CN203643097U - Building external window water-pouring test device for engineering supervision - Google Patents

Building external window water-pouring test device for engineering supervision Download PDF

Info

Publication number
CN203643097U
CN203643097U CN201320843290.7U CN201320843290U CN203643097U CN 203643097 U CN203643097 U CN 203643097U CN 201320843290 U CN201320843290 U CN 201320843290U CN 203643097 U CN203643097 U CN 203643097U
Authority
CN
China
Prior art keywords
window
shower nozzle
rear plate
plate
water collector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320843290.7U
Other languages
Chinese (zh)
Inventor
郭建淼
胡勇
陈国江
车明海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RUIHE ANHUI PROJECT MANAGEMENT GROUP CO Ltd
Original Assignee
RUIHE ANHUI PROJECT MANAGEMENT GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RUIHE ANHUI PROJECT MANAGEMENT GROUP CO Ltd filed Critical RUIHE ANHUI PROJECT MANAGEMENT GROUP CO Ltd
Priority to CN201320843290.7U priority Critical patent/CN203643097U/en
Application granted granted Critical
Publication of CN203643097U publication Critical patent/CN203643097U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model relates to a building external window water-pouring test device for engineering supervision. The building external window water-pouring test device comprises a nozzle connected with a water pipe, and a connecting mechanism supporting the nozzle to be located at the top part of a lower window. The connecting mechanism is rotationally connected to and fixedly clamped on a clamping set on the bottom part of an upper window through a rotation adjusting mechanism. The connecting mechanism is connected with a water collector arranged below the nozzle. When the connecting mechanism rotates close to the lower window, the water collector is attached to the wall below the lower window. The building external window water-pouring test device is convenient to operate, the trouble of holding the nozzle by hand is avoided, sprayed water can be recycled, and a good practicality is achieved.

Description

Project supervision external window of building sprinkling test equip
Technical field
The utility model relates to a kind of project supervision pick-up unit, relates in particular to a kind of project supervision external window of building sprinkling test equip.
Background technology
Along with popularizing of high residential building, in rainy season, the problem of dwelling external window infiltration is more and more outstanding, and in order to solve external window leakage in residential engineering problem, in residential project, carrying out the artificial water pouring test of exterior window becomes the pressure acceptance specification of various places gradually.Artificial water pouring test can be simulated precipitation weather preferably, finds in time the mass defect of exterior window, so that unit in charge of construction can repair in time in the completion of works course of receiving.At present, domestic exterior window water pouring test equipment is all also very simple, is substantially all that artificial hand-held shower sprays, and so not only expends a large amount of manpowers, easily makes water spray inhomogeneous because operating personnel are tired, and impact detects effect.And in process of the test, a large amount of shower waters flows down along external wall, not only causes the serious waste of water resource, also can damage testing ground environment.
Utility model content
For solving the deficiencies in the prior art, the utility model provides a kind of project supervision external window of building sprinkling test equip, and it is easy to operate, has saved the trouble of artificial hand-held shower, and can recycle shower water, has good practicality.
For achieving the above object, this project supervision comprises the shower nozzle being connected with water pipe with external window of building sprinkling test equip, also comprise and support described shower nozzle in the bindiny mechanism at lower floor's window top, described bindiny mechanism is rotationally connected with engaging clamping on seat in upper strata window bottom via rotating governor motion, in described bindiny mechanism, be positioned at shower nozzle below be connected with water collector, when described water collector has the rotation of close lower floor window in bindiny mechanism, be fitted on the wall of lower floor's window below.Adopt above-mentioned technical scheme, the bottom of an engaging at upper strata window will be clamped, then via rotating governor motion, bindiny mechanism is installed to and is clamped on seat, rotational coupling mechanism makes shower nozzle be positioned at the top of lower floor's window, and water collector is fitted on the wall of lower floor's window below, like this when cross current water source water supply start can spray the window of lower floor, the water flowing down along upper strata window in spray process is collected by the water collector below lower floor's window, thereby make this test unit can save the trouble that artificial hand-held shower sprays, also shower water is recycled.
As the restriction to aforesaid way, the described seat that clamps comprises the front plate that is arranged on the window bottom inside wall of upper strata and the rear plate on the wall of outside, and be arranged in front plate and rear plate, with threaded rod and the bolt on the window two bottom sides wall of upper strata by front plate and rear plate engaging, the height of described front plate is lower than rear plate.Clamping when seat is installed first uses threaded rod that front plate and rear plate are coupled together, then by threaded rod across the bottom at upper strata window, front plate and rear plate are laid respectively in the side walls of window bottom, upper strata, then at the bolt that screws threaded rod two ends, make front plate and rear plate be clamped on upper strata window two bottom sides, just can be clamping an engaging on the window of upper strata, rotate governor motion bindiny mechanism is supported to installation thereby just can use.And the height of front plate is set to lower than rear plate, there is a gradient upwards of stretching out upper strata window after can making bindiny mechanism install, thereby while rotation in bindiny mechanism, be conducive to that water collector fits on wall tightr.
As the improvement to aforesaid way, on the end face of described front plate and the relative wall of rear plate, be provided with elastomer block.Elastomer block is set on the end face of front plate and the relative wall of rear plate and can prevents from after the engaging of engaging seat, wall being caused damage, especially protect the edges and corners of window bottom, upper strata body of wall.
As the restriction to aforesaid way, described rotation governor motion comprises the adjustable plate that is vertically connected in front plate center of top, the middle part of adjustable plate offers regulating tank, in described regulating tank, be movably set with adjusting fastening bolt, and be connected in the installing plate of rear plate center of top, on described installing plate, rotate and be provided with rotating shaft.Bindiny mechanism is installed on installing plate by rotating shaft, just can make bindiny mechanism rotate relative to engaging seat, again one end of bindiny mechanism is used and regulates fastening bolt to be installed on adjustable plate, adjust and regulate the position of fastening bolt in regulating tank, also be the angle that adjusting connection mechanism rotates, after mechanism to be connected angle is suitable, again regulating fastening bolt to screw on regulating tank, so just can realizes the determine angle of bindiny mechanism on engaging seat and fix.
As the restriction to aforesaid way, described bindiny mechanism comprises the support bar being located between described adjusting fastening bolt and rotating shaft, and is connected with one end that described support bar is positioned at rear plate side and to the tilting spray bar of rear plate direction; Described shower nozzle is connected on spray bar via position adjusting mechanism, and described water collector is connected in the lower end of spray bar.The two ends of support bar are installed on installing plate and adjustable plate by rotating shaft and adjusting fastening bolt respectively, just can be by regulating support bar realize the angular adjustment of determining to bindiny mechanism's entirety.Because spray bar is fixed on the termination of support bar, and spray bar is to the direction of rear plate, also the direction that is wall is tilting, so in the time that rotary supporting rod rotates one end of its spray bar that is connected, just can realize fast water collector on the wall of lower floor window below near and laminating, after water collector and wall post, then adjust the distance of shower nozzle apart from lower floor's window top by position adjusting mechanism, just can complete the installation adjustment of test unit.
As the restriction to aforesaid way, described position adjusting mechanism comprises the shower nozzle pole being connected with shower nozzle, be opened in the shower nozzle regulating tank on shower nozzle pole, and be arranged on the shower nozzle adjusting tight fixed bolt on spray bar, described shower nozzle regulating tank is set in shower nozzle and regulates on tight fixed bolt.In the time that needs regulate shower nozzle, regulate tight fixed bolt as long as unscrew shower nozzle, then change shower nozzle and regulate the tightening position of tight fixed bolt in shower nozzle regulating tank and the angle of the relative spray bar of shower nozzle pole, and then regulate tight fixed bolt to screw in shower nozzle.
As the improvement to aforesaid way, the bottom of described water collector is provided with freeing port.Bottom at water collector arranges freeing port, then is communicated with upper hose, just can realize water collected in water collector is discharged in real time, can prevent from causing when water is too many in water collector laminating degree between water collector and wall to reduce to cause in water collector and reveal.
As the improvement to aforesaid way, the end face of described water collector and wall laminating is provided with elastomeric pad.Elastomeric pad is set on the end face of water collector and wall laminating and can increases the sealing between water collector and wall laminating.
In sum, adopt the technical solution of the utility model, can complete the water pouring test operation to external window of building, it is easy to operate, has saved the trouble of artificial hand-held shower, and can recycle shower water, has good practicality.
Accompanying drawing explanation
Below in conjunction with the drawings and the specific embodiments, the utility model is done further to describe in detail:
Fig. 1 is the structural representation of the utility model embodiment;
In figure: 1, front plate; 2, rear plate; 3, threaded rod; 4, adjustable plate; 5, installing plate; 6, support bar; 7, connecting link; 8, spray bar; 9, regulating tank; 10, regulate fastening bolt; 11, shower nozzle pole; 12, shower nozzle regulating tank; 13, shower nozzle; 14, water collector; 15, freeing port; 16, water pipe; 17, block rubber; 18, rubber sheet gasket; 19, bolt; 20, shower nozzle regulates tight fixed bolt; 21, rotating shaft.
Embodiment
The present embodiment relates to a kind of project supervision external window of building sprinkling test equip, as shown in Figure 1, it comprises engaging seat, the rear plate 2 that described engaging seat comprises front plate 1 and is oppositely arranged with front plate 1, the height of front plate 1 is less than rear plate 2, front plate 1 and rear plate 2 couple together by two threaded rods 3, the outside that is positioned at front plate 1 and rear plate 2 on every threaded rod 3 is provided with bolt 19, the inner side of front plate 1 and rear plate 2 be positioned at threaded rod 3 below be also fixed with elastomer block, the present embodiment Elastic piece is block rubber 17, and block rubber 17 also has a projection near one end of threaded rod 3, make thus engaging seat by front plate 1 and rear plate 2 on the wall of upper strata window two bottom sides engaging when being fixed, block rubber 17 can be protected the corner angle of body of wall.
Center of top place at front plate 1 is vertically fixed with adjustable plate 4, offers rectangular regulating tank 9 at the middle part of adjustable plate 4, is movably installed with and regulates fastening bolt 10 in regulating tank 9.Center of top place at rear plate 2 is also vertically fixed with installing plate 5, and installing plate 5 is the both sides of two and the rear plate 2 top center lines that are placed in, and two 5 of installing plates are separated by a distance, and are rotatablely equipped with rotating shaft 21 on two installing plates 5.Adjustable plate 4 and be arranged on the regulating tank 9 on adjustable plate 4, be installed on the adjusting fastening bolt 10 in regulating tank 9, and installing plate 5 and the rotating shaft 21 that is arranged on installing plate 5 formed rotation governor motion jointly, for bindiny mechanism is rotated and is installed on engaging seat.
Bindiny mechanism comprises that the support bar 6 after installation is because the height of front plate 1 is that one end is inclined upwardly lower than rear plate 2 by regulating fastening bolt 10 and rotating shaft 21 to be installed on the support bar 6 in the middle of adjustable plate 4 one sides and two installing plates 5.The end that is positioned at rear plate 2 one sides at support bar 6 is fixed with connecting link 7, and connecting link 7 is downward inclination with respect to support bar 6.Be fixed with spray bar 8 at the other end of connecting link 7, and spray bar 8 is tilting to rear plate 2 directions.Be rotatablely equipped with shower nozzle in the middle and lower part of spray bar 8 and regulate tight fixed bolt 20, shower nozzle 13 regulates tight fixed bolt 20 to be arranged on spray bar 8 by position adjusting mechanism via shower nozzle.
Position adjusting mechanism comprises the shower nozzle pole 11 being connected with shower nozzle 13, offers shower nozzle regulating tank 12 on shower nozzle pole 11, and shower nozzle regulates tight fixed bolt 20 to be arranged in shower nozzle regulating tank 12 so that shower nozzle pole 11 is connected on spray bar 8.In the present embodiment, shower nozzle 13 is one to offer the straight tube of the closed at both ends of multiple jet holes, and shower nozzle pole 11 is fixed on the middle part of straight tube, is connected with the water pipe 16 being communicated with water source on straight tube.Below shower nozzle 13, the lower end that is positioned at spray bar 8 is connected with water collector 14, the rectangle box body that water collector 14 is opening for end face and near the side end face of rear plate 2 direction one sides, the side end face of opening is for fitting with body of wall, sealing while laminating with wall for increasing water collector 14, on the side end face of opening, being provided with elastomeric pad, is rubber sheet gasket 18 in the present embodiment.Bottom at water collector 14 also offers freeing port 15.
In use, first unscrew bolt 19, so that the threaded rod 3 in engaging seat is across the bottom of upper strata window, and front plate 1 and rear plate 2 are placed on the wall of upper strata window two bottom sides, then screw bolt 19, front plate 1 and rear plate 2 are clamped between the wall of upper strata window two bottom sides, thereby engaging seat have been fixed on to the bottom of upper strata window.First shower nozzle is regulated tight fixed bolt 20 to unscrew, shower nozzle pole 11 is suspended downwards.Then support bar 6 is placed into above the rotating shaft 21 in the middle of two installing plates 5, when adjusting support bar 6 and observing spray bar 8 near the bottom of lower floor's window, the distance of lower floor's window distance from top spray bar 8, then support bar 6 is mentioned to withdrawal, according to the distance of lower floor's window distance from top spray bar 8 of observing above, use shower nozzle to regulate tight fixed bolt 20 that shower nozzle pole 11 is tightened at spray bar 8, so that shower nozzle 13 is positioned at lower floor's window top place during near lower floor window bottom just at spray bar 8.Support bar 6 is installed between two installing plates 5 by rotating shaft 21, then rotary supporting rod 6 makes spray bar 8 near lower floor's window, at window place of lower floor, water collector 14 is installed on to the lower end of spray bar 8, and rotary supporting rod 6 to be to observe the whether below in lower floor's window, position of water collector 14, by adjust the installation site of water collector 14 on spray bar 8 make water collector 14 be just positioned at lower floor's window below.Again by regulating fastening bolt 10 that the other end of support bar 6 is installed on adjustable plate 4, then upwards rotate the one end that support bar 6 is positioned to adjustable plate 4 places, the end face that makes the water collector 14 of spray bar 8 lower ends be fixed with rubber sheet gasket 18 fits tightly on the wall below lower floor's window, now adjusting fastening bolt 10 is screwed again.Finally connect drainpipe (not shown) at freeing port 15 places of water collector 14 bottoms, open the valve at the water source that water pipe 16 is communicated with, adjust hydraulic pressure and can start to test to specified value.

Claims (8)

1. a project supervision external window of building sprinkling test equip, comprise the shower nozzle being connected with water pipe, it is characterized in that: also comprise and support described shower nozzle in the bindiny mechanism at lower floor's window top, described bindiny mechanism is rotationally connected with engaging clamping on seat in upper strata window bottom via rotating governor motion, in described bindiny mechanism, be positioned at shower nozzle below be connected with water collector, when described water collector has the rotation of close lower floor window in bindiny mechanism, be fitted on the wall of lower floor's window below.
2. project supervision according to claim 1 external window of building sprinkling test equip, it is characterized in that: the described seat that clamps comprises the front plate that is arranged on the window bottom inside wall of upper strata and the rear plate on the wall of outside, and be arranged in front plate and rear plate, with threaded rod and the bolt on the window two bottom sides wall of upper strata by front plate and rear plate engaging, the height of described front plate is lower than rear plate.
3. project supervision according to claim 2 external window of building sprinkling test equip, is characterized in that: on the end face of described front plate and the relative wall of rear plate, be provided with elastomer block.
4. project supervision according to claim 2 external window of building sprinkling test equip, it is characterized in that: described rotation governor motion comprises the adjustable plate that is vertically connected in front plate center of top, the middle part of adjustable plate offers regulating tank, in described regulating tank, be movably set with adjusting fastening bolt, and be connected in the installing plate of rear plate center of top, on described installing plate, rotate and be provided with rotating shaft.
5. project supervision according to claim 4 external window of building sprinkling test equip, it is characterized in that: described bindiny mechanism comprises the support bar being located between described adjusting fastening bolt and rotating shaft, and be connected with one end that described support bar is positioned at rear plate side and to the tilting spray bar of rear plate direction; Described shower nozzle is connected on spray bar via position adjusting mechanism, and described water collector is connected in the lower end of spray bar.
6. project supervision according to claim 5 external window of building sprinkling test equip, it is characterized in that: described position adjusting mechanism comprises the shower nozzle pole being connected with shower nozzle, be opened in the shower nozzle regulating tank on shower nozzle pole, and being arranged on the shower nozzle adjusting tight fixed bolt on spray bar, described shower nozzle regulating tank is set in shower nozzle and regulates on tight fixed bolt.
7. project supervision according to claim 1 external window of building sprinkling test equip, is characterized in that: the bottom of described water collector is provided with freeing port.
8. project supervision according to claim 1 external window of building sprinkling test equip, is characterized in that: the end face of described water collector and wall laminating is provided with elastomeric pad.
CN201320843290.7U 2013-12-20 2013-12-20 Building external window water-pouring test device for engineering supervision Expired - Fee Related CN203643097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320843290.7U CN203643097U (en) 2013-12-20 2013-12-20 Building external window water-pouring test device for engineering supervision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320843290.7U CN203643097U (en) 2013-12-20 2013-12-20 Building external window water-pouring test device for engineering supervision

Publications (1)

Publication Number Publication Date
CN203643097U true CN203643097U (en) 2014-06-11

Family

ID=50874332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320843290.7U Expired - Fee Related CN203643097U (en) 2013-12-20 2013-12-20 Building external window water-pouring test device for engineering supervision

Country Status (1)

Country Link
CN (1) CN203643097U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109141753A (en) * 2018-07-19 2019-01-04 天津建科建筑节能环境检测有限公司 A kind of building external doors and windows performance scene water drenching detection device
CN109406057A (en) * 2018-10-25 2019-03-01 浙江双圆工程监理咨询有限公司 A kind of project supervision external wall and window side water test device
CN109668815A (en) * 2019-01-18 2019-04-23 温州市恒业建设监理有限公司 A kind of project supervision window side water test device
CN110567643A (en) * 2019-09-24 2019-12-13 杭州同正建设工程检测有限公司 Device for detecting rain of field window

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109141753A (en) * 2018-07-19 2019-01-04 天津建科建筑节能环境检测有限公司 A kind of building external doors and windows performance scene water drenching detection device
CN109141753B (en) * 2018-07-19 2020-04-10 天津建科建筑节能环境检测有限公司 On-spot trickle check out test set of building outer door and window performance
CN109406057A (en) * 2018-10-25 2019-03-01 浙江双圆工程监理咨询有限公司 A kind of project supervision external wall and window side water test device
CN109668815A (en) * 2019-01-18 2019-04-23 温州市恒业建设监理有限公司 A kind of project supervision window side water test device
CN109668815B (en) * 2019-01-18 2022-02-11 深圳市昊源建设监理有限公司 Window limit infiltration testing arrangement is used in engineering supervision
CN110567643A (en) * 2019-09-24 2019-12-13 杭州同正建设工程检测有限公司 Device for detecting rain of field window

Similar Documents

Publication Publication Date Title
CN203643097U (en) Building external window water-pouring test device for engineering supervision
CN206448459U (en) One kind greening water storage circulation drainage equipment
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN108442452B (en) Rainwater collection device for municipal garden
CN206752575U (en) A kind of municipal water supply part flow arrangement
CN110133212A (en) A kind of artificial rain system for the test of indoor side slope
CN205284436U (en) Portable field artificial rain device
CN208753934U (en) A kind of seal for pipe joints plug
CN208379396U (en) A kind of depositing dust plate compactor
CN206774086U (en) A kind of photovoltaic power generation plate rainwater-collecting experimental model
CN105052686A (en) Automatic control device for irrigation of paddy fields and using method of automatic control device
CN210289998U (en) Tidal power generation device
CN212976044U (en) Solar photovoltaic panel with self-cleaning function
CN207176622U (en) Portable anti-flood wall and its column agency
CN107435510A (en) Residential building corridor or corridor adjustable sealing block apparatus during a kind of flood flood situation
CN204115672U (en) Protection of goal device and monitoring system are sighted in surface deformation optical measurement
CN203798707U (en) Drainage function detecting device for drainage pavement
CN208704706U (en) A kind of hydraulic dam gate angle detection device
CN113109520A (en) Soil-vegetation environment monitoring analogue means
CN204126276U (en) Wall of High-building structure automatic spray curing system
CN214574292U (en) Active intelligent water-saving equipment
CN220453000U (en) Pipe fitting joint structure for water supply and drainage pipe
CN209144923U (en) A kind of tap water outlet nozzle quick access device
CN201058817Y (en) Water energy level regulating controlled horizontal plane water-taking device
CN215924447U (en) Novel water supply device for sewage evaporation body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20151220

EXPY Termination of patent right or utility model