CN108342976A - A kind of panel splicing type construction bridge - Google Patents

A kind of panel splicing type construction bridge Download PDF

Info

Publication number
CN108342976A
CN108342976A CN201711433572.9A CN201711433572A CN108342976A CN 108342976 A CN108342976 A CN 108342976A CN 201711433572 A CN201711433572 A CN 201711433572A CN 108342976 A CN108342976 A CN 108342976A
Authority
CN
China
Prior art keywords
bearing type
floorings
bearing
fixing device
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711433572.9A
Other languages
Chinese (zh)
Inventor
汪田
杨志平
熊志
谢北萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Harzone Industry Corp Ltd
Original Assignee
China Harzone Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Harzone Industry Corp Ltd filed Critical China Harzone Industry Corp Ltd
Priority to CN201711433572.9A priority Critical patent/CN108342976A/en
Publication of CN108342976A publication Critical patent/CN108342976A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of panel splicing type construction bridge, which includes superstructure and substructure, and substructure is identical as the substructure of traditional construction trestle, including steel-pipe pile and stake top load bearing beam;Superstructure includes bearing type floorings and beam-ends fixing device;The end at bearing type floorings length direction both ends is concave configuration, is provided with the mounting hole through bearing type bridge floor plate thickness direction in concave configuration, the both sides of bearing type floorings are respectively fixed with monaural seat and ears seat;Two pieces of bearing type floorings along spanning length direction are fixed by beam-ends fixing device and stake top load bearing beam, are connected two-by-two with ears seat by monaural seat along two pieces of bearing type floorings of spanning width direction, bridge floor is spliced into the width of needs.It is excessive, cumbersome for installation that the present invention can solve existing construction bridge superstructure component, the defect taken time and effort.

Description

A kind of panel splicing type construction bridge
Technical field
The invention belongs to emergency bridge erection technique fields, and in particular to a kind of construction bridge.
Background technology
Construction bridge generally uses deck type Bailey bridge, bridge mainly to form component and be according to this from bottom to up at present:Steel pipe Stake, stake top load bearing beam, Bailey beam, crossbeam, floorings, railing street lamp etc..Trestle substructure is by support, stake between steel-pipe pile, stake Carrier beam of bearing responsibility forms, and construction method generally uses " halieutics " to drive piles, pile foundation construction rapid and convenient.Trestle superstructure mainly by The compositions such as Bailey beam, crossbeam, floorings, construction method are generally installed using erection by protrusion.Current construction level, greatly The construction that substructure at one can be completed in about 4 hours, the installation for completing superstructure in about 6 hours, i.e., can complete 1 in 1 day The construction of bridge.
Invention content
In view of this, the present invention provides a kind of panel splicing type construction bridge, existing construction bridge top can be solved Structural elements is excessive, cumbersome for installation, the defect taken time and effort.
A kind of panel splicing type construction bridge, the trestle include superstructure and substructure, and substructure is applied with tradition The substructure of work trestle is identical, including steel-pipe pile and stake top load bearing beam;Superstructure includes that bearing type floorings and beam-ends are solid Determine device;
The both sides of bearing type floorings are respectively fixed with monaural seat and ears seat;
The beam-ends fixing device is U-shaped structure;
Two pieces of bearing type floorings along spanning length direction are fixed by beam-ends fixing device and stake top load bearing beam, along bridge It is connected two-by-two with ears seat by monaural seat across two pieces of bearing type floorings of width direction, bridge floor is spliced into the width of needs.
Further, the end at the bearing type floorings length direction both ends is concave configuration, is provided in concave configuration Through the mounting hole of bearing type bridge floor plate thickness direction, the horizontal bottom of beam-ends fixing device passes through stake top load bearing beam, beam-ends solid Determine device vertical both sides be each passed through the mounting hole of two pieces of bearing type floorings after, the part of exposing passes through bolt and bearing type Floorings are fixed;Concave configuration after two pieces of bearing type floorings docking forms a complete pit, beam-ends fixing device Exposed portion is less than bridge floor.
Advantageous effect:
1, the present invention has abandoned the components such as Bailey beam, crossbeam, longeron in traditional trestle work structure, as shown in Fig. 5, using holding Load type floorings directly use large-tonnage loop wheel machine lifting construction, convenient and efficient.
2, because steel-pipe pile is constructed using " halieutics ", i.e. the overhanging piling of loop wheel machine cantilever is limited to building site loop wheel machine tonnage, outside Stretch distance it is general≤15 meters, so construction bridge single hole span it is general≤15 meters, for so small across footpath, can not fully send out The bearing capacity of Bailey truss is waved, superstructure seems more than swelling, directly substitutes existing top using the bearing type floorings increased Structure is feasible, and whole steel using amount is more economical.Traditional construction trestle superstructure is about 1.4t/m with girder steel, and uses face After plate splicing construction, superstructure girder steel can be reduced to 1t/m or so.
3, construction bridge of the invention can significantly reduce steel using amount, carry simultaneously under the premise of not reducing single hole span High construction efficiency, i.e. " 1 day 1 hole trestle of construction " rise to " 2 days 3 bridges of construction ".Construction of the present invention for large-scale over-long Trestle especially has construction advantage.
Description of the drawings
Fig. 1 is the construction bridge general structure schematic diagram of the present invention
Fig. 2 is bearing bridge panel end scheme of installation of the present invention
Fig. 3 is bearing bridge panel mounting structure schematic diagram of the present invention
Fig. 4 is bridge floor splicing sectional view
Fig. 5 is traditional construction trestle layout drawing
In figure, 1- substructures, 2- superstructures, 3- steel-pipe piles, 4- stake tops load bearing beam, 5- beam-ends fixing device, 6- are held Load type floorings, 7- monaurals seat, 8- ears seat, 9- connecting pins.
Specific implementation mode
The present invention will now be described in detail with reference to the accompanying drawings and examples.
As shown in Fig. 1, the present invention provides a kind of panel splicing type construction bridge, which includes 2 He of superstructure Substructure 1, substructure 1 is identical as the substructure of traditional construction trestle, and as shown in Fig. 2, substructure 1 includes steel pipe Stake 3 and stake top load bearing beam 4, steel-pipe pile 3 are vertically fixed on riverbed bottom, and stake top load bearing beam 4 is fixedly connected on the top of steel-pipe pile 3 End;Superstructure 2 includes bearing type floorings 6 and beam-ends fixing device 5, and beam-ends fixing device 5 is U-shaped structure;
The end at 6 length direction both ends of bearing type floorings is concave configuration, is provided with through bearing type bridge in concave configuration The mounting hole in plate thickness direction, as shown in Fig. 3, the both sides of bearing type floorings 6 are respectively fixed with monaural seat 7 and ears seat 8;
Two pieces of bearing type floorings 6 along spanning length direction are fixed by beam-ends fixing device 5 and stake top load bearing beam 4, The horizontal bottom of beam-ends fixing device 5 passes through stake top load bearing beam 4, and the vertical both sides of beam-ends fixing device 5 are each passed through two pieces and hold After the mounting hole of load type floorings 6, the part of exposing is fixed by bolt and bearing type floorings 6;Two pieces of bearing type floorings 6 Concave configuration after docking forms a complete pit, and the exposed portion of beam-ends fixing device 5 is less than bridge floor, therefore will not be right Vehicle and personnel, which pass through, to be impacted.
As shown in Fig. 4, along two pieces of bearing type floorings 6 of spanning width direction by monaural seat 7 and ears seat 8 by even Outbound 9 is connected two-by-two, and bridge floor is spliced into the width of needs, and bearing type floorings 6 directly use large-tonnage loop wheel machine lifting construction, side Just quick.
In conclusion the above is merely preferred embodiments of the present invention, being not intended to limit the scope of the present invention. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (2)

1. a kind of panel splicing type construction bridge, which is characterized in that the trestle includes superstructure and substructure, substructure It is identical as the substructure of traditional construction trestle, including steel-pipe pile and stake top load bearing beam;Superstructure includes bearing type floorings With beam-ends fixing device;
The both sides of bearing type floorings are respectively fixed with monaural seat and ears seat;
The beam-ends fixing device is U-shaped structure;
Two pieces of bearing type floorings along spanning length direction are fixed by beam-ends fixing device and stake top load bearing beam, wide along spanning Degree two pieces of direction bearing type floorings are connected by monaural seat with ears seat two-by-two, and bridge floor is spliced into the width of needs.
2. panel splicing type construction bridge as described in claim 1, which is characterized in that the bearing type floorings length direction The end at both ends is concave configuration, is provided with the mounting hole through bearing type bridge floor plate thickness direction in concave configuration, beam-ends is fixed The horizontal bottom of device passes through stake top load bearing beam, and the vertical both sides of beam-ends fixing device are each passed through two pieces of bearing type floorings After mounting hole, the part of exposing is fixed by bolt and bearing type floorings;Recessed knot after two pieces of bearing type floorings docking Structure forms a complete pit, and the exposed portion of beam-ends fixing device is less than bridge floor.
CN201711433572.9A 2017-12-26 2017-12-26 A kind of panel splicing type construction bridge Pending CN108342976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711433572.9A CN108342976A (en) 2017-12-26 2017-12-26 A kind of panel splicing type construction bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711433572.9A CN108342976A (en) 2017-12-26 2017-12-26 A kind of panel splicing type construction bridge

Publications (1)

Publication Number Publication Date
CN108342976A true CN108342976A (en) 2018-07-31

Family

ID=62962693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711433572.9A Pending CN108342976A (en) 2017-12-26 2017-12-26 A kind of panel splicing type construction bridge

Country Status (1)

Country Link
CN (1) CN108342976A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867309A (en) * 2018-09-18 2018-11-23 赵文富 A kind of assembled steel bridge
CN109183629A (en) * 2018-10-31 2019-01-11 上海城建市政工程(集团)有限公司 A kind of great cantilever bent cap precast assembly method
CN110374009A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A method of improving full circle swinging Bridge Erector construction efficiency
CN115652772A (en) * 2022-12-28 2023-01-31 中冶建筑研究总院有限公司 Quick connecting system and method for bridge deck of steel temporary bridge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5325557A (en) * 1992-01-22 1994-07-05 Penuela Julio P Portable, demountable bridge to ford rivers and the like
CN1836078A (en) * 2003-06-19 2006-09-20 丹尼尔·查尔斯·安德伍德 A bar connector assembly
CN2880899Y (en) * 2006-03-31 2007-03-21 中山市公路钢结构制造有限公司 U-type steel bridge panel of assembling type steel bridge
SE1151151A1 (en) * 2011-12-02 2012-11-20 Fmt Int Trade Ab Passenger jetty for airports and ships
CN102797224A (en) * 2012-08-22 2012-11-28 中铁二十三局集团有限公司 Paving method and template supporting device of bridge deck slab
CN204780560U (en) * 2015-06-10 2015-11-18 中交路桥北方工程有限公司 Steel suspension bridge assembly structure
CN205100104U (en) * 2015-07-24 2016-03-23 陈永勇 Foldable landing stage decking
CN206706549U (en) * 2017-05-12 2017-12-05 屠仲德 The bridging apparatus that a kind of civil small-scale quickly splices

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5325557A (en) * 1992-01-22 1994-07-05 Penuela Julio P Portable, demountable bridge to ford rivers and the like
CN1836078A (en) * 2003-06-19 2006-09-20 丹尼尔·查尔斯·安德伍德 A bar connector assembly
CN2880899Y (en) * 2006-03-31 2007-03-21 中山市公路钢结构制造有限公司 U-type steel bridge panel of assembling type steel bridge
SE1151151A1 (en) * 2011-12-02 2012-11-20 Fmt Int Trade Ab Passenger jetty for airports and ships
CN102797224A (en) * 2012-08-22 2012-11-28 中铁二十三局集团有限公司 Paving method and template supporting device of bridge deck slab
CN204780560U (en) * 2015-06-10 2015-11-18 中交路桥北方工程有限公司 Steel suspension bridge assembly structure
CN205100104U (en) * 2015-07-24 2016-03-23 陈永勇 Foldable landing stage decking
CN206706549U (en) * 2017-05-12 2017-12-05 屠仲德 The bridging apparatus that a kind of civil small-scale quickly splices

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867309A (en) * 2018-09-18 2018-11-23 赵文富 A kind of assembled steel bridge
CN109183629A (en) * 2018-10-31 2019-01-11 上海城建市政工程(集团)有限公司 A kind of great cantilever bent cap precast assembly method
CN109183629B (en) * 2018-10-31 2020-04-28 上海城建市政工程(集团)有限公司 Large cantilever bent cap prefabrication and assembly method
CN110374009A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A method of improving full circle swinging Bridge Erector construction efficiency
CN115652772A (en) * 2022-12-28 2023-01-31 中冶建筑研究总院有限公司 Quick connecting system and method for bridge deck of steel temporary bridge

Similar Documents

Publication Publication Date Title
CN108342976A (en) A kind of panel splicing type construction bridge
CN204530418U (en) A kind of steel plate combination beam bridge
CN108729354B (en) Downstream bridge movable formwork and construction method thereof
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN110847062A (en) Construction method for whole-hole assembly double-width erection in 80-meter-span wide steel box girder factory
CN109024225A (en) Ultra-high performance concrete truss arch blade unit, truss arch piece bridge and construction method
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
CN102518034B (en) Bidirectional pre-bent multi-steel-girder and concrete bridge deck combined small box girder bridge structure
CN216640288U (en) Tower-passing sliding platform for steel box girder of cable-stayed bridge
CN203559329U (en) Steel-RPC (reactive powder concrete) combined bridge
CN203411888U (en) Multi-gang and multi-span continuous steel truss bridge
CN206418390U (en) Metro steel crossbeam transom pier adds concrete-steel Beam composite bridge
CN211141349U (en) Track panel well gantry crane foundation fixing structure
CN208167484U (en) The steel construction overline bridge being easily installed
CN212771950U (en) Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam
CN106522566B (en) A kind of roof system steel truss sliding rail and assembly and disassembly methods
CN204919348U (en) Supplementary head tower of using of self anchored suspension bridge installation
CN114701949A (en) Method for installing main girder of bridge crane of main power house of pump station
CN109972531B (en) External prestressing device for improving temporary support span of bailey beam
CN208803363U (en) A kind of belt track free cantilever erection steel girder bridge
CN203008390U (en) Roof truss installation device
CN207812189U (en) A kind of suspension type bottom plate open steel web truss combined track girder system system
CN208267379U (en) A kind of trapezoidal steel structure support being used to support 24-32m cast-in-situ box girder and adjustable span
CN205636464U (en) Novel modular bridge structures
CN110512639A (en) A kind of no floor steel structure tower crane foundation construction method and constructing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180731

WD01 Invention patent application deemed withdrawn after publication