CN203605693U - Spanish tile sintering tunnel kiln - Google Patents

Spanish tile sintering tunnel kiln Download PDF

Info

Publication number
CN203605693U
CN203605693U CN201320831393.1U CN201320831393U CN203605693U CN 203605693 U CN203605693 U CN 203605693U CN 201320831393 U CN201320831393 U CN 201320831393U CN 203605693 U CN203605693 U CN 203605693U
Authority
CN
China
Prior art keywords
zone
watt
slow cooling
west
chilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320831393.1U
Other languages
Chinese (zh)
Inventor
简伟闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN RONGGUAN GLASS MATERIAL FOR BUILDING Co Ltd
Original Assignee
FOSHAN RONGGUAN GLASS MATERIAL FOR BUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN RONGGUAN GLASS MATERIAL FOR BUILDING Co Ltd filed Critical FOSHAN RONGGUAN GLASS MATERIAL FOR BUILDING Co Ltd
Priority to CN201320831393.1U priority Critical patent/CN203605693U/en
Application granted granted Critical
Publication of CN203605693U publication Critical patent/CN203605693U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a Spanish tile sintering tunnel kiln. The Spanish tile sintering tunnel kiln comprises a machine frame, and is characterized in that a preheating zone, a Spanish tile sintering zone, a quick cooling zone, a slow cooling zone and a final cooling zone are sequentially arranged on the machine frame from front to back according to the sintering production sequence of Spanish tiles, all the zones are respectively formed in a modularized splicing mode independently, a conveying belt is arranged on the machine frame and penetrates through the preheating zone, the Spanish tile sintering zone, the quick cooling zone, the slow cooling zone and the final cooling zone in sequence, and the outer side of each working zone is wrapped by asbestos. The Spanish tile sintering tunnel kiln carries out integrated sintering on Spanish tile materials by adopting a production line, combines the several stages of preheating, sintering, quick cooling, slow cooling, final cooling and the like to the same production line, and achieves unification of Spanish tile sintering working procedures, thereby simplifying production processes and steps, simplifying intermediate links and improving the production efficiency of the Spanish tiles. The Spanish tile sintering tunnel kiln is compact in structure, good in automation degree, and high in production efficiency.

Description

A kind of west watt sintering tunnel cave
Technical field
The utility model relates to a kind of west watt agglomerating plant, especially a kind of west watt sintering tunnel cave.
Background technology
West watt, it is the abbreviation of Spain watt, English name Spanish tile, because its external form resembles English alphabet " S ", so Wa Dexiwa pattern is commonly called as and cries S type watt, because it is in Western European countries' appearance popular such as Spain the earliest, import gradually the Korea S in Asia into, Japan, similar with the glazed tiles of China, and approved and come into vogue, become a kind of decorative tile with European style.Its functional shift of keeping out wind and rain from common tiling for mainly take decoration functions as main, west watt is the sintering encaustic tile belonging in tiling at present, the finial use watt that is mainly used in the buildings such as villa, little Western style building, booth platform, its decorative effect allusion is simple and elegant, graceful bearing is unique.
The sintering in west watt need to pass through preheating, burns till, chilling, slow cooling and several stages such as end is cold, in watt burning process of old-fashioned west, west watt fire be by west watt blank be placed in kiln, adjust the sintering temperature in kiln by regular hour section, make western unbaked tile material in kiln, complete the sintering circuit in above-mentioned several stages.But such sintering processing is unfavorable for watt production of large batch of west, sintering and cooling stand-by period have been contained the production efficiency of western watt slowly.
Utility model content
The purpose of this utility model is to provide a kind of west watt a whole set of production process, one-shot forming, west watt sintering tunnel cave that production efficiency is high integrated.
For achieving the above object, the technical scheme that the utility model adopts is: a kind of west watt sintering tunnel cave, comprise: frame, it is characterized in that: according to the SINTERING PRODUCTION order of western watt, in frame, be provided with successively from front to back preheating zone, west watt firing zone, quench zone, slow cooling district and whole cold-zone, above-mentioned each district is that separate modular is spliced, conveyer belt is located in frame, and run through successively preheating zone, west watt firing zone, quench zone, slow cooling district and whole cold-zone, described outside, each workspace is all coated asbestos.
Preferably, described preheating zone is made up of preheating cabinet, preheating fan and pre-hot-flow flue, and preheating fan is arranged on preheating cabinet top, and its position is close to west watt firing zone, and preheating fan is connected with preheating cabinet by pre-hot-flow flue and forms hot air circulation.
Preferably, described west watt firing zone is burnt till case, heater, burns till blower fan and is burnt till air channel by west watt and forms, heater is located at west and watt burns till in case, burns till blower fan and is located at west watt and burns till box top, burns till blower fan by burning till air channel and burning till case and be connected and form hot air circulation.
Preferably, described quench zone is made up of chilling case, chilling blower fan, refrigerating plant and chilling air channel, refrigerating plant is located in chilling case, chilling blower fan is located at chilling box top, chilling blower fan is connected with chilling case by chilling air channel, chilling duct outlet is evenly distributed on chilling case, and forms cold wind circulation simultaneously.
Preferably, described slow cooling district is made up of slow cooling box, slow cooling motor and slow cooling air channel, the described air-heater of taking out is located at slow cooling box top, position and the quench zone of taking out air-heater are close, take out air-heater and be connected with slow cooling box by slow cooling air channel, the air outlet in slow cooling air channel is evenly distributed on slow cooling box.
Preferably, the cold-zone of postponing, described slow cooling air channel extends to whole cold-zone, and is communicated with whole cold-zone, and the air outlet in slow cooling air channel is evenly distributed on whole cold-zone.
Preferably, described conveyer belt is foraminous conveyer.
The utility model adopts after said structure, by adopting the form of production line, west watt material is carried out to integral type sintering, by preheating, burn till, chilling, slow cooling and several stages such as cold are attached on same production line eventually, the operation that realizes west watt sintering is unified, thereby simplify production process and step, simplified intermediate link, improved the production efficiency of western watt.The utility model compact conformation, automaticity is good, and production efficiency is high.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the utility model preheating zone syndeton schematic diagram.
Fig. 3 is the utility model west watt firing zone syndeton schematic diagram.
Fig. 4 is the utility model quench zone syndeton schematic diagram.
Fig. 5 is the utility model slow cooling district syndeton schematic diagram.
In figure: 1, frame, 2, preheating zone, 21, preheating cabinet, 22, preheating fan, 23, pre-hot-flow flue, 3, west watt firing zone, 31, west watt burns till case, 32, heater, 33, burn till blower fan, 34, burn till air channel, 4, quench zone, 41, chilling case, 42, chilling blower fan, 43, refrigerating plant, 44, chilling air channel, 5, slow cooling district, 51, slow cooling box, 52, slow cooling motor, 53, slow cooling air channel, 54, take out air-heater, 6, whole cold-zone, 7, conveyer belt.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As shown in the figure, a kind of west watt sintering tunnel cave, comprise: frame 1, it is characterized in that: according to the SINTERING PRODUCTION order of western watt, in frame 1, be provided with successively from front to back preheating zone 2, west watt firing zone 3, quench zone 4, slow cooling district 5 and whole cold-zone 6, above-mentioned each district is that separate modular is spliced, and conveyer belt 7 is located in frame 1, and run through successively preheating zone 2, west watt firing zone 3, quench zone 4, slow cooling district 5 and whole cold-zone 6, described outside, each workspace is all coated asbestos.
Preferably, described preheating zone 2 is made up of preheating cabinet 21, preheating fan 22 and pre-hot-flow flue 23, preheating fan 22 is arranged on preheating cabinet 21 tops, and its position is close to west watt firing zone 3, and preheating fan 22 is connected and forms hot air circulation with preheating cabinet 21 by pre-hot-flow flue 23.
Preferably, described west watt firing zone 3 is burnt till case 31, heater 32, burns till blower fan 33 and is burnt till air channel 34 by west watt and forms, heater 32 is located at west watt and burns till in case 31, burn till blower fan 33 and be located at west and watt burn till case 31 tops, burn till blower fan 33 and burn till case 31 and be connected and form hot air circulation with western watt by burning till air channel 34.
Preferably, described quench zone 4 is made up of chilling case 41, chilling blower fan 42, refrigerating plant 43 and chilling air channel 44, refrigerating plant 43 is located in chilling case 41, chilling blower fan 42 is located at chilling case 41 tops, chilling blower fan 42 is connected with chilling case 41 by chilling air channel 44, chilling air channel 44 air outlets are evenly distributed on chilling case 41, and form cold wind circulation simultaneously.
Preferably, described slow cooling district 5 is made up of slow cooling box 51, slow cooling motor 52 and slow cooling air channel 53, the described air-heater 54 of taking out is located at slow cooling box 51 tops, position and the quench zone 4 of taking out air-heater 54 are close, take out air-heater 54 and be connected with slow cooling box 51 by slow cooling air channel 53, the air outlet in slow cooling air channel 53 is evenly distributed on slow cooling box 51.
Preferably, the cold-zone 5 of postponing, described slow cooling air channel 53 extends to whole cold-zone 6, and is communicated with whole cold-zone 6, and the air outlet in slow cooling air channel 53 is evenly distributed on whole cold-zone 6.
Preferably, described conveyer belt 7 is foraminous conveyer.
Operation principle: material enters from tunnel cave entrance, first through preheating zone 2, preheating fan 22 is drawn into the waste heat in watt firing zone 3 of west, rear in preheating cabinet 21 by pre-hot-flow flue 23, in the process that material is carried at conveyer belt 7, completes preheating; Material is followed conveyer belt 7 and is entered west watt firing zone 3, heater 32 on watt firing zone 3 of west burns till case 31 to west watt and heats, be arranged on the western watt of blower fan 33 extraction west watt of burning till of burning till case 31 tops and burn till the hot-air in case 31, and be again discharged into west and watt burn till in case 31 by burning till air channel 34, form thermal cycle, material completes the sinter molding of western watt at west watt firing zone 3; West watt firing zone 3 is left in west watt under the conveying of conveyer belt 7, enter quench zone 4, identical with west watt firing zone 3 is, refrigerating plant 43 in quench zone 4 carries out cooling processing to chilling case 41, chilling blower fan 42 extracts cold air in chilling case 41 and forms cold wind circulation by chilling air channel 44 at chilling case 41, the west that just sintering has completed watt in this region by cooling rapidly; A west watt continuation of entering after over-quenching is carried forward, and according to this through slow cooling district 5 and whole cold-zone 6, slow cooling district 5 is drawn into this two region with whole cold-zone 6 by the cold air of slow cooling motor 52 blower fans and 53Jiang quench zone, slow cooling air channel 4, thereby last refrigerating work procedure is carried out in west watt.
The above is preferred embodiment of the present utility model; certainly can not limit with this interest field of the utility model; should be understood that; for those skilled in the art; the technical solution of the utility model is modified or is equal to replacement, do not depart from the protection domain of technical solutions of the utility model.

Claims (7)

1. a west watt sintering tunnel cave, comprise: frame (1), it is characterized in that: according to the SINTERING PRODUCTION order of western watt, in frame (1), be provided with successively from front to back preheating zone (2), west watt firing zone (3), quench zone (4), slow cooling district (5) and whole cold-zone (6), above-mentioned each district is that separate modular is spliced, conveyer belt (7) is located in frame (1), and run through successively preheating zone (2), west watt firing zone (3), quench zone (4), slow cooling district (5) and whole cold-zone (6), described outside, each workspace is all coated asbestos.
2. west according to claim 1 watt sintering tunnel cave, it is characterized in that: described preheating zone (2) is made up of preheating cabinet (21), preheating fan (22) and pre-hot-flow flue (23), preheating fan (22) is arranged on preheating cabinet (21) top, its position is close to west watt firing zone (3), and preheating fan (22) is connected and forms hot air circulation with preheating cabinet (21) by pre-hot-flow flue (23).
3. west according to claim 1 watt sintering tunnel cave, it is characterized in that: described west watt firing zone (3) is burnt till case (31), heater (32), burns till blower fan (33) and burnt till air channel (34) by west watt and forms, heater (32) is located at west watt and burns till in case (31), burn till blower fan (33) and be located at west and watt burn till case (31) top, burn till blower fan (33) and burn till case (31) and be connected and form hot air circulation with western watt by burning till air channel (34).
4. west according to claim 1 watt sintering tunnel cave, it is characterized in that: described quench zone (4) is by chilling case (41), chilling blower fan (42), refrigerating plant (43) and chilling air channel (44) formation, refrigerating plant (43) is located in chilling case (41), chilling blower fan (42) is located at chilling case (41) top, chilling blower fan (42) is connected with chilling case (41) by chilling air channel (44), it is upper that chilling air channel (44) air outlet is evenly distributed on chilling case (41), and form cold wind circulation simultaneously.
5. west according to claim 1 watt sintering tunnel cave, it is characterized in that: described slow cooling district (5) is by slow cooling box (51), slow cooling motor (52) and slow cooling air channel (53) formation, the described air-heater (54) of taking out is located at slow cooling box (51) top, position and quench zone (4) of taking out air-heater (54) are close, take out air-heater (54) and be connected with slow cooling box (51) by slow cooling air channel (53), the air outlet of slow cooling air channel (53) is evenly distributed on slow cooling box (51).
6. west according to claim 5 watt sintering tunnel cave, it is characterized in that: the cold-zone (5) of postponing, described slow cooling air channel (53) extends to whole cold-zone (6), and be communicated with whole cold-zone (6), the air outlet of slow cooling air channel (53) is evenly distributed on whole cold-zone (6).
7. west according to claim 1 watt sintering tunnel cave, is characterized in that: described conveyer belt (7) is foraminous conveyer.
CN201320831393.1U 2013-12-17 2013-12-17 Spanish tile sintering tunnel kiln Expired - Fee Related CN203605693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320831393.1U CN203605693U (en) 2013-12-17 2013-12-17 Spanish tile sintering tunnel kiln

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320831393.1U CN203605693U (en) 2013-12-17 2013-12-17 Spanish tile sintering tunnel kiln

Publications (1)

Publication Number Publication Date
CN203605693U true CN203605693U (en) 2014-05-21

Family

ID=50718361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320831393.1U Expired - Fee Related CN203605693U (en) 2013-12-17 2013-12-17 Spanish tile sintering tunnel kiln

Country Status (1)

Country Link
CN (1) CN203605693U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017000093A1 (en) * 2015-07-02 2017-01-05 唐山亚捷机械有限公司 Heat-exchanging device for single channel heat treatment furnace
CN108489263A (en) * 2016-07-06 2018-09-04 福建省德化同鑫陶瓷有限公司 A kind of tunnel oven hot air circulation method
CN109341333A (en) * 2018-10-16 2019-02-15 广东科达洁能股份有限公司 A kind of big specification foamed ceramic roller kilns device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017000093A1 (en) * 2015-07-02 2017-01-05 唐山亚捷机械有限公司 Heat-exchanging device for single channel heat treatment furnace
CN108489263A (en) * 2016-07-06 2018-09-04 福建省德化同鑫陶瓷有限公司 A kind of tunnel oven hot air circulation method
CN109341333A (en) * 2018-10-16 2019-02-15 广东科达洁能股份有限公司 A kind of big specification foamed ceramic roller kilns device
WO2020078063A1 (en) * 2018-10-16 2020-04-23 广东科达洁能股份有限公司 Roller kiln device for large-scale foamed ceramic
CN109341333B (en) * 2018-10-16 2024-02-09 佛山市科达机电有限公司 Roller kiln device for large-size foamed ceramics

Similar Documents

Publication Publication Date Title
CN201262512Y (en) Heated air circulation baking oven
CN203605693U (en) Spanish tile sintering tunnel kiln
CN106212757B (en) White tea LED light source withering device and withering process thereof
CN204482960U (en) The drying equipment of a kind of red date
CN205209223U (en) Continuous automatic production foamed ceramics energy saving and emission reduction tunnel cave
CN206056251U (en) Light stone heat insulating decorative board fires roller kilns
CN106977084A (en) Devitrified glass hot bending crystallization continuous tunnel furnace and its method for producing crystallized glass article
CN102583971A (en) Hot-melting glass with bowlder effect and manufacturing method of hot-melting glass
CN206959527U (en) Porcelain tendre continuous type roaster
CN204346078U (en) A kind of roller way kiln residual heat using device
CN2903871Y (en) High air temp. backheating tunnel kiln
CN208795012U (en) Kiln waste heat utilization system
CN204881147U (en) A tunnel cave that is used for energy -concerving and environment -protective de -waxing of smokeless odorless
CN101372390A (en) Forced heated air circulation convection glass tempering technology
CN105180650B (en) A kind of tunnel cave for smokeless and odorless energy-conserving and environment-protective de-waxing
CN205537101U (en) Rapid cooling economizer of expanded letter ceramic sanitary ware tunnel cave
CN205175097U (en) Hot air circulating system of full -automatic gas continuous tunnel furnace
CN203985874U (en) A kind of tealeaves automatic production line
CN105258500A (en) Hot-air circulating systems for fully-automatic fuel gas tunnel furnace and proportional controlling method of hot-air circulating systems
CN206799427U (en) Devitrified glass hot bending crystallization continuous tunnel furnace
CN207214638U (en) A kind of solar drying kiln
CN102538444B (en) Mn-Zn ferrite sintering furnace and sintering process thereof
CN204854257U (en) Circulation roasting kiln
CN104611940B (en) Natural gas heated synthetic leather production line
CN204689879U (en) Full-automatic foam lear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20151217

EXPY Termination of patent right or utility model