Prior art keywords
coal pulverizer
air passage
coal
bypass
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721452406.9U
Other languages
Chinese (zh)
Inventor
唐坚
赵喆
陈绍龙
张军
路光杰
吴爱军
陈振宇
王峰
张东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Longyuan Environmental Protection Co Ltd
National Energy Group Baoqing Power Generation Co Ltd
Original Assignee
Guodian Hunan Baoqing Coal Ltd
Beijing Guodian Longyuan Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian Hunan Baoqing Coal Ltd, Beijing Guodian Longyuan Environmental Engineering Co Ltd filed Critical Guodian Hunan Baoqing Coal Ltd
Priority to CN201721452406.9U priority Critical patent/CN207422181U/en
Application granted granted Critical
Publication of CN207422181U publication Critical patent/CN207422181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of boiler of power plant cold start system, coal pulverizer branch air passage of the coal pulverizer main road air passage, parallel communication connected including coal pulverizer inlet air passage, with coal pulverizer inlet air passage on coal pulverizer main road air passage and connection are in the coal pulverizer of coal pulverizer branch duct outlet, parallel communication is gone back on the coal pulverizer inlet air passage has coal pulverizer to bypass air passage, electric heater is communicated on the coal pulverizer bypass air passage, the both ends of the electric heater are respectively provided with a coal pulverizer bypass air passage switch;The coal pulverizer inlet air passage is switched equipped with coal pulverizer inlet air passage, and the coal pulverizer bypass air passage is connected in parallel on coal pulverizer inlet air passage switch ends.The utility model solves the problems, such as that existing boiler of power plant cold start system start-up cost is high, fuel consumption is big.

Description

A kind of boiler of power plant cold start system
Technical field
The utility model is related to boiler startups, particularly a kind of boiler of power plant cold start system.
Background technology
In thermal power plant's generating set cold start stage, the mode of firing coal-dust has fuel ignition, few-oil ignition, micro- in boiler Four kinds of oil drop fire, plasma igniting modes.The fuel ignition mode that traditional boiler cold-state starts, fuel consumption is larger, base This is substituted by modes such as few-oil ignition, tiny-oil ignition, plasma ignitions.
Generating set is different with intermediate pressure cylinder wall temperature according to furnace outage time, and starting state can be divided into:Cold start, warm state open The time that dynamic, hot starting, hot start and very hot startup, wherein cold start need is most long, to meet the needs of boiler cold-state startup, It needs to coal pulverizer hot wind powder, boiler air preheater soot blowing, feedwater thermal de-aeration, turbine shaft seal vapour, steam feed pump punching Deng offer auxiliary thermal source.Boiler of power plant starts the mode mainly setting starting trouble room of offer heat source or by adjacent stove neighbour machine at present Heat source is provided.But heat source can only be provided in a manner that starting trouble room is set for new-built unit, but builds starting trouble room It needs to increase pork barrel, and starting trouble itself is also required to consumption great amount of fuel oil, so as to which the cold conditions for considerably increasing boiler opens Dynamic funds.
Utility model content
The purpose of this utility model is to provide a kind of boiler of power plant cold start system, to solve existing boiler of power plant cold conditions The problem of activation system start-up cost is high, fuel consumption is big.
To achieve the above object, the utility model adopts the following technical solution:A kind of boiler of power plant cold start system, bag The coal pulverizer main road air passage that include coal pulverizer inlet air passage, connects with coal pulverizer inlet air passage, parallel communication are in coal pulverizer main road wind Coal pulverizer branch air passage and connection on road is in the coal pulverizer of coal pulverizer branch duct outlet, the coal pulverizer inlet air passage On go back parallel communication and there is coal pulverizer to bypass air passage, coal pulverizer bypass is communicated with electric heater, the electric heater on air passage Both ends be respectively provided with coal pulverizer bypass air passage switch;It is opened equipped with coal pulverizer inlet air passage in the coal pulverizer inlet air passage It closes, the coal pulverizer bypass air passage is connected in parallel on coal pulverizer inlet air passage switch ends.
Preferably, the coal pulverizer bypass air passage switch includes coal pulverizer bypass tunnel inlet switch and coal pulverizer bypasses wind Road gate out switch;Wherein described coal pulverizer bypass tunnel inlet switch is located at coal pulverizer bypass air inlet of air duct end, the coal-grinding Machine bypass ducting outlet switch is located at coal pulverizer bypass duct outlet end.
Preferably, the coal pulverizer branch air passage is at least two.
Preferably, the coal pulverizer branch air passage is equipped with coal mill control valve.
Preferably, the electric heater includes five groups of heating modules, and heating module is individually controlled by control system described in every group System.
Preferably, the power of heating module described in every group is 400kw.
The utility model has the characteristics that and advantageous effect compared with prior art:The utility model is in coal pulverizer inlet Parallel communication one coal pulverizer in air passage bypasses air passage, and sets electric heater on coal pulverizer bypass air passage, is provided by electric heater Auxiliary thermal source needed for boiler cold-state start-up course, so as to which starting trouble room or the situation using external heat source need not be being built It realizes that the cold conditions of generating set boiler quickly starts down, greatly reduces the cost of boiler cold-state startup, reduce fuel consumption, Start-up course is simplified, is consumed energy by electric energy replacing fuel oil, energy conservation and environmental protection, while the more existing Starting mode of startup speed of boiler 50%-80% is improved, ensures the safely and fast startup of boiler.
The utility model can be widely applied in the cold start system of equipment.
Description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the system diagram of the utility model.
Reference numeral:1- coal pulverizer inlets air passage, 2- coal pulverizer main roads air passage, 3- coal pulverizer branches air passage, 4- mills Coal machine, 5- coal pulverizers bypass air passage, 6- electric heaters, 7- coal pulverizer inlets air passage switch, 8- coal pulverizers bypass air passage enter Mouth switch, 9- coal pulverizers bypass ducting outlet switch, 10- coal mill control valves.
Specific embodiment
Embodiment is shown in Figure 1, a kind of boiler of power plant cold start system, including coal pulverizer inlet air passage 1 and coal-grinding Coal pulverizer branch 3 air passage of the coal pulverizer main road air passage 2, parallel communication of machine inlet conduits connection on coal pulverizer main road air passage 2 And connection is in the coal pulverizer 4 of 3 air outlet of coal pulverizer branch air passage, wherein the coal pulverizer branch air passage 3 totally six, outlet air Mouth connects 1# coal pulverizers, 2# coal pulverizers, 3# coal pulverizers, 4# coal pulverizers, 5# coal pulverizers and 6# coal pulverizers, the coal pulverizer 4 respectively Maximum output is 60 t/h, and parallel communication is gone back on the coal pulverizer inlet air passage 1 has coal pulverizer to bypass air passage 5, the coal pulverizer Electric heater 6 is communicated on bypass air passage 5, the both ends of the electric heater 6 are respectively provided with a coal pulverizer bypass air passage switch;Institute It states coal pulverizer inlet air passage 1 and switchs 7 equipped with coal pulverizer inlet air passage, the coal pulverizer bypass air passage 5 is connected in parallel on coal pulverizer and enters One's intention as revealed in what one says road switchs 7 both ends;The coal pulverizer bypass air passage switch includes coal pulverizer bypass tunnel inlet switch 8 and coal pulverizer bypass Ducting outlet switch 9;Wherein described coal pulverizer bypass tunnel inlet switch 8 is located at coal pulverizer bypass air inlet of air duct end, described Coal pulverizer bypass ducting outlet switch 9 is located at coal pulverizer bypass duct outlet end;The coal pulverizer branch air passage 3 is at least two Item;The coal pulverizer branch air passage 3 is equipped with coal mill control valve 10;The electric heater 6 include five groups of heating modules, every group The heating module is individually controlled by control system;The power of heating module described in every group is 400kw.
The course of work of the utility model:Below by taking 600MW unit boiler cold start as an example, when boiler cold-state starts, Coal pulverizer inlet air passage switch 7 is closed, and opens coal pulverizer bypass tunnel inlet switch 8 and mill on coal pulverizer bypass air passage 5 Coal machine bypass ducting outlet switch 9, cold air enters coal pulverizer bypass air passage 5, while starts electric heater 6 to a coal pulverizer Cold air needed for 4 is heated, and when temperature reaches 60-90 DEG C, coal pulverizer 4 reaches operating condition, then opens connection 1# Coal mill control valve 10 on the coal pulverizer branch air passage 3 of coal pulverizer starts 1# coal pulverizers, adjusts 1# pulverizer capacities and reaches 20 The 1/3 of t/h namely its maximum output(Maximum output is 60 t/h), after ignition of the boiler burning, when air preheater heats First air To after required temperature, coal pulverizer inlet air passage 1 is opened, and the coal pulverizer bypass air passage closed on coal pulverizer bypass air passage 5 enters Mouthful switch 8, coal pulverizer bypass ducting outlet switch 9 and electric heater 6, progressively start 1# coal pulverizers to its maximum output and by Step starts whole coal pulverizers, when Boiler Steam parameter reaches certain parameter, to the auxiliary vapour header steam supply of generating set, then by auxiliary Vapour header is supplied to water thermal de-aeration and the required vapour of steam feed pump red switch, completes the cold start of boiler.

Claims (6)

1. a kind of boiler of power plant cold start system, including coal pulverizer inlet air passage(1), the mill that connects with coal pulverizer inlet air passage Coal owner's transportation work style road(2), parallel communication is in coal pulverizer main road air passage(2)On coal pulverizer branch air passage(3)And connection is being ground Coal machine branch air passage(3)The coal pulverizer of air outlet(4), it is characterised in that:The coal pulverizer inlet air passage(1)On go back parallel communication There is coal pulverizer to bypass air passage(5), the coal pulverizer bypass air passage(5)On be communicated with electric heater(6), the electric heater(6) Both ends be respectively provided with coal pulverizer bypass air passage switch;
The coal pulverizer inlet air passage(1)Coal pulverizer inlet air passage is equipped with to switch(7), the coal pulverizer bypass air passage(5)And It is associated in coal pulverizer inlet air passage switch(7)Both ends.
2. boiler of power plant cold start system according to claim 1, it is characterised in that:It opens in the coal pulverizer bypass air passage Pass includes coal pulverizer bypass tunnel inlet switch(8)With coal pulverizer bypass ducting outlet switch(9);
Wherein described coal pulverizer bypass tunnel inlet switch(8)Coal pulverizer bypass air inlet of air duct end is located at, by the coal pulverizer Road ducting outlet switch(9)It is located at coal pulverizer bypass duct outlet end.
3. boiler of power plant cold start system according to claim 2, it is characterised in that:The coal pulverizer branch air passage (3)At least two.
4. boiler of power plant cold start system according to claim 3, it is characterised in that:The coal pulverizer branch air passage (3)It is equipped with coal mill control valve.
5. according to claim 1-4 any one of them boiler of power plant cold start systems, it is characterised in that:The electric heater (6)Including five groups of heating modules, heating module is individually controlled by control system described in every group.
6. boiler of power plant cold start system according to claim 5, it is characterised in that:The work(of heating module described in every group Rate is 400kw.
CN201721452406.9U 2017-11-03 2017-11-03 A kind of boiler of power plant cold start system Active CN207422181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721452406.9U CN207422181U (en) 2017-11-03 2017-11-03 A kind of boiler of power plant cold start system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721452406.9U CN207422181U (en) 2017-11-03 2017-11-03 A kind of boiler of power plant cold start system

Publications (1)

Publication Number Publication Date
CN207422181U true CN207422181U (en) 2018-05-29

Family

ID=62307034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721452406.9U Active CN207422181U (en) 2017-11-03 2017-11-03 A kind of boiler of power plant cold start system

Country Status (1)

Country Link
CN (1) CN207422181U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113294799A (en) * 2021-05-27 2021-08-24 东方电气集团东方锅炉股份有限公司 Hot primary air and air-powder mixture heat exchange system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113294799A (en) * 2021-05-27 2021-08-24 东方电气集团东方锅炉股份有限公司 Hot primary air and air-powder mixture heat exchange system

Similar Documents

Publication Publication Date Title
CN108240236B (en) Steam supplementing and extracting system of steam turbine and control method
CN207145026U (en) Combined Cycle Unit steam turbine quickly starts warming-up system
CN206972383U (en) A kind of heated by natural gas system for Combined cycle gas-steam turbine
CN106499455A (en) Combined-cycle power plant's soda pop backheat and fuel heating integrated put forward effect system
CN207422181U (en) A kind of boiler of power plant cold start system
CN212205685U (en) Cement waste heat power generation coal mill drying air balance adjusting system
CN103644032A (en) System for heating natural gas through gradient utilization of water supplied at medium pressure from waste heat boiler of gas turbine power plant
CN104564195A (en) Comprehensive waste heat utilization system of internal combustion engine
CN107524527A (en) A kind of gas turbine available for circulating power station becomes back pressure modernization system
CN105464810B (en) Combustion and steam association system and its progress control method
CN105484816B (en) Combustion and steam association system and its progress control method
CN204457898U (en) Afterheat of IC engine utilization system
CN110671158A (en) High-pressure cylinder air pre-warming and quick-cooling system and adjusting method thereof
CN203454675U (en) Biomass hot air system applied to fabric washing and drying
CN205260142U (en) Joint formula technology firing equipment
CN109139133A (en) A kind of electricity generation system of new type solar energy auxiliary biomass energy
CN203687006U (en) Preheat starting system for supercritical generator set
CN100458290C (en) Apparatus for refrigeration or pyrogenicity or sanitary hot water using generator exhaust or residual heat
CN104594964A (en) Novel single-shaft natural gas combined cycle heat supply unit system
CN209469458U (en) A kind of back pressure type heat supply steam turbine energy conservation regulating system
CN211314295U (en) High-pressure cylinder air pre-warming and quick-cooling system
CN209386263U (en) A kind of solid heat reservoir of auxiliary heating
CN105484814B (en) Combustion and steam association system and its progress control method
CN103397942B (en) Heat and power system
CN105698162A (en) System and method for adjusting air temperature of inlet of coal mill through fed water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100039 room 901, 9 / F, building 1, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing

Patentee after: Guoneng Longyuan environmental protection Co.,Ltd.

Patentee after: STATE POWER HUNAN BAOQING COAL POWER Co.,Ltd.

Address before: 100039 room 911, 1 building, 16 West Fourth Ring Road, Haidian District, Beijing.

Patentee before: BEIJING GUODIAN LONGYUAN ENVIRONMENTAL ENGINEERING Co.,Ltd.

Patentee before: STATE POWER HUNAN BAOQING COAL POWER Co.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: 100039 room 901, 9 / F, building 1, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing

Patentee after: Guoneng Longyuan environmental protection Co.,Ltd.

Patentee after: National Energy Group Baoqing Power Generation Co.,Ltd.

Address before: 100039 room 901, 9 / F, building 1, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing

Patentee before: Guoneng Longyuan environmental protection Co.,Ltd.

Patentee before: STATE POWER HUNAN BAOQING COAL POWER Co.,Ltd.

CP01 Change in the name or title of a patent holder