CN203603059U - Prestress steel bar thread anchorage used in cable-stayed bridge main tower - Google Patents

Prestress steel bar thread anchorage used in cable-stayed bridge main tower Download PDF

Info

Publication number
CN203603059U
CN203603059U CN201320721600.8U CN201320721600U CN203603059U CN 203603059 U CN203603059 U CN 203603059U CN 201320721600 U CN201320721600 U CN 201320721600U CN 203603059 U CN203603059 U CN 203603059U
Authority
CN
China
Prior art keywords
steel bar
prestressed steel
prestress steel
tower
king
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320721600.8U
Other languages
Chinese (zh)
Inventor
马永存
秦雪花
李龙
张新志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sino Rubber Technology Co ltd
Tiangong Lide Technology Development Co ltd
Original Assignee
HENGSHUI RUBBER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENGSHUI RUBBER CO Ltd filed Critical HENGSHUI RUBBER CO Ltd
Priority to CN201320721600.8U priority Critical patent/CN203603059U/en
Application granted granted Critical
Publication of CN203603059U publication Critical patent/CN203603059U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a prestress steel bar thread anchorage used in a cable-stayed bridge main tower and belongs to the field of cable-stayed bridge construction. The prestress steel bar thread anchorage structurally comprises prestress steel bars with the outer walls provided with protective sleeves. The prestress steel bar thread anchorage is characterized in that the prestress steel bars are distributed in a main tower body in a rectangular shape by being staggered longitudinally and horizontally, the left ends and the right ends of the prestress steel bars are provided with pre-buried anchor plates and fastening assemblies, the protective sleeves match the prestress steel bars in a sliding mode, and the left ends and the right ends of the prestress steel bars penetrate through positioning holes in the pre-buried anchor plates respectively and are fixedly connected with the main tower body through the fastening assemblies. The prestress steel bar thread anchorage used in the cable-stayed bridge main tower can overcome the defects in the prior art and have the good product performance and cost performance, the rib distribution distance is smaller, the distance between the prestress steel bar thread anchorage and the wall of a main tower is reduced, the tensile capacity and the shear capacity of the main tower body are improved, due to the anchorage with the standard size, waste of steel in construction is avoided, anchoring and tensioning in construction of the anchorage is simple, a non-bonding construction method is adopted, and the construction period is shortened.

Description

A kind of prestressed steel bar screw thread ground tackle of using in stayed-cable bridge king-tower
Technical field
The utility model belongs to oblique pull lock bridge construction field, is specifically related to a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower.
Background technology
At present, the horizontal and vertical presstressed reinforcing steel of oblique pull lock bridge king-tower mainly adopts fining twisted steel anchor both at home and abroad, and construction adopts bonding mode.The defect that prior art exists: fining twisted steel strength grade is low, elongation per unit length is little, anchorage stress is difficult to the problems such as control.Rebar sizes deviation is large, and construction precision is low, easily causes disconnected muscle.Construction adopts bonding mode, and 50mm duct grouting drawback is large, is in the milk unreal, and after grouting, concrete shrinkage produces gap, all can cause reinforcement corrosion to lose efficacy.The grouted-aggregate concrete coefficient of expansion that adds expansion agent is difficult to control, and easily produces swelling stress, causes tower body infant cracking.
Summary of the invention
The utility model is for solving the problems of the technologies described above, a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower is provided, replace fining twisted steel in former design, tension and the shear resistance of king-tower are improved, a large amount of rolled steel dosage that reduce, and can design thus brand-new construction method, improve safety.
For achieving the above object, the technical solution adopted in the utility model is: a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower, structure comprises that outer wall is provided with the prestressed steel bar of protective sleeve, key is: described prestressed steel bar is vertical, laterally staggered rectangular being distributed in king-tower tower body, a left side for above-mentioned prestressed steel bar, right two ends are provided with pre-buried anchor slab and fastening assembly thereof, protective sleeve and prestressed steel bar have and are slidably matched, a left side for prestressed steel bar, right two ends are passed respectively the locating hole on pre-buried anchor slab and are fixedly connected with king-tower tower body by fastening assembly.
In the utility model, prestressed steel bar screw thread ground tackle can solve the defect existing in prior art, there is excellent properties of product, higher cost performance, cloth muscle spacing is less, shorten the distance with king-tower tower wall, tension and the shear resistance of king-tower tower body are improved, standard size anchoring avoid the waste of steel in construction, construction anchoring tension operation simple, without bonding form of construction work, shorten construction period.
Illustrate: the longitudinal cloth muscle of JL32 fining twisted steel spacing is 20cm, be 50cm apart from the distance of tower wall, and adopt after φ 16 prestressed steel bars, the hypotelorism of cloth muscle is 7.5cm, be 47.5cm apart from the Distance Shortened of tower wall, presstressed reinforcing steel is arranged compacter, reduced space hold, and improved the shear resistance of longitudinal prestressing muscle in king-tower after adopting prestressed steel bar.
JL32 fining twisted steel structure needs reserving hole channel, and channel diameter is greater than 50mm, takes up room large, when construction, steel mesh reinforcement needs shift position, and prestressed steel bar screw thread ground tackle adopts without bonding mode, rod iron is 18mm without bonding outer diameter sheath dimension, takies structure space little.Following table is the Contrast on effect that uses two kinds of structures:
Figure 384548DEST_PATH_IMAGE001
Wherein, the first hurdle is the prestressed steel bar screw thread ground tackle that uses the prestressed steel bar that diameter is 16mm, and the second hurdle is for using JL32 fining twisted steel structure.
From table, we can find out, the nominal bearing capacity of 3 φ 16 prestressed steel bars is suitable with the nominal bearing capacity of single JL32 fining twisted steel, below our stretch-draw safety and the saving steels amount of calculating respectively both contrast.
(1) safety
Fining twisted steel stretch-draw safety factor=829.57KN/568.2KN=1.46,
Prestressed steel bar stretch-draw safety factor=285.42KN/189.4KN=1.51;
(2) rolled steel dosage
With saving steels amount under bearing capacity=(6650g-1578g × 3)/6650g=28.8%.
For convenience of construction, fining twisted steel when construction cutting length need grow 40mm than design length, and press design length blanking when prestressed steel bar blanking, therefore adopt prestressed steel bar to construct and at least can save 28.8% steel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation that in the utility model, fastening assembly is connected with pre-buried anchor slab, rod iron.
In figure, 1 represents oblique pull lock bridge king-tower, and 3A represents protective sleeve, and 3B represents prestressed steel bar, and 4 represent pre-buried anchor slab, and 4A represents spiral bar, and 5 represent fastening assembly, and 5A represents anchoring nut.
In Fig. 1, owing to showing overall structure, both are closely connected pre-buried anchor slab 4 and fastening assembly 5, badly in the drawings clearly show, but in Fig. 2, have detailed content.
The specific embodiment
A kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower; structure comprises that outer wall is provided with the prestressed steel bar 3B of protective sleeve 3A; importantly: described prestressed steel bar 3B vertical, horizontal rectangular being distributed in king-tower tower body 1 of interlocking; the left and right two ends of above-mentioned prestressed steel bar 3B are provided with pre-buried anchor slab 4 and fastening assembly 5 thereof; protective sleeve 3A and prestressed steel bar 3B have and are slidably matched, and the left and right two ends of prestressed steel bar 3B are respectively through the locating hole on pre-buried anchor slab 4 and be fixedly connected with king-tower tower body 1 by fastening assembly 5.
The nominal diameter of described prestressed steel bar is φ 14mm~φ 40mm.
Described prestressed steel bar two ends are provided with the screw thread of different length, and the long end of thread is stretching end, and short thread end is fixed end.
Described pre-buried anchor slab 4 inner sides are with spiral bar 4A, and prestressed steel bar is spacing through spiral bar 4A and locating hole.
Described fastening assembly 5 comprises: anchoring nut 5A, prestressed steel bar end is through the spiral bar 4A on pre-buried anchor slab 4 and the locating hole on pre-buried anchor slab 4, at pre-buried anchor slab 4 opposite sides by anchoring nut 5A anchoring.
In described king-tower tower body, prestressed steel bar 3B longitudinal or horizontally set is a group or more, and prestressed steel bar 3B number longitudinal and horizontally set is identical or different.
Between described prestressed steel bar 3B and protective sleeve 3A, be provided with grease lubricant layer.
Referring to Fig. 1, the prestressed steel bar screw thread ground tackle longitudinally, laterally arranging respectively in the king-tower 1 of oblique pull lock bridge, sees rectangular distribution on the whole.The structure of prestressed steel bar screw thread ground tackle comprises that surface scribbles grease and outer wall and has the prestressed steel bar 3B of protective sleeve 3A; the pre-buried anchor slab 4 at prestressed steel bar 3B two ends; the fastening assembly 5 of prestressed steel bar on pre-buried anchor slab 4; in illustrated embodiment, in the king-tower 1 of oblique pull lock bridge, longitudinally, be laterally provided with respectively three groups of prestressed steel bar screw thread ground tackles.
Referring to Fig. 2; prestressed steel bar 3B has protective sleeve 3A outward; the fixed end of the prestressed steel bar 3 with protective sleeve and stretching end are adopted fixing in the same way; prestressed steel bar fixed end or stretching end be through the locating hole on pre-buried anchor slab 4 spiral bar 4A and pre-buried anchor slab 4 above, at pre-buried anchor slab 4 opposite sides by anchoring nut 5A anchoring.Locating hole quantity on pre-buried anchor slab 4 is one or more, in this example, has three locating holes on pre-buried anchor slab 4, in the middle of a pair of pre-buried anchor slab 4, can place three prestressed steel bar 3B.

Claims (7)

1. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower, structure comprises that outer wall is provided with the prestressed steel bar of protective sleeve (3A) (3B), it is characterized in that: described prestressed steel bar (3B) is vertical, laterally staggered rectangular being distributed in king-tower tower body (1), a left side for above-mentioned prestressed steel bar (3B), right two ends are provided with pre-buried anchor slab (4) and fastening assembly (5) thereof, protective sleeve (3A) has and is slidably matched with prestressed steel bar (3B), a left side for prestressed steel bar (3B), right two ends are passed respectively the locating hole on pre-buried anchor slab (4) and are fixedly connected with king-tower tower body (1) by fastening assembly (5).
2. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower according to claim 1, is characterized in that: the nominal diameter of described prestressed steel bar is φ 14mm~φ 40mm.
3. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower according to claim 1, is characterized in that: described prestressed steel bar two ends are provided with the screw thread of different length, the long end of thread is stretching end, and short thread end is fixed end.
4. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower according to claim 1, is characterized in that: described pre-buried anchor slab (4) inner side is with spiral bar (4A), and prestressed steel bar is spacing through spiral bar (4A) and locating hole.
5. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower according to claim 1, it is characterized in that: described fastening assembly (5) comprising: anchoring nut (5A), prestressed steel bar end is through the spiral bar (4A) on pre-buried anchor slab (4) and the locating hole on pre-buried anchor slab (4), at pre-buried anchor slab (4) opposite side by anchoring nut (5A) anchoring.
6. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower according to claim 1, it is characterized in that: in described king-tower tower body, prestressed steel bar (3B) longitudinal or horizontally set is a group or more, and prestressed steel bar (3B) number longitudinal and horizontally set is identical or different.
7. a kind of prestressed steel bar screw thread ground tackle of using in oblique pull lock bridge king-tower according to claim 1, is characterized in that: between described prestressed steel bar (3B) and protective sleeve (3A), be provided with grease lubricant layer.
CN201320721600.8U 2013-11-13 2013-11-13 Prestress steel bar thread anchorage used in cable-stayed bridge main tower Expired - Lifetime CN203603059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320721600.8U CN203603059U (en) 2013-11-13 2013-11-13 Prestress steel bar thread anchorage used in cable-stayed bridge main tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320721600.8U CN203603059U (en) 2013-11-13 2013-11-13 Prestress steel bar thread anchorage used in cable-stayed bridge main tower

Publications (1)

Publication Number Publication Date
CN203603059U true CN203603059U (en) 2014-05-21

Family

ID=50715741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320721600.8U Expired - Lifetime CN203603059U (en) 2013-11-13 2013-11-13 Prestress steel bar thread anchorage used in cable-stayed bridge main tower

Country Status (1)

Country Link
CN (1) CN203603059U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727222A (en) * 2015-04-07 2015-06-24 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727222A (en) * 2015-04-07 2015-06-24 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure
CN104727222B (en) * 2015-04-07 2017-01-18 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure

Similar Documents

Publication Publication Date Title
CN204023411U (en) Novel assembled bracket bracket construction equipment
CN105649217A (en) Profiled steel structure beam column joint for reverse construction of stiffened structure and construction method
CN108678225A (en) The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice
CN203603059U (en) Prestress steel bar thread anchorage used in cable-stayed bridge main tower
CN201133085Y (en) Structure for enhancing external prestressing force effect
CN203403359U (en) Vertical prestress steel bar threaded anchor used in box girder
DE6609641U (en) CONCRETE REINFORCEMENT BAR.
CN108374516B (en) Profiled steel sheet-raw bamboo-concrete composite floor and manufacturing method thereof
EP2410097A2 (en) Butt joints of highly stressed prefabricated columns
CN201671213U (en) Load-bearing heat insulation brick block
CN104110100A (en) Steel bar clip pre-stress tensioning anchor block
CN204059609U (en) A kind of reinforcing steel bar connecting device of precast beam Column border node
CN203373997U (en) Guide rail type steel strand limiting tool
CN103334424B (en) Rail fabrication and installation technology and rail antislide pile
CN101012694A (en) Concrete beam with built-in transverse prestressed reinforcing steel bar
CN203411899U (en) Bolt type steel strand limiting device
CN216041227U (en) Beam-anchor combined supporting and reinforcing structure for slope landslide control
DE932970C (en) Reinforced concrete railway sleeper and its method of manufacture
CN205558035U (en) Wide flat beam of coincide
CN204551279U (en) A kind of tension of prestressed tendon device
CN213897083U (en) PSB finish rolling deformed steel bar prestressing force adds muscle TRD structure
CN203373662U (en) Combined type steel strand limiting device
CN202626975U (en) Hollow concrete square pile
CN203320358U (en) Compound type pre-tensioning prestress rail board
CN114575269B (en) Cable-stayed bridge box girder and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: Hengshui City, Hebei Province, 053000 North Park industrial base Taocheng District Road No. 9

Patentee after: SINO RUBBER TECHNOLOGY Co.,Ltd.

Address before: 053000 East Road, North Industrial Park, Hebei, Hengshui, No. 9

Patentee before: HENGSHUI RUBBER Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180212

Address after: Hengshui City, Hebei Province, 053000 North Park industrial base Taocheng District Road No. 9

Co-patentee after: HEBEI DESHENG WIREMESH CO.,LTD.

Patentee after: SINO RUBBER TECHNOLOGY Co.,Ltd.

Address before: Hengshui City, Hebei Province, 053000 North Park industrial base Taocheng District Road No. 9

Patentee before: SINO RUBBER TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Hengshui City, Hebei Province, 053000 North Park industrial base Taocheng District Road No. 9

Co-patentee after: Tiangong Lide Technology Development Co.,Ltd.

Patentee after: SINO RUBBER TECHNOLOGY Co.,Ltd.

Address before: Hengshui City, Hebei Province, 053000 North Park industrial base Taocheng District Road No. 9

Co-patentee before: HEBEI DESHENG WIREMESH CO.,LTD.

Patentee before: SINO RUBBER TECHNOLOGY Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140521