CN203629423U - 水泵后置的高位收水冷却水循环系统 - Google Patents

水泵后置的高位收水冷却水循环系统 Download PDF

Info

Publication number
CN203629423U
CN203629423U CN201320758878.2U CN201320758878U CN203629423U CN 203629423 U CN203629423 U CN 203629423U CN 201320758878 U CN201320758878 U CN 201320758878U CN 203629423 U CN203629423 U CN 203629423U
Authority
CN
China
Prior art keywords
water
condenser
cooling
cooling tower
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320758878.2U
Other languages
English (en)
Inventor
李晓一
张文君
徐传海
曾剑辉
李进
尹高强
韩旻沂
尤晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Original Assignee
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp filed Critical China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Priority to CN201320758878.2U priority Critical patent/CN203629423U/zh
Application granted granted Critical
Publication of CN203629423U publication Critical patent/CN203629423U/zh
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

一种水泵后置的高位收水冷却水循环系统,它是一个冷却水的回流管路,包括安装在汽机房中的凝汽器,凝汽器的出水端通过凝汽器出水管道与循环水泵的进水端相连;循环水泵的出水端通过冷却塔进水管道与冷却塔进水端相连;冷却塔的出水端通过冷却塔出水沟道与高位集水池及清污设备间的进水端相连;高位集水池及清污设备间的出水端通过凝汽器进水管道与凝汽器的进水端相连。本方案采用循环水泵在凝汽器出水端设置的方案,使凝汽器的承压大幅减小,凝汽器本体和管材的壁厚降低,可提高传热效率和降低凝汽器和循环水泵的工程造价。

Description

水泵后置的高位收水冷却水循环系统
技术领域
本实用新型涉及发电厂设备,具体地指一种水泵后置的高位收水冷却水循环系统。
背景技术
在火力发电流程中,燃料在锅炉中燃烧,加热水形成蒸汽,蒸汽压力推动汽轮机旋转,然后汽轮机带动发电机旋转,将机械能转变成电能进行发电。用于加热成蒸汽进行做功的水,称为工质水。工质水完成做功后,需先进入凝汽器中进行热交换降温,再重新进入循环利用加热做功。在凝汽器中与工质水进行热交换的为冷却水。冷却水在凝汽器中吸热,再到冷却塔中散热构成冷却水循环。
冷却水循环系统的设计是火力发电厂冷却系统配置的重要课题。冷却水循环系统中的冷却塔、循环水泵、凝汽器和循环水管沟布置设计是否合理,对发电厂的安全经济运行有着重要影响。在当前发电厂的设计中常通过循环水系统冷端优化计算,结合各项设备的固定投资和运行费用,以年费用最小法来确定最优、最合理的各项组合。常规工程冷却塔通常采用集水池为地下布置的自然通风冷却塔,随着节能降耗的政策导向,越来越多的工程中采用集水槽在地面上布置的高位收水自然通风冷却塔降低循环水泵静扬程达到节能的目的。尤其是随着高参数、大容量机组的发展,节能效果更加明显。优化高位收水冷却水循环系统的布置是节能降耗的一个重要手段。
如图1、图2所示以往工程,采用高位收水冷却塔的冷却水循环系统布置方案的流程通常为:冷却塔1(出口端:集水槽)→冷却塔出水沟道2→清污设备间9→循环水泵6→凝汽器进水管4→凝汽器5→凝汽器出水管道8→冷却塔1(进口端:中央配水竖井)。其中循环水泵采用卧式离心泵或者立式混流泵。
高位收水冷却塔循环冷却水系统中循环水泵扬程约为20.4m,当其布置于凝汽器进口前端时,凝汽器本体承压最大值约为34.9m。综上所述,现有的技术方案存在凝汽器水室承压大、传热效率低、造价高,循环水泵房深度较深、工程量大等问题。
实用新型内容
本实用新型的目的是提供一种水泵后置的,降低凝汽器水室承压,从而降低工程成本的水泵后置的高位收水冷却水循环系统,通过如下措施来达到的:
一种水泵后置的高位收水冷却水循环系统,它是一个冷却水的回流管路。
它包括安装在汽机房中的凝汽器,所述凝汽器的出水端通过凝汽器出水管道与循环水泵的进水端相连;所述循环水泵的出水端通过冷却塔进水管道与冷却塔进水端相连。
所述冷却塔的出水端通过冷却塔出水沟道与高位集水池及清污设备间的进水端相连;所述高位集水池及清污设备间的出水端通过凝汽器进水管道与凝汽器的进水端相连。
更进一步地,所述冷却塔为高位收水冷却塔。所述循环水泵为卧式离心循环水泵。
冷却水循环流程改进为:高位收水冷却塔(出口端:集水槽)→冷却塔出水沟道→高位集水池及清污设备间→凝汽器进水管道→凝汽器→凝汽器出水管道→循环水泵→冷却塔进水管道→高位收水冷却塔(进口端:中央配水竖井)。以1000MW级机组为例,高位收水冷却塔的集水池液面标高约为14.5m,凝汽器水室最高点液面通常标高约为6~7m;两者间高差即可满足克服从高位收水冷却塔集水槽至凝汽器两者间管道阻力和凝汽器本身的水阻的要求。当循环水泵布置于凝汽器出口后端时,凝汽器本体承压最大值约仅为14.5m。相比原有方案,本方案中由于承压大幅减小,凝汽器本体和管材的壁厚降低,可提高传热效率和降低凝汽器的造价。
附图说明
图1为卧式离心水泵前置高位收水冷却水循环系统的总平面布置图
图2为立式混流水泵前置高位收水循环冷却水系统的总平面布置图
图3为水泵后置的高位收水冷却水循环系统的总平面布置图
图中:1-冷却塔,2-冷却塔出水沟道,3-高位集水池及清污设备间,4-凝汽器进水管道,5-凝汽器,6-循环水泵,7-冷却塔进水管道,8-凝汽器出水管道,9-清污设备间。
具体实施方式
以下结合附图和具体实施例对本实用新型做进一步的详细描述,但该实施例不应该理解为对本实用新型的限制。
如图1所示,一种水泵后置的高位收水冷却水循环系统,它是一个冷却水的回流管路。
它包括安装在汽机房中的凝汽器5,凝汽器5的出水端通过凝汽器出水管道8与循环水泵6的进水端相连;循环水泵6的出水端通过冷却塔进水管道7与冷却塔1进水端相连。
冷却塔1的出水端通过冷却塔出水沟道2与高位集水池及清污设备间3的进水端相连;高位集水池及清污设备间3的出水端通过凝汽器进水管道4与凝汽器5的进水端相连。
本实施例中,冷却塔1为高位收水冷却塔。循环水泵6为卧式离心循环水泵。
本实用新型工作时,冷却水循环流程改进为:高位收水冷却塔1(出口端:集水槽)→冷却塔出水沟道2→高位集水池及清污设备间3→凝汽器进水管道4→凝汽器5→凝汽器出水管道6→循环水泵7→冷却塔进水管道8→高位收水冷却塔1(进口端:中央配水竖井)。
具体地,本实用新型提供1000MW级机组的火力发电厂循环水系统的一种设备和管道布置的具体实施例,高位收水冷却塔塔高为192m,进风口高度14.3m,高位集水槽设计水位14.3m,竖井水位23.6m,供水高度9.3m;每台机组配置4台循环水泵,采用卧式离心泵,单泵流量7.1m3/s,扬程20.5m;凝汽器进出水管道直径DN2800mm;冷却塔进水管道直径DN3800mm;凝汽器水室最高点标高6.5m,凝汽器换热面积60000m2
凝汽器承压大幅减小,凝汽器本体和管材的壁厚降低,大幅提高传热效率和降低凝汽器的造价。
即如下表所示,本实用新型与现有技术比较有以下优势:
Figure BDA0000423053700000041
Figure BDA0000423053700000051
其它未说明的部分均为现有技术。

Claims (3)

1.一种水泵后置的高位收水冷却水循环系统,为一个冷却水的回流管路,其特征在于:
包括安装在汽机房中的凝汽器(5),所述凝汽器(5)的出水端通过凝汽器出水管道(8)与循环水泵(6)的进水端相连;所述循环水泵(6)的出水端通过冷却塔进水管道(7)与冷却塔(1)进水端相连;
所述冷却塔(1)的出水端通过冷却塔出水沟道(2)与高位集水池及清污设备间(3)的进水端相连;所述高位集水池及清污设备间(3)的出水端通过凝汽器进水管道(4)与凝汽器(5)的进水端相连。
2.根据权利要求1所述的水泵后置的高位收水冷却水循环系统,其特征在于:所述冷却塔(1)为高位收水冷却塔。
3.根据权利要求1或2所述的水泵后置的高位收水冷却水循环系统,其特征在于:所述循环水泵(6)为卧式离心循环水泵。
CN201320758878.2U 2013-11-26 2013-11-26 水泵后置的高位收水冷却水循环系统 Withdrawn - After Issue CN203629423U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320758878.2U CN203629423U (zh) 2013-11-26 2013-11-26 水泵后置的高位收水冷却水循环系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320758878.2U CN203629423U (zh) 2013-11-26 2013-11-26 水泵后置的高位收水冷却水循环系统

Publications (1)

Publication Number Publication Date
CN203629423U true CN203629423U (zh) 2014-06-04

Family

ID=50815889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320758878.2U Withdrawn - After Issue CN203629423U (zh) 2013-11-26 2013-11-26 水泵后置的高位收水冷却水循环系统

Country Status (1)

Country Link
CN (1) CN203629423U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103743287A (zh) * 2013-11-26 2014-04-23 中国电力工程顾问集团中南电力设计院 水泵后置的高位收水冷却水循环系统及循环方法
CN105115350A (zh) * 2015-09-24 2015-12-02 中国能源建设集团广东省电力设计研究院有限公司 高位冷却塔的循环供水系统及方法
CN107941036A (zh) * 2017-12-21 2018-04-20 中国电力工程顾问集团西北电力设计院有限公司 一种高位布置的辅机冷却水系统

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103743287A (zh) * 2013-11-26 2014-04-23 中国电力工程顾问集团中南电力设计院 水泵后置的高位收水冷却水循环系统及循环方法
CN103743287B (zh) * 2013-11-26 2016-07-20 中国电力工程顾问集团中南电力设计院有限公司 水泵后置的高位收水冷却水循环系统及循环方法
CN105115350A (zh) * 2015-09-24 2015-12-02 中国能源建设集团广东省电力设计研究院有限公司 高位冷却塔的循环供水系统及方法
CN107941036A (zh) * 2017-12-21 2018-04-20 中国电力工程顾问集团西北电力设计院有限公司 一种高位布置的辅机冷却水系统
CN107941036B (zh) * 2017-12-21 2023-08-22 中国电力工程顾问集团西北电力设计院有限公司 一种高位布置的辅机冷却水系统

Similar Documents

Publication Publication Date Title
CN205101052U (zh) 一种新型火电厂供热系统
CN204929512U (zh) 一种用于变流器的供水冷却装置
CN204646384U (zh) 柴油机冷却液及烟气热能利用装置
CN203629423U (zh) 水泵后置的高位收水冷却水循环系统
CN105609262A (zh) 一种可水冷降温的变压器
CN203940498U (zh) 一种生物废弃物供暖系统
CN204373272U (zh) 一种直接接触式沸腾换热器
CN201230256Y (zh) 风力发电变流器冷却机
CN211316295U (zh) 一种用于土壤源热泵系统的节能补热装置
CN104235870A (zh) 凝汽器乏汽余热回收节能装置及节能方法
CN204665244U (zh) 一种相变换热器带热网加热器的联合系统
CN103743287B (zh) 水泵后置的高位收水冷却水循环系统及循环方法
CN203687746U (zh) 水泵后置的高位收水循环水系统
CN204313478U (zh) 一种直流循环式空气能热水器
CN201662280U (zh) 应用系统热回收的地源热泵系统
CN204371787U (zh) 一种干燥炉风机轴承冷却水循环装置
CN210292329U (zh) 一种新型蓄热电热水锅炉
CN203529927U (zh) 无水氟化氢生产设备
CN204851350U (zh) 一种利用电厂乏汽余热的生水加热系统
CN204703396U (zh) 一种模块化移动房屋的太阳能结构
CN209263110U (zh) 太阳能热泵组合加热装置
CN204923153U (zh) 生物质发电循环水供热系统
CN207702572U (zh) 电磁加热水循环采暖装置
CN202532582U (zh) 一种供热机组循环水余热回收利用系统
CN207268002U (zh) 一种采用露天泵房的循环供水系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CENTRAL SOUTHERN CHINA ELECTRIC POWER DESIGN INSTI

Free format text: FORMER OWNER: CENTRAL SOUTHERN CHINA ELECTRIC POWER DESIGN INSTITUTE, CHINA POWER ENGINEERING CONSULTING GROUP COR

Effective date: 20150204

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150204

Address after: 430071 Wuchang District, Hubei, South Central Road No. two, No. 12, No.

Patentee after: Co., Ltd of Central Southern China Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Address before: 430071 Power Engineering Company of Zhongnan Power Design Institute, 668 Democratic Road, Wuchang District, Hubei, Wuhan

Patentee before: Central Southern China Electric Power Design Institute, China Power Engineering Consulting Group Cor

AV01 Patent right actively abandoned

Granted publication date: 20140604

Effective date of abandoning: 20160720

C25 Abandonment of patent right or utility model to avoid double patenting