CN203607687U CN201320766619.4U CN201320766619U CN203607687U CN 203607687 U CN203607687 U CN 203607687U CN 201320766619 U CN201320766619 U CN 201320766619U CN 203607687 U CN203607687 U CN 203607687U
Authority
CN
China
Prior art keywords
circuit breaker
complete string
main bus
complete
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320766619.4U
Other languages
Chinese (zh)
Inventor
李超
韩先才
邱宁
李宝金
方静
李雪松
梁波
高春英
王充
王振蛟
高宏杰
崔忠宁
崔巍
李单红
李菁华
俞敦耀
陈跃
林伟明
王刚
樊玥
刘晓瑞
项力恒
康鹏
刘菲
葛明
李龙才
邹家勇
庞亚东
吴祎琼
赵衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
China Power Engineering Consulting Group Corp
Electric Power Planning and Engineering Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
North China Electric Power Design Institute of China Power Engineering Consulting Group Corp
China Power Engineering Consulting Group Corp
Electric Power Planning and Engineering Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Northwest Electric Power Design Institute of China Power Engineering Consulting Group, Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group, China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd, China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp, Northeast Electric Power Design Institute of China Power Engineering Consulting Group, North China Electric Power Design Institute of China Power Engineering Consulting Group Corp, China Power Engineering Consulting Group Corp, Electric Power Planning and Engineering Institute Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320766619.4U priority Critical patent/CN203607687U/en
Application granted granted Critical
Publication of CN203607687U publication Critical patent/CN203607687U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Distribution Board (AREA)

Abstract

The utility model relates to a line arrangement structure of a GIS power distribution device. Adjacent breakers at corresponding positions between two adjacent complete strings are connected via the same branch bus and main buses, so that compared to the prior art, three branch buses are saved between the two adjacent completes strings, and reserved lengths of the main buses for the three branch buses are saved at the same time. For an ultrahigh voltage transformer station GIS power distribution device distributed linearly and comprising a plurality of complete strings, the branch buses and the main buses saved by the line arrangement structure provided are considerably long, so that land occupation and equipment costs of the GIS power distribution device are reduced.

Description

A kind of line arrangement structure of GIS power distribution equipment
Technical field
The utility model relates to ultra-high voltage transformer station technical field, more particularly, relates to a kind of line arrangement structure of GIS power distribution equipment.
Background technology
At present GIS(Gas-insulated Metal-enclosed Switchgear, Cubicle Gas-Insulated Switchgear) power distribution equipment is little with its floor space, security reliability is high, maintenance workload is little etc., and advantage is widely used in substation project.
AC extra high voltage technology has represented the highest level of international T & D Technology, GIS power distribution equipment is applied in ultra-high voltage transformer station, its line arrangement structure comprises multiple complete strings, each complete string includes: 6 main bus bars, 6 branch bars and 9 circuit breakers, and the connection of each complete string is separate.
The complete string of the line arrangement structure of GIS power distribution equipment generally adopts the mode of a half breaker wiring at present, concrete structure is as shown in Figure 1: 6 main bus bars of the first complete string 101 are divided into first group and second group, first group comprises that 113, the second groups of the first main bus bar 111 of representing respectively A, B, C three-phase, the second main bus bar 112 and the 3rd main bus bars comprise the 4th main bus bar 114, the 5th main bus bar 115 and the 6th main bus bar 116 that represent respectively A, B, C three-phase; Branch road one end that the first circuit breaker 121, the 4th circuit breaker 134 are connected formed with the 7th circuit breaker 137 is connected with the first main bus bar 111 by the first branch bar 121, and the other end is connected with the 4th main bus bar 114 by the 4th branch bar 124; Branch road one end that the second circuit breaker 122, the 5th circuit breaker 135 are connected formed with the 8th circuit breaker 138 is connected with the second main bus bar 112 by the second branch bar 122, and the other end is connected with the 5th main bus bar 115 by quintafurcation bus 125; Branch road one end that the 3rd circuit breaker 123, the 6th circuit breaker 136 are connected formed with the 9th circuit breaker 139 is connected with the 3rd main bus bar 113 by the 3rd branch bar 123, and the other end is connected with the 6th main bus bar 116 by the 6th branch bar 126.6 main bus bars of the second complete string 102 are identical with 6 main bus bars of the first complete string 101, the above-mentioned line connection of the second complete string 102 same employing, and the second complete string 102 and the first complete string 101 are yi word pattern and arrange.
Because ultra-high voltage transformer station engineering has the features such as electric pressure is high, insulating requirements is high, contour size of the unit(s) is large, cause the floor space of ultra-high voltage transformer station larger, and GIS power distribution equipment adopts yi word pattern to arrange conventionally, cause the main bus bar of device longer, branch bar is more, make the floor space of GIS power distribution equipment larger, equipment manufacturing cost is higher.
Utility model content
The utility model provides a kind of line arrangement structure of GIS power distribution equipment, to reduce floor space and the equipment manufacturing cost of GIS power distribution equipment.
For achieving the above object, the utility model provides following technical scheme:
A kind of line arrangement structure of GIS power distribution equipment, comprise multiple complete strings, each described complete string includes 6 main bus bars, article 6, branch bar and 9 circuit breakers, described 6 articles of main bus bars are respectively the first main bus bar~six main bus bar, described 6 articles of branch bars are respectively the first branch bar~six branch bar, described 9 circuit breakers are respectively the first circuit breaker~nine circuit breaker, 6 main bus bars of described multiple complete strings are identical, each described complete string all adopts the mode of a half breaker wiring, described multiple complete string comprises the first adjacent complete string and the second complete string, the first circuit breaker of described the first complete string, the 7th circuit breaker of the second circuit breaker and the 3rd circuit breaker and described the second complete string, the 8th circuit breaker is adjacent with the 9th circuit breaker, the 7th circuit breaker of the first circuit breaker of described the first complete string and described the second complete string is all connected with described the first main bus bar by the first branch bar of described the first complete string, the 8th circuit breaker of the second circuit breaker of described the first complete string and described the second complete string is all connected with described the second main bus bar by the second branch bar of described the first complete string, the 3rd circuit breaker of described the first complete string and the 9th circuit breaker of described the second complete string are all connected with described the 3rd main bus bar by the 3rd branch bar of described the first complete string.
Preferably, described line arrangement structure also comprises the three complete string adjacent with described the first complete string, the 7th circuit breaker of described the first complete string, the first circuit breaker of the 8th circuit breaker and the 9th circuit breaker and described the 3rd complete string, the second circuit breaker is adjacent with the 3rd circuit breaker, the 7th circuit breaker of described the first complete string is all connected with described the 4th main bus bar by the 4th branch bar of described the first complete string with the first circuit breaker of described the 3rd complete string, the 8th circuit breaker of described the first complete string is all connected with described the 5th main bus bar by the quintafurcation bus of described the first complete string with the second circuit breaker of described the 3rd complete string, the 9th circuit breaker of described the first complete string is all connected with described the 6th main bus bar by the 6th branch bar of described the first complete string with the 3rd circuit breaker of described the 3rd complete string.
Preferably, the syndeton of described main bus bar and described branch bar is T-shaped syndeton.
Preferably, described line arrangement structure comprises 4~6 complete strings.
Preferably, described multiple complete string is yi word pattern layout.
Compared with prior art, technical scheme provided by the utility model at least has the following advantages:
The line arrangement structure of GIS power distribution equipment provided by the utility model, the separate mode of wiring in the prior art of forgoing between each complete string, by circuit breaker adjacent between adjacent complete string, correspondence position is connected with main bus bar by same branch bar, make two adjacent complete strings compared with saving 3 branch bars in prior art, saved main bus bar is these 3 length that branch bar is reserved simultaneously.For comprising multiple complete strings and being the ultra-high voltage transformer station GIS power distribution equipment that yi word pattern is arranged, the branch bar that line arrangement structure provided by the utility model can be saved and main bus bar length are considerable, thereby have reduced floor space and the equipment manufacturing cost of GIS power distribution equipment.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the line map of a complete string of the GIS power distribution equipment of a half breaker mode of connection of available technology adopting;
The line map of a complete string of the GIS power distribution equipment of the half breaker mode of connection of employing that Fig. 2 provides for the utility model embodiment.
Embodiment
For above-mentioned purpose of the present utility model, feature and advantage can be become apparent more, below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail.
A lot of details are set forth in the following description so that fully understand the utility model, but the utility model can also adopt other to be different from alternate manner described here and implement, those skilled in the art can do similar popularization without prejudice to the utility model intension in the situation that, and therefore the utility model is not subject to the restriction of following public specific embodiment.
Secondly, the utility model is described in detail in conjunction with schematic diagram, in the time that the utility model embodiment is described in detail in detail; for ease of explanation; the profile of indication device structure can be disobeyed general ratio and be done local amplification, and described schematic diagram is example, and it should not limit the scope of the utility model protection at this.In addition in actual fabrication, should comprise, the three-dimensional space of length, width and the degree of depth.
The utility model embodiment provides a kind of line arrangement structure of GIS power distribution equipment, comprise multiple complete strings, each described complete string includes 6 main bus bars, 6 branch bars and 9 circuit breakers, described 6 articles of main bus bars are respectively the first main bus bar~six main bus bar, described 6 articles of branch bars are respectively the first branch bar~six branch bar, described 9 circuit breakers are respectively the first circuit breaker~nine circuit breaker, 6 main bus bars of described multiple complete strings are identical, and each described complete string all adopts the mode of a half breaker wiring.
As shown in Figure 2, described multiple complete string comprises the first adjacent complete string 201 and the second complete string 202.As an example of the first complete string 201 example, the line construction of a complete string that adopts a half breaker mode of connection is described, described the first complete string 201 comprises:
The first main bus bar 211, the second main bus bar 212, the 3rd main bus bar 213, the 4th main bus bar 214, the 5th main bus bar 215 and the 6th main bus bar 216; Wherein, the first main bus bar 211, the second main bus bar 212 and the 3rd main bus bar 213 are first group of main bus bar, represent respectively A, B, C three-phase; The 4th main bus bar 214, the 5th main bus bar 215 and the 6th main bus bar 216 are second group of main bus bar, represent respectively A, B, C three-phase;
The first branch bar 221, the second branch bar 222, the 3rd branch bar 223, the 4th branch bar 224, quintafurcation bus 225 and the 6th branch bar 226;
The first circuit breaker 231, the second circuit breaker 232, the 3rd circuit breaker 233, the 4th circuit breaker 234, the 5th circuit breaker 235, the 6th circuit breaker 236, the 7th circuit breaker 237, the 8th circuit breaker 238 and the 9th circuit breaker 239; Wherein, the first circuit breaker 231, the 4th circuit breaker 234 and the 7th circuit breaker 237 are connected into the first branch road, one end of the first branch road is connected with the first main bus bar 211 by the first branch bar 221, and the other end is connected with the 4th main bus bar 214 by the 4th branch bar 224; The second circuit breaker 232, the 5th circuit breaker 235 and the 8th circuit breaker 238 are connected into the second branch road, and one end of the second branch road is connected with the second main bus bar 212 by the second branch bar 222, and the other end is connected with the 5th main bus bar 215 by quintafurcation bus 225; The 3rd circuit breaker 233, the 6th circuit breaker 236 and the 9th circuit breaker 239 are connected into the 3rd branch road, and one end of the 3rd branch road is connected with the 3rd main bus bar 213 by the 3rd branch bar 223, and the other end is connected with the 6th main bus bar 216 by the 6th branch bar 226.
6 main bus bars of the second complete string 202 are identical with 6 main bus bars of the first complete string.
In the present embodiment, the first circuit breaker 231 of described the first complete string 201, the second circuit breaker 232 are adjacent with the 9th circuit breaker 2313 with the 7th circuit breaker 2310, the 8th circuit breaker 2311 of described the second complete string 202 with the 3rd circuit breaker 233;
The first circuit breaker 231 of described the first complete string 201 is all connected with described the first main bus bar 211 by the first branch bar 231 of described the first complete string 201 with the 7th circuit breaker 2310 of described the second complete string 202;
The second circuit breaker 232 of described the first complete string 201 is all connected with described the second main bus bar 212 by the second branch bar 222 of described the first complete string 201 with the 8th circuit breaker 2311 of described the second complete string 202;
The 3rd circuit breaker 233 of described the first complete string 201 is all connected with described the 3rd main bus bar 213 by the 3rd branch bar 223 of described the first complete string 201 with the 9th circuit breaker 2312 of described the second complete string 202.
Be not difficult to find by foregoing description, in the present embodiment, the 7th branch bar of the second complete string 202 is identical with the first branch bar 221 of the first complete string 201, the 8th branch bar of the second complete string 202 is identical with the second branch bar 222 of the first complete string 201, and the 9th branch bar of the second complete string 202 is identical with the 3rd branch bar 223 of the first complete string 201.
That is to say, be 3 branch bars between two groups of circuit breakers that in the present embodiment, adjacent complete string is adjacent, 3 branch bars of partial common that adjacent complete string joins.
And the connection between each complete string is separate in prior art.In conjunction with Fig. 1, the 7th circuit breaker 1310, the 8th circuit breaker 1311 of the first circuit breaker 131, the second circuit breaker 132 and the 3rd circuit breaker 133 and the second complete string of the first complete string 101 are adjacent with the 9th circuit breaker 1312; The first circuit breaker 131 of the first complete string 101 is connected with the first main bus bar 111 by the first branch bar 121 of the first complete string 101; The second circuit breaker 132 of the first complete string 101 is connected with the second main bus bar 112 by the second branch bar 122 of the first complete string 101; The 3rd circuit breaker 133 of the first complete string 101 is connected with the second main bus bar 113 by the second branch bar 123 of the first complete string 101; The 7th circuit breaker 1310 of the second complete string 102 is connected by the 7th branch bar 127 of the second complete string 102; The 8th circuit breaker 1311 of the second complete string 102 is connected by the 8th branch bar 128 of the second complete string 102; The 9th circuit breaker 1312 of the second complete string 102 is connected by the 9th branch bar 129 of the second complete string 102.
Visible, in prior art, between the adjacent two groups of circuit breakers of adjacent complete string, there are 6 branch bars.
Contrast known, the line arrangement structure that the utility model embodiment provides is by making between adjacent complete string, the circuit breaker of correspondence position shares same branch bar and is connected with main bus bar, makes the branch bar of the part that adjacent complete string joins be reduced to 3 by 6.Along with the minimizing of branch bar number, on main bus bar, by connecting the reserved also corresponding minimizing of length of branch bar, this just makes floor space and the equipment manufacturing cost of the line arrangement structure of GIS power distribution equipment reduce.
For further reducing the number of branch bar and the length of main bus bar, in the present embodiment, preferably can make between two adjacent groups circuit breaker, all to adopt the shared connected mode of above-mentioned branch bar in all adjacent complete strings.
Concrete, described line arrangement structure also comprises the three complete string (not shown) adjacent with described the first complete string 201, and the 7th circuit breaker 237, the 8th circuit breaker 238 of described the first complete string 201 are adjacent with the 3rd circuit breaker with the first circuit breaker, second circuit breaker of described the 3rd complete string with the 9th circuit breaker 239;
The 7th circuit breaker 237 of described the first complete string 201 is all connected with described the 4th main bus bar 214 by the 4th branch bar 224 of described the first complete string 201 with the first circuit breaker of described the 3rd complete string;
The 8th circuit breaker 238 of described the first complete string 201 is all connected with described the 5th main bus bar 215 by the quintafurcation bus 225 of described the first complete string 201 with the second circuit breaker of described the 3rd complete string;
The 9th circuit breaker 239 of described the first complete string 201 is all connected with described the 6th main bus bar 216 by the 6th branch bar 226 of described the first complete string 201 with the 3rd circuit breaker of described the 3rd complete string.
Wherein, the syndeton of described main bus bar and described branch bar is preferably T-shaped syndeton.
For the GIS power distribution equipment of ultra-high voltage transformer station engineering, its line arrangement structure preferably includes 4~6 complete strings, and described multiple complete strings are preferably yi word pattern and arrange.
Adopt above-mentioned preferred line arrangement structure, for the GIS power distribution equipment of ultra-high voltage transformer station engineering, the main bus bar that can save and the length of branch bar are considerable.Take 1000kV GIS power distribution equipment as example, the GIS power distribution equipment of the line arrangement structure that employing the utility model embodiment provides, each complete string lateral dimension can reduce approximately 6.3%, and main bus bar reduces approximately 6.3%, and branch bar reduces approximately 28.1%.
Be explained below in conjunction with actual correction data.
Table 1
Figure BDA0000420261580000071
It should be noted that, in table 1, represented data are the difference of the scheme of prior art and the utility model embodiment, and this difference is take the scheme of prior art as benchmark.
Main bus bar is that a reserved width of branch bar is about 1.5m.As shown in Table 1, owing to having reduced by 3 branch bars, therefore the diminishbb length of complete string is 3 × 1.5m=4.5m; Comprise 6 complete strings with GIS power distribution equipment, the length of its main bus bar can reduce by 6 × 4.5m=27.0m; The length of the branch bar of a complete string can reduce 25m.This saves equipment manufacturing cost and has larger effect for the floor space that reduces GIS power distribution equipment.
Although the utility model discloses as above with preferred embodiment, but not in order to limit the utility model.Any those of ordinary skill in the art, do not departing from technical solutions of the utility model scope situation, all can utilize method and the technology contents of above-mentioned announcement to make many possible variations and modification to technical solutions of the utility model, or be revised as the equivalent embodiment of equivalent variations.Therefore, every content that does not depart from technical solutions of the utility model,, all still belongs in the scope of technical solutions of the utility model protection any simple modification made for any of the above embodiments, equivalent variations and modification according to technical spirit of the present utility model.

Claims (5)

1. the line arrangement structure of a GIS power distribution equipment, comprise multiple complete strings, each described complete string includes 6 main bus bars, article 6, branch bar and 9 circuit breakers, described 6 articles of main bus bars are respectively the first main bus bar~six main bus bar, described 6 articles of branch bars are respectively the first branch bar~six branch bar, described 9 circuit breakers are respectively the first circuit breaker~nine circuit breaker, 6 main bus bars of described multiple complete strings are identical, each described complete string all adopts the mode of a half breaker wiring, it is characterized in that, described multiple complete string comprises the first adjacent complete string and the second complete string, the first circuit breaker of described the first complete string, the 7th circuit breaker of the second circuit breaker and the 3rd circuit breaker and described the second complete string, the 8th circuit breaker is adjacent with the 9th circuit breaker, the 7th circuit breaker of the first circuit breaker of described the first complete string and described the second complete string is all connected with described the first main bus bar by the first branch bar of described the first complete string, the 8th circuit breaker of the second circuit breaker of described the first complete string and described the second complete string is all connected with described the second main bus bar by the second branch bar of described the first complete string, the 3rd circuit breaker of described the first complete string and the 9th circuit breaker of described the second complete string are all connected with described the 3rd main bus bar by the 3rd branch bar of described the first complete string.
2. the line arrangement structure of GIS power distribution equipment according to claim 1, it is characterized in that, described line arrangement structure also comprises the three complete string adjacent with described the first complete string, the 7th circuit breaker of described the first complete string, the first circuit breaker of the 8th circuit breaker and the 9th circuit breaker and described the 3rd complete string, the second circuit breaker is adjacent with the 3rd circuit breaker, the 7th circuit breaker of described the first complete string is all connected with described the 4th main bus bar by the 4th branch bar of described the first complete string with the first circuit breaker of described the 3rd complete string, the 8th circuit breaker of described the first complete string is all connected with described the 5th main bus bar by the quintafurcation bus of described the first complete string with the second circuit breaker of described the 3rd complete string, the 9th circuit breaker of described the first complete string is all connected with described the 6th main bus bar by the 6th branch bar of described the first complete string with the 3rd circuit breaker of described the 3rd complete string.
3. the line arrangement structure of GIS power distribution equipment according to claim 1, is characterized in that, the syndeton of described main bus bar and described branch bar is T-shaped syndeton.
4. the line arrangement structure of GIS power distribution equipment according to claim 1, is characterized in that, described line arrangement structure comprises 4~6 complete strings.
5. the line arrangement structure of GIS power distribution equipment according to claim 4, is characterized in that, described multiple complete strings are yi word pattern and arrange.
CN201320766619.4U 2013-11-22 2013-11-22 Line arrangement structure of GIS power distribution device Expired - Lifetime CN203607687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320766619.4U CN203607687U (en) 2013-11-22 2013-11-22 Line arrangement structure of GIS power distribution device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320766619.4U CN203607687U (en) 2013-11-22 2013-11-22 Line arrangement structure of GIS power distribution device

Publications (1)

Publication Number Publication Date
CN203607687U true CN203607687U (en) 2014-05-21

Family

ID=50720349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320766619.4U Expired - Lifetime CN203607687U (en) 2013-11-22 2013-11-22 Line arrangement structure of GIS power distribution device

Country Status (1)

Country Link
CN (1) CN203607687U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103633567A (en) * 2013-11-22 2014-03-12 国家电网公司 Circuit layout structure of GIS (gas-insulated metal-enclosed switchgear) power distribution device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103633567A (en) * 2013-11-22 2014-03-12 国家电网公司 Circuit layout structure of GIS (gas-insulated metal-enclosed switchgear) power distribution device
CN103633567B (en) * 2013-11-22 2016-01-20 国家电网公司 The line arrangement structure of GIS power distribution equipment

Similar Documents

Publication Publication Date Title
CN103904564A (en) High-voltage distribution device with double breakers used for single bus segmentation and application thereof
CN203607687U (en) Line arrangement structure of GIS power distribution device
CN203747256U (en) 220 kV double-bus single-segment breaker single-row arranged arrangement structure
CN103633567B (en) The line arrangement structure of GIS power distribution equipment
CN109066320B (en) HGIS equipment applied to double-bus outgoing line
CN203014185U (en) Line connecting structure for crossed matching of incoming lines and outgoing lines of 500kV power distribution device
CN203632069U (en) An equipment layout structure of a GIS power distribution unit
CN203774631U (en) High-voltage distribution device with dual circuit breakers in single bus sectionalizing mode
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
CN204645805U (en) Double back becomes single time angle steel tower
CN203983899U (en) A kind of vertically arranged three-phase bus fixture
CN207282908U (en) The 500kV power distribution equipments arranged using half c-type
CN202197020U (en) 110 kV back-to-back arranged bidirectional outlet power distribution device
CN201927896U (en) Double-row type switch base
CN202817512U (en) Wiring system for 110kV transformer station
CN203607858U (en) Arrangement mode of 110KV reactive power compensator
CN203967529U (en) A kind of arrangement of 220kV power distribution equipment
CN203607689U (en) Arrangement mode of disconnecting switches
CN203607729U (en) Compact 35kv transformer substation
CN214478482U (en) Double-layer outgoing line structure of GIS power distribution device
CN204531565U (en) Shaft tower is arranged with bar in the three loop line roads for three direction corners
CN205670620U (en) A kind of main transformer inlet wire arrangement
CN205070173U (en) 750kV open -type distribution device quadrangle structure
CN206272138U (en) A kind of 750kV power distribution equipments GIS device reversed arrangement end breaker
CN203522179U (en) Power grid structure applicable to urban centers

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: CHINA POWER ENGINEERING CONSULTING (GROUP) CORPORATION

Patentee after: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Patentee after: Co., Ltd of Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee after: NORTHWEST ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING GROUP

Patentee after: Co., Ltd of Huabei Power Design Inst., China Power Engineering Consulting Group

Patentee after: Co., Ltd of Central Southern China Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee after: China Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd.

Patentee after: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING GROUP

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: China Power Engineering Consulting Group Corporation

Patentee before: ELECTRIC POWER PLANNING & ENGINEERING INSTITUTE

Patentee before: Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee before: Northwest Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee before: Huabei Power Design Inst., China Power Engineering Consulting Group

Patentee before: Central Southern China Electric Power Design Institute, China Power Engineering Consulting Group Cor

Patentee before: Southwest Electric Power Design Institute of China Power Engineering Consulting Group Corporation

Patentee before: North China Electric Power Design Institute of China Power Engineering Consulting Group Corporation

AV01 Patent right actively abandoned

Granted publication date: 20140521

Effective date of abandoning: 20160120

C25 Abandonment of patent right or utility model to avoid double patenting