CN203640771U - Pipeline fixing clamp for vertical shaft construction on coal mine - Google Patents
Pipeline fixing clamp for vertical shaft construction on coal mine Download PDFInfo
- Publication number
- CN203640771U CN203640771U CN201420010504.7U CN201420010504U CN203640771U CN 203640771 U CN203640771 U CN 203640771U CN 201420010504 U CN201420010504 U CN 201420010504U CN 203640771 U CN203640771 U CN 203640771U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- clamp
- pipeline fixing
- coal mine
- pipe clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
- Clamps And Clips (AREA)
Abstract
The utility model discloses a pipeline fixing clamp for vertical shaft construction on a coal mine. The pipeline fixing clamp comprises a pipe clamp seat, support arms, nuts, a fixing frame and a U-shaped pipe clamp. The pipe clamp seat is a platy device arranged on the wall of a concrete well in a connected manner, an outer plane of the pipe clamp seat is connected onto the wall of the concrete well, the support arms are arranged on an inner plane of the pipe clamp seat, the fixing frame is arranged at the outer ends of the support arms in a connected manner, through holes are formed in two ends of the fixing frame, two ends of the U-shaped pipe clamp penetrate the through holes in the two ends of the fixing frame and are fixed onto the fixing frame by the aid of the nuts, and a steel pipe is fixedly connected onto the wall of the concrete well of a vertical shaft of the coal mine. The through holes in the two ends of the fixing frame are horizontal slot holes, so that certain quantities of horizontal movement and error adjustment can be carried out in pipeline fixing operation procedures, and the pipeline fixing clamp can be particularly operated conveniently. The pipeline fixing clamp has the advantages that the pipeline fixing clamp is simple in integral structure, convenient to mount, operate and utilize, good in stability and high in reliability, and can be conveniently mounted on the wall of the well, and a pipeline can be conveniently fixed to the wall of the well by the aid of the pipeline fixing clamp.
Description
Technical field
The utility model relates to the fastening devices of coal mine shaft lining construction pipeline, relates in particular to coal mine shaft lining construction pipeline fixing fastener.
Background technology
In the process of shaft construction, need to adopt many sinking winch to suspend in midair or the same equipment of tensioning simultaneously, according to design, need to be arranged in the both sides stable vehicles of pit shaft with many sinking winch, supporting electrical control cubicles and operating system thereof are arranged in the electric control chamber separately of both sides.And in the less shaft construction of hole diameter, pipeline is carried out on the borehole wall to wall hanging, will provide larger space to kibble hoist.Promote safety and also have larger guarantee.In the coal mine shaft lining construction of prior art, the pressure wind that work plane uses and the ponding of work plane all need to use pipeline to carry or discharge, in present stage shaft construction, pipeline be fixed with two kinds of modes; The one, suspention, the 2nd, wall hanging.With respect to suspention, wall hanging has many advantages, particularly, in the less shaft construction of hole diameter, pipeline is carried out on the borehole wall to wall hanging, will provide larger space to kibble hoist.In operating process, need to have multiple person cooperational, be easy to occur the problem that operation is chaotic, extend the time of adjusting, directly affect the cycle period of construction, and then affect progress, duration and the benefit of engineering.
Utility model content
The purpose of this utility model is, overcomes the deficiencies in the prior art part, and a kind of coal mine shaft lining construction pipeline fixing fastener is provided, and can facilitate and the installation of standard borehole wall pipeline and the fitting operation of fixing pipeline, guarantees the stability and safety of borehole wall pipeline and fixing pipeline.
Coal mine shaft lining construction pipeline fixing fastener described in the utility model, includes clamp seat, support arm, nut, fixed mount and U-shaped pipe clamp.Clamp seat is to connect the tabular device being arranged on concrete walling, the outerplanar of clamp seat is connected on concrete walling, on the inner plane of clamp seat, be provided with support arm, the outer end of support arm is connected with fixed mount, in the two ends of fixed mount, be provided with through hole, the two ends of U-shaped pipe clamp penetrate in the through hole in fixed mount two ends, and the two ends of U-shaped pipe clamp are fixed on fixed mount with nut, steel pipe are fixedly connected on the concrete walling of coal mine shaft lining.Through hole in fixed mount two ends is arranged to the form of horizontal slotted hole, in the fixing operation process of carrying out pipeline, has allowed a certain amount of moving horizontally and error adjustment, makes concrete more convenient to operate.
Coal mine shaft lining construction pipeline fixing fastener described in the utility model, overall structure is simple, installation and easy for operation, good stability, reliability is high.Use coal mine shaft lining construction pipeline fixing fastener described in the utility model, all very convenient in borehole wall installation pipeline fixed card and fixing pipeline.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of coal mine shaft lining construction pipeline fixing fastener described in the utility model.1-clamp seat, 2-support arm, 3-nut, 4-fixed mount, 5-U-shaped pipe clamp.
The specific embodiment
Referring now to accompanying drawing 1, be described as follows: coal mine shaft lining construction pipeline fixing fastener described in the utility model, includes clamp seat 1, support arm 2, nut 3, fixed mount 4 and U-shaped pipe clamp 5 in conjunction with the embodiments.Clamp seat is to connect 1 to connect the tabular device being arranged on concrete walling, the outerplanar of clamp seat 1 is connected on concrete walling, on the inner plane of clamp seat 1, be provided with support arm 2, the outer end of support arm 2 is connected with fixed mount 4, in the two ends of fixed mount 4, be provided with through hole, the two ends of U-shaped pipe clamp 5 penetrate in the through hole in fixed mount 4 two ends, and the two ends of U-shaped pipe clamp 5 are fixed on fixed mount 4 with nut 3, steel pipe are fixedly connected on the concrete walling of coal mine shaft lining.Through hole in fixed mount 4 two ends is arranged to the form of horizontal slotted hole, in the fixing operation process of carrying out pipeline, has allowed a certain amount of moving horizontally and error adjustment, makes concrete more convenient to operate.Coal mine shaft lining construction pipeline fixing fastener described in the utility model, overall structure is simple, installation and easy for operation, good stability, reliability is high.Use coal mine shaft lining construction pipeline fixing fastener described in the utility model, all very convenient in borehole wall installation pipeline fixed card and fixing pipeline.
Claims (1)
1. coal mine shaft lining construction pipeline fixing fastener, include clamp seat (1), support arm (2), nut (3), fixed mount (4) and U-shaped pipe clamp (5), clamp seat is to connect (1) to connect the tabular device being arranged on concrete walling, the outerplanar of clamp seat (1) is connected on concrete walling, it is characterized in that being provided with support arm (2) on the inner plane of clamp seat (1), the outer end of support arm (2) is connected with fixed mount (4), in the two ends of fixed mount (4), be provided with through hole, the two ends of U-shaped pipe clamp (5) penetrate in the through hole in fixed mount (4) two ends, the nut for two ends (3) of U-shaped pipe clamp (5) is fixed on fixed mount (4), steel pipe is fixedly connected on the concrete walling of coal mine shaft lining.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420010504.7U CN203640771U (en) | 2014-01-08 | 2014-01-08 | Pipeline fixing clamp for vertical shaft construction on coal mine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420010504.7U CN203640771U (en) | 2014-01-08 | 2014-01-08 | Pipeline fixing clamp for vertical shaft construction on coal mine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203640771U true CN203640771U (en) | 2014-06-11 |
Family
ID=50872026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420010504.7U Expired - Fee Related CN203640771U (en) | 2014-01-08 | 2014-01-08 | Pipeline fixing clamp for vertical shaft construction on coal mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203640771U (en) |
-
2014
- 2014-01-08 CN CN201420010504.7U patent/CN203640771U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201381166Y (en) | Hanging-point adjustable transverse hanging beam | |
CN203755640U (en) | Slope surface scaffold pedestal device | |
CN104074367A (en) | Mounting adjustment device for prefabricated wall panel | |
CN203961322U (en) | Prefabricated panel installation adjusting device | |
CN203640771U (en) | Pipeline fixing clamp for vertical shaft construction on coal mine | |
CN204435834U (en) | The adjustable of a kind of supporting foot hand cradle supports wall device | |
CN204510804U (en) | A kind of Multifunctional building template bracing frame | |
CN204942760U (en) | Double flute hanger | |
CN204299142U (en) | A kind of unloading-structure of builder's jack | |
CN204324685U (en) | Interim hanger is used in a kind of novel short range lifting | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN203932929U (en) | The erecting device of the anti-fall guide rail of level on a kind of electric pole | |
CN203499724U (en) | Improved bracket for coal mine air-water pipelines | |
CN204345208U (en) | A kind of spherical camera mounting bracket | |
CN202706511U (en) | Fixing device for hanging scaffold used in dismantling high structures | |
CN201851158U (en) | Wind and water pipeline hanging device | |
CN203653144U (en) | Building construction lifting device | |
CN203939226U (en) | A kind of wall-connecting piece device for scaffold | |
CN203214013U (en) | Power swivel reaction torque device | |
CN205175251U (en) | Foundation ditch blasting nonel detonator connecting piece | |
CN201626778U (en) | Sky anchor in grotto | |
CN204649088U (en) | A kind of explosive cartridge easy to use | |
CN203878752U (en) | Connecting device for large steel beam and connecting plate | |
CN203877747U (en) | Smelting furnace tube lifting frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140611 Termination date: 20150108 |
|
EXPY | Termination of patent right or utility model |