CN203613822U - Triangle splicing mobile ramp - Google Patents

Triangle splicing mobile ramp Download PDF

Info

Publication number
CN203613822U
CN203613822U CN201320604420.1U CN201320604420U CN203613822U CN 203613822 U CN203613822 U CN 203613822U CN 201320604420 U CN201320604420 U CN 201320604420U CN 203613822 U CN203613822 U CN 203613822U
Authority
CN
China
Prior art keywords
triangle
support
utility
model
connected panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320604420.1U
Other languages
Chinese (zh)
Inventor
赵亚军
王士震
刘启祥
刘新民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201320604420.1U priority Critical patent/CN203613822U/en
Application granted granted Critical
Publication of CN203613822U publication Critical patent/CN203613822U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a triangle splicing mobile ramp. The mobile ramp comprises two right triangle frames which are arranged symmetrically, and a plurality of reinforcing steel bars; each right triangle frame comprises a bottom edge bracket, a right-angle edge bracket and a hypotenuse bracket; the reinforcing steel bars are paved on the hypotenuse brackets of the two right triangle frames to form a slope. The triangle splicing mobile ramps disclosed by the utility model are respectively placed on the two sides of a pipeline obstacle for obstructing the walking of workers on a construction site road so as to facilitate the walking of the workers; the splicing mobile ramp is convenient to manufacture and can be used in a recycle manner and a construction site is beautified.

Description

A kind of triangle pin-connected panel moving ramp
Technical field
The utility model, about a kind of ramp of building field, refers in particular to a kind of triangle pin-connected panel moving ramp.
Background technology
Shown in Fig. 1, on general site road, connect the pump line 60 of establishing, the bank of escape way access, the walking all can hinder workman and push away go-cart 70 time is convenient, and affects the attractive in appearance of building site, does not meet the requirement of green construction.Shown in Fig. 2, while adopting 2m3 concrete bucket 80 concreting on tradition building site, conventionally due to the excessive height of concrete bucket 80, cannot, by concrete discharging in concrete bucket 80, affect normally carrying out of construction and cause building of concrete tank 90 to manage 91.
Utility model content
Because the problems referred to above, the utility model provides a kind of triangle pin-connected panel moving ramp, and described moving ramp comprises:
Two symmetrically arranged right-angled triangle frames, described right-angled triangle frame comprises a base support, a right-angle side support and a hypotenuse support;
Complex root reinforcing bar, be layed on the hypotenuse support of described two right-angled triangle frames, form domatic.
Further improvement of the utility model is, between described base support and described hypotenuse support, is welded with the vertical reinforcing bar of complex root.
Further improvement of the utility model is, the hypotenuse support of described two right-angled triangle frames stretches out respectively and forms a horizontal stand near one end of right-angle side support, the length of the corresponding described horizontal stand of described base support stretches out, between described horizontal stand and described base support, be welded with the vertical reinforcing bar of complex root, before the horizontal stand of described two right-angled triangle frames, be laterally equipped with complex root reinforcing bar.
Further improvement of the utility model is, is welded with respectively a channel-section steel and reinforces between the end of the horizontal stand of described two right-angled triangle frames and between the end of base support.
Further improvement of the utility model is, is welded with the vertical reinforcing bar of complex root between described two channel-section steels.
Further improvement of the utility model is, described base support and described right-angle side support employing angle steel, and described hypotenuse support adopts channel-section steel.
One triangle pin-connected panel moving ramp of the present utility model is set respectively in the both sides of pump line, just can facilitates workman's go-cart to pass through.Concrete tank is parked on the slope of triangle pin-connected panel moving ramp of the present utility model, promote concrete tank and build the height of pipe, can be easily by concrete discharging in concrete bucket, make concrete construction convenient, operating efficiency is high, labour intensity is little, accelerates concreting speed.
It is former material that triangle pin-connected panel moving ramp of the present utility model adopts discarded reinforcing bar, realizes the recycling of waste material, meets national energy-saving consumption reduction, green construction requirement.Pin-connected panel moving ramp is easy to make, beautifies job site, can have enough to meet the need use.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that connects the pump line obstruction go-cart of establishing on existing site road.
Fig. 2 is that existing concrete tank cannot be by concrete discharging to the schematic diagram in concrete bucket.
Fig. 3 is a kind of embodiment schematic diagram of triangle pin-connected panel moving ramp of the present utility model.
Fig. 4 is the top view of triangle pin-connected panel moving ramp of the present utility model in Fig. 3.
Fig. 5 is the schematic diagram of a kind of application mode of triangle pin-connected panel moving ramp of the present utility model.
Fig. 6 is the another kind of embodiment schematic diagram of triangle pin-connected panel moving ramp of the present utility model.
Fig. 7 is the schematic diagram of the another kind of application mode of triangle pin-connected panel moving ramp of the present utility model.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
Coordinate referring to shown in Fig. 3, Fig. 4, triangle pin-connected panel moving ramp 1 of the present utility model, comprising:
Two symmetrically arranged right-angled triangle frames 20, described right-angled triangle frame 20 is welded by a base support 201, a right-angle side support 202 and a hypotenuse support 203;
Complex root reinforcing bar 10, be layed on the hypotenuse support 203 of described two right-angled triangle frames 20, form domatic.
Between described base support 201 and described hypotenuse support 203, be welded with the vertical reinforcing bar 30 of complex root.Further, described base support 201 adopts ∠ 5*50 angle steel with right-angle side support 202, and described hypotenuse support 203 adopts 10# channel-section steel.
Coordinate shown in Figure 5, in a kind of application mode, using triangle pin-connected panel moving ramp 1 of the present utility model as workman, the passage of walking, arranges respectively a triangle pin-connected panel moving ramp 1 of the present utility model in the both sides of pump line 60, just can facilitate workman's go-cart 70 to pass through.
Coordinate shown in Figure 6, in another embodiment of the present utility model, the hypotenuse support 203 of described two right-angled triangle frames 20 stretches out respectively and forms a horizontal stand 204 near one end of right-angle side support 202, the length of described base support 201 corresponding described horizontal stands 204 stretches out, between described horizontal stand 204 and described base support 201, be welded with the vertical reinforcing bar 30 of complex root, before the horizontal stand 204 of described two right-angled triangle frames 20, be laterally equipped with complex root reinforcing bar 10.Further, between the end of the horizontal stand 204 of described two right-angled triangle frames 20 and between the end of base support 201, being welded with respectively a channel-section steel 40 reinforces.Between described two channel-section steels 40, be welded with the vertical reinforcing bar 30 of complex root.
Coordinate shown in Figure 7, in another kind of application mode, when in using triangle pin-connected panel moving ramp 1 of the present utility model as concrete tank 90 the ramp, the about 3.5m of ramp length, height 50cm, width 60cm, wherein slope is about 3m, horizontal segment 50cm.By concrete tank 90 be parked in the utility model as shown in Figure 5 the slope of triangle pin-connected panel moving ramp 1 on, can improve the height of building pipe 91, convenient by concrete discharging in concrete bucket 80.
The above is only preferred embodiment of the present utility model, not the utility model is done to any pro forma restriction, although the utility model discloses as above with preferred embodiment, but not in order to limit the utility model, any those skilled in the art, not departing from the scope of technical solutions of the utility model, when can utilizing the technology contents of above-mentioned announcement to make a little change or being modified to the equivalent embodiment of equivalent variations, in every case be the content that does not depart from technical solutions of the utility model, any simple modification of above embodiment being done according to technical spirit of the present utility model, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (6)

1. a triangle pin-connected panel moving ramp, is characterized in that described moving ramp comprises:
Two symmetrically arranged right-angled triangle frames, described right-angled triangle frame comprises a base support, a right-angle side support and a hypotenuse support;
Complex root reinforcing bar, be layed on the hypotenuse support of described two right-angled triangle frames, form domatic.
2. triangle pin-connected panel moving ramp as claimed in claim 1, is characterized in that being welded with the vertical reinforcing bar of complex root between described base support and described hypotenuse support.
3. triangle pin-connected panel moving ramp as claimed in claim 2, the hypotenuse support that it is characterized in that described two right-angled triangle frames stretches out respectively and forms a horizontal stand near one end of right-angle side support, the length of the corresponding described horizontal stand of described base support stretches out, between described horizontal stand and described base support, be welded with the vertical reinforcing bar of complex root, before the horizontal stand of described two right-angled triangle frames, be laterally equipped with complex root reinforcing bar.
4. triangle pin-connected panel moving ramp as claimed in claim 3, is characterized in that between the end of horizontal stand of described two right-angled triangle frames and is welded with respectively a channel-section steel between the end of base support reinforcing.
5. triangle pin-connected panel moving ramp as claimed in claim 4, is characterized in that being welded with between described two channel-section steels the vertical reinforcing bar of complex root.
6. the triangle pin-connected panel moving ramp as described in any one in claim 1-5, is characterized in that described base support and described right-angle side support adopt angle steel, and described hypotenuse support adopts channel-section steel.
CN201320604420.1U 2013-09-27 2013-09-27 Triangle splicing mobile ramp Expired - Fee Related CN203613822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320604420.1U CN203613822U (en) 2013-09-27 2013-09-27 Triangle splicing mobile ramp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320604420.1U CN203613822U (en) 2013-09-27 2013-09-27 Triangle splicing mobile ramp

Publications (1)

Publication Number Publication Date
CN203613822U true CN203613822U (en) 2014-05-28

Family

ID=50766477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320604420.1U Expired - Fee Related CN203613822U (en) 2013-09-27 2013-09-27 Triangle splicing mobile ramp

Country Status (1)

Country Link
CN (1) CN203613822U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108993236A (en) * 2018-08-21 2018-12-14 云南纳玉环保科技有限公司 A kind of titanium white production agitating device
CN109047248A (en) * 2018-07-24 2018-12-21 中昱博新能源科技南京有限公司 A kind of photovoltaic panel cleaning robot mobile holder
CN109047248B (en) * 2018-07-24 2024-04-19 中昱博新能源科技南京有限公司 Photovoltaic board clearance robot walking support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109047248A (en) * 2018-07-24 2018-12-21 中昱博新能源科技南京有限公司 A kind of photovoltaic panel cleaning robot mobile holder
CN109047248B (en) * 2018-07-24 2024-04-19 中昱博新能源科技南京有限公司 Photovoltaic board clearance robot walking support
CN108993236A (en) * 2018-08-21 2018-12-14 云南纳玉环保科技有限公司 A kind of titanium white production agitating device

Similar Documents

Publication Publication Date Title
CN203961992U (en) Portable full framing chassis
CN203499247U (en) Cylinder shaping wooden mold construction structure
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN203613822U (en) Triangle splicing mobile ramp
CN204040515U (en) Cat ladder
CN204626448U (en) A kind of steel reinforced concrete counterfort wall for high roadbed district
CN204551172U (en) A kind of prefabricated road surface of assembled steel reinforced concrete hollow
CN202194392U (en) Floorslab thickness control device
CN204662493U (en) A kind of concrete filled steel tube Cantilever Retaining Wall for high roadbed district
CN204960302U (en) Be used for a superimposed sheet post -cast strip mode structure
CN104790656B (en) Superelevation abnormity water conservancy project structure corner formwork support structure and construction method thereof
CN201991144U (en) Hanging stool for thickness-quality control of cast-in-place concrete floor upper-layer plate-rib protecting layer and concrete plate
CN202214967U (en) Portable column construction hanging frame
CN202787038U (en) Pavement concrete steel channel shaping formwork
CN203096578U (en) Road concrete pavement template
CN204626450U (en) A kind of concrete filled steel tube counterfort wall for high roadbed district
CN205313960U (en) Easy operation platform of shake, make level, quick travel is integrated
CN204626449U (en) A kind of steel reinforced concrete Cantilever Retaining Wall for high roadbed district
CN204825570U (en) Pavement prefabricated plate
CN204729104U (en) A kind of Simple steel mould trolley
CN202866271U (en) Template supporting structure based on recycling square wood at construction site
CN206220533U (en) A kind of horizontal pipe holder of concrete pumping
CN210561620U (en) Limiting device for supporting sidewalk template
CN202483083U (en) Concrete split heads

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhao Li

Inventor after: Zhao Yajun

Inventor after: Wang Shizhen

Inventor after: Liu Qixiang

Inventor after: Liu Xinmin

Inventor before: Zhao Yajun

Inventor before: Wang Shizhen

Inventor before: Liu Qixiang

Inventor before: Liu Xinmin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHAO YAJUN WANG SHIZHEN LIU QIXIANG LIU XINMIN TO: ZHAO LI ZHAO YAJUN WANG SHIZHEN LIU QIXIANG LIU XINMIN

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140528

Termination date: 20210927