CN203684166U - Earthquake-resistant and water-proof structure for stone dam - Google Patents

Earthquake-resistant and water-proof structure for stone dam Download PDF

Info

Publication number
CN203684166U
CN203684166U CN201320734630.2U CN201320734630U CN203684166U CN 203684166 U CN203684166 U CN 203684166U CN 201320734630 U CN201320734630 U CN 201320734630U CN 203684166 U CN203684166 U CN 203684166U
Authority
CN
China
Prior art keywords
composite material
material layer
water
cover
asphalt emulsion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320734630.2U
Other languages
Chinese (zh)
Inventor
缪家戌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Royal Construction Engineering Co., Ltd.
Original Assignee
Chengdu Kechuang Jiasi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kechuang Jiasi Technology Co Ltd filed Critical Chengdu Kechuang Jiasi Technology Co Ltd
Priority to CN201320734630.2U priority Critical patent/CN203684166U/en
Application granted granted Critical
Publication of CN203684166U publication Critical patent/CN203684166U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an earthquake-resistant and water-proof structure for a stone dam. The earthquake-resistant and water-proof structure comprises a high-toughness cement-based composite material layer, wherein two expansion bolts are arranged on the high-toughness cement-based composite material layer; an elastic edge sealing device is connected between the expansion bolts; a through hole is formed in the middle part of the elastic edge sealing device; a rubber cover is arranged in the through hole; an anti-seepage cover is arranged in the rubber cover; the anti-seepage cover is connected with the rubber cover by adopting an expansion screw; the cover openings of the anti-seepage cover and the rubber cover are connected to the upper surface of the high-toughness cement-based composite material layer; a V-shaped groove is formed corresponding to the opening of the anti-seepage cover on the high toughness cement-based composite material layer. The earthquake-resistant and water-proof structure for the stone dam can play good roles in resisting earthquake and stopping water and is suitable for high earth-rock dam engineering in highly seismic regions, the anti-deforming capability of a concrete panel can be effectively increased, the concrete panel is prevented from being staggered under the action of shake, high reliability is realized, and leakage is avoided.

Description

Masonry dam antidetonation water-stopping structure
Technical field
The utility model relates to a kind of antidetonation water-stopping structure, particularly a kind of masonry dam antidetonation water-stopping structure.
Background technology
Concrete concrete slab is as the main leakage preventing structure of Concrete Face Rockfill Dam, one of subject matter that its security reliability Shi Ba work circle is paid close attention to always.Due to the ability of concrete material opposing stretcher strain a little less than, under water ballast(ing) and seismic loading, easily produce the structural horizontal drawing crack seam that runs through panel, this position seepage prevention system was lost efficacy.Therefore how to make concrete slab water-stopping structure there is stronger deformability by certain measure, can adapt to earthquake operating mode, avoid the vertical lap seam two sides board concrete at middle part, riverbed to be extruded the situation generation of destruction simultaneously, effectively prevention seismic damage, reaching the object of antidetonation sealing, is the problem of the current most important thing.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, provide one can effectively improve concrete slab resistance capacity to deformation, and can prevent the masonry dam antidetonation water-stopping structure of the generation of concrete slab faulting of slab ends under shock effect.
To achieve these goals, the technical solution adopted in the utility model is such: masonry dam antidetonation water-stopping structure of the present utility model, comprise high tenacity cement-base composite material layer, high tenacity cement-base composite material layer is provided with expansion bolt, expansion bolt is two, between expansion bolt, be connected with elasticity edge banding apparatus, elasticity edge banding apparatus middle part has through hole, in through hole, be equiped with serum cap, in serum cap, be provided with antiseepage lid, between antiseepage lid and serum cap, adopt swell fixture to be connected, the lid mouth of antiseepage lid and serum cap is all connected to high tenacity cement-base composite material layer upper surface, the cover port of the corresponding antiseepage lid of high tenacity cement-base composite material layer has V-type groove, V-type rooved face is half elliptic flexible filler, V-type trench bottom is connected with rubber bar, rubber bar is connected with asphalt emulsion layer through concrete slab, asphalt emulsion layer upper surface is provided with steel nail, steel nail is two, between two steel nails, connect by steel disc, steel disc middle part has the through hole passing for rubber bar, asphalt emulsion layer soffit is provided with cement sand bed, between cement sand bed and asphalt emulsion layer, be provided with horizontal joint, horizontal joint is parallel with asphalt emulsion layer.
Further, as a kind of concrete form of structure, horizontal joint described in the utility model is permanent horizontal joint.
Further, as a kind of concrete form of structure, V-type groove groove depth described in the utility model is two to five centimetres, and width is eight to ten centimetres.
Further, as a kind of concrete form of structure, concrete slab described in the utility model middle part is connected with reinforcing bar.
Compared with prior art, the utility model has the advantage of: the utility model masonry dam antidetonation water-stopping structure can play good antidetonation sealing effect, be applicable to the high earth-rock works of meizoseismal area, can effectively improve concrete slab resistance capacity to deformation, and can prevent the generation of concrete slab faulting of slab ends under shock effect, reliability is high, is difficult for causing seepage.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
In figure: 1. elasticity edge banding apparatus; 2. expansion bolt; 3. serum cap; 4. antiseepage lid; 5.V type groove; 6. rubber bar; 7. high tenacity cement based meets material layer; 8. concrete slab; 9. steel disc; 10. steel nail; 11. horizontal joints; 12. cement sand beds; 13. asphalt emulsion layers.
The specific embodiment
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, and basic structure of the present utility model is only described in a schematic way, and therefore it only shows the formation relevant with the utility model.
The preferred embodiment of the utility model masonry dam antidetonation water-stopping structure as shown in Figure 1, comprise high tenacity cement-base composite material layer 7, high tenacity cement-base composite material layer 7 is provided with expansion bolt 2, expansion bolt 2 is two, between expansion bolt 2, be connected with elasticity edge banding apparatus 1, elasticity edge banding apparatus 1 middle part has through hole, in through hole, be equiped with serum cap 3, in serum cap 3, be provided with antiseepage lid 4, between antiseepage lid 4 and serum cap 3, adopt swell fixture to be connected, antiseepage lid 4 is all connected to high tenacity cement-base composite material layer 7 upper surface with the lid mouth of serum cap 3, the cover port of high tenacity cement-base composite material layer 7 corresponding antiseepage lid 4 has V-type groove 5, V-type groove 5 surfaces are half elliptic flexible filler, V-type groove 5 bottoms are connected with rubber bar 6, rubber bar 6 is connected with asphalt emulsion layer 13 through concrete slab 8, asphalt emulsion layer 13 upper surface are provided with steel nail 10, steel nail 10 is two, between two steel nails 10, connect by steel disc 9, steel disc 9 middle parts have the through hole passing for rubber bar 6, asphalt emulsion layer 13 soffit are provided with cement sand bed 12, between cement sand bed 12 and asphalt emulsion layer 13, be provided with horizontal joint 11, horizontal joint 11 is parallel with asphalt emulsion layer 13, described horizontal joint 11 is permanent horizontal joint, described V-type groove 5 groove depths are two to five centimetres, width is eight to ten centimetres, described concrete slab 8 middle parts are connected with reinforcing bar.
The utility model masonry dam antidetonation water-stopping structure can play good antidetonation sealing effect, be applicable to the high earth-rock works of meizoseismal area, can effectively improve concrete slab 8 resistance capacity to deformation, and can prevent the generation of concrete slab faulting of slab ends under shock effect, reliability is high, is difficult for causing seepage.Described horizontal joint 11 is permanent horizontal joint, meets design requirement; Described V-type groove 5 groove depths are two to five centimetres, and width is eight to ten centimetres, can better resistance to compression; Described concrete slab 8 middle parts are connected with reinforcing bar, have improved soundness.
Take above-mentioned foundation desirable embodiment of the present utility model as enlightenment, by above-mentioned description, relevant staff can, not departing from the scope of this utility model technological thought, carry out various change and modification completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to claim scope.

Claims (4)

1. a masonry dam antidetonation water-stopping structure, comprise high tenacity cement-base composite material layer, it is characterized in that: high tenacity cement-base composite material layer is provided with expansion bolt, expansion bolt is two, between expansion bolt, be connected with elasticity edge banding apparatus, elasticity edge banding apparatus middle part has through hole, in through hole, be equiped with serum cap, in serum cap, be provided with antiseepage lid, between antiseepage lid and serum cap, adopt swell fixture to be connected, the lid mouth of antiseepage lid and serum cap is all connected to high tenacity cement-base composite material layer upper surface, the cover port of the corresponding antiseepage lid of high tenacity cement-base composite material layer has V-type groove, V-type rooved face is half elliptic flexible filler, V-type trench bottom is connected with rubber bar, rubber bar is connected with asphalt emulsion layer through concrete slab, asphalt emulsion layer upper surface is provided with steel nail, steel nail is two, between two steel nails, connect by steel disc, steel disc middle part has the through hole passing for rubber bar, asphalt emulsion layer soffit is provided with cement sand bed, between cement sand bed and asphalt emulsion layer, be provided with horizontal joint, horizontal joint is parallel with asphalt emulsion layer.
2. masonry dam antidetonation water-stopping structure according to claim 1, is characterized in that: described horizontal joint is permanent horizontal joint.
3. masonry dam antidetonation water-stopping structure according to claim 1, is characterized in that: described V-type groove groove depth is two to five centimetres, and width is eight to ten centimetres.
4. masonry dam antidetonation water-stopping structure according to claim 1, is characterized in that: described concrete slab middle part is connected with reinforcing bar.
CN201320734630.2U 2013-11-20 2013-11-20 Earthquake-resistant and water-proof structure for stone dam Expired - Fee Related CN203684166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320734630.2U CN203684166U (en) 2013-11-20 2013-11-20 Earthquake-resistant and water-proof structure for stone dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320734630.2U CN203684166U (en) 2013-11-20 2013-11-20 Earthquake-resistant and water-proof structure for stone dam

Publications (1)

Publication Number Publication Date
CN203684166U true CN203684166U (en) 2014-07-02

Family

ID=51006089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320734630.2U Expired - Fee Related CN203684166U (en) 2013-11-20 2013-11-20 Earthquake-resistant and water-proof structure for stone dam

Country Status (1)

Country Link
CN (1) CN203684166U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131531A (en) * 2013-11-20 2014-11-05 成都科创佳思科技有限公司 Anti-seismic water stopping structure for stone dam
CN104762926A (en) * 2015-04-16 2015-07-08 长江勘测规划设计研究有限责任公司 Embedded groove type aqueduct water-stop structure and construction method thereof
CN104912035A (en) * 2015-06-12 2015-09-16 中国电建集团贵阳勘测设计研究院有限公司 Elastic connection structure of concrete panel vertical seam and construction method thereof
CN109113030A (en) * 2018-09-13 2019-01-01 西京学院 A kind of the panel anti-seismic structure and its construction method of concrete face rockfill dam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131531A (en) * 2013-11-20 2014-11-05 成都科创佳思科技有限公司 Anti-seismic water stopping structure for stone dam
CN104762926A (en) * 2015-04-16 2015-07-08 长江勘测规划设计研究有限责任公司 Embedded groove type aqueduct water-stop structure and construction method thereof
CN104912035A (en) * 2015-06-12 2015-09-16 中国电建集团贵阳勘测设计研究院有限公司 Elastic connection structure of concrete panel vertical seam and construction method thereof
CN109113030A (en) * 2018-09-13 2019-01-01 西京学院 A kind of the panel anti-seismic structure and its construction method of concrete face rockfill dam
CN109113030B (en) * 2018-09-13 2020-11-13 西京学院 Concrete panel rock-fill dam panel seismic structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN202298564U (en) Anti-seismic and water-stopping structure for concrete face rock-fill dam
CN203429601U (en) Sealing-up structure for intersection position of reservoir bank water-tight face plate and concrete gravity dam cross joint
CN203684166U (en) Earthquake-resistant and water-proof structure for stone dam
CN204530633U (en) The soft rock that a kind of subregion is arranged builds rock dam body
CN105484204A (en) Stone masonry dam or concrete dam sealing anti-seepage reinforcement structure and construction method thereof
CN206090638U (en) Underground side wall post -cast strip waterproof construction
CN107165177A (en) A kind of side slope supporting construction method
CN204703179U (en) A kind of composite geo-membrane sloping core cofferdam
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN103422473A (en) Anti-seismic face plate structure for rock-fill dam with concrete face plate and method for constructing face plate anti-seismic structure
CN202706060U (en) Waterproof structure for base plate deformation joint with width of 50 mm
CN111622184A (en) Flexible anti-seepage connecting structure for mask-toe board of mask rock-fill dam and construction method of flexible anti-seepage connecting structure
CN203866776U (en) Connecting structure of geomembrane and concrete building
CN209723000U (en) A kind of deep water cofferdam steel sheet pile fore shaft
CN104131531A (en) Anti-seismic water stopping structure for stone dam
CN205314056U (en) It seals prevention of seepage reinforced structure to grout masonry dam or concrete dam
CN203684290U (en) Deformation joint construction for underground engineering cast-in-place concrete structure
CN207846345U (en) Seamless sealing face dam
CN104372770B (en) Rubber panel rock-fill dams and construction method thereof
CN214301579U (en) Diaphragm wall and toe board water pressure canned type flexible stagnant water structure
CN205206055U (en) Basement outer wall post -cast strip thickening anti -seepage waterstop structure
CN204551378U (en) Seepage-proofing structure of upstream surface layer of rock-fill dam
CN205444125U (en) Concrete faced rockfill dam
CN103590429B (en) A kind of underground engineering cast-in-place concrete structure deformation joint structure
CN204940564U (en) A kind of structure of strength cement-based grouting material sealing body of wall splicing seams

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TIAN YANCHAO

Free format text: FORMER OWNER: CHENGDU KECHUANG JIASI TECHNOLOGY CO., LTD.

Effective date: 20141030

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 610000 CHENGDU, SICHUAN PROVINCE TO: 401120 YUBEI, CHONGQING

TR01 Transfer of patent right

Effective date of registration: 20141030

Address after: 401120 Chongqing Yubei District Longxiang Street No. 47

Patentee after: Tian Yanchao

Address before: 610000 Sichuan city of Chengdu province Jinjiang District East Street No. 139 Building 1 3 floor No. 4

Patentee before: Chengdu Kechuang Jiasi Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: CHONGQING YULIN CONSTRUCTION ENGINEERING CO., LTD.

Free format text: FORMER OWNER: TIAN YANCHAO

Effective date: 20141113

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141113

Address after: 401120, Shuanglong Road, Shuanglong Lake, Chongqing, Yubei District, No. 1, building 57, 4-1

Patentee after: Chongqing Royal Construction Engineering Co., Ltd.

Address before: 401120 Chongqing Yubei District Longxiang Street No. 47

Patentee before: Tian Yanchao

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20151120