CN203668968U - 一种用于变电站户外ais电气设备的支架支撑部件 - Google Patents

一种用于变电站户外ais电气设备的支架支撑部件 Download PDF

Info

Publication number
CN203668968U
CN203668968U CN201320836825.8U CN201320836825U CN203668968U CN 203668968 U CN203668968 U CN 203668968U CN 201320836825 U CN201320836825 U CN 201320836825U CN 203668968 U CN203668968 U CN 203668968U
Authority
CN
China
Prior art keywords
equipment
ais
rim
basis
cup basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320836825.8U
Other languages
English (en)
Inventor
邱新刚
孔宪扬
荣发兵
龚金凤
郑跃
谢登科
陈华春
姚秦生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Priority to CN201320836825.8U priority Critical patent/CN203668968U/zh
Application granted granted Critical
Publication of CN203668968U publication Critical patent/CN203668968U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型涉及一种用于变电站户外AIS电气设备的支架支撑部件,与现有技术相比解决了造价成本高、施工难度大、施工效率低的缺陷。本实用新型包括AIS电气设备(7)和设备支架(4),所述的AIS电气设备(7)固定安装在设备支架(4)上,还包括垫层(6)、设备杯口基础(3)、顶杆(1)和杯口基础(2),所述的设备支架(4)固定安装在设备杯口基础(3)的上部,顶杆(1)的上部固定安装在设备杯口基础(3)的下部,顶杆(1)的下部固定安装在杯口基础(2)上,所述的垫层(6)固定安装在杯口基础(2)的下方。本实用新型具有施工便携、安全性高、成本低廉的优点。

Description

一种用于变电站户外AIS电气设备的支架支撑部件
技术领域
本实用新型涉及变电站AIS电气设备基础地基技术领域,具体来说是一种用于变电站户外AIS电气设备的支架支撑部件。
背景技术
在日常建成投运的220kV户外AIS变电站中,特别是在山区变电站工程中,部分电气配电装置位于填方区。由于基础持力层位于场平标高以下较深,在该区域设备支架基础处理通常采用桩基础或毛石混凝土换填。当采用桩基础方案的情况下,虽然质量可靠,但由于户外AIS设备重量轻,即使按规范采用最小直径的桩基,其竖向承载力也不起控制作用,桩基的特性无法得到全面发挥。而且工程中采用桩基方案工程造价较高,实施过程中存在试桩、试桩检测、工程桩施工、工程桩检测、设备基础施工等诸多环节,导致工程建设速度慢,影响变电站工程整体施工进度。当采用毛石混凝土换填方案的情况下,其比较桩基础方案节约了造价,但持力层深度在4.5米以下时,砌筑毛石混凝土的高度将超过3米,工程造价会急剧增加,且砌筑高度过高,砌筑难度加大,导致施工危险性较大。因此针对于持力层深度在4.5~8.0米的户外AIS设备支架基础,采用桩基造价高、工期慢,采用毛石混凝土换填方案砌筑难度大、施工存在危险,如何开发出一种经济合理、施工方便的针对于AIS设备的支架支撑部件已经成为急需解决的技术问题。
实用新型内容
本实用新型的目的是为了解决现有技术中造价成本高、施工难度大、施工效率低的缺陷,提供一种用于变电站户外AIS电气设备的支架支撑部件来解决上述问题。
为了实现上述目的,本实用新型的技术方案如下:
一种用于变电站户外AIS电气设备的支架支撑部件,包括AIS电气设备和设备支架,所述的AIS电气设备固定安装在设备支架上,还包括垫层、设备杯口基础、顶杆和杯口基础,所述的设备支架固定安装在设备杯口基础的上部,顶杆的上部固定安装在设备杯口基础的下部,顶杆的下部固定安装在杯口基础上,所述的垫层固定安装在杯口基础的下方。
所述的顶杆为钢筋混凝土环形杆。
所述的顶杆的下部通过灌浆混凝土固定安装在杯口基础上。
有益效果
本实用新型的一种用于变电站户外AIS电气设备的支架支撑部件,与现有技术相比具有施工便携、安全性高、成本低廉的优点。相对于桩基础方案省去了桩基本体造价,综合节约工程造价达35%左右,同时节省了试桩、桩基检测等诸多环节,大量节约了施工工期,加快了工程建设速度。相对于毛石混凝土换填方案相比,避免了超深基础深度在4.5米以上时采用毛石混凝土砌筑(浇筑)工程量大的缺点,工程造价较毛石混凝土换填方案节约20%以上,同时省去了毛石砌筑(浇筑)及基坑大开挖及回填的过程,缩短了施工工期。
附图说明                      
图1为本实用新型的结构示意图
其中,1-顶杆、2-杯口基础、3-设备杯口基础、4-设备支架、5-灌浆混凝土、6-垫层、7-AIS电气设备、8-地面。
具体实施方式
为使对本实用新型的结构特征及所达成的功效有更进一步的了解与认识,用以较佳的实施例及附图配合详细的说明,说明如下:
如图1所示,本实用新型所述的一种用于变电站户外AIS电气设备的支架支撑部件,包括AIS电气设备7和设备支架4,AIS电气设备7固定安装在设备支架4上,其中设备支架4穿过地面8,将AIS电气设备7支撑出地面8,AIS电气设备7通过现有技术中的固定件安装在设备支架4上即可。还包括垫层6、设备杯口基础3、顶杆1和杯口基础2。顶杆1可以为钢筋混凝土环形杆,采用工厂化制作,加工、运输及安装都更加方便。垫层6用于更好的固定杯口基础2并可以更加方便对杯口基础2的施工,设备杯口基础3用于实现设备支架4与顶杆1中间连接件的作用。设备支架4固定安装在设备杯口基础3的上部,固定的方式可以采用在施工过程中用混凝土进行直接浇灌固定。顶杆1的上部固定安装在设备杯口基础3的下部,顶杆1则通过设备杯口基础3实现对AIS电气设备7的支撑,同样顶杆1与设备杯口基础3的固定也可以采用在施工过程中用混凝土进行直接浇灌固定。顶杆1的下部固定安装在杯口基础2上,为了使用效果最好可以通过灌浆混凝土5固定安装在杯口基础2上。垫层6固定安装在杯口基础2的下方,从而实现了杯口基础2对AIS电气设备7的支撑。
在实际使用时,先开挖土方至持力层标高,将固定安装好的杯口基础2和垫层6先放入,也可以在开挖土方至持力层标高后,直接浇筑出杯口基础2和垫层6。再将顶杆1插入杯口基础2中,并调整其垂直度,采用灌浆混凝土5二次灌浆将顶杆1固定。此时杯口基础2直接受力于原状土持力层上,顶杆1与杯口基础2采用二次灌浆固定,可以更好的保证环形杆的垂直度。然后同步回填压实顶杆1四周的地基土,可以压至顶杆1顶部以下200mm处。再在顶杆1上部固定安装设备杯口基础3;也可以在顶杆1与杯口基础2进行二次灌浆之前,先将顶杆1的上部与设备杯口基础3浇筑固定;也可以在顶杆1上部直接二次浇筑设备杯口基础3,将顶杆1插入设备杯口基础3内100mm~150mm即可,之后回填压实设备杯口基础3四周土方。最后在设备杯口基础3内插入设备支架4,设备支架4本身为安装AIS电气设备7的支架,则完成对于AIS电气设备7的支撑工作。
以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是本实用新型的原理,在不脱离本实用新型精神和范围的前提下本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型的范围内。本实用新型要求的保护范围由所附的权利要求书及其等同物界定。  

Claims (3)

1.一种用于变电站户外AIS电气设备的支架支撑部件,包括AIS电气设备(7)和设备支架(4),所述的AIS电气设备(7)固定安装在设备支架(4)上,其特征在于:还包括垫层(6)、设备杯口基础(3)、顶杆(1)和杯口基础(2),所述的设备支架(4)固定安装在设备杯口基础(3)的上部,顶杆(1)的上部固定安装在设备杯口基础(3)的下部,顶杆(1)的下部固定安装在杯口基础(2)上,所述的垫层(6)固定安装在杯口基础(2)的下方。
2.根据权利要求1所述的一种用于变电站户外AIS电气设备的支架支撑部件,其特征在于:所述的顶杆(1)为钢筋混凝土环形杆。
3.根据权利要求1所述的一种用于变电站户外AIS电气设备的支架支撑部件,其特征在于:所述的顶杆(1)的下部通过灌浆混凝土(5)固定安装在杯口基础(2)上。
CN201320836825.8U 2013-12-18 2013-12-18 一种用于变电站户外ais电气设备的支架支撑部件 Expired - Lifetime CN203668968U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320836825.8U CN203668968U (zh) 2013-12-18 2013-12-18 一种用于变电站户外ais电气设备的支架支撑部件

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320836825.8U CN203668968U (zh) 2013-12-18 2013-12-18 一种用于变电站户外ais电气设备的支架支撑部件

Publications (1)

Publication Number Publication Date
CN203668968U true CN203668968U (zh) 2014-06-25

Family

ID=50965284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320836825.8U Expired - Lifetime CN203668968U (zh) 2013-12-18 2013-12-18 一种用于变电站户外ais电气设备的支架支撑部件

Country Status (1)

Country Link
CN (1) CN203668968U (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10008317B2 (en) 2015-12-08 2018-06-26 Smart Wires Inc. Voltage or impedance-injection method using transformers with multiple secondary windings for dynamic power flow control
US10097037B2 (en) 2016-02-11 2018-10-09 Smart Wires Inc. System and method for distributed grid control with sub-cyclic local response capability
US10180696B2 (en) 2015-12-08 2019-01-15 Smart Wires Inc. Distributed impedance injection module for mitigation of the Ferranti effect
US10199150B2 (en) 2015-12-10 2019-02-05 Smart Wires Inc. Power transmission tower mounted series injection transformer
US10218175B2 (en) 2016-02-11 2019-02-26 Smart Wires Inc. Dynamic and integrated control of total power system using distributed impedance injection modules and actuator devices within and at the edge of the power grid
US10418814B2 (en) 2015-12-08 2019-09-17 Smart Wires Inc. Transformers with multi-turn primary windings for dynamic power flow control
US10468880B2 (en) 2016-11-15 2019-11-05 Smart Wires Inc. Systems and methods for voltage regulation using split-conductors with loop current reduction
US10651633B2 (en) 2016-04-22 2020-05-12 Smart Wires Inc. Modular, space-efficient structures mounting multiple electrical devices
US10666038B2 (en) 2017-06-30 2020-05-26 Smart Wires Inc. Modular FACTS devices with external fault current protection
US10903653B2 (en) 2015-12-08 2021-01-26 Smart Wires Inc. Voltage agnostic power reactor

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10424929B2 (en) 2015-12-08 2019-09-24 Smart Wires Inc. Transformers with multi-turn primary windings for dynamic power flow control
US10903653B2 (en) 2015-12-08 2021-01-26 Smart Wires Inc. Voltage agnostic power reactor
US10180696B2 (en) 2015-12-08 2019-01-15 Smart Wires Inc. Distributed impedance injection module for mitigation of the Ferranti effect
US10008317B2 (en) 2015-12-08 2018-06-26 Smart Wires Inc. Voltage or impedance-injection method using transformers with multiple secondary windings for dynamic power flow control
US10283254B2 (en) 2015-12-08 2019-05-07 Smart Wires Inc. Voltage or impedance-injection method using transformers with multiple secondary windings for dynamic power flow control
US10418814B2 (en) 2015-12-08 2019-09-17 Smart Wires Inc. Transformers with multi-turn primary windings for dynamic power flow control
US10199150B2 (en) 2015-12-10 2019-02-05 Smart Wires Inc. Power transmission tower mounted series injection transformer
US10749341B2 (en) 2016-02-11 2020-08-18 Smart Wires Inc. Dynamic and integrated control of total power system using distributed impedance injection modules and actuator devices within and at the edge of the power grid
US10559975B2 (en) 2016-02-11 2020-02-11 Smart Wires Inc. System and method for distributed grid control with sub-cyclic local response capability
US10218175B2 (en) 2016-02-11 2019-02-26 Smart Wires Inc. Dynamic and integrated control of total power system using distributed impedance injection modules and actuator devices within and at the edge of the power grid
US10097037B2 (en) 2016-02-11 2018-10-09 Smart Wires Inc. System and method for distributed grid control with sub-cyclic local response capability
US11594887B2 (en) 2016-02-11 2023-02-28 Smart Wires Inc. Dynamic and integrated control of total power system using distributed impedance injection modules and actuator devices within and at the edge of the power grid
US10651633B2 (en) 2016-04-22 2020-05-12 Smart Wires Inc. Modular, space-efficient structures mounting multiple electrical devices
US10468880B2 (en) 2016-11-15 2019-11-05 Smart Wires Inc. Systems and methods for voltage regulation using split-conductors with loop current reduction
US10666038B2 (en) 2017-06-30 2020-05-26 Smart Wires Inc. Modular FACTS devices with external fault current protection
US11309701B2 (en) 2017-06-30 2022-04-19 Smart Wires Inc. Modular FACTS devices with external fault current protection
US11888308B2 (en) 2017-06-30 2024-01-30 Smart Wires Inc. Modular facts devices with external fault current protection

Similar Documents

Publication Publication Date Title
CN203668968U (zh) 一种用于变电站户外ais电气设备的支架支撑部件
CN103469802A (zh) 组合式格构钢架喷锚支护方法及其支护结构
CN204151813U (zh) 一种用于纠正输电铁塔基础沉降的可调式基础
CN203583493U (zh) 组合式格构钢架喷锚基坑支护结构
CN201695407U (zh) 有盾构隧道下穿的地铁车站基坑围护结构
CN106120791A (zh) 无预作竖向支撑体系地下结构盖挖逆作施工方法
CN103243721B (zh) 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法
CN204780981U (zh) 一种浅埋式户外gis设备基础
CN202090352U (zh) 钢管桩-自钻式预应力锚杆深基坑支护系统
CN205152938U (zh) 一种建筑建造专用的地基夯实机械
EE01304U1 (et) Meetod astangu taastamiseks ja kindlustamiseks ning astangul paikneva tehiskoormuse toestamiseks
CN203668967U (zh) 一种用于变电站中电流互感器的支架与管桩的安装连接装置
CN203403431U (zh) 具有预制基础的快装塔结构
CN203080540U (zh) 一种输电线路铁塔基础
CN204163084U (zh) 地铁区间高压电线下风井深基坑组合围护结构
CN204531575U (zh) 水泥杆加固治理钢砼结构
CN209523202U (zh) 基坑支护拉锚结构
CN203755319U (zh) 破碎岩带边坡开挖准备结构
CN201809776U (zh) 斜柱卡盘桩基础
CN203626358U (zh) 直埋式无线通信装置
CN204163085U (zh) 钻孔灌注桩基坑支护
CN206279531U (zh) 一种无隔水栓水下灌注施工装置
CN204703185U (zh) 一种预制钢筋混凝土构件
CN204343777U (zh) 一种便捷线杆底座
CN105569066B (zh) 一种用于陆上风电机组的填芯筒形基础结构及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP ANHUI ELECTRIC POWE

Free format text: FORMER NAME: CHINA ENERGY CONSTRUCTION GROUP ANHUI ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 230601 Hefei City, Anhui province Avenue, No. 369

Patentee after: CEEC ANHUI ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 230601 Hefei City, Anhui province Avenue, No. 369

Patentee before: Anhui Electric Power Design Institute, CEEC

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140625