CN203626714U - Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well - Google Patents

Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well Download PDF

Info

Publication number
CN203626714U
CN203626714U CN201320652690.XU CN201320652690U CN203626714U CN 203626714 U CN203626714 U CN 203626714U CN 201320652690 U CN201320652690 U CN 201320652690U CN 203626714 U CN203626714 U CN 203626714U
Authority
CN
China
Prior art keywords
limiting gasket
hole
temporarily
stifled
solid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320652690.XU
Other languages
Chinese (zh)
Inventor
高玉军
陈素娟
张义萍
王庆红
于亚明
刘伟
王慧
曹纪绒
崔和安
唐作峰
文健
刘洋
周黎
陈永刚
权崇国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201320652690.XU priority Critical patent/CN203626714U/en
Application granted granted Critical
Publication of CN203626714U publication Critical patent/CN203626714U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a limiting gasket for a downhole feeder for temporary blocking and energization processing of a heavy oil steam huff and puff well. The outer diameter of the limiting gasket is equal to the inner diameter of a pipe body of the downhole feeder, the height of the limiting gasket ranges from 100 mm to 200 mm, a circular-truncated-cone-shaped through hole which penetrates through the limiting gasket in the longitudinal direction is formed in the middle of the limiting gasket, the caliber of the upper end of the circular-truncated-cone-shaped through hole ranges from 50 mm to 80 mm, and the caliber of the lower end of the circular-truncated-cone-shaped through hole ranges from 30 mm to 50 mm. The limiting gasket is applied to the downhole feeder for conveying temporary-blocking solid materials, can play a role in guiding small resin balls formed after decomposition of the temporary-blocking solid materials is accomplished and limiting the flow of the small resin balls, and facilitate temporary blocking and energization processing.

Description

Thickened oil steam-stimulated well temporarily stifled energization is processed the limiting gasket that down-hole feed appliance is used
Technical field
The utility model is that the one stifled acidifying temporarily that development late stage takes in order to increase oil of handling up increases oil tech about viscous crude, specifically about a kind of thickened oil steam-stimulated well temporarily stifled energization process the limiting gasket that down-hole feed appliance is used, belong to heavy oil development technical field.
Background technology
The heavy crude reservoir development late stage of handling up, ubiquity poor efficiency well increases, the situation of the obvious variation of economic benefit; Steam is handled up repeatedly at the oil reservoir of good penetrability, and some oil reservoirs cannot effectively be employed; Strata pressure is low, the contradiction such as does not go out after usually causing steam injection to drive a well.Although have a lot of reported in literature to propose from different perspectives solution at present, due to many-sided reasons such as cost, technology, safety, have limitation separately.
In prior art, be also of all shapes and colors for the temporary plugging technique of oil well, be useful on drilling well, be useful on pressure break, be useful on well, be also useful on temporarily stifled profile control etc.For example: the Chinese patent application that application number is 00102576.7 discloses a kind of diverting agent that utilizes waste polyolefine to prepare; The Chinese patent application of application number 91101010.6 discloses a kind of Temperarily blocking agent for water soluble stratum; The Chinese patent application of application number 93114648.8 discloses a kind of temporary plugging technique of injection distribution working construction of oil field; The Chinese patent application of application number 99113250.5 discloses a kind of high-temperature temporary blocking agent and preparation method thereof; The Chinese patent application of application number 200410009408.1 discloses a kind of water-solubility acidity temporary plugging agent for press cracking; The Chinese patent application of application number 200510072118.6 discloses a kind of Hydrolysiable high elastic well remending liquid temperary blocking agent; The Chinese patent application of application number 200910082151.5 discloses a kind of preparation method of the profile control agent for oil field deep temporary blocking; The Chinese patent application of application number 200910086548.1 discloses a kind of high-strength temporary blocking agent and preparation method thereof; The Chinese patent application of application number 200910090931.4 discloses a kind of temporary plugging agent for acidization; The Chinese patent application of application number 200910237814.6 discloses the high controllable gelout chemical temporary plugging liquid rubber stopper of a kind of intensity; The Chinese patent application of application number 200910242178.6 discloses a kind of hyposmosis thixotropic gel temporary plugging agent for acidifying oil layer of oil field and preparation and application; The Chinese patent application of application number 200910243764.2 discloses a kind of preparation method of slow-release rubber breaking agent for chemical temporary-plugging rubber plug; The Chinese patent application of application number 201010130407.8 discloses a kind of diverting agent for high temperature oil gas reservoir; The Chinese patent application of application number 201010134590.9 discloses a kind of temporary plugging agent for staged fracturing of horizontal well and preparation method thereof; The Chinese patent application of application number 201010599287.6 discloses a kind of temporary plugging diversion agent for refracturing of oil-water well and preparation method thereof; The Chinese patent application of application number 201110033337.9 discloses a kind of high temperature mixed phase and has blocked temporarily and alter agent and preparation method thereof; The Chinese patent application of application number 201110095943.3 discloses efficient stifled the de-connecting of a kind of oil field late high water content period oil reservoir continuously steady production and has made new method; The Chinese patent application of application number 201110256819.0 discloses a kind of drilling leakage blockage high molecular polymer absorbent material; The Chinese patent application of application number 201110330609.1 discloses a kind of acid fracturing diverting agent; The Chinese patent application of application number 201210028177.3 discloses a kind of leakage oil well microballoon diverting agent.
Oil well diverting agent used in above-mentioned prior art is especially in the heavy oil wells steam soak diverting agent in latter stage, and its ubiquity consumption is large, effect is single, high in cost of production problem.
So need badly, existing heavy oil wells steam soak temporary blocking method in latter stage is improved.
Utility model content
Main purpose of the present utility model is to provide a kind of thickened oil steam-stimulated well limiting gasket that stifled energization processing down-hole feed appliance is used temporarily, it is applied to conveying solid substance and blocks up temporarily in the down-hole feed appliance of material, can play guiding and metering function to the resin beads after solid stifled material disintegration temporarily, and be beneficial to temporarily stifled energization processing.
For reaching above-mentioned purpose, the utility model provides a kind of thickened oil steam-stimulated well limiting gasket that stifled energization processing down-hole feed appliance is used temporarily, it is characterized in that, this limiting gasket external diameter is identical with the internal diameter of tube body of down-hole feed appliance, be highly 100~200mm, in the middle of limiting gasket, offer the truncated cone-shaped through hole longitudinally running through, bore 50~80mm, lower bore 30~50mm on truncated cone-shaped through hole.
According to specific embodiments of the present utility model, limiting gasket is the packing ring of being made up of nylon 66 or the packing ring of being made up of nylon 1010.
According to specific embodiments of the present utility model, the upper limb of the truncated cone-shaped through hole of limiting gasket arranges circular chamfering.
According to specific embodiments of the present utility model, in the truncated cone-shaped through hole in the middle of limiting gasket, be filled with curing calcium carbonate lump, and in the middle of calcium carbonate lump, to be provided with 5~10 diameters be the longitudinal through hole of 5~10mm.
Limiting gasket of the present utility model is mainly to block up temporarily the down-hole feed appliance specialized designs for delivery of solid material in energization processing method for thickened oil steam-stimulated well.Described thickened oil steam-stimulated well temporarily stifled energization processing method comprises:
Utilize down-hole feed appliance by a kind of mixed with carbonic hydroammonium by resin beads after through solid compressing and that make temporarily stifled material send into, 1~2 meter of oil reservoir bottom;
By just clamp-oning the mud acid being made into by 7~12% hydrochloric acid and 3~6% hydrofluoric acid in instlated tubular, solid temporarily stifled material disintegrates and disperses gradually under sour effect, and resin beads is along with acid solution enters stratum, shutoff high permeability zone; Acid solution turns to and enters less permeable layer, carries out selective acidizing, and carbonic hydroammonium generates gas energization is carried out in stratum under sour effect;
Complete and squeeze after acid construction, termination of pumping 0.5~1 hour;
Turn on pump is clamp-oned displacement fluid or energization chemical assistant, control clamp-on speed 20~50 sides/hour; The raw material composition of the energization chemical assistant preferably adopting comprises (taking the gross weight of this chemical assistant as benchmark): perfluorinated nonene oxygen base benzene sulfonic acid sodium salt 0.2~0.8%, alcohol 2~8%, and silicones polyethers emulsion 0.2~0.8%, ammonium carbonate 15-20%, surplus is water;
Complete after clamp-oning the construction of displacement fluid or energization chemical assistant and directly carry out steam injection construction.
Except indicating especially, described percentage number and proportion is all based on weighing scale herein.
In said method, after steam injection construction, resin beads can be decomposed under HTHP, oil reservoir is not produced to have injured temporarily and blocks up.A part in energization chemical assistant used can resolve into gas and realize energization under residual acid, high temperature, does not decompose part and can play the effect of the displacement of reservoir oil, viscosity reduction, the row of helping, and can improve steam injection efficiency.
Particularly, described solid temporarily stifled material be by the nylon 1010 resin beads of diameter 5~6mm and moistening carbonic hydroammonium (moistening moisture 5%~6% left and right of carbonic hydroammonium conventionally) by volume 1~1.2:1 mix after through compressing and make, it is the cylindrical shape with longitudinal through hole.Preferably, described solid blocks up temporarily the cylindrical peripheral diameter of material and thickened oil steam-stimulated well oil pipe and matches, and its through hole is arranged on cylinder axial centre, through hole diameter 5~10mm.More preferably, described cylindrical peripheral diameter 50~150mm, its length 50~150mm.In addition, for ease of transport and preservation, can, at described solid polyvinyl chloride or the polyethylene plastic film of external surface parcel a layer thickness 0.1~0.5mm of stifled material temporarily, while specifically using this solid to block up material temporarily, plastic foil be scratched or be torn.
Described down-hole feed appliance mainly comprises a body (can be for example 4 cun of 1-3m short oil pipes of standard), it in body, is the accommodating described solid space of stifled material temporarily, body upper end is provided with box box cupling, body lower end arranges pin thread, and body inside is welded one in order to bear the solid spacing steel ring of stifled material weight temporarily in the position that approaches pin thread.Spacing steel ring external diameter is identical with down-hole feed appliance internal diameter of tube body, and spacing steel ring height is 5~15mm, thickness 2~3mm.Spacing steel ring is mainly to accept the solid weight of stifled material temporarily of loading on it, when solid allows acid solution and resin beads to pass through when stifled material disintegrates temporarily.
When concrete application, can be that solid material described in one or more is packed in the feed appliance of down-hole, send into underground need and block up temporarily at stifled position temporarily.The solid temporarily amount of sending into of stifled material is the solid stifled material (length described here refers to the solid stifled cylindrical axial length of material temporarily) temporarily of 0.3~1 meter of length of oil reservoir cooperation of every 1 meter of thickness.
Above-mentioned solid blocks up material (being called for short " sprue temporarily " or " material block ") temporarily by being mainly made up of two parts: resin beads and carbonic hydroammonium.Resin beads material is preferably nylon 1010 (outward appearance: pure white or micro-yellow translucent particle, relative density: 1.03~1.05, fusing point (DEG C): 200~210, moisture content (%) :≤1.5, relative viscosity: 1.9~2.3, hot strength (MPa): >=42, static bending intensity (MPa): >=78, notched Izod impact strength (KJ/m2): >=20, volume resistance (Ω .cm): 1014~1015, sheet resistance (Ω): 1014~1015, Martin heat resistance (DEG C): 42, heat distortion temperature (1.81MPa, DEG C): 45, molding shrinkage (%): 1.2~2.2).The solid temporarily carbonic hydroammonium in stifled material dissolves and generates gas under the effect of acid solution, thereby the stifled material disintegration temporarily of block solid discharges resin beads, and resin beads is along with acid solution enters stratum, shutoff high permeability zone, and acid solution turns to and realizes selective acidizing; When follow-up steam injection construction, resin beads can be decomposed under the high temperature and high pressure environment of steam injection, does not pollute stratum, realizes stifled temporarily.The solid temporarily effect of the longitudinal through hole of stifled material is mainly to allow acid solution pass through, and dissolves gradually the solid carbonic hydroammonium in stifled material temporarily, make block solid temporarily stifled material disintegrate and discharge resin beads.
Carbonic hydroammonium course of reaction under acid effect and heat effect is mainly:
NH 4HCO 3+HCl=====NH 4Cl+H 2O+CO 2↑;
NH 4hCO 3==heating==NH 3↑+H 2o+CO 2↑.
The beneficial effects of the utility model:
Limiting gasket of the present utility model is to be the resin beads specialized designs of stifled material after disintegrating temporarily of the above-mentioned solid of drainage better.When concrete application, limiting gasket is placed on the spacing steel ring in feed appliance body, can be used for placing solid load-bearing when stifled material temporarily (, the limiting gasket of hot melt material of the present utility model is blocked up between material temporarily at spacing steel ring and solid), and solid temporarily stifled material after disintegrating resin beads played to water conservancy diversion and metering function, limiting gasket is owing to being that hot melt material is made, and can in the time of steam injection, melt and not affect the circulation of steam.And after the fusing of described hot melt material nylon 66 or nylon 1010 to stratum substantially without injuring.The circular chamfering of limiting gasket truncated cone-shaped through hole upper limb can be beneficial to water conservancy diversion resin beads better.Calcium carbonate lump in limiting gasket intermediate throughholes can play good fixation, prevents that resin beads from falling in well in a large number.
Brief description of the drawings
Fig. 1 is the thickened oil steam-stimulated well structural representation of the down-hole feed appliance of stifled energization processing use temporarily of the utility model one specific embodiment.
Fig. 2 is that the thickened oil steam-stimulated well of the utility model one specific embodiment blocks up the solid used cross-sectional view of stifled material temporarily in energization processing method temporarily.
Fig. 3 is the cross-sectional view of the thickened oil steam-stimulated well limiting gasket (not filling solid carbonic acid calcium) that stifled energization processing down-hole feed appliance is used temporarily of the utility model one specific embodiment.
Fig. 4 is the plan structure schematic diagram of the thickened oil steam-stimulated well limiting gasket that stifled energization processing down-hole feed appliance is used temporarily of the utility model one specific embodiment.
Fig. 5 is the cross-sectional view of the thickened oil steam-stimulated well hot melt material limiting gasket that is filled with solid carbonic acid calcium that stifled energization processing down-hole feed appliance is used temporarily of the utility model one specific embodiment.
Number in the figure explanation:
10 solids are stifled material 20 bodys temporarily
30 limiting gasket 201 box box cuplings
The spacing steel ring of 202 pin thread 203
101 solids are the body 102 solids through hole of stifled material temporarily of stifled material temporarily
103 plastic foil 1011 resin beads
1012 carbonic hydroammonium material 301 limiting gasket bodies
3011 limiting gasket body through hole A chamferings
302 calcium carbonate lump 3021 calcium carbonate lump through holes
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with embodiment and accompanying drawing, embodiment of the present utility model is described in further detail.
Embodiment 1
It is the thickened oil steam-stimulated well stifled energization processing down-hole feed appliance conveying solid substance limiting gasket that stifled material designs temporarily temporarily specially that the present embodiment provides.
First, shown in Figure 1, the down-hole feed appliance that blocks up temporarily material 10 for delivery of solid mainly comprises in a body 20(the present embodiment being 4 cun of oil pipes of standard, length 1~3m), in body, be the accommodating described solid space of stifled material 10 temporarily, body upper end is provided with box box cupling 201, body lower end arranges pin thread 202, body inside is welded a spacing steel ring 203 in order to load-bearing in the position that approaches pin thread 202, spacing steel ring height (longitudinal in figure) is about 10mm, thickness 2~3mm.
Solid is stifled material 10 temporarily, its structure is shown in Figure 2, the body (solid is the body 101 of stifled material temporarily) that it mainly comprises by the stacking profile forming of multiple resin beads 1011 is cylindrical shape, the solid temporarily axial centre of the body 101 of stifled material is provided with through hole (solid is the through hole 102 of stifled material temporarily).The solid temporarily peripheral diameter of stifled material can be slightly less than 4 cun of pipe apertures of standard, and the single solid temporarily length of stifled material not can be 50~150mm not etc.Solid temporarily through hole 102 diameters of stifled material is about 10mm.Described resin beads 1011 is that material is the resin beads of nylon 1010, diameter 5~6mm; Its outward appearance: pure white or micro-yellow translucent particle, relative density: 1.03~1.05, fusing point (DEG C): 200~210, moisture content (%) :≤1.5, relative viscosity: 1.9~2.3, hot strength (MPa): >=42, static bending intensity (MPa): >=78, notched Izod impact strength (KJ/m2): >=20, volume resistance (Ω .cm): 1014~1015, sheet resistance (Ω): 1014~1015, Martin heat resistance (DEG C): 42, heat distortion temperature (1.81MPa, DEG C): 45, molding shrinkage (%): 1.2~2.2.The solid temporarily interior multiple resin beads 1011 of body 101 of stifled material is stacked between adjacent resin beads and forms stacking space, is filled with carbonic hydroammonium material 1012 in this space.The solid with said structure temporarily stifled material can prepare in accordance with the following methods: after by resin beads, 1.2:1 mixes by volume with moistening carbonic hydroammonium, inject mould, repressed moulding, make the solid material with the cylindrical shape of longitudinal through hole, be the solid stifled material temporarily of the present embodiment.Described moistening carbonic hydroammonium is moisture 5%~6% left and right conventionally, and in compressing process, moisture can be dried and evaporate.
Incorporated by reference to referring to Fig. 1, Fig. 3, Fig. 4, for guiding and current limliting solid block up the resin beads after material disintegrates temporarily better, and be beneficial to temporarily stifled energization processing, the utility model has designed the limiting gasket 30 that a kind of hot melt material is made, these limiting gasket 30 external diameters are identical with down-hole feed appliance internal diameter of tube body 20, when application, be to be placed on spacing steel ring 203, can be used for placing solid load-bearing when stifled material 10 temporarily (, hot melt material limiting gasket 30 is blocked up between material 10 temporarily at spacing steel ring 203 and solid).
In the present embodiment, described limiting gasket 30 is that material is the packing ring of nylon 66 or nylon 1010, and it is highly about 100mm.The limiting gasket 30 of the present embodiment comprises the limiting gasket body 301 of hot melt material, offers the limiting gasket body through hole 3011 of the truncated cone-shaped longitudinally running through in the middle of limiting gasket body 301.In the present embodiment, on limiting gasket body through hole 3011, bore is about 80mm, lower bore is about 40mm.Also be provided with circular chamfering A at limiting gasket body through hole upper limb, so that water conservancy diversion resin beads better.
Shown in Figure 5, in the present embodiment, in limiting gasket body through hole 3011 in the middle of hot melt material limiting gasket 30, be also filled with curing calcium carbonate lump 302, and calcium carbonate lump 302 central longitudinal are to being provided with the calcium carbonate lump through hole 3021 that 5~10 (only showing two in figure) diameters are 5~10mm.
In the present embodiment, apply above-mentioned hot melt material limiting gasket and down-hole feed appliance and carry out thickened oil steam-stimulated well stifled energization processing temporarily.
Processing thickened oil steam-stimulated well is 45 certain wells of brocade, producing well section 1004.4-1023.3m, and 13.6 meters 2 layers, steam injection 11 is taken turns, oil density 0.9526g/cm 3, viscosity 2885mPa.s.Because of many rounds steam injection, occur not drive a well after steam injection, stratum energy is low, determines to adopt temporarily stifled acidifying energization method to increase production.
By diameter 100mm, be about 100mm solid temporarily stifled 80 of materials pack in above-mentioned feed appliance.Feed appliance length is inadequate, and top can connect 4 cun of oil pipes and supplement filling.
After heat-insulating and sealing head bottom connects two 4 cun of oil pipes, pick again glassware, with instlated tubular down to 1025 meters of (, 1~2 meter of oil reservoir bottom).
By just clamp-oning mud acid 15 sides that are made into by approximately 10% hydrochloric acid and approximately 5% hydrofluoric acid in instlated tubular, start control clamp-on speed 5 sides/hour, if pressure 20MPa, after 20 minutes, pressure starts to decline gradually, now accelerates speed of application, pressure is bottom out again, when pressure reaches 50MPa, confirm that diverting agent plays a role, continue construction, termination of pumping pressure 30MPa, termination of pumping 0.5 hour.Now, with 18 DEG C of clear water preparation energization chemical assistant 30 sides, percentage by weight composition is as follows: perfluorinated nonene oxygen base benzene sulfonic acid sodium salt 0.5%, alcohol 5%, and silicones polyethers emulsion 0.5%, ammonium carbonate 17%, surplus is water.
Turn on pump continues to clamp-on energization chemical assistant, oil reservoir 10 sides that the consumption of chemical assistant is every meter of thickness, clamp-on speed 30 sides/hour, operation pressure 35MPa.
After completing construction, carry out steam injection construction.
When steam injection, initial stage steam injection pressure slightly raises, and then declines and is stabilized in 7.2MPa, is going up cycle decline 0.8MPa, has illustrated that new layer is employed.This steam injection 2000 sides are identical with a upper cycle.
Opening well and making production after steam injection, daily output 18.2 side's liquid, 3.5 tons of oil.This aboveground cycle does not go out while just having driven a well, stewing well fluid after 16 days, daily output 9.7 side's liquid, 0.2 ton of oil.By contrast, the method has obtained good oil increasing effect.

Claims (4)

1. the thickened oil steam-stimulated well limiting gasket that stifled energization processing down-hole feed appliance is used temporarily, it is characterized in that, this limiting gasket external diameter is identical with the internal diameter of tube body of down-hole feed appliance, be highly 100~200mm, in the middle of limiting gasket, offer the truncated cone-shaped through hole longitudinally running through, bore 50~80mm, lower bore 30~50mm on truncated cone-shaped through hole.
2. the thickened oil steam-stimulated well according to claim 1 limiting gasket that stifled energization processing down-hole feed appliance is used temporarily, is characterized in that, limiting gasket is the packing ring of being made up of nylon 66 or the packing ring of being made up of nylon 1010.
3. the thickened oil steam-stimulated well according to claim 2 limiting gasket that stifled energization processing down-hole feed appliance is used temporarily, is characterized in that, the upper limb of the truncated cone-shaped through hole of limiting gasket arranges circular chamfering.
4. the thickened oil steam-stimulated well according to claim 1 limiting gasket that stifled energization processing down-hole feed appliance is used temporarily, it is characterized in that, in truncated cone-shaped through hole in the middle of limiting gasket, be filled with curing calcium carbonate lump, and in the middle of calcium carbonate lump, to be provided with 5~10 diameters be the longitudinal through hole of 5~10mm.
CN201320652690.XU 2013-10-22 2013-10-22 Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well Expired - Fee Related CN203626714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320652690.XU CN203626714U (en) 2013-10-22 2013-10-22 Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320652690.XU CN203626714U (en) 2013-10-22 2013-10-22 Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well

Publications (1)

Publication Number Publication Date
CN203626714U true CN203626714U (en) 2014-06-04

Family

ID=50813203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320652690.XU Expired - Fee Related CN203626714U (en) 2013-10-22 2013-10-22 Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well

Country Status (1)

Country Link
CN (1) CN203626714U (en)

Similar Documents

Publication Publication Date Title
CN103590804B (en) Thickened oil steam-stimulated well is stifled energization processing method temporarily
CN103075127B (en) A kind of flexible filling material drilling and sealing device and method
CN102444118A (en) Construction method for grouting reinforcement of sleeve valve pipe
CN103470212B (en) A kind of active drilling and sealing device and method
CN104314508A (en) Hole sealing method for coal bed gas drainage drill hole
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN102937011A (en) Secondary grouting and plugging device and method of regional crack field of gas extraction and drilling group
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN108678721A (en) Packaged type hydraulic fracturing and injection hole sealing integrated apparatus and its construction method
CN106761627B (en) It is a kind of to adjust the stifled row of helping economic benefits and social benefits that viscous crude is assisted to handle up development approach
CN104074542B (en) A kind of colliery C0 2concrete formula placement method
CN103589410B (en) Thickened oil steam-stimulated well stifled energization is used temporarily chemical assistant and compound method and application
CN201826315U (en) Grouting sleeve valve pipe
CN104790982B (en) A kind of bored tunnel superdeep holes grouting sleeve shell material
CN104481475B (en) Oil well carbon dioxide carbonated water is handled up method for increasing
CN203626665U (en) Downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well
CN103589411B (en) Thickened oil steam-stimulated well is material block blocking up energization and preparation method thereof and application temporarily
CN203626714U (en) Limiting gasket for downhole feeder for temporary blocking and energization processing of heavy oil steam huff and puff well
CN102425434A (en) Surrounding rock grouting construction method of completely weathered granite tunnel
CN103410467A (en) Hole drilling and sealing device and method with continuous belt pressure
CN205858263U (en) Formula squeezing leak stoppage device is sent in a kind of down-hole
CN203625301U (en) Material block for temporary blocking and energy increasing of thick oil steam huff-puff well
CN205314085U (en) A biliquid slip casting system that is used for cement and water glass solution
CN111396052B (en) Method for mineralizing and reinforcing coal pillar by urease microorganisms
CN1032367C (en) Oil well porthole resin small ball sealing agent and its made method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20211022