CN203654993U - Concrete structure cantilever bay window board - Google Patents

Concrete structure cantilever bay window board Download PDF

Info

Publication number
CN203654993U
CN203654993U CN201320836575.8U CN201320836575U CN203654993U CN 203654993 U CN203654993 U CN 203654993U CN 201320836575 U CN201320836575 U CN 201320836575U CN 203654993 U CN203654993 U CN 203654993U
Authority
CN
China
Prior art keywords
luffer boards
bay window
window
window board
under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320836575.8U
Other languages
Chinese (zh)
Inventor
韩建成
高文光
王晓刚
索志方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Sixth Group Co Ltd
Original Assignee
Beijing Urban Construction Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Sixth Group Co Ltd filed Critical Beijing Urban Construction Sixth Group Co Ltd
Priority to CN201320836575.8U priority Critical patent/CN203654993U/en
Application granted granted Critical
Publication of CN203654993U publication Critical patent/CN203654993U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a concrete structure cantilever bay window board which comprises an upper bay window board and a lower bay window board, wherein the upper bay window board is wholly placed and molded with concrete for a window upper connecting beam and an upper floor slab, and the inner end of an upper bay window board steel bar of the upper bay window board extends into the window upper connecting beam to be anchored; the lower bay window board is wholly placed and molded with concrete at the upper part of a window lower connecting beam, and the inner end of a lower bay window board steel bar of the lower bay window board extends into the window lower connecting beam to be anchored. The concrete structure cantilever bay window board has the beneficial effects that through reserving the position of the bay window board in the construction of a concrete wall body, the upper bay window board, the window upper connecting beam and the upper floor slab are simultaneously placed, and the lower bay window board and the upper part of the window lower connecting beam are simultaneously placed; the integrity is better; the cracking at the root of the bay window board and the leakage and the potential safety hazards caused by the cracking are effectively eliminated; the later maintenance and treatment expense of a bay window is reduced; the cantilever bay window board can be widely applied to the construction of non-French bay windows for cast-in-situ concrete shear wall structure residences.

Description

The concrete structure luffer boards that waft of encorbelmenting
Technical field
The utility model relates to a kind of cast-in-situ concrete floating window structure of encorbelmenting.
Background technology
In order to pursue the permeability in building room, form the space that widens the vision, improve the livable quality of Urban House, the window that wafts obtains using more and more widely as a kind of special building design form in residential project.Waft window upper and lower plates as cast-in-situ concrete cantilevered structure, and when conventional construction method generally adopts wall construction, reserved or pre-buried cantilevered plate horizontal reinforcement, after walls concrete has been built, then builds separately overhanging component, as shown in Figure 1.This construction technology exists that embedded bar position is inaccurate, horizontal reinforcement repeatedly bends, constuction joint is vertically retained in buttress portion, constuction joint picks the problems such as cutter is not in place, the bearing capacity and the durability that have reduced to a certain extent cantilevered plate, even form seepage and potential safety hazard.
Utility model content
The utility model provides a kind of concrete structure luffer boards that waft of encorbelmenting, and solve existing floating window structure bearing capacity and poor durability, the technical problem that efficiency of construction is low.
The utility model solves the technical scheme that its technical problem adopts:
This concrete structure luffer boards that waft of encorbelmenting, comprise waft luffer boards and under the luffer boards that waft, the concrete monobloc cast moulding of coupling beam and upper strata floor on waft on described luffer boards and window, the interior anchoring of coupling beam on window is stretched in the luffer boards reinforcing bar the inner of wafing on the luffer boards that above waft;
Waft under the described concrete monobloc cast moulding on coupling beam top under luffer boards and window, under waft luffer boards under the luffer boards reinforcing bar the inner of wafing stretch into anchoring in coupling beam under window.
The luffer boards reinforcing bar that wafts on described is positioned at the luffer boards top of wafing.
The luffer boards top of wafing under the luffer boards reinforcing bar that wafts under described is positioned at.
Feature of the present utility model and beneficial effect are as follows:
1, the utility model by reserving the luffer boards position of wafing in concrete wall work progress, by on waft coupling beam and upper strata floor on luffer boards and window build simultaneously, under the coupling beam top under luffer boards and window of wafing build simultaneously, the vertical constuction joint that changes traditional luffer boards root that wafts is horizontal construction joint, globality is better, has effectively eliminated the luffer boards root cracking that wafts, and the seepage causing thus and potential safety hazard, obtain good mass effect, reduced the expense of the window later period maintenance processing of wafing.
2, the luffer boards reinforcing bar that wafts of the present utility model just carries out colligation after the window formwork erection that wafts, and makes number of steel bars and position accurate, can ensure that cantilevered plate cage of reinforcement size is correct, effectively guarantees that the bearing capacity of cantilevered structure meets design requirement.
3, the coupling beam bed die on luffer boards and window that wafts on of the present utility model is the same system that installs, and the faulting of slab ends wafing between luffer boards and reservation window hole that while having stopped to build due to body of wall, window hole displacement, distortion cause, for later stage decoration construction creates good conditions.
The Social benefit and economic benefit the utlity model has is as follows:
The encorbelment luffer boards monobloc cast construction that wafts of concrete has fundamentally solved the common fault of the luffer boards root cracking of wafing, seepage, the luffer boards reinforcement location that wafts can effectively be ensured, also greatly improved the stress performance of cantilevered plate, make structure safer, for waft luffer boards construction of residential project provides a kind of new construction method, can provide reference to similar engineering construction, there is good promotional value.
The encorbelment luffer boards monobloc cast construction that wafts of concrete has been eliminated the luffer boards crack problem that wafts, can ensure the accuracy of window hole and the luffer boards relative position that wafts simultaneously, reduce in work progress that cutter is reprocessed expense and engineering hands over by rear leakage maintaining expense due to window hole and the luffer boards relative position that wafts picking in a large number of being forbidden to cause, there is good economic benefit.
The utility model can be widely used in the waft window construction of the non-console mode of cast-in-place concrete shear wall structure house.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is traditional floating window structure schematic diagram.
Fig. 2 is the schematic diagram of luffer boards reinforcing bar binding of wafing.
Fig. 3 is the schematic diagram of concreting.
Fig. 4 be pre-buried filler and under the pre-buried drawing of site of luffer boards reinforcing bar that wafts.
Fig. 5 is the installation drawing of luffer boards template of wafing.
Reference numeral: luffer boards waft on 1-, luffer boards reinforcing bar wafts on 1.1-, luffer boards waft under 2-, luffer boards reinforcing bar wafts under 2.1-, coupling beam on 3-window, coupling beam reinforcing bar on 3.1-window, coupling beam under 4-window, coupling beam reinforcing bar under 4.1-window, 5-upper strata floor, 6-lower floor floor, 7-window hole, 8-filler, 9-window hole molding board, 10-support system, 11-constuction joint, 12-body of wall, on 13-window coupling beam and on the luffer boards bed die that wafts, coupling beam side form on 14-window, 15-upper strata floor bottom mould, luffer boards bed die wafts under 16-.
Detailed description of the invention
Embodiment is referring to shown in Fig. 2, Fig. 3, this concrete structure luffer boards that waft of encorbelmenting, comprise waft luffer boards 1 and under the luffer boards 2 that waft, the concrete monobloc cast moulding of the coupling beam 3 and upper strata floor 5 on luffer boards 1 and window of wafing on described, the interior anchoring of coupling beam 3 on window is stretched in luffer boards reinforcing bar 1.1 the inners of wafing on the luffer boards 1 that above waft;
Waft under the described concrete monobloc cast moulding on coupling beam 4 tops under luffer boards 2 and window, under waft luffer boards 2 under luffer boards reinforcing bar 2.1 the inners of wafing stretch into the interior anchoring of coupling beam 4 under window.
The luffer boards reinforcing bar 1.1 that wafts on described is positioned at luffer boards 1 top of wafing.
Luffer boards 2 tops of wafing under the luffer boards reinforcing bar 2.1 that wafts under described is positioned at.
Shown in Fig. 2~5, this construction method of luffer boards concrete monobloc cast structure of wafing of encorbelmenting, construction sequence is as follows:
Step 1, check structural working drawing and architectural working drawing, determine size and the position of the luffer boards that waft, carry out plane unwrapping wire and absolute altitude is copied survey according to the luffer boards position of wafing of design drawing mark, machine by design drawing waft luffer boards reinforcing bar 1.1 and under the luffer boards reinforcing bar 2.1(that wafts only process 90 ° of ends crotch);
Step 2, after wall steel bar colligation completes, carries out hidden examination;
Step 3, at the window hole 7 pre-buried fillers 8 in hitch position, both sides, top, and with window on 3.1 colligations of coupling beam reinforcing bar firm, this filler can be the square block of wrapping up in adhesive tape outward and make 300mm × thickness of wall body × (on window coupling beam high-floor thickness of slab) with polyphenyl; The pre-buried filler 8 of coupling beam 4 upper position under window, and with window under 4.1 colligations of coupling beam reinforcing bar firm, this packing size under being, waft luffer boards length × thickness of wall body × under the luffer boards thickness of slab that wafts;
Under window after pre-buried the completing of filler 8 on coupling beam 4 tops, will under luffer boards reinforcing bar 2.1 the inners of wafing be embedded in advance under window in coupling beam 4, under waft luffer boards reinforcing bar 2.1 under the part of wafing in luffer boards 2 temporarily vertically stretch into window hole molding board 9 inboards, in the time of step 8, then carry out in-site measurement location and will under the luffer boards reinforcing bar 2.1 that wafts bend 90 and spend to level;
Step 4, window hole molding board 9 is installed, and when window hole molding board 9 is installed, window hole molding board adopts wooden model or punching block to be made into gate-type shape, window hole molding board bottom is on-the-spot installs the lumps of wood or steel pipe is shored as bottom, and fixes luffer boards reinforcing bar 2.1 positions of wafing under pre-buried simultaneously;
Step 5, installs wall form, builds walls concrete;
Step 6, after wall form is removed, filler 8 is cleaned out, and under reserved hitch and window, coupling beam upper position carries out treatment of construction joints; When treatment of construction joints, according to coupling beam tip position snap the line on body of wall under reserved hitch and window, adopt machine for working stone cutting 8~10mm degree of depth along the line, then carry out constuction joint and pick cutter;
Step 7, the luffer boards template of wafing is installed, coupling beam 3 and upper strata floor 5 formwork simultaneously on above waft luffer boards 1 and window, support system 10 is linked to be entirety; On window at the bottom of coupling beam with on the absolute altitude that wafts at the bottom of luffer boards identical, on window coupling beam and on the luffer boards bed die 13 that wafts adopt same template, guarantee that absolute altitude is consistent, there is not faulting of slab ends;
Step 8, waft luffer boards reinforcement installation and examination;
Step 9, concreting, on above waft luffer boards 1 and window, the concrete monobloc cast moulding of coupling beam 3 and upper strata floor 5, first builds the luffer boards 1 that waft, then builds coupling beam 3 on window, finally builds upper strata floor 5; Under the waft concrete monobloc cast moulding on coupling beam 4 tops under luffer boards 2 and window;
Step 10, concrete curing, the luffer boards concrete curing mode of wafing is identical with floorslab concrete maintenance method, adopts covered with plastic film, water seasoning under normal temperature, and curing time is no less than 14d;
Step 11, form removal, the luffer boards bed die that wafts is removed and should be met concrete crushing strength and reach more than 100% (by concrete with the judgement of condition test specimen cubic compressive strength).

Claims (3)

1. the concrete structure luffer boards that waft of encorbelmenting, comprise the luffer boards that waft (1) and under the luffer boards (2) that waft, it is characterized in that:
The concrete monobloc cast moulding of the coupling beam (3) and upper strata floor (5) on luffer boards (1) and window of wafing on described, the interior anchoring of coupling beam on window (3) is stretched in luffer boards reinforcing bar (1.1) the inner of wafing on the luffer boards (1) that above waft;
Waft under the described concrete monobloc cast moulding on coupling beam (4) top under luffer boards (2) and window, under waft luffer boards (2) under luffer boards reinforcing bar (2.1) the inner of wafing stretch into the interior anchoring of coupling beam under window (4).
2. the concrete structure according to claim 1 luffer boards that waft of encorbelmenting, is characterized in that: the luffer boards reinforcing bar (1.1) that wafts on described is positioned at the luffer boards that waft (1) top.
3. the concrete structure according to claim 1 luffer boards that waft of encorbelmenting, is characterized in that: luffer boards (2) top of wafing under the luffer boards reinforcing bar (2.1) that wafts under described is positioned at.
CN201320836575.8U 2013-12-18 2013-12-18 Concrete structure cantilever bay window board Expired - Fee Related CN203654993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320836575.8U CN203654993U (en) 2013-12-18 2013-12-18 Concrete structure cantilever bay window board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320836575.8U CN203654993U (en) 2013-12-18 2013-12-18 Concrete structure cantilever bay window board

Publications (1)

Publication Number Publication Date
CN203654993U true CN203654993U (en) 2014-06-18

Family

ID=50921395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320836575.8U Expired - Fee Related CN203654993U (en) 2013-12-18 2013-12-18 Concrete structure cantilever bay window board

Country Status (1)

Country Link
CN (1) CN203654993U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746639A (en) * 2015-01-29 2015-07-01 上海紫宝实业投资有限公司 Prefabricated bay window structure installed on laminated wall board and installing method
CN105275086A (en) * 2015-02-11 2016-01-27 中建四局第三建筑工程有限公司 Method for constructing all-concrete-structure external vertical face
CN106836637A (en) * 2017-01-20 2017-06-13 温州大学 Multiple material pipe binding type steel concrete connecting-beam and its construction method
CN107806174A (en) * 2017-11-30 2018-03-16 中建钢构有限公司 A kind of window that floats applied in assembling type steel structure building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746639A (en) * 2015-01-29 2015-07-01 上海紫宝实业投资有限公司 Prefabricated bay window structure installed on laminated wall board and installing method
CN104746639B (en) * 2015-01-29 2017-06-23 宝业集团股份有限公司 A kind of installation method that the prefabricated window that floats is installed in composite wallboard
CN105275086A (en) * 2015-02-11 2016-01-27 中建四局第三建筑工程有限公司 Method for constructing all-concrete-structure external vertical face
CN106836637A (en) * 2017-01-20 2017-06-13 温州大学 Multiple material pipe binding type steel concrete connecting-beam and its construction method
CN107806174A (en) * 2017-11-30 2018-03-16 中建钢构有限公司 A kind of window that floats applied in assembling type steel structure building

Similar Documents

Publication Publication Date Title
CN103669562B (en) The construction method of cantilever bay window board concrete monobloc cast structure
CN102116061B (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN103266767B (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN202433536U (en) Physical model testing system for tunnel-penetrated ground crack zone
CN203654993U (en) Concrete structure cantilever bay window board
CN102323396B (en) Solid simulation test device for mass concrete and test construction method thereof
CN104712076A (en) Autoclaved sand aerated concrete block wall construction method based on BIM technique
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN207231732U (en) A kind of assembled piping lane joint waterproofing test device
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN106368245A (en) Construction method for post-cast strip supporting formwork easy to clean
CN103821253A (en) Constructing technique for aerated concrete block filler wall
CN102535495B (en) U-shaped groove base for prefabricated building and construction method thereof
CN105442629A (en) Construction method for T-shaped platform vibration-isolating base of large-scale equipment
CN202787330U (en) Post-cast strip template
CN203782577U (en) Template assembly for anti-collision wall settlement joint construction
CN105756377A (en) Swimming pool and construction method thereof
CN203096762U (en) Anti-frost ground beam
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN206646549U (en) Underground engineering assembly concrete air channel
CN105133630A (en) Prefabricated part for constructing foundation forming molds
CN104612315A (en) Concrete self-temperature-preservation composite block and construction method
CN202119771U (en) Mass concrete entity simulation test device
CN205875714U (en) A consolidate fixture for retainer plate beam mold board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20201218