, described arc truss is formed by connecting by two tablets, a tablet of arc truss has groove, and another piece tablet of arc truss is fixedly installed on the ground, and can be for the through hole of stone bolt along being circumferentially with.
Further, one end of the fixing tablet in described arc truss and ground is provided with the protruding position of dovetail shaped, the dovetail shaped recess that the other end is provided with and match in the protruding position of dovetail shaped, and adjacent arc truss is stitched together with coordinating of dovetail shaped recess by the protruding position of dovetail shaped.
Further, described syndeton comprises the bolt, intermediate plate and the nut that are made up of bolt head and screw rod; Described intermediate plate is located between described bolts and nuts, described intermediate plate is provided with the through hole matching with screw rod, described screw rod is connected with nut thread through after the through hole of intermediate plate, and the bight of described wallboard and the end of link embed in the recess between described bolt head and intermediate plate.
Further, the first recess of described bolt head and the second recess of intermediate plate match and form the I shape recess embedding for the end of link.
Further, the bottom surface of the bolt head of described syndeton is along being circumferentially with multiple claws, the intermediate plate of described syndeton is provided with the draw-in groove that for claw snap in corresponding to claw, the bight of described wallboard is provided with the installation through hole being used in conjunction with claw, and the claw of described bolt head bottom surface is fastenedly connected to realize through the installation through hole of wallboard and the draw-in groove of intermediate plate successively.
Further, described underframe, wallboard, link and syndeton are made up of PC engineering plastics.
Compared with prior art, the utility model is directly stitched together wallboard to form the space of movable plank house with link, by syndeton, different wallboards is fixedly connected with link again, do not need to set up integral house framework, only need to utilize the cooperation of underframe, wallboard, link and syndeton just can install, reduce construction period, also reduced construction volume.Connected mode between structure is simple, even ordinary person also can understand mounting means easily, can oneself install, and simple structure has facilitated installation and removal, is conducive to repeatedly reuse, and reduces the wasting of resources.And underframe of the present utility model is bent frame, link is arc cap ned, wallboard with radian splices by link, and be arranged on underframe, energy forming section spherical movable space after to be installed completing, it is spherical that monnolithic case is, outward appearance uniqueness, elegant in appearance, can meet people's esthetic requirement.
Further, the utility model, by the groove of underframe and link, is embedded into wallboard in groove, and link position transitions smooth is beautiful.And make full use of the bolt head of syndeton and recess and the buckle structure that intermediate plate forms, and different wallboards and link are fixed together, make the utility model simple in structure, be convenient to installation and removal.In addition, underframe of the present utility model, wallboard, link and syndeton material are PC engineering plastics, have good transparency, not perishable, impact resistance is high, it is transparent spherical that this can make whole spherical movable board house present, aesthetic measure is higher, while also making it as security monitoring booth, can be convenient to observe surrounding environment, and be not easy to be impacted, improve safety.Corrosion resistance of the present utility model can adapt to mal-condition, applies more extensively, and impact resistance can also increase its wind loading rating, is not easy to damage to cave in, and reaches after application life, can also reclaim it and manufacture raw material, is reused, more environmental protection.
Brief description of the drawings
Fig. 1 is the stereogram of the utility model spherical movable board house.
Fig. 2 is the underframe stereogram of the utility model spherical movable board house.
Fig. 3 is the arc truss stereogram of the utility model spherical movable board house.
Fig. 4 is the link stereogram of the utility model spherical movable board house.
Fig. 5 is the pentagon wallboard stereogram of the utility model spherical movable board house.
Fig. 6 is the hexagon wallboard stereogram of the utility model spherical movable board house.
Fig. 7 is the syndeton three-dimensional exploded view of the utility model spherical movable board house.
Fig. 8 is wallboard and the installation site schematic diagram of link on intermediate plate of the utility model spherical movable board house.
Detailed description of the invention
As shown in Figure 1, the utility model comprises underframe 1, multiple wallboard 2, multiple link 3 and multiple syndeton 4, and described underframe 1 is bent frame, underframe 1 be fixedly installed on ground, when installation, after underframe 1 is laid, can be fixed on ground with stone bolt.Fix after underframe 1, wallboard 2 and link 3 are connected on underframe 1, described wallboard 2 is the polygonal panel with radian, 3 of described links are the arc cap ned that can embed for wallboard 2 edges, the space that the part diameter of Spherical Volume that multiple described wallboards 2 are spliced to form by link 3 is movable plank house.Adjacent wallboard 2 and being fixedly connected with by syndeton 4 of link 3 are realized, and syndeton 4 is being fixedly connected with adjacent wallboard 2 and link 3 at the concourse of different links 3.The utility model overall structure is simple, do not need to set up in advance house framework, only need just can fast install by the cooperation of underframe 1, wallboard 2, link 3 and syndeton 4, be convenient to dismounting yet, and connected mode between structure is simple, ordinary person also can understand mounting means easily, does not need professional's help also can oneself to install, and can repeatedly reuse, reduce the wasting of resources, after installing, overall structure presents spherical, and good looking appearance is good-looking.
In order to be convenient for people to turnover, on described spherical movable board house, be provided with door 5, door 5 is arranged on the top of underframe 1 opening, door 5 can be the door-plate that one-shot forming forms, optimal way is, the door 5 of described spherical movable board house is to cut rear remaining clout by the wallboard 2 of movable plank house relevant position and link 3 to be spliced, so can save material, cut the waste, secondly, after the door 5 being spliced with the clout of wallboard 2 and link 3 installs, the overall structure outward appearance of spherical movable board house has very high harmony, more elegant in appearance.The door 5 of described spherical movable board house is hinged by hinge 51 with the doorframe of spherical movable board house, described hinge 51 is arranged on a side of door 5, its installation site height is consistent with centre of sphere height, in opening door 5, will reduce like this interference of door 5 and doorframe, on the door 5 of described spherical movable board house, be also provided with door handle, be convenient for people to open door 5.
Further, underframe 1 of the present utility model, wallboard 2, link 3 and syndeton 4 materials can be PC engineering plastics, PC engineering plastics itself have impact resistance, corrosion-resistant, properties of transparency is good simultaneously, in the time adopting PC engineering plastics as manufactured materials, can effectively improve the impact resistance of spherical movable board house, strengthen its wind loading rating, be not easy to damage and cave in, more sturdy and durable.And make spherical movable board house corrosion-resistant, and can adapt to more rugged environment, expand range of application, increase recycling number of times.In addition, installing after spherical movable board house whole spherical movable board house, to present place transparent spherical, beautiful.During as security monitoring booth, transparent room is conducive to observe bad border around, and itself has impact resistance, can improve safety.And as live use board house time, can in spherical movable board house, hang up as required check apron and protect self privacy, need to watch surrounding environment time, check apron can be dismantled.And PC engineering plastics can effectively reduce weight of the present utility model, make its more convenient to install and dismounting, be convenient to be transported to different place to use place and use, reach after application life, can also salvage material, re-use environmental protection more.Underframe 1, link 3 and syndeton 4 can adopt Shooting Technique to produce, and wallboard 2 can adopt plastic uptake explained hereafter, can be applied in suitability for industrialized production, and batch production can effectively reduce manufacturing cost.
As shown in Figure 2, can be connected with underframe 1 with link 3 for the ease of wallboard 2, underframe 1 is provided with the groove that can supply wallboard 2 and link 3 to embed.Need to intercept parts being connected to wallboard on underframe 12 bottoms, can be matched with the groove of underframe 1 in its lower surface, then its lower surface is plugged in the groove of underframe 1, realize being fixedly connected with of wallboard 2 and underframe 1.Also need the link 3 being connected on underframe 1 to intercept part, wallboard 2 after can cutting with quilt matches, and that one end that link 3 contacts with underframe 1 need to process a Plug Division of matching with the groove of underframe 1, link 3 can be plugged in the groove of underframe 1 by Plug Division, realizes being fixedly connected with of link 3 and underframe 1.
For the ease of producing, store and using underframe 1, as shown in Figures 2 and 3, underframe 1 is by multistage arc truss 11 end to end forming, and described arc truss 11 is formed by connecting by two tablets.Wherein a tablet has groove, and wallboard 2 is realized being fixedly connected with of wallboard 2 and link 3 and underframe 1 in can being embedded into this groove with link 3.Another piece tablet be fixedly installed on ground, for the ease of fixing of 11 realizations of arc truss and ground, with can be for the through hole of stone bolt 112 along circumferentially offering in the fixing tablet in ground, so just can utilize stone bolt that arc truss 11 has been fixed on the ground.
Described arc truss 11 is with radian, by multistage arc truss 11 is stitched together and can forms bent frame, for the ease of splicing arc truss 11, be provided with the protruding position 113 of dovetail shaped in one end of the fixing tablet in arc truss 11 and ground, the other end is provided with and the protruding position of the dovetail shaped 113 dovetail shaped recess 114 that are used in conjunction with, adjacent arc truss 11 is stitched together with coordinating of dovetail shaped recess 114 by the protruding position 113 of dovetail shaped, the installation and removal of underframe 1 have in use been facilitated by utilizing the protruding position 113 of arc truss 11 self structure dovetail shapeds and dovetail shaped recess 114 to realize splicing.And the bent frame of underframe 1 is provided with opening, above opening, be provided with door 5, only need to intercept arc truss 11 and be positioned at the part of opening part, just can make underframe 1 form an opening.
As shown in Figure 4, described link 3 is the arc cap ned that can embed for wallboard 2 edges, and both sides are provided with fluting, and adjacent wallboard 2 couples together adjacent wallboard 2 by being embedded in the fluting of both sides.The link 3 that is arranged on underframe 1 need to intercept part fall, can be arranged on underframe 1 on the wallboard 2 that intercepted after part match, and that one end that link 3 contacts with underframe 1 need to process a Plug Division of matching with the groove of underframe 1, and link 3 can be plugged in the groove of underframe 1 by Plug Division.Described wallboard 2 is the polygonal panel with radian, can be triangle wallboard, can be also quadrangle wallboard, only need to be by the cooperation energy forming section spherical movable space of wallboard 2 and link 3.As shown in Figure 5 and Figure 6, described wallboard 2 is preferably divided into 22 two kinds of pentagon wallboard 21 and hexagon wallboards, according to the connecting method of the pentagon fabric of football and hexagon fabric, wallboard 2 is stitched together with these two kinds of wallboards, like this after spherical movable board house installs, entirety is very similar to football, outward appearance uniqueness.
At the concourse of different link 3, syndeton 4 is set, so just different wallboard 2 and link 3 can be coupled together.Described syndeton 4 can be taked bolt fastening structure.As shown in Figure 7, syndeton 4 comprises bolt 41, intermediate plate 42 and nut 43, wherein bolt 41 is made up of bolt head 411 and screw rod 412, intermediate plate 42 is arranged between bolt 41 and nut 43, one through hole matching with screw rod 412 is set on intermediate plate 42, when use, through intermediate plate 42 through holes, bolt 41 and intermediate plate 42 are linked together screw rod 412, screw rod 412 is threaded togather with nut 43.After bolt 41 is connected with intermediate plate 42, bolt head 411 matches with intermediate plate 42 and will form the recess for the bight of wallboard 2 and the embedding of the end of link 3.The first recess 4111 of bolt head 411 matches with the second recess 421 of intermediate plate 42 and forms the I shape recess that can embed for the end of link 3.Wallboard 2 and the installation site of link 3 on intermediate plate are as shown in Figure 8, when spherical movable board house is installed, the termination of the bight of wallboard 2 and link 3 will be embedded in the recess between bolt head 411 and intermediate plate 42, and then fastening nut 43, just can realize being fixedly connected with of different wallboard 2 and link 3.
Need the bight of the wallboard 2 that is embedded into recess to intercept part simultaneously, after different wallboards 2 are stitched together, form a through hole that can allow screw rod 412 pass smoothly in the intersection of different wallboards 2, this is that wallboard 2 can not interfere with screw rod 412 when installing.So just only need to utilize simple syndeton 4 just different wallboards 2 and link 3 can be coupled together, be convenient to installation and removal, be also conducive to batch production, effectively reduce costs.
Further, for make between different wallboard 2 and link 3 be connected more firm, make install and use procedure in overall structure be not easy to deform, strengthened the overall steadiness of spherical movable board house, in syndeton 4, buckle structure is set.
For the wallboard 2 of polygonal panel, as shown in FIG. 7 and 8, in the bottom surface of the bolt head 411 of described syndeton 4 along being circumferentially with multiple claws 4112, claw 4112 has certain elasticity, after can pressing, pass the draw-in groove 422 being arranged on intermediate plate 42, then reinstatement, fastens wallboard 2 and link 3.For coordinating claw 4112 to use, the intermediate plate 42 of described syndeton 4 is provided with the draw-in groove 422 being used in conjunction with claw 4112, the bight of described wallboard 2 is provided with the installation through hole being used in conjunction with claw 4112, the claw 4112 of described bolt head 411 bottom surfaces is successively through the installation through hole of wallboard 2 and the draw-in groove 422 of intermediate plate, snap in after draw-in groove 422, claw 4112 just springs back to origin-location, so just can utilize claw 4112 and the clamping force of draw-in groove 422 to fasten wallboard 2 and link 3.Fasten like this after wallboard 2 and link 3, fixed the relative position of wallboard 2 with link 3, then locked with nut 43, utilize simple structure that wallboard 2 is closely connected with link 3, increased integrally-built steadiness.
For pentagon wallboard 21 and hexagon wallboard 22 as illustrated in Figures 5 and 6, in the bottom surface of the bolt head 411 of described syndeton 4 along being circumferentially provided with three claws 4112, intermediate plate 42 is provided with three draw-in grooves 422 that are used in conjunction with claw 4112, claw 4112 has certain elasticity, after can pressing, pass draw-in groove 422, then reinstatement, fastens wallboard 2 and link 3.In order to coordinate the use of claw 4112, be provided with three draw-in grooves 422 that are used in conjunction with claw 4112 at the intermediate plate 42 of syndeton 4, pentagon wallboard 21 is provided with the first bight that through hole 211 and hexagon wallboard 22 are installed being used in conjunction with claw 4112 and is provided with the second installation through hole 221 being used in conjunction with claw 4112, in installing engineering, by with contacting of through hole and draw-in groove 422 is installed, make claw 4112 be out of shape installation through hole and the draw-in groove 422 through wallboard 2 successively, snap in after draw-in groove 422, claw 4112 springs back to origin-location, claw 4112 interacts and has clamping force with draw-in groove 422, wallboard 2 and link 3 so just can be fastened.So just fix the relative position of wallboard 2 and link 3, and then locked with nut 43.
Use after buckle structure, do not need extra fitter's tool, only the claw 4112 of bolt head 411 bottom surfaces need to be passed successively to the draw-in groove 422 of wallboard 2 and intermediate plate 42, just can utilize the clamping force realization of self to be fastenedly connected, in having ensured the convenience of installation, dismounting, utilize simple structure to increase overall structure steadiness like this.
When installation, first underframe 1 is fixedly installed on the ground, and then wallboard 2 is embedded in the fluting of underframe 1, adjacent wallboard 2 is stitched together wallboard 2 by being embedded in the both sides fluting of link 3.Realize being fixedly connected with between adjacent wallboard 2 and link 3 by syndeton 4, when adjacent wall board 2 is fixedly connected with link 3, adjacent wallboard 2 and link 3 are spliced, then the bight of wallboard 2 is embedded in the recess of intermediate plate 42 correspondences, the end of link 3 is embedded into 421 li of second recess of intermediate plate 42, the through hole through intermediate plate 42 screw rod 412 again, now the claw 4112 of bolt head 411 bottom surfaces is successively through the installation through hole of wallboard 2 and the draw-in groove 422 of intermediate plate 42, fasten wallboard 2 and link 3 by snapping in draw-in groove 422, last fastening nut 43.By above-mentioned mounting method, all wallboards 2 and link 3 are spliced to the space of rear forming section diameter of Spherical Volume as movable plank house, just can use, installation process is convenient and swift, is convenient to repeatedly mount and dismount.

Claims (10)

1. a spherical movable board house, is characterized in that, comprises underframe (1), multiple wallboard (2), multiple link (3) and multiple syndeton (4); Described underframe (1), for can be arranged on ground bent frame, is connecting wallboard (2) and link (3) on underframe (1); Described wallboard (2) is the polygonal panel with radian; Described link (3) is the arc cap ned that can supply wallboard (2) edge to embed; The space that the part diameter of Spherical Volume that multiple described wallboards (2) are spliced to form by link (3) is movable plank house, adjacent wallboard (2) and link (3) couple together by described syndeton (4) at the concourse of different links (3); Be provided with door (5) in the top of described underframe (1) opening.
2. spherical movable board house according to claim 1, is characterized in that, described door (5) cuts remaining clout by the wallboard (2) of movable plank house relevant position and link (3) and is spliced; Described door (5) is hinged with movable plank house by the installation site height hinge (51) consistent with centre of sphere height.
3. spherical movable board house according to claim 1, it is characterized in that, described wallboard (2) is divided into (22) two kinds of pentagon wallboard (21) and hexagon wallboards, and described pentagon wallboard (21) and hexagon wallboard (22) are stitched together according to the connecting method of the pentagon fabric of football and hexagon fabric.
4. spherical movable board house according to claim 1, is characterized in that, described link (3) is respectively equipped with the arc cap ned of groove for both sides, and adjacent described wallboard (2) embeds respectively in the groove of arc cap ned both sides.
5. spherical movable board house according to claim 1, is characterized in that, described underframe (1) is provided with the groove that can supply wallboard (2) and link (3) to embed; Described underframe (1) is by end to end the forming of multistage arc truss (11), described arc truss (11) is formed by connecting by two tablets, a tablet of arc truss (11) has groove, another piece tablet of arc truss (11) is fixedly installed on the ground, and can be for the through hole of stone bolt (112) along being circumferentially with.
6. spherical movable board house according to claim 5, it is characterized in that, one end of the fixing tablet in described arc truss (11) and ground is provided with the protruding position of dovetail shaped (113), the other end is provided with the dovetail shaped recess (114) matching with the protruding position of dovetail shaped (113), and adjacent arc truss (11) is stitched together with coordinating of dovetail shaped recess (114) by the protruding position of dovetail shaped (113).
7. according to the spherical movable board house described in claim 1-6 any one, it is characterized in that, described syndeton (4) comprises the bolt (41), intermediate plate (42) and the nut (43) that are made up of bolt head (411) and screw rod (412); Described intermediate plate (42) is located between described bolt (41) and nut (43), described intermediate plate (42) is provided with the through hole matching with screw rod (412), described screw rod (412) is threaded with nut (43) through after the through hole of intermediate plate (42), and the end of the bight of described wallboard (2) and link (3) embeds in the recess between described bolt head (411) and intermediate plate (42).
8. spherical movable board house according to claim 7, is characterized in that, first recess (4111) of described bolt head (411) matches with second recess (421) of intermediate plate (42) and forms the I shape recess embedding for the end of link (3).
9. spherical movable board house according to claim 7, it is characterized in that, the bottom surface of the bolt head (411) of described syndeton (4) is along being circumferentially with multiple claws (4112), the intermediate plate (42) of described syndeton (4) is provided with the draw-in groove (422) that for claw (4112) snap in corresponding to claw (4112), the bight of described wallboard (2) is provided with the installation through hole being used in conjunction with claw (4112), the claw (4112) of described bolt head (411) bottom surface is fastenedly connected to realize through the installation through hole of wallboard (2) and the draw-in groove (422) of intermediate plate (42) successively.
10. spherical movable board house according to claim 1, is characterized in that, described underframe (1), wallboard (2), link (3) and syndeton (4) are made up of PC engineering plastics.
CN201420016838.5U 2014-01-10 2014-01-10 Spherical prefabricated house Expired - Fee Related CN203701273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420016838.5U CN203701273U (en) 2014-01-10 2014-01-10 Spherical prefabricated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420016838.5U CN203701273U (en) 2014-01-10 2014-01-10 Spherical prefabricated house

Publications (1)

Publication Number Publication Date
CN203701273U true CN203701273U (en) 2014-07-09

Family

ID=51051729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420016838.5U Expired - Fee Related CN203701273U (en) 2014-01-10 2014-01-10 Spherical prefabricated house

Country Status (1)

Country Link
CN (1) CN203701273U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863302A (en) * 2016-04-08 2016-08-17 江苏新国际会展集团有限公司 Exhibition stand and erecting method thereof
CN106499057A (en) * 2016-11-25 2017-03-15 湖州优创科技有限公司 The movable dwellings being made up of metallic plate
CN106592844A (en) * 2016-12-19 2017-04-26 杜海平 Hemispherical reticulated shell structure assembling house
CN106759891A (en) * 2016-12-30 2017-05-31 河南奥斯派克科技有限公司 High intensity square tube Roof system
CN106812349A (en) * 2016-12-27 2017-06-09 上海交通大学 A kind of transparent field setup
RU2659102C1 (en) * 2017-10-03 2018-06-28 Сергей Валентинович Вихарев Spherical detachable residential module
CN111549908A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house and framework structure thereof
CN111550113A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house
CN112726826A (en) * 2019-10-28 2021-04-30 佛山市南海区品位智能家具有限公司 Football sunlight room and installation method thereof
RU220106U1 (en) * 2023-06-15 2023-08-25 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Spherical module

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863302B (en) * 2016-04-08 2018-01-30 江苏新国际会展集团有限公司 Exhibitions exhibition position and its building method
CN105863302A (en) * 2016-04-08 2016-08-17 江苏新国际会展集团有限公司 Exhibition stand and erecting method thereof
CN106499057A (en) * 2016-11-25 2017-03-15 湖州优创科技有限公司 The movable dwellings being made up of metallic plate
CN106592844B (en) * 2016-12-19 2022-05-06 杜海平 Hemisphere latticed shell structure assembled house
CN106592844A (en) * 2016-12-19 2017-04-26 杜海平 Hemispherical reticulated shell structure assembling house
CN106812349A (en) * 2016-12-27 2017-06-09 上海交通大学 A kind of transparent field setup
CN106759891A (en) * 2016-12-30 2017-05-31 河南奥斯派克科技有限公司 High intensity square tube Roof system
RU2659102C1 (en) * 2017-10-03 2018-06-28 Сергей Валентинович Вихарев Spherical detachable residential module
CN112726826A (en) * 2019-10-28 2021-04-30 佛山市南海区品位智能家具有限公司 Football sunlight room and installation method thereof
CN111550113A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house
CN111549908A (en) * 2020-04-29 2020-08-18 广州被动屋科技有限公司 Military protection house and framework structure thereof
RU220106U1 (en) * 2023-06-15 2023-08-25 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Spherical module
RU220110U1 (en) * 2023-06-15 2023-08-25 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Spherical module
RU220108U1 (en) * 2023-06-15 2023-08-25 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Spherical module
RU220104U1 (en) * 2023-06-15 2023-08-25 Федеральное государственное бюджетное образовательное учреждение высшего образования "Национальный исследовательский Московский государственный строительный университет" (НИУ МГСУ) Spherical module

Similar Documents

Publication Publication Date Title
CN203701273U (en) Spherical prefabricated house
JP2021022555A (en) Module assembly type outdoor illumination device and installation method thereof
WO2016202298A1 (en) Section bar and frame having same
CN106760298A (en) A kind of detachable decoration wallboard and its installation method
CN204899113U (en) Quick installation pendant of board section bar
CN103114694A (en) Decoration insulation board system
CN202899393U (en) Unit assembly type suspended ceiling connection structure
CN102146703B (en) Installation and fixing method for wallboards
CN207776274U (en) Water-proof roofing harden structure and building
CN203052549U (en) Grille lamp panel
CN201908416U (en) Architectural decoration plate being convenient to mount
CN201747019U (en) Buckle plate used in ceiling
CN202673916U (en) Installation structure for stone material frame
WO2016184376A1 (en) Wood veneer
CN210526160U (en) Landscape ecological bamboo structure module
CN202767445U (en) Mounting structure for mounting decorative glass on wall body
CN204781823U (en) Ornamental strip fastener
CN201943205U (en) Internal corner fixing device for insulation board
CN203531138U (en) Novel lock wall proximate matter structure of sunlight room
CN209620274U (en) A kind of concealed column mounting assembly
CN204850342U (en) Keep warm and decorate intergral template's package assembly
CN205564133U (en) Sturdy and durable and simple to operate's assembled outdoor signboard
CN217000471U (en) Embedded building panel, external wall panel and suspended ceiling
CN104847047B (en) A kind of double ceiling grid system
KR200472721Y1 (en) Embedded-type Flange, and Membrane structure using it

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20220110

CF01 Termination of patent right due to non-payment of annual fee