CN203640056U - Bolt embedding fixing frame - Google Patents
Bolt embedding fixing frame Download PDFInfo
- Publication number
- CN203640056U CN203640056U CN201320816039.1U CN201320816039U CN203640056U CN 203640056 U CN203640056 U CN 203640056U CN 201320816039 U CN201320816039 U CN 201320816039U CN 203640056 U CN203640056 U CN 203640056U
- Authority
- CN
- China
- Prior art keywords
- bolt
- fixing frame
- steel pipes
- frame body
- carlings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 26
- 239000010959 steel Substances 0.000 claims abstract description 26
- 238000010276 construction Methods 0.000 abstract description 8
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Abstract
The utility model relates to a bolt embedding fixing frame which comprises a rectangular frame body composed of two parallel carlings and a beam which is connected between the carlings. The bolt embedding fixing frame is characterized in that two steel pipes which are parallel to the beam are arranged between the two carlings of the frame body, scales are marked on the carlings and the steel pipes of the frame body and six trapezoid-shaped clamps which can slide on the steel pipes are arranged on the two steel pipes respectively in a sleeved mode. The bolt embedding fixing frame has the advantages that after the fixing frame is applied, accuracy of the elevation of a bolt and the horizontal position can be ensured, a construction manner is more precise compared with an original single embedding bolt construction manner, construction efficiency is greatly improved, construction progress is accelerated and the difficulty in managing construction tools is lowered.
Description
Technical field
The utility model relates to a kind of bolt embedment fixed mount, belongs to building operations aid field.
Background technology
Existing in building operations, bolt embedment technique is: after single footing reinforcing bar binding and formwork reinforcement complete, at template upper edge cultellation unwrapping wire, eject the horizontal level control line of bolt transverse and longitudinal direction, then inside template, surrounding is emitted levelling line and is used for elevation control, bolt enters mould, finds tram according to horizontal control line and level control line, with reinforcing bar by bolt with basis in bar frame be tentatively welded and fixed.Check bolt verticality and spacing, after all debugging correctly, be welded, a bolt embedment completes.Pre-buried 6 same bolts in general single footing, above-mentioned operation needs repetition six times, and inefficiency, the length that expends time in, affected construction speed.
Summary of the invention
The purpose of this utility model is more accurate in order to guarantee bolt absolute altitude and horizontal level, improves bolt embedment efficiency, and a kind of bolt embedment fixed mount is provided.
The purpose of this utility model is achieved in the following ways:
The utility model comprises the longeron parallel by two and a rectangle frame support body that the crossbeam being connected between longeron forms, it is characterized in that: between two longerons of frame body, be provided with two steel pipes parallel with crossbeam, on the longeron of frame body and steel pipe, all indicate scale, on two steel pipes, cover has 6 trapezoidal clamps that can slide on steel pipe respectively.
The utility model has the advantages that: after application the utility model, guaranteed the accuracy of bolt absolute altitude and horizontal level, the mode of executing of more former single pre-embedded bolt is more accurate, and has greatly improved efficiency of construction, accelerate construction speed, reduced the difficulty of building implement management.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the connection diagram of trapezoidal clamp and steel pipe.
The specific embodiment
With reference to accompanying drawing, the utility model comprises the longeron 2 parallel by two and a rectangle frame support body that the crossbeam 1 being connected between longeron forms, crossbeam and the longeron of frame body are made by angle steel, wherein: upwards, the angle steel external corner of two longerons upwards for the angle steel inner corner trim of crossbeam; Between two longerons of frame body, be provided with first steel pipe 3 parallel with crossbeam and the second steel pipe 4, on the longeron of frame body and steel pipe, all indicate scale 6, on the first steel pipe 3 and the second steel pipe 4, cover has 6 trapezoidal clamps 5 that can slide on steel pipe respectively.
When application, for example pre-buried three 33mm bolts, the spacing of drawing regulation bolt and bolt is 300mm, for convenient narration by 6 on the first steel pipe and the second steel pipe can trapezoidal clamp respectively serial number be 1, 2, 3, 4, 5, No. 6 clamps, every two clamps are the bolt in one group of location, according to the scale on the first steel pipe by 1, No. 2 clamp spacing are adjusted to 33mm and are used for fixing first bolt, similarly by 3, No. 4 clamp spacing and 5, No. 6 clamp spacing is also all adjusted to 33mm, be used for fixing second and the 3rd bolt, the head of all bolts all withstands on the crossbeam of frame body.And then the middle dot spacing of the mid point of 1, No. 2 clamp and 3, No. 4 clamps is adjusted to 300mm, the middle dot spacing of the mid point of 3, No. 4 clamps and 5, No. 6 clamps is adjusted to 300mm.6 clamps on the second steel pipe are also adjusted and are fixed bolt according to the method described above, and two arrange the verticality that has guaranteed bolt that arranges of clamps.The distance that calculates bolt and push up absolute altitude control line on foundation forms by drawing finds this distance, and three bolts is connected and are welded simultaneously with a suitable reinforcing bar 8 of length at this scale place on the scale of frame body longeron.Such three bolts form the fixing entirety of a spacing and have had an absolute altitude control reinforcing bar.So far the spacing of bolt and absolute altitude control all completes on fixed mount, bolt is taken off into mould pre-buried from fixed mount, and the reinforcing bar that has welded elevation control is fixed on the absolute altitude control point in template, adjusts integral position, and bolt is fixedly welded simultaneously.So far the spacing of three bolts and absolute altitude have been controlled simultaneously.
Claims (1)
1. a bolt embedment fixed mount, comprise the longeron parallel by two and a rectangle frame support body that the crossbeam being connected between longeron forms, it is characterized in that: between two longerons of frame body, be provided with two steel pipes parallel with crossbeam, on the longeron of frame body and steel pipe, all indicate scale, on two steel pipes, cover has 6 trapezoidal clamps that can slide on steel pipe respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320816039.1U CN203640056U (en) | 2013-12-13 | 2013-12-13 | Bolt embedding fixing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320816039.1U CN203640056U (en) | 2013-12-13 | 2013-12-13 | Bolt embedding fixing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203640056U true CN203640056U (en) | 2014-06-11 |
Family
ID=50871312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320816039.1U Expired - Lifetime CN203640056U (en) | 2013-12-13 | 2013-12-13 | Bolt embedding fixing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203640056U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130391A (en) * | 2019-05-31 | 2019-08-16 | 中国五冶集团有限公司 | Isolated footing pre-embedded bolt mounting structure and method |
-
2013
- 2013-12-13 CN CN201320816039.1U patent/CN203640056U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130391A (en) * | 2019-05-31 | 2019-08-16 | 中国五冶集团有限公司 | Isolated footing pre-embedded bolt mounting structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102003071B (en) | Prestressing channel drilling and positioning construction process of prestressed beam by post-tensioning method | |
CN103132455B (en) | Three-dimensional combined type cable-stayed bridge body cable duct accurate positioning device and positioning method | |
CN101761032A (en) | Jack-in erection equipment for bridge | |
CN203160133U (en) | Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct | |
CN203866831U (en) | Telescopic splicing guide frame for large-diameter steel protecting cylinder | |
CN203247565U (en) | Auxiliary riveting stud second-phase embedding part mounting device for vertical ship lift | |
CN203640056U (en) | Bolt embedding fixing frame | |
CN205907609U (en) | Supplementary utensil in pre -buried hole of bridge supporting base stone location | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN204386608U (en) | A kind of tunnel invert construction tool | |
CN102155097B (en) | Locating device for installing large embedded member of concrete wall and installing method thereof | |
CN203049608U (en) | Communication tower foundation pre-buried foundation bolt device | |
CN203034818U (en) | Special fixture for installation of adjustable embedded part | |
CN205476528U (en) | Precast pile device of taking one's place fast | |
CN206600005U (en) | The positioning component and positioner of reserved joint bar in shear wall | |
CN204899949U (en) | Bow -shaped steel pipe back up support | |
CN205117363U (en) | Accurate positioner of two lined steel muscle in tunnel | |
CN103643646A (en) | Bracket-free and pull rod-free steel template device for overhead cast-in-place concrete anti-collision wall | |
CN202000681U (en) | Three-dimensional die bracket for concrete embedded parts | |
CN204212175U (en) | A kind of positioning auxiliary device installing pre-embedded bolt | |
CN204418705U (en) | Stone bolt erecting device | |
CN204000641U (en) | A kind of large-scale pier stud concrete vertical reinforcement locating rack | |
CN202644563U (en) | Installation device for embedded foundation bolt of small facility | |
CN204662936U (en) | The fastening devices of overhanging type discharging platform anchored end | |
CN203049462U (en) | Pre-embedded sleeve locating mould of continuous beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140611 |
|
CX01 | Expiry of patent term |