CN203695101U - Ore crushing and screening device - Google Patents

Ore crushing and screening device Download PDF

Info

Publication number
CN203695101U
CN203695101U CN201420036634.8U CN201420036634U CN203695101U CN 203695101 U CN203695101 U CN 203695101U CN 201420036634 U CN201420036634 U CN 201420036634U CN 203695101 U CN203695101 U CN 203695101U
Authority
CN
China
Prior art keywords
belt conveyer
ore
jaw crusher
belt
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420036634.8U
Other languages
Chinese (zh)
Inventor
王秀峰
李民菁
李少帅
李军伟
兰建厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dongda Polytron Technologies Inc
Original Assignee
HENAN DONGDA MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN DONGDA MINING CO Ltd filed Critical HENAN DONGDA MINING CO Ltd
Priority to CN201420036634.8U priority Critical patent/CN203695101U/en
Application granted granted Critical
Publication of CN203695101U publication Critical patent/CN203695101U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model relates to an ore crushing and screening device, and effectively solves the problems that the wear and load of equipment and the labor intensity are increased in the prior art. The technical scheme is as follows: the device comprises a vibrant screening feeder, a jaw crusher and a belt conveyer, a material bin is arranged below the screen of the vibrant screening feeder, the first feed outlet formed in the lower part of the material bin is arranged on the belt of the belt conveyer, the second feed outlet formed in the vibrant screening feeder is communicated with the crushing cavity of the jaw crusher, an ore discharging end arranged at the lower part of the crushing cavity is arranged on the belt of the belt conveyer, and the vibrant screening feeder, the jaw crusher and the belt conveyer are connected with a motor respectively to form an operation power structure. According to the utility model, the device is simple in structure and good in using effect and an innovation in ore crushing and screening devices.

Description

A kind of ore reduction screening plant
Technical field
The utility model relates to mineral processing production field, particularly a kind of ore reduction screening plant.
Background technology
At present, the technical process that mineral processing production field obtains fine ore material is: be stacked at ore raft according to the difference of the supplied materials grade of ore through haulage vehicle, after three grades of homogenizing of stacker, enter crushing system, carry out three grades of fragmentations of coarse broken, the broken, thin broken, ore after fragmentation is transported to muck storage warehouse through belt conveyer, enters roller mill and grinds, and obtains fine ore material.Shortcoming is: 1, enter the muck of the ore approximately 45% of crushing system, and slightly broken without carrying out fragmentation, therefore increase crushing, thereby increased equipment attrition and machine utilization.2, increase staff labor intensity, post poor working environment.3, disintegrating apparatus needs continuous operation guarantee grinding machine to measure with ore deposit, and the parking maintenance time is few, gives continuously and produces and bring destabilizing factor.Therefore, after ore reduction, how sieving is the problem of needing at present solution badly.
Summary of the invention
For above-mentioned situation, for solving the defect of prior art, the object of the utility model is just to provide a kind of ore reduction screening plant, and can effectively solve prior art has increased equipment attrition and machine utilization, increases the problem of staff labor intensity.
The technical scheme that the utility model solves is, involving vibrations screening feeding machine, jaw crusher and belt conveyer, storehouse connects material below the screen cloth of vibrosieve batcher, the first discharging opening of bottom, storehouse of connecting material is placed in the belt top of belt conveyer, the second discharging opening on vibrosieve batcher is connected with the crusher chamber of jaw crusher, the ore discharge end of crusher chamber bottom is placed in the belt top of belt conveyer, vibrosieve batcher, jaw crusher and belt conveyer are all connected with motor, form operation power structure.
The utility model is simple in structure, result of use good, lump ore and muck can be separated, and only needs lump ore to enter jaw crushing crusher machine, thereby reduces the equipment attrition of crushing system, alleviates the advantage of machine utilization, is the innovation on ore reduction screening plant.
Brief description of the drawings
Fig. 1 is structural front view of the present utility model.
Fig. 2 is mesh structure front view of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Provided by Fig. 1-2, the utility model involving vibrations screening feeding machine, jaw crusher and belt conveyer, the storehouse 9 that connects material, screen cloth 4 belows of vibrosieve batcher 1, the first discharging opening 5 of 9 bottoms, storehouse of connecting material is placed in the belt top of belt conveyer 3, the second discharging opening 6 on vibrosieve batcher 1 is connected with the crusher chamber 7 of jaw crusher 2, the ore discharge end 8 of crusher chamber 7 bottoms is placed in the belt top of belt conveyer 3, vibrosieve batcher 1, jaw crusher 2 is all connected with motor with belt conveyer 3, (motor is known power-equipment to form operation power structure, therefore do not indicate in figure).
In order to ensure result of use, the sieve aperture≤30mm of the screen cloth 4 of described vibrosieve batcher 1, screen cloth 4 is square, sieve aperture is parallelogram.
Described vibrosieve batcher 1 is be together made up of multiple uniform rail weldings square.
The described storehouse 9 that connects material is contained in the frame 10 of screen cloth 4 bottoms.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the not restriction to the utility model protection domain, described those skilled in the art on the basis of technical solutions of the utility model, make without creationary various amendments and change still within protection domain of the present utility model.
Service condition of the present utility model is, vibrosieve batcher is connected with belt conveyer respectively with jaw crusher, after jaw crusher starts, vibrosieve batcher vibrates running under jaw crusher motor drags, vibrosieve batcher carries out vibrosieve to supplied materials ore, the fragment ore of≤30mm is transported to medium crushing hopper by belt conveyer, all the other massive ores are entered jaw crusher and carry out fragmentation under effect of vibration by vibrosieve batcher, be transported to medium crushing hopper finally by belt conveyer.
Remarkable result of the present utility model: 1, after this utility unit comes into operation, ore need not pass through jaw crushing crusher machine through the muck of screening approximately≤45% left and right, alleviate the equipment attrition degree of jaw crusher, extension device life cycle, maintenance cost and power consumption are reduced, can save power consumption 2500 remainings known every day through putting into practice, monthly can save more than 1.8 ten thousand yuan of maintenance costs, reduce enterprise's production cost.2, ore reduction screening plant come into operation after crushing system can reach more than 8 hours down time every day, have the sufficient time to carry out maintenance to equipment.3, reduce Dust Capacity in shattering process, reduced worker's labour intensity, improved broken post working environment.
The utility model is simple in structure, result of use good, lump ore and muck can be separated, only need lump ore to enter jaw crushing crusher machine, thereby reduce the equipment attrition of crushing system, alleviate the advantage of machine utilization, be the innovation on ore reduction screening plant, there is good economic and social benefit.

Claims (4)

1. an ore reduction screening plant, involving vibrations screening feeding machine, jaw crusher and belt conveyer, it is characterized in that, storehouse (9) connects material below the screen cloth (4) of vibrosieve batcher (1), first discharging opening (5) of bottom, storehouse (9) of connecting material is placed in the belt top of belt conveyer (3), the second discharging opening (6) on vibrosieve batcher (1) is connected with the crusher chamber (7) of jaw crusher (2), the ore discharge end (8) of crusher chamber (7) bottom is placed in the belt top of belt conveyer (3), vibrosieve batcher (1), jaw crusher (2) is all connected with motor with belt conveyer (3), form operation power structure.
2. ore reduction screening plant according to claim 1, is characterized in that, the sieve aperture≤30mm of the screen cloth (4) of described vibrosieve batcher (1), and screen cloth (4) is square, sieve aperture is parallelogram.
3. ore reduction screening plant according to claim 1, is characterized in that, described vibrosieve batcher (1) is be together made up of multiple uniform rail weldings square.
4. ore reduction screening plant according to claim 1, is characterized in that, the described storehouse that connects material (9) is contained in the frame (10) of screen cloth (4) bottom.
CN201420036634.8U 2014-01-21 2014-01-21 Ore crushing and screening device Expired - Fee Related CN203695101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420036634.8U CN203695101U (en) 2014-01-21 2014-01-21 Ore crushing and screening device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420036634.8U CN203695101U (en) 2014-01-21 2014-01-21 Ore crushing and screening device

Publications (1)

Publication Number Publication Date
CN203695101U true CN203695101U (en) 2014-07-09

Family

ID=51045602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420036634.8U Expired - Fee Related CN203695101U (en) 2014-01-21 2014-01-21 Ore crushing and screening device

Country Status (1)

Country Link
CN (1) CN203695101U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108940540A (en) * 2018-09-27 2018-12-07 华北理工大学 A method of using impact grinding quick obtaining ore

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108940540A (en) * 2018-09-27 2018-12-07 华北理工大学 A method of using impact grinding quick obtaining ore

Similar Documents

Publication Publication Date Title
CN206287400U (en) A kind of plastic crushing screening plant
CN201596527U (en) Mineral ore crushing and dressing device
CN104492581B (en) The slag processing metal recovery production method that the cooling of the multiple type of cooling obtains
CN203620755U (en) Phosphorite crushing device
CN210994674U (en) Crushing and ore grinding system
CN202762516U (en) Granite machining system
CN108543616A (en) A kind of stone classification crushing system
CN103418481A (en) Equipment for crushing raw material phosphorus ore
CN201752669U (en) Artificial mica synthesis stepped crushing screening machine
CN205146403U (en) Iron ore separation breaker
CN202137028U (en) Ore-drawing screening and crushing device
CN103964176A (en) Ore dividing system
CN213377131U (en) Multipurpose aggregate crushing and screening production line
CN202155307U (en) Vibration feeding and screening equipment
CN203991634U (en) A kind of high resource utilization system containing civil engineering building refuse
CN204220251U (en) Calcined coke deep processing device
CN205868519U (en) Broken system is concentrated in ore dressing
CN203235536U (en) Integrated iron ore production device
CN203695101U (en) Ore crushing and screening device
CN103831157A (en) Crushing device of aluminum oxide crusting block
CN103157543A (en) Alumina crust block crushing process and production line thereof
CN204338217U (en) A kind of engineering disintegrating machine
CN208786623U (en) A kind of efficient ore crushing system
CN215464748U (en) Second grade crushing and screening all-in-one
CN203018168U (en) Grinding equipment for alumina crusting block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 452471, Henan, Zhengzhou, Dengfeng Province Tang Township, Tang Dong Village North River

Patentee after: Henan Dongda Polytron Technologies Inc

Address before: 452471, Henan, Zhengzhou, Dengfeng Province Tang Township, Tang Dong Village North River

Patentee before: Henan Dongda Mining Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20170121

CF01 Termination of patent right due to non-payment of annual fee