CN203654277U - Pile tip connecting device for pre-stressed concrete pipe pile/square pile - Google Patents
Pile tip connecting device for pre-stressed concrete pipe pile/square pile Download PDFInfo
- Publication number
- CN203654277U CN203654277U CN201420004996.9U CN201420004996U CN203654277U CN 203654277 U CN203654277 U CN 203654277U CN 201420004996 U CN201420004996 U CN 201420004996U CN 203654277 U CN203654277 U CN 203654277U
- Authority
- CN
- China
- Prior art keywords
- pile
- stake
- concrete pipe
- square
- prestressed concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a pile tip connecting device for a pre-stressed concrete pipe pile/square pile. The pile tip connecting device is connected between an upper pile and a lower pile and comprises two pile hoops, two pile end plates and at least six connecting plates, the thickness of each pile hoop ranges from 6.0mm to 12.0mm, the two pile hoops sleeve the ends of the upper pile and the lower pile respectively, the two pile end plates are fixedly arranged at the top ends of the two pile hoops respectively, and the connecting plates are radially and uniformly welded on the pile hoops. The pile tip connecting device is conveniently welded, tightness is improved, the tensile strength of connection of the two piles is effectively improved, cost is saved, and connection is safe and reliable.
Description
Technical field
The utility model relates to a kind of stake end connection device of prestressed concrete pipe pile/square pile, belongs to Construction Technology field.
Background technology
It is high that prestressed concrete pipe pile/square pile has vertical bearing capacity of single pile, and batch production is produced, and pile quality is convenient to control and is stable, and economy and compliance are good, the advantages such as easy construction.Be widely used in as vertical pressure bearing pile in the engineerings such as industrial and civilian multi-rise building, field of traffic, airport, harbour, harbour, municipal administration.Prestressed concrete pipe pile has obtained application to a certain degree as vertically pulling-resistant stake during the course because of factors such as its good economy performance, quick construction in recent years, lost efficacy because contact connectivity problem causes prestressed concrete pipe pile/square pile resistance to plucking, caused the accidents resulting from poor quality of projects such as some basement bottom board floatings.Domestic to pile tube method of attachment done some research work, there are at present mechanical fast thread connection, the connection of novel Quick mechanical, clip mechanical connection, mechanical engagement to connect, these methods of attachment all, because machining accuracy is higher, difficulty of construction is large, the more high factor of cost, are subject to certain limitation in engineering construction.
Utility model content
Technical problem to be solved in the utility model is, overcomes the shortcoming of prior art, and the stake end connection device that a kind of simple to operate, easy construction, welding difficulty are little, connect reliable prestressed concrete pipe pile/square pile is provided.
In order to solve above technical problem, the utility model provides a kind of stake end connection device of prestressed concrete pipe pile/square pile, be connected between joint stake and the stake of lower joint, described linkage comprises two pile protection hoops, two pile end plates and at least six junction plates, the thickness of two pile protection hoops is 6.0 ~ 12.0mm, the end that is socketed on respectively joint stake and lower joint stake, two pile end plates are fixedly installed on respectively the top of two pile protection hoops, and described junction plate is radially welded on described pile protection hoop uniformly.
Being further defined to of technical solutions of the utility model, in the time that the stake footpath of described pile tube/square pile is less than or equal to 700mm, the thickness of described pile protection hoop is 6.0 ~ 8.0mm.
Further, in the time that the stake footpath of described pile tube/square pile is more than or equal to 800mm, the thickness of described pile protection hoop is 10.0 ~ 12.0mm.
Further, described junction plate is strip plate, and plate is long is 24cm, and plate is wide is 8cm, thickness 6.0 ~ 12.0mm.
Further, the junction plate of prestressed concrete pipe pile is circular arc strip plate, and the diameter of described circular arc strip plate is identical with the external diameter of corresponding pile tube; The junction plate of prestressed concrete square pile is rectangle strip plate.
Further, the number of described junction plate is 6 ~ 12.
The beneficial effects of the utility model are: the stake end connection device of the disclosed a kind of prestressed concrete pipe pile/square pile of the utility model, pile protection hoop thickness is adjusted to 6 ~ 12mm, make easy to process, adopt junction plate and pile protection hoop to weld, two joint stakes are reliably connected, simple to operate, easy construction, welding difficulty are little, improve safety, meanwhile, cost is lower, and economic performance is good.
Accompanying drawing explanation
Fig. 1 is the structural representation of the stake end connection device of prestressed concrete pipe pile described in the utility model;
Fig. 2 is the top view of the stake end connection device of prestressed concrete pipe pile described in the utility model.
The specific embodiment
The stake end connection device of a kind of prestressed concrete pipe pile that the present embodiment provides, be connected between joint stake 4 and lower joint stake 5, its structural representation as shown in Figure 1, top view as shown in Figure 2, linkage comprises at least two pile protection hoops 2, two pile end plates 3 and at least six junction plates 1, in the present embodiment, adopt 6 ~ 12 junction plates 1, concrete quantity according to pipe pile footpath, stake the composite factor such as long and single pile tension bearing capacity determine.
Two pile end plates 3 adopt and the arc plate of pile tube external diameter with diameter, are fixedly installed on respectively the top of two pile protection hoops 2.
In the time that the stake footpath of described pile tube is less than or equal to 700mm, the thickness of described pile protection hoop 2 is 6.0 ~ 8.0mm.In the time that the stake footpath of described pile tube is more than or equal to 800mm, the thickness of described pile protection hoop 2 is 10.0 ~ 12.0mm.In the present embodiment, the stake footpath of pile tube is 500mm, and the thickness of pile protection hoop 2 is 8.0mm.
The linkage of the present embodiment only need increase junction plate welding in pile tube is manufactured middle adjustment pile protection hoop 2 steel plate thickness and constructed.Calculate uplift pile connected node as an example of 500 pile tubes example and increase expense, pile protection hoop increases steel plate materials 5x3.14x(0.08-0.015) 1.5x7.8=11.94KG, junction plate (by 8) steel plate materials 2.4x0.8x0.08x7.8x8=9.58KG, a connected node increases steel plate materials 11.94x2+9.58=33.46KG, consider the construction factors such as processing, welding, steel plate calculates by 7 yuan/KG, costs altogether and uses 33.46x7=234.22 unit, is greatly better than other types uplift pile.
The stake end connection device of a kind of prestressed concrete square pile that the present embodiment provides, its primary structure and parameter are similar to embodiment 1, difference is: prestressed concrete square pile junction plate 1 is rectangle vertical bar plate, and the stake footpath of square pile is 800mm, and the thickness of pile protection hoop 2 is 10.0mm.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.
Claims (6)
1. the stake end connection device of a prestressed concrete pipe pile/square pile, be connected between joint stake (4) and lower joint stake (5), it is characterized in that, described linkage comprises two pile protection hoops (2), two pile end plates (3) and at least six junction plates (1), the thickness of two pile protection hoops (2) is 6.0 ~ 12.0mm, be socketed on respectively the end of joint stake (4) and lower joint stake (5), two pile end plates (3) are fixedly installed on respectively the top of two pile protection hoops (2), and described junction plate (1) is radially welded on described pile protection hoop (2) uniformly.
2. the stake end connection device of a kind of prestressed concrete pipe pile/square pile according to claim 1, is characterized in that, in the time that the stake footpath of described pile tube/square pile is less than or equal to 700mm, the thickness of described pile protection hoop (2) is 6.0 ~ 8.0mm.
3. the stake end connection device of a kind of prestressed concrete pipe pile/square pile according to claim 1, is characterized in that, in the time that the stake footpath of described pile tube/square pile is more than or equal to 800mm, the thickness of described pile protection hoop (2) is 10.0 ~ 12.0mm.
4. the stake end connection device of a kind of prestressed concrete pipe pile/square pile according to claim 1, is characterized in that, described junction plate (1) is strip plate, and plate is long is 24cm, and plate is wide is 8cm, thickness 6.0 ~ 12.0mm.
5. the stake end connection device of a kind of prestressed concrete pipe pile/square pile according to claim 4, it is characterized in that, the junction plate (1) of prestressed concrete pipe pile is circular arc strip plate, and the diameter of described circular arc strip plate is identical with the external diameter of corresponding pile tube; The junction plate (1) of prestressed concrete square pile is rectangle strip plate.
6. the stake end connection device of a kind of prestressed concrete pipe pile/square pile according to claim 1, is characterized in that, the number of described junction plate (1) is 6 ~ 12.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420004996.9U CN203654277U (en) | 2014-01-06 | 2014-01-06 | Pile tip connecting device for pre-stressed concrete pipe pile/square pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420004996.9U CN203654277U (en) | 2014-01-06 | 2014-01-06 | Pile tip connecting device for pre-stressed concrete pipe pile/square pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203654277U true CN203654277U (en) | 2014-06-18 |
Family
ID=50920684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420004996.9U Expired - Fee Related CN203654277U (en) | 2014-01-06 | 2014-01-06 | Pile tip connecting device for pre-stressed concrete pipe pile/square pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203654277U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952537A (en) * | 2019-12-17 | 2020-04-03 | 中电建路桥集团有限公司 | Hoop-type connected PHC tubular pile and hoop size determination method thereof |
CN113653044A (en) * | 2021-08-10 | 2021-11-16 | 大成科创基础建设股份有限公司 | Construction method of deep soft soil pipe pile |
CN114922167A (en) * | 2022-05-22 | 2022-08-19 | 中建八局第二建设有限公司 | Prefabricated square pile for geological condition of mud flat sludge, construction method and composition |
-
2014
- 2014-01-06 CN CN201420004996.9U patent/CN203654277U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952537A (en) * | 2019-12-17 | 2020-04-03 | 中电建路桥集团有限公司 | Hoop-type connected PHC tubular pile and hoop size determination method thereof |
CN110952537B (en) * | 2019-12-17 | 2021-07-09 | 中电建路桥集团有限公司 | Hoop-type connected PHC tubular pile and hoop size determination method thereof |
CN113653044A (en) * | 2021-08-10 | 2021-11-16 | 大成科创基础建设股份有限公司 | Construction method of deep soft soil pipe pile |
CN114922167A (en) * | 2022-05-22 | 2022-08-19 | 中建八局第二建设有限公司 | Prefabricated square pile for geological condition of mud flat sludge, construction method and composition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654277U (en) | Pile tip connecting device for pre-stressed concrete pipe pile/square pile | |
CN203977582U (en) | A kind of steel core concrete column and beam connecting node | |
CN203514533U (en) | Inner partition plate-outer partition plate square concrete filled steel tubular column and steel beam cross-shaped joint structure | |
CN203229943U (en) | Steel reinforcement laying structure of squeezed bearing plate of pile foundation well | |
CN204418510U (en) | Floor support plate steel bar girder structure | |
CN204098241U (en) | Trapezoidal steel plate interpolation type rectangular steel-tube concrete column and steel beam connecting joint | |
CN203569557U (en) | Reinforcing steel bar combined mechanism based on construction concrete | |
CN206693403U (en) | A kind of steel core concrete column and connected mode | |
CN208363078U (en) | A kind of assembled steel pile cover | |
CN109138272B (en) | Super high-rise steel bar group connection fixing device and method | |
CN203846403U (en) | Assembled type ashore temporary buttress device | |
CN214940350U (en) | Prefabricated assembled basis of lightning rod | |
CN201981836U (en) | Anti-climbing JC plastic dipping fence | |
CN202047354U (en) | Steel tube concrete rectangular arch rib inner tabula structure | |
CN204098020U (en) | High-strength concrete pile cover | |
CN205314372U (en) | Steel reinforcement cage protective layer cushion | |
CN204920241U (en) | Quick construction structures of building modularization | |
CN209585099U (en) | A kind of substation truss assembled pile foundation using flanged joint | |
CN208815672U (en) | The connecting joint structure of circular steel tube concrete column and reinforced beam | |
CN203613532U (en) | Square pile connector | |
CN105804293A (en) | Prefabricated concrete-filled steel tube construction column rammed earth wall | |
CN207175392U (en) | A kind of construction jacking equipment | |
CN206385800U (en) | A kind of cylindrical concrete groove tank body | |
CN205742960U (en) | A kind of vertical scaffold reinforcement assembly across Bars In Poured Concrete Slab | |
CN204343317U (en) | A kind of straight anchor formula steel platform of tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 Termination date: 20170106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |