CN203685613U - Combined driving system of primary fan and blower of coal-fired power generator set - Google Patents

Combined driving system of primary fan and blower of coal-fired power generator set Download PDF

Info

Publication number
CN203685613U
CN203685613U CN201320868238.7U CN201320868238U CN203685613U CN 203685613 U CN203685613 U CN 203685613U CN 201320868238 U CN201320868238 U CN 201320868238U CN 203685613 U CN203685613 U CN 203685613U
Authority
CN
China
Prior art keywords
primary air
fan
air fan
steam turbine
blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320868238.7U
Other languages
Chinese (zh)
Inventor
崔福东
张晓坤
郑立国
史志杰
贾绍广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Hebei Electric Power Engineering Co Ltd
Original Assignee
Hebei Electric Power Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Electric Power Design and Research Institute filed Critical Hebei Electric Power Design and Research Institute
Priority to CN201320868238.7U priority Critical patent/CN203685613U/en
Application granted granted Critical
Publication of CN203685613U publication Critical patent/CN203685613U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a combined driving system of a primary fan and a blower of a coal-fired power generator set. The combined driving system comprises the primary fan, the blower as well as a turbine, wherein one end of a rotating shaft of the turbine is connected with a main shaft of the primary fan through speed regulation equipment; the other end of the rotating shaft of the turbine is connected with a main shaft of the blower through the speed regulation equipment. By adopting the combined driving system, the power consumption of a power plant is reduced, the power efficiency of the power plant is improved, the production cost is saved, the production efficiency is improved, and the economic benefits are improved.

Description

Coal fired power generation unit primary air fan and gas fan associating drive system
Technical field
The utility model relates to a kind of power plant accessories, specifically a kind of blower fan associating drive system.
Background technique
Power station mainly utilizes coal fired power generation unit to carry out thermal power generation at home at present, thermal power generation is to point to boiler to carry the fuel such as treated coal dust, the fuel combustions such as coal dust make the water in boiler become water vapor, after once heating, water vapor enters high-pressure cylinder, in order to improve the thermal efficiency, water vapor is carried out to double heating, water vapor enters intermediate pressure cylinder, utilizes the Steam Actuation steam turbine generator generating of intermediate pressure cylinder.
In the process of thermal power generation, the fuel such as coal dust burn in boiler, and therefore primary air fan and gas fan are the main supplementary equipment in power station.Primary air fan is mainly used in drying fuel, and fuel is sent in boiler; Gas fan is used for overcoming the resistance of air preheater, air channel and burner, and the hot air that input burning is required, maintains full combustion of fuel.
Primary air fan and gas fan generally directly drive operation by motor at present, the generator set that is 300MW for capacity, and the electric weight that drives the motor of primary air fan and gas fan operation to take is about 0.8% of full station service.Along with the power supply demand of China is growing, also fast rise thereupon of Generator pool-size, adopts the power station power consumption of motoring primary air fan and gas fan to increase sharply, and the power consumption efficiency of power station is low, has increased cost of production.
Model utility content
The utility model technical issues that need to address are to provide a kind of coal fired power generation unit primary air fan and gas fan associating drive system, have reduced the power consumption of power station, have reduced cost of production.
For solving the problems of the technologies described above, the technological scheme that the utility model adopts is:
Coal fired power generation unit primary air fan and gas fan associating drive system, comprise primary air fan and gas fan, also comprise a steam turbine, one end of the rotating shaft of described steam turbine is connected with the main shaft of primary air fan by speed control device, and the other end of the rotating shaft of steam turbine is connected with the main shaft of gas fan by speed control device.
Further improvement of the utility model is: between the described speed control device being connected with the main shaft of primary air fan and rotating shaft of steam turbine, clutch is set.
Further improvement of the utility model is: described speed control device is gear-box or fluid coupling.
Owing to having adopted technique scheme, the technological progress that the utility model is obtained is:
The utility model is simple in structure, utilizes the rotating shaft of same steam turbine to be connected with gas fan with primary air fan simultaneously, drives primary air fan and gas fan to run well, and has reduced the power consumption of power station, has saved cost of production, has improved manufacturing efficiency.
The utility model has improved the power consumption efficiency of power station, has saved cost of production, has increased economic benefit.Primary air fan and gas fan have all been realized stepless change, have greatly improved the underrun efficiency of primary air fan and gas fan, have reduced the steam consumption, have improved the Economy of generator set operation.Calculate with 5500h according to generator unit annual interest, for separate unit 300MW generator set, year can increase electricity volume and be about 1,870 ten thousand kWh; For separate unit 600MW generator set, a year increase electricity volume is about 3,740 ten thousand kWh; For separate unit 1000MW generator set, a year increase electricity volume is about 5,610 ten thousand kWh.
Between primary air fan and steam turbine, speed control device is set between steam turbine and gas fan, the rotating speed needing according to primary air fan and gas fan regulates, and speed governing is convenient, guarantees device security.Clutch is arranged between the speed control device and steam turbine that connects primary air fan, meets the start and stop needs of primary air fan, guarantees to produce and carries out smoothly.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, 1, steam turbine, 2, primary air fan, 3, gas fan, 4, speed control device, 5, clutch.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further details:
Coal fired power generation unit primary air fan and gas fan associating drive system, structure as shown in Figure 1, comprises steam turbine 1, two cover speed control device 4, primary air fan 2 and gas fans 3.
Described steam turbine 1 is for driving primary air fan 2 and gas fan 3 to run well, rotating shaft one end of steam turbine 1 connects the input end of a set of speed control device 4, speed control device 4 described in the present embodiment is selected gear-box, also can select fluid coupling etc. other can adjusting rotary speed equipment.The output terminal of speed control device 4 is connected with the main shaft of gas fan 3.
The other end of the rotating shaft of steam turbine 1 connects clutch 5.Described clutch 5 is for controlling the start and stop of primary air fan.The output terminal of clutch 5 connects the input end of another set of speed control device 4, and the output terminal of described speed control device 4 connects the main shaft of primary air fan 2.
Working principle of the present utility model is:
Primary air fan and gas fan are by steam turbine Driven by Coaxial; because the rotating speed of steam turbine is higher; and primary air fan and gas fan rotating speed are relatively low, for protection equipment, guarantee to produce, between steam turbine and primary air fan, configure speed control device between steam turbine and gas fan.
In primary air fan side, clutch is set, meets blower fan start and stop needs.When based on fuel burning, the boot sequence of boiler, first starts gas fan, then starts primary air fan; In the time that boiler is shut down, the primary air fan of first stopping transport, the gas fan of then stopping transport.

Claims (3)

1. coal fired power generation unit primary air fan and gas fan associating drive system, comprise primary air fan (2) and gas fan (3), it is characterized in that: also comprise a steam turbine (1), one end of the rotating shaft of described steam turbine (1) is connected with the main shaft of primary air fan (2) by speed control device (4), and the other end of the rotating shaft of steam turbine (1) is connected with the main shaft of gas fan (3) by speed control device (4).
2. coal fired power generation unit primary air fan according to claim 1 and gas fan associating drive system, is characterized in that: between the described speed control device (4) being connected with the main shaft of primary air fan (2) and steam turbine (1) rotating shaft, clutch (5) is set.
3. according to the coal fired power generation unit primary air fan described in claim 1 or 2 any one and gas fan associating drive system, it is characterized in that: described speed control device (4) is gear-box or fluid coupling.
CN201320868238.7U 2013-12-27 2013-12-27 Combined driving system of primary fan and blower of coal-fired power generator set Expired - Lifetime CN203685613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320868238.7U CN203685613U (en) 2013-12-27 2013-12-27 Combined driving system of primary fan and blower of coal-fired power generator set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320868238.7U CN203685613U (en) 2013-12-27 2013-12-27 Combined driving system of primary fan and blower of coal-fired power generator set

Publications (1)

Publication Number Publication Date
CN203685613U true CN203685613U (en) 2014-07-02

Family

ID=51007521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320868238.7U Expired - Lifetime CN203685613U (en) 2013-12-27 2013-12-27 Combined driving system of primary fan and blower of coal-fired power generator set

Country Status (1)

Country Link
CN (1) CN203685613U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110873334A (en) * 2019-11-26 2020-03-10 李宏江 Method and device for purifying waste gas or industrial waste gas of combustion furnace and stove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110873334A (en) * 2019-11-26 2020-03-10 李宏江 Method and device for purifying waste gas or industrial waste gas of combustion furnace and stove

Similar Documents

Publication Publication Date Title
CN104373164B (en) A kind of IGCC electric power station system with HRSG with Supplementary Firing and method of work
CN204460852U (en) Air source heat pump heat supply and blower fan generate electricity association system
CN203685613U (en) Combined driving system of primary fan and blower of coal-fired power generator set
CN104136742A (en) Gas power plant
CN204200282U (en) A kind of space division system compression device drive unit
CN102251818B (en) Gas and steam turbine system
CN102635932A (en) Gas water heater
CN205482289U (en) Raw coal steam drying system of power plant suitable for operate in a variable working condition
CN102562200A (en) Low-pressure residual heat steam power generation system
CN204923920U (en) Pure low temperature waste heat power generation system in cement cellar for storing things
CN202228140U (en) Comprehensive utilization system of waste heat of flue gas of coke oven
CN205279769U (en) Flue gas waste heat power generation facility
CN203670124U (en) Water feed pump system of combined cycle power station
CN204386668U (en) A kind of Turbo-generator Set
JP6532253B2 (en) Steam generation cogeneration system
CN103629656A (en) Air supplying system and method of experiment table of small supercharged boiler
CN102720600A (en) Waste heat power generation system of oil rig
CN204238988U (en) A kind of Thermal generation unit electric coupling steam-driven induced draft fan system
CN202643715U (en) Gas steam combined cycle power generation process waste heat utilization system
CN202813329U (en) Gas boiler capable of operating load on large scale
CN106382161B (en) A kind of multiple level efficient air turbine installation using hydrogen-rich fuel
CN103711670A (en) Feed pump system of combined cycle power station
CN207422181U (en) A kind of boiler of power plant cold start system
CN201786457U (en) Electricity generating device utilizing tail gas of fuel gas turbine
CN201463488U (en) Coal-to-gas direct-fired dry gypsum board device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 050031 No. 6 Jianbei Street, Chang'an District, Shijiazhuang City, Hebei Province

Patentee after: POWERCHINA HEBEI ELECTRIC POWER ENGINEERING Co.,Ltd.

Address before: 050031 No. 6 Jianbei Street, Chang'an District, Shijiazhuang City, Hebei Province

Patentee before: HEBEI ELECTRIC POWER DESIGN & Research Institute

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140702