CN203668829U - Wet joint construction protection plate of over-crossing bridge - Google Patents

Wet joint construction protection plate of over-crossing bridge Download PDF

Info

Publication number
CN203668829U
CN203668829U CN201320320933.XU CN201320320933U CN203668829U CN 203668829 U CN203668829 U CN 203668829U CN 201320320933 U CN201320320933 U CN 201320320933U CN 203668829 U CN203668829 U CN 203668829U
Authority
CN
China
Prior art keywords
steel plate
plate
side steel
bar
anchor bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320320933.XU
Other languages
Chinese (zh)
Inventor
刘文兵
秦秀雨
马海贤
王兴权
高志军
匡建国
朱善美
黄景新
莫立汝
吴福莉
刘冯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201320320933.XU priority Critical patent/CN203668829U/en
Application granted granted Critical
Publication of CN203668829U publication Critical patent/CN203668829U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a wet joint construction protection plate of an over-crossing bridge. The wet joint construction protection plate comprises a left steel plate, a middle steel plate and a right steel plate. Bolts are embedded in a left box girder flange plate and a right box girder flange plate to fix the left steel plate and the right steel plate to box girders. A transverse box girder embedded bar is connected between the left box girder and the right box girder and is welded to a longitudinal left anchoring steel bar and a longitudinal right anchoring steel bar. The left anchoring steel bar and the right anchoring steel bar are fixedly welded to the left steel plate and the right steel plate respectively. The end of the left steel plate and the end of the right steel plate are fixedly welded to the two sides of the middle steel plate respectively. According to a protection system, a train can run normally without the requirement for occupying a station track, the protection effect is good, the on-site construction environment is completely isolated from the train running environment, and it is guaranteed that construction sundries cannot drop and damage trains passing through. Meanwhile, cost is greatly reduced, a large number of contact network cables do not need to be modified, and the construction time is shortened.

Description

The wet seam construction protection plate of overpass beam
Technical field
The utility model relates generally to the construction of overpass beam, relates in particular to the wet seam construction of highway case beam of crossing over running railway line.
Background technology
Newly-built five lakes main road overcrossing railway overpass bridge crosses existing Huainan uplink and Huainan downlink with simple supported box beam form, become 88 ° of angles with circuit, infall Huainan Railway downlink mileage K73+343, is positioned at two Dun Ji to sieve collection interval, circuit is electric railway, headroom 9.35m.Adopt 30m simple supported box beam structure across the design of Huainan line, case deck-molding 1.6m, width is respectively 2.4m and 2.85m; Bridge deck width is 24m(single width), case beam all adopts prefabricated erection construction, and for such, across iron project, the seam that wets after box beam erection construction faces bed die fixing problem cannot be installed.
For the electrified Business Line work items of such leap, safety requirements is high, difficulty of construction is large, how after box beam erection in the attached work progress of bridge floor, ensure the safety of construction, guarantee again the unimpeded and safety of railway, do not take the space of railway, and the foreign material of can guaranteeing to construct can not fall dealing train is damaged, this has become the common important topic of paying close attention to of unit in charge of construction and unit of operation.
For above problem, in prior art, adopt set up protecting canopy frame constructure scheme more, but in this scheme implementation, needs to spend a large amount of manpower and materials, increases by 300,000 yuan of construction costs.
Utility model content
The utility model object is can not fall dealing train and contact net lines are damaged in order to ensure construction foreign material, and a kind of shoulder guard is provided.
The utility model is achieved through the following technical solutions:
A kind of wet seam construction protection plate of overpass beam, include left side steel plate, middle steel plate, right side steel plate, on the box beam flange plate of left and right side, be embedded with respectively bolt left side steel plate, right side steel plate are fixed on to case beam, between the case beam in left side and the case beam on right side, be connected with horizontal case beam embedded bar, case beam embedded bar is welded with longitudinal left anchor bar, right anchor bar, left anchor bar, right anchor bar are fixed welding with left side steel plate, right side steel plate respectively, and weld with middle steel plate both sides are fixing respectively left side steel plate, steel plate end, right side.
Between described left side steel plate, middle steel plate, right side steel plate, have the gap of wide 1cm, gap adopts 2mm steel plate to cover, and with gap, ointment shutoff both sides.
Described left side steel plate, right side steel plate thickness are 8mm, middle steel plate thickness is 2mm, material is Q345, bolt is M25 bolt, anchor bar is φ 16 reinforcing bars, described left side steel plate, middle steel plate, right side steel plate, bolt, anchor bar adopt multi-component alloy co-cementation or zincizing+reach the processing of cola+confining bed, and wherein zincizing thickness is >=50um, and confining bed thickness is 5-8um.
The utility model has the advantages that:
Adopt and shoulder guard is installed without taking station track, train is normally moved, and protection effect better on-the-spot construction environment and train operation environment isolate completely, the foreign material of can guaranteeing to construct can not fall dealing train is damaged.Reduce construction cost.
Brief description of the drawings
Fig. 1 is scheme of installation of the present utility model.
Fig. 2 is cross sectional representation of the present utility model.
Fig. 3 is floor map of the present utility model.
Detailed description of the invention
As shown in the figure, a kind of wet seam construction protection plate of overpass beam, includes left side steel plate 1, middle steel plate 3, right side steel plate 2, on a left side, on the box beam flange plate on right side, be embedded with respectively bolt 6, 7 by left side steel plate 1, right side steel plate 2 is fixed on case beam, is connected with horizontal case beam embedded bar 8 between the case beam in left side and the case beam on right side, and case beam embedded bar 8 is welded with longitudinal left anchor bar 4, right anchor bar 5, left anchor bar 9, right anchor bar 10 respectively with left side steel plate 1, the fixing welding of right side steel plate 2, left side steel plate 1, weld with middle steel plate both sides are fixing respectively steel plate 2 ends in right side, left side steel plate, middle steel plate, between the steel plate of right side, have the gap of wide 1cm, gap adopts 2mm steel plate to cover, and with gap, ointment shutoff both sides, left side steel plate, right side steel plate thickness is 8mm, and middle steel plate thickness is 2mm, and material is Q345, and bolt is M25 bolt, and anchor bar is φ 16 reinforcing bars, described left side steel plate, middle steel plate, right side steel plate, bolt, anchor bar employing multi-component alloy co-cementation or zincizing+reach the processing of cola+confining bed, wherein zincizing thickness is >=50um, confining bed thickness is 5-8um.
The bolt 6 of shoulder guard and bolt 7 are embedded in case beam in the time that case is beam prefabricated, before box beam erection, left side steel plate 1, right side steel plate 2 are arranged on case beam (for avoid case beam in the time setting a roof beam in place even at the cost of one's life, when steel plate is installed according to the reserved spacing 2cm of plane between left side steel plate 1, right side steel plate 2).After box beam erection puts in place, steel plate 3 is placed on left side steel plate 1, right side steel plate 2, the mode that adopts point to be welded in left side steel plate 1, right side steel plate 2 is fixed.For strengthening the fastness of left side steel plate 1, right side steel plate 2, anchor bar 4 and anchor bar 5 are adopted the mode of welding be connected with the wet seam embedded bar of case beam.

Claims (3)

1. the wet seam construction protection plate of an overpass beam, it is characterized in that: include left side steel plate, middle steel plate, right side steel plate, on a left side, on the box beam flange plate on right side, be embedded with respectively bolt by left side steel plate, right side steel plate is fixed on case beam, between the case beam in left side and the case beam on right side, be connected with horizontal case beam embedded bar, case beam embedded bar is welded with longitudinal left anchor bar, right anchor bar, left anchor bar, right anchor bar respectively with left side steel plate, the fixing welding of right side steel plate, left side steel plate, weld with middle steel plate both sides are fixing respectively steel plate end, right side.
2. the wet seam construction protection plate of overpass beam according to claim 1, is characterized in that: between described left side steel plate, middle steel plate, right side steel plate, have the gap of wide 1cm, gap adopts 2mm steel plate to cover, and with gap, ointment shutoff both sides.
3. the wet seam construction protection plate of overpass beam according to claim 1, it is characterized in that: described left side steel plate, right side steel plate thickness are 8mm, middle steel plate thickness is 2mm, material is Q345, bolt is M25 bolt, and anchor bar is φ 16 reinforcing bars, and described left side steel plate, middle steel plate, right side steel plate, bolt, anchor bar adopt multi-component alloy co-cementation or zincizing+reach cola+confining bed processing, wherein zincizing thickness is >=50um, and confining bed thickness is 5-8um.
CN201320320933.XU 2013-06-04 2013-06-04 Wet joint construction protection plate of over-crossing bridge Expired - Fee Related CN203668829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320320933.XU CN203668829U (en) 2013-06-04 2013-06-04 Wet joint construction protection plate of over-crossing bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320320933.XU CN203668829U (en) 2013-06-04 2013-06-04 Wet joint construction protection plate of over-crossing bridge

Publications (1)

Publication Number Publication Date
CN203668829U true CN203668829U (en) 2014-06-25

Family

ID=50965145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320320933.XU Expired - Fee Related CN203668829U (en) 2013-06-04 2013-06-04 Wet joint construction protection plate of over-crossing bridge

Country Status (1)

Country Link
CN (1) CN203668829U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499430A (en) * 2014-12-18 2015-04-08 上海市城市建设设计研究总院 Wet connection section connection structure used between fully prefabricated assembled bridge girders
CN106351132A (en) * 2016-11-16 2017-01-25 福州大学 Bridge widening structure adopting corrugated steel sheet connecting parts and construction method thereof
CN107806009A (en) * 2017-10-27 2018-03-16 中铁五局集团有限公司 A kind of across the Existing Railway Line contact net protection canopy of highway and its construction method
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499430A (en) * 2014-12-18 2015-04-08 上海市城市建设设计研究总院 Wet connection section connection structure used between fully prefabricated assembled bridge girders
CN104499430B (en) * 2014-12-18 2016-03-23 上海市城市建设设计研究总院 Section connection structure is connect for wet between full prefabricated bridge
CN106351132A (en) * 2016-11-16 2017-01-25 福州大学 Bridge widening structure adopting corrugated steel sheet connecting parts and construction method thereof
CN106351132B (en) * 2016-11-16 2018-04-13 福州大学 A kind of bridge using corrugated sheet steel connector spells wide construction and its construction method
CN107806009A (en) * 2017-10-27 2018-03-16 中铁五局集团有限公司 A kind of across the Existing Railway Line contact net protection canopy of highway and its construction method
CN114263119A (en) * 2021-12-28 2022-04-01 中铁六局集团石家庄铁路建设有限公司 Construction method for bridging machine to span railway
CN114263119B (en) * 2021-12-28 2024-04-23 中铁六局集团石家庄铁路建设有限公司 Bridge girder erection machine cross-railway girder erection construction method

Similar Documents

Publication Publication Date Title
CN203668829U (en) Wet joint construction protection plate of over-crossing bridge
CN103061242B (en) A kind of simple T beam bridge with sound barrier
CN201843076U (en) Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN201144398Y (en) Straddling type track traffic elevated 'bridge-build' structure
CN107190593A (en) Lattice overhead monorail traffic track beam
CN202658532U (en) Bridge wet joint construction template
CN104018426A (en) Steel truss installation method
CN108342976A (en) A kind of panel splicing type construction bridge
CN103485270A (en) Setting technology of second-phase pre-stressed tendons in straddle type single-traffic-track girder bridge
CN204849562U (en) Little box girder bridge roof beam
CN108842530B (en) A kind of straddle-type monorail two-wire combined track girder construction
CN202611714U (en) Tunnel assembly type construction trolley without welding
CN203741690U (en) Pedestrian overcrossing assembling type steel truss girder
CN203411888U (en) Multi-gang and multi-span continuous steel truss bridge
CN204822978U (en) Belt feeder steel vestibule structure
CN104389263A (en) High-speed railway bridge wind blocking structure
CN103669231B (en) Highway bridge widens improvement project cross-line safeguard structure and installation method
CN204940101U (en) A kind of small box girder bridge lateral connecting sealed structure and small box girder
CN203334182U (en) Structure used for connecting railway concrete retaining wall with steel bridge panel
CN205772763U (en) A kind of hoisting beam adjustable auxiliary device of plate framework of steel reinforcement
CN202214676U (en) Bridge extension device
CN203295956U (en) Large-span cable stayed bridge structure
CN208777181U (en) A kind of anti-fall anti-electric canopy of bridge span Rail Highway
CN207484299U (en) A kind of grade separation bridge steel structural shielding canopy
CN203603071U (en) Overline protection structure for highway bridge broadening modification project

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

CF01 Termination of patent right due to non-payment of annual fee