CN203639925U - Supporting pile body with waterproof curtains around foundation pit - Google Patents

Supporting pile body with waterproof curtains around foundation pit Download PDF

Info

Publication number
CN203639925U
CN203639925U CN201320818999.1U CN201320818999U CN203639925U CN 203639925 U CN203639925 U CN 203639925U CN 201320818999 U CN201320818999 U CN 201320818999U CN 203639925 U CN203639925 U CN 203639925U
Authority
CN
China
Prior art keywords
cement
stop curtain
pile body
foundation pit
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320818999.1U
Other languages
Chinese (zh)
Inventor
史杰
贾旭斌
邵艳丽
马延辉
马翔
兰小花
王鹏
王芳
申伟
闫晨星
申彦萍
董海燕
刘杉
吴霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi No3 Construction Engineering Co
Original Assignee
Shanxi No3 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi No3 Construction Engineering Co filed Critical Shanxi No3 Construction Engineering Co
Priority to CN201320818999.1U priority Critical patent/CN203639925U/en
Application granted granted Critical
Publication of CN203639925U publication Critical patent/CN203639925U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a supporting pile body with waterproof curtains around a foundation pit. The supporting pile body solves the technical problems that in the prior art, the construction operation face is large, and the construction costs are high. The supporting pile body comprises the foundation pit (1), the sealed cement waterproof curtains (2) are arranged on the side faces of the periphery of the foundation pit (1), reinforced concrete supporting piles (3) are arranged on the outer sides of the sealed cement waterproof curtains (2) at intervals, the reinforced concrete supporting piles (3) are meshed with the sealed cement waterproof curtains (2), and when the reinforced concrete supporting piles (3) and the sealed cement waterproof curtains (2) are meshed, the largest meshing thickness is 250 mm. The supporting pile body is simple in construction process and low in construction cost and ensures the safety of the surrounding building.

Description

The supporting pile body of foundation ditch surrounding band water-stop curtain
Technical field
The utility model relates to a kind of soldier pile, particularly the supporting pile body of a kind of foundation ditch sealing and soldier pile interlock.
Background technology
Along with social development and the progress of urban construction, due to the growing tension of building land, impel building to develop to high-altitude.Build highrise building and generally all be unable to do without deep pit digging.Also more and more less in the old construction operation space of adjoining between inhering architecture and new proposed building, in limited operating distance, carry out pattern foundation pit supporting structure, reach the sealing of foundation ditch and guarantee the safety of foundation ditch, become difficult point and the emphasis of foundation pit supporting project.For the sealing requirement of excavation of foundation pit, the following two kinds of construction methods of the general employing of prior art.The first is carried out reinforced concrete pile supporting and cement-soil curtain water stop; It two is to utilize steel sheet pile self support characteristic to carry out pile body to improve to carry out sealing.Above-mentioned two kinds of methods have certain limitation, and the first construction technology is simple, easy to operate, cheap, but constructing operation face is large; The second applicability is wide, and safety factor is high, but construction costs is high.
Summary of the invention
The utility model provides a kind of supporting pile body of foundation ditch surrounding band water-stop curtain, solved the large and high technical problem of construction costs of constructing operation face that prior art exists.
The utility model is to solve by the following technical programs above technical problem:
A kind of supporting pile body of foundation ditch surrounding band water-stop curtain, comprise foundation ditch, be provided with the cement-soil water-stop curtain of sealing in the surrounding side of foundation ditch, compartment of terrain, outside at cement-soil water-stop curtain is provided with steel concrete soldier pile, steel concrete soldier pile and cement-soil water-stop curtain are interlocked, and the maximum interlock thickness that steel concrete soldier pile and cement-soil water-stop curtain are interlocked is 250 millimeters.
Be provided with and pass through beam on the top of steel concrete soldier pile.
The pile body that a kind of sealing that the utility model provides is combined with supporting, is particularly suitable for the construction operation difficult problem for the working space of inadequate 1.75 meters of next-door neighbour surrounding building operating space; Construction technology is simple, and construction costs is low, has ensured the safety of surrounding building.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation in cross section of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is elaborated:
A kind of supporting pile body of foundation ditch surrounding band water-stop curtain, comprise foundation ditch 1, be provided with the cement-soil water-stop curtain 2 of sealing in the surrounding side of foundation ditch 1, compartment of terrain, outside at cement-soil water-stop curtain 2 is provided with steel concrete soldier pile 3, steel concrete soldier pile 3 is interlocked with cement-soil water-stop curtain 2, and steel concrete soldier pile 3 is 250 millimeters with the maximum interlock thickness 4 that cement-soil water-stop curtain 2 is interlocked.
Be provided with and pass through beam 5 on the top of steel concrete soldier pile 3.
The utility model has changed the usual practice of former construction, cement-soil water-stop curtain and reinforced concrete pile supporting position have been carried out to evolution, and carry out anti-stake mechanics check computation, and supporting scheme checking computations and demonstration, check the technical data of cement-soil water-stop curtain and reinforced concrete pile, and the relation of definite foundation ditch sideline and cement-soil water-stop curtain and the position of cement-soil water-stop curtain and reinforced concrete pile.Carry out the construction of cement-soil water-stop curtain, to cement-soil water-stop curtain unwrapping wire, draw control point, stake position outward at cement-soil water-stop curtain, utilize cement-soil water-stop curtain control point to draw control point, reinforced concrete pile stake position, reduce the accumulation of error, guarantee cement-soil water-stop curtain construction axis and structural drawings axial line distance, error is controlled at carries out operation in 10 millimeters; When cement-soil water-stop curtain starts to construct, the test cube in the same condition that utilizes cement-soil water-stop curtain self material to make by professional is differentiated the cement-soil water-stop curtain initial setting time, utilize the actual test cube in the same condition of job site and laboratory provide cement-soil water-stop curtain material just, the report of final setting time, control activity duration of reinforced concrete pile.In reinforced concrete pile operation, strictly control the size of interlock between cement-soil water-stop curtain and reinforced concrete pile, carry out steel concrete pile driving construction.
The utility model is to carry out anti-pile driving construction in 6 hours that have constructed to cement initial set by cement water-stop curtain, utilize cement water-stop curtain self material to carry out mud off, in cement water-stop curtain, adopt the boring of percussive drill retaining wall, reinforcing cage is winched in boring with crane, and carry out concrete building by conduit, in shortening water-stop curtain, the setting time interval of cement and anti-pile concrete, finally makes the stake of steel concrete poured support and the complete interlock of cement water-stop curtain stake.

Claims (2)

1. the supporting pile body of a foundation ditch surrounding band water-stop curtain, comprise foundation ditch (1), it is characterized in that, be provided with the cement-soil water-stop curtain (2) of sealing in the surrounding side of foundation ditch (1), be provided with steel concrete soldier pile (3) in the compartment of terrain, outside of cement-soil water-stop curtain (2), steel concrete soldier pile (3) is interlocked with cement-soil water-stop curtain (2), and steel concrete soldier pile (3) is 250 millimeters with the maximum interlock thickness (4) that cement-soil water-stop curtain (2) is interlocked.
2. the supporting pile body of a kind of foundation ditch surrounding band water-stop curtain according to claim 1, is characterized in that, is provided with and passes through beam (5) on the top of steel concrete soldier pile (3).
CN201320818999.1U 2013-12-13 2013-12-13 Supporting pile body with waterproof curtains around foundation pit Expired - Lifetime CN203639925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320818999.1U CN203639925U (en) 2013-12-13 2013-12-13 Supporting pile body with waterproof curtains around foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320818999.1U CN203639925U (en) 2013-12-13 2013-12-13 Supporting pile body with waterproof curtains around foundation pit

Publications (1)

Publication Number Publication Date
CN203639925U true CN203639925U (en) 2014-06-11

Family

ID=50871183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320818999.1U Expired - Lifetime CN203639925U (en) 2013-12-13 2013-12-13 Supporting pile body with waterproof curtains around foundation pit

Country Status (1)

Country Link
CN (1) CN203639925U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403336A (en) * 2018-09-28 2019-03-01 上海建工七建集团有限公司 A kind of closing foundation ditch side dilapidated house protects structure and its construction method
CN109811774A (en) * 2018-06-14 2019-05-28 江西基良工程机械设备有限公司 A kind of continuous barricade of deep basal pit and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811774A (en) * 2018-06-14 2019-05-28 江西基良工程机械设备有限公司 A kind of continuous barricade of deep basal pit and its construction method
CN109403336A (en) * 2018-09-28 2019-03-01 上海建工七建集团有限公司 A kind of closing foundation ditch side dilapidated house protects structure and its construction method
CN109403336B (en) * 2018-09-28 2020-12-11 上海建工七建集团有限公司 Dangerous house protection structure near foundation pit and construction method thereof

Similar Documents

Publication Publication Date Title
CN100465386C (en) Pile-anchor foundation ditch supporting construction method
CN109723085B (en) Deep foundation pit division construction rib wall support replacing structure and construction method thereof
CN104099943B (en) Diaphram wall and discarded underground civil defense engineering intersection processing method
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN204418187U (en) Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN102943479A (en) System and method for controlling deformation of deep and large foundation pit through partition unloading
CN102116030A (en) Combined bracing structure for foundation pit and construction method thereof
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN102444143A (en) Construction method for cancelling operation channel for facades of basement
CN205100989U (en) Utilize oblique access structure of subway access & exit double as construction
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN103939115A (en) Semi-subsurface excavation method construction shed tunnel method and structure
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN203639925U (en) Supporting pile body with waterproof curtains around foundation pit
CN102220764B (en) Construction method of deep foundation pit bracing system
CN111501771A (en) Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering
CN102767187A (en) Reverse construction method for pebble foundation swirling well
CN203530958U (en) Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN106088758B (en) A kind of bilayer assembled underground granary
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN103527217B (en) Small-curvature-radius shield tunnel duct piece under dense pile foundation environment and manufacturing method thereof
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140611