CN203626227U CN201320834031.8U CN201320834031U CN203626227U CN 203626227 U CN203626227 U CN 203626227U CN 201320834031 U CN201320834031 U CN 201320834031U CN 203626227 U CN203626227 U CN 203626227U
Authority
CN
China
Prior art keywords
support plate
unloading
utility
model
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320834031.8U
Other languages
Chinese (zh)
Inventor
罗天寿
张宽荣
李倩倩
张岩琨
魏悦天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Bureau Construction Development Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201320834031.8U priority Critical patent/CN203626227U/en
Application granted granted Critical
Publication of CN203626227U publication Critical patent/CN203626227U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种悬挑脚手架的卸荷结构,包括悬挑梁和与其端部垂直连接的套管,其特征在于,所述套管底部焊接有支撑板,所述支撑板与悬挑梁端部的连接为可拆连接;在所述支撑板内侧设有拉环,所述拉环与所述支撑板的周围焊接。本实用新型采用工字钢为卸荷主杆件,在工字钢端部设置可拆卸的支撑板,支撑板上焊接可与脚手架钢管连接的套管及可作为卸荷钢丝绳拉结点的拉环,使用时只需将支撑板采用螺栓固定连接在工字钢上,即可形成悬挑脚手架悬挑结构的卸荷结构;使用后只需拆除支撑板即可,工字钢可投入其他使用或作为周转材料重复利用,提高了材料的周转效率,提高了悬挑梁的利用率。并且本实用新型结构简单可靠,操作简便,安全性好,成本低。

The utility model discloses an unloading structure of a cantilevered scaffold, which comprises a cantilevered beam and a casing vertically connected to its end, and is characterized in that a support plate is welded at the bottom of the casing, and the support plate is connected with the cantilever The connection at the end of the beam is a detachable connection; a pull ring is arranged inside the support plate, and the pull ring is welded to the periphery of the support plate. The utility model adopts I-shaped steel as the main unloading rod, and a detachable support plate is arranged at the end of the I-shaped steel. The support plate is welded with a sleeve that can be connected with the steel pipe of the scaffold and a pull ring that can be used as a node of the unloading steel wire rope. , when in use, you only need to connect the support plate to the I-beam with bolts to form the unloading structure of the cantilevered scaffolding structure; after use, you only need to remove the support plate, and the I-beam can be put into other uses or It can be reused as a turnover material, which improves the turnover efficiency of the material and the utilization rate of the cantilever beam. Moreover, the utility model has the advantages of simple and reliable structure, convenient operation, good safety and low cost.

Description

一种悬挑脚手架的卸荷结构Unloading structure of a cantilevered scaffold

技术领域technical field

本实用新型涉及一种悬挑脚手架,特别是一种悬挑脚手架的卸荷结构。The utility model relates to a cantilevered scaffold, in particular to an unloading structure of the cantilevered scaffold.

背景技术Background technique

现有悬挑式脚手架施工,底部一般采用槽钢或工字钢作为悬挑梁,为了保证上部悬挑架荷载有效传递至悬挑梁,普遍采用直接将套管焊接在型钢上的结构,由于脚手架搭设宽度通长需要依据工程实际进行设计,因此套管焊接位置每次都不同,焊接成型的悬挑梁周转使用效率低;同时在工程使用中,为了保证施工安全,针对转角、开洞口等位置需要采取加固措施,通常采用钢丝绳拉接在悬挑架端部,由于型钢端部无可靠连接点,现场施工操作不便,固定方式常采用钢丝兜底绑扎,给施工留下了安全隐患。In the construction of existing cantilevered scaffolding, channel steel or I-beam is generally used as the cantilever beam at the bottom. In order to ensure the effective transmission of the load of the upper cantilever frame to the cantilever beam, the structure of directly welding the casing to the section steel is commonly used. The width and length of the scaffolding need to be designed according to the actual project, so the welding position of the casing is different each time, and the turnover efficiency of the welded cantilever beam is low; at the same time, in the project use, in order to ensure the safety of construction, for corners, openings, etc. Reinforcement measures are required for the location, and steel wire ropes are usually used to connect the ends of the cantilever frame. Since there is no reliable connection point at the end of the section steel, the on-site construction operation is inconvenient.

实用新型内容Utility model content

本实用新型为解决公知技术中存在的技术问题而提供一种悬挑脚手架的卸荷结构,采用该结构能够提高材料的周转效率,提高悬挑梁的利用率。The utility model provides an unloading structure of a cantilevered scaffold to solve the technical problems existing in the known technology, and adopting the structure can improve the turnover efficiency of materials and the utilization rate of the cantilevered beam.

本实用新型为解决公知技术中存在的技术问题所采取的技术方案是:一种悬挑脚手架的卸荷结构,包括悬挑梁和与其端部垂直连接的套管,所述套管底部焊接有支撑板,所述支撑板与悬挑梁端部的连接为可拆连接;在所述支撑板内侧设有拉环,所述拉环与所述支撑板的周围焊接。The technical scheme adopted by the utility model to solve the technical problems existing in the known technology is: an unloading structure of a cantilevered scaffold, comprising a cantilever beam and a casing vertically connected to its end, the bottom of the casing is welded with A support plate, the connection between the support plate and the end of the cantilever beam is detachable; a pull ring is arranged inside the support plate, and the pull ring is welded to the periphery of the support plate.

所述支撑板与所述悬挑梁端部通过螺栓连接。The support plate is connected to the end of the cantilever beam through bolts.

所述悬挑梁采用工字钢形成。The cantilever beam is formed by I-beam.

本实用新型具有的优点和积极效果是:采用工字钢为卸荷主杆件,在工字钢端部设置可拆卸的支撑板,支撑板上焊接可与脚手架钢管连接的套管及可作为卸荷钢丝绳拉结点的拉环,使用时只需将支撑板采用螺栓固定连接在工字钢上,即可形成悬挑脚手架悬挑结构的卸荷结构;使用后只需拆除支撑板即可,工字钢可投入其他使用或作为周转材料重复利用,提高了材料的周转效率,提高了悬挑梁的利用率。并且本实用新型结构简单可靠,操作简便,安全性好,成本低。The utility model has the advantages and positive effects: the I-shaped steel is used as the main rod for unloading, and a detachable support plate is arranged at the end of the I-shaped steel. For the pull ring of the steel wire rope pull node, you only need to connect the support plate to the I-beam with bolts to form the unloading structure of the cantilevered scaffolding structure; after use, you only need to remove the support plate. The I-beam can be put into other uses or reused as a turnover material, which improves the turnover efficiency of the material and the utilization rate of the cantilever beam. And the utility model has the advantages of simple and reliable structure, easy and convenient operation, good safety and low cost.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;

图3为图1的侧视图。FIG. 3 is a side view of FIG. 1 .

图中:1、悬挑梁;2、拉环;3、螺栓;4、套管;5、支撑板。In the figure: 1. Cantilever beam; 2. Pull ring; 3. Bolt; 4. Sleeve; 5. Support plate.

具体实施方式Detailed ways

为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:In order to further understand the invention content, characteristics and effects of the present utility model, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:

请参阅图1~图3,一种悬挑脚手架的卸荷结构,包括悬挑梁1和与其端部垂直连接的套管4,所述套管4底部焊接有支撑板5,所述支撑板5与悬挑梁端部的连接为可拆连接;在所述支撑板5内侧设有拉环2,所述拉环2与所述支撑板5的周围焊接。所述套管4可直接与脚手架立杆连接,方便固定脚手架立杆,保证施工安全,所述支撑板5上的拉环,可作为卸荷钢丝绳连接的拉结点,保证架体荷载有效传递,确保施工使用安全。Please refer to Figures 1 to 3, a kind of unloading structure of cantilevered scaffolding, including cantilever beam 1 and casing 4 vertically connected to its end, the bottom of the casing 4 is welded with a support plate 5, the support plate The connection between 5 and the end of the cantilever beam is a detachable connection; a pull ring 2 is arranged inside the support plate 5 , and the pull ring 2 is welded to the surrounding of the support plate 5 . The casing 4 can be directly connected to the scaffolding pole, which is convenient for fixing the scaffolding pole and ensuring construction safety. The pull ring on the support plate 5 can be used as a tie point for unloading steel wire rope connection to ensure the effective transmission of the load on the frame body , to ensure the safety of construction and use.

在本实施例中,所述支撑板5与所述悬挑梁端部通过螺栓3连接。所述悬挑梁1采用工字钢形成。In this embodiment, the support plate 5 is connected to the end of the cantilever beam through bolts 3 . The cantilever beam 1 is formed by I-beam.

尽管上面结合附图对本实用新型的优选实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本实用新型的保护范围之内。Although the preferred embodiment of the utility model has been described above in conjunction with the accompanying drawings, the utility model is not limited to the above-mentioned specific implementation, and the above-mentioned specific implementation is only illustrative and not restrictive. Under the enlightenment of the utility model, those skilled in the art can also make many forms without departing from the purpose of the utility model and the protection scope of the claims, and these all belong to the protection scope of the utility model.

Claims (3)

1. a unloading-structure for builder's jack, comprise Cantilever Beams and with its end sleeve pipe connected vertically, it is characterized in that, described sleeve bottom is welded with gripper shoe, described gripper shoe and Cantilever Beams end be connected to releasable connection; Be provided with draw ring, surrounding's welding of described draw ring and described gripper shoe in described gripper shoe inner side.
2. the unloading-structure of builder's jack according to claim 1, is characterized in that, described gripper shoe and described Cantilever Beams end are bolted.
3. the unloading-structure of builder's jack according to claim 1, is characterized in that, described Cantilever Beams adopts i iron to form.
CN201320834031.8U 2013-12-13 2013-12-13 Unloading structure of cantilever scaffold Expired - Fee Related CN203626227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320834031.8U CN203626227U (en) 2013-12-13 2013-12-13 Unloading structure of cantilever scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320834031.8U CN203626227U (en) 2013-12-13 2013-12-13 Unloading structure of cantilever scaffold

Publications (1)

Publication Number Publication Date
CN203626227U true CN203626227U (en) 2014-06-04

Family

ID=50812718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320834031.8U Expired - Fee Related CN203626227U (en) 2013-12-13 2013-12-13 Unloading structure of cantilever scaffold

Country Status (1)

Country Link
CN (1) CN203626227U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472560A (en) * 2020-04-29 2020-07-31 中国十七冶集团有限公司 Installation method of steel wire rope hanging ring of overhanging discharging steel platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472560A (en) * 2020-04-29 2020-07-31 中国十七冶集团有限公司 Installation method of steel wire rope hanging ring of overhanging discharging steel platform

Similar Documents

Publication Publication Date Title
CN102900021B (en) Split mounting type bridge wet joint construction method
CN102070071A (en) Steel reinforcement cage hoisting method
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN205329547U (en) Lid corbel frame dismounting device
CN203112378U (en) Introduction device of tower crane standard knot
CN203306910U (en) Gravity swing unhooking lifting appliance of flexible rope
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN204608997U (en) A kind of new builing structure being provided with oblique pull hawser
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN211473342U (en) Overhanging scaffolding pole with anti-skid device
CN204781892U (en) Combined elevator shaft lifting operation platform
CN204454225U (en) A kind of welded structure of solid drawn pipe is without moment of flexure support beam
CN205328438U (en) Handling is from lift -type cylindric spud leg hanging beam
CN203128003U (en) Special hanger for cast-in-situ bored pile steel reinforcement cage
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN202324586U (en) Integral attached device attached with lifting scaffold
CN206985507U (en) A kind of pipe of concrete suspender
CN203640312U (en) Inter-pipe construction operation vehicle with inverted siphon erected on inclined long steep slope
CN205990200U (en) 360 ° of luffing independent hoist device
CN203583856U (en) Construction operation platform in elevator shaft
CN202786308U (en) Converter cover opening machine
CN204326486U (en) Outrigger oblique pull wire rope fixing device
CN204248815U (en) A kind of dismantling device for brake beam of railway vehicle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604