CN203594039U - Underground water cut slope heat preservation protection structure - Google Patents
Underground water cut slope heat preservation protection structure Download PDFInfo
- Publication number
- CN203594039U CN203594039U CN201320800693.3U CN201320800693U CN203594039U CN 203594039 U CN203594039 U CN 203594039U CN 201320800693 U CN201320800693 U CN 201320800693U CN 203594039 U CN203594039 U CN 203594039U
- Authority
- CN
- China
- Prior art keywords
- slope
- heat preservation
- underground water
- cut slope
- infiltration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 38
- 238000004321 preservation Methods 0.000 title abstract 9
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 15
- 230000008595 infiltration Effects 0.000 claims description 35
- 238000001764 infiltration Methods 0.000 claims description 35
- 238000009413 insulation Methods 0.000 claims description 28
- 238000000465 moulding Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 8
- 239000004575 stone Substances 0.000 abstract 5
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 230000035699 permeability Effects 0.000 abstract 1
- 230000006641 stabilisation Effects 0.000 abstract 1
- 238000011105 stabilization Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 230000008014 freezing Effects 0.000 description 3
- 238000007710 freezing Methods 0.000 description 3
- 239000003673 groundwater Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Abstract
The utility model relates to an underground water cut slope heat preservation protection structure. The underground water cut slope heat preservation protection structure comprises a mortar rubble revetment, a water seepage blind ditch, a water seepage blind tube, a broken stone hardcore and a heat preservation layer. The water seepage blind ditch is formed below a cut slope side ditch platform. The water seepage blind tube and the broken stone hardcore are laid in a cut slope. The heat preservation layer is laid on the broken stone hardcore. The water seepage blind tube is communicated with the water seepage blind ditch below the side ditch platform. The mortar rubble revetment is arranged on the heat preservation layer. The broken stone hardcore and the water seepage blind tube have permeability to form a drainage channel, and seeped underground water is drained out of the slope through the water seepage blind ditch. The heat preservation layer has the heat preservation function, prevents the broken stone hardcore from being frozen and makes seeped water of the slope smoothly drained. The mortar rubble revetment has the function of protecting the cut slope. The underground water cut slope heat preservation protection structure has the advantages of being good in drainage effect, easy and convenient to construct and low in manufacturing cost, can prevent underground water from damaging and affecting the railroad slope and has significance in guaranteeing firmness and stabilization of a roadbed.
Description
Technical field
The utility model belongs to railway subgrade works, particularly relates to a kind of insulation safeguard structure of underground water cutting side slope.
Background technology
Underground water has very large harm and impact to railway bed and side slope strength and stability thereof, performs eliminating ground water engineering, very big to guaranteeing the firm and stable relation of roadbed.For the cutting of excavation moulding, conventionally take, under lateral sulcus platform, blind drain is set at present, side slope is established the measures such as side slope sewer and is got rid of underground water.Fig. 1 is the subgrade structure that blind drain is set under prior art lateral sulcus platform, formed by mortar rubble masonry pavement 3 and blind drain 4, mainly the underground water that reduces and get rid of roadbed scope by blind drain, although this structure can be got rid of near underground water subgrade bed, for severe cold area, the depth of frost penetration is large, groundwater table is higher than curb location, cut slope infiltration is difficult for getting rid of, and underground water will exert an influence to side slope, and winter side slope icing effect traffic safety.Fig. 2 is the subgrade structure that prior art side slope arranges side slope sewer, formed by mortar rubble masonry pavement 3, blind drain 4 and side slope sewer 8, mainly the underground water of being got rid of subgrade bed and side slope by side slope sewer 8 and blind drain 4, although this structure can be got rid of slope underground water, but for rock matter cut slope, constructional difficulties, cost is high, and drainage effect is not good.
Utility model content
Get rid of the problem of the cut slope structure existence of underground water for existing railway, the utility model is released a kind of underground water cutting side slope insulation safeguard structure, its objective is, infiltration blind pipe is set on cut slope, on infiltration blind pipe, lay hardcore bed, insulation layer is set on hardcore bed, makes severe cold area rocky cutting slope drainage channel prevent from freezing, so that infiltration is discharged smoothly.
The underground water cutting side slope insulation safeguard structure that the utility model relates to, for excavating the cut slope of moulding, comprises mortar rubble masonry pavement, blind drain, infiltration blind pipe, hardcore bed and insulation layer.Under cut slope lateral sulcus platform, blind drain is set, on cut slope, arrange and lay infiltration blind pipe, on infiltration blind pipe, lay hardcore bed, on hardcore bed, lay insulation layer, infiltration blind pipe is communicated with the blind drain under lateral sulcus platform, and mortar rubble masonry pavement is arranged on insulation layer.
Infiltration blind pipe adopts plastic filter pipe, is covered with infiltration micropore, to be layed on cut slope perpendicular to roadbed line direction is alternate on pipe.The spacing of infiltration blind pipe is 3-5m, and the lower end of infiltration blind pipe connects blind drain.Infiltration blind pipe, hardcore bed and blind drain form drainage channel, and the underground water oozing out enters blind drain, then discharges cut slope through hardcore bed, infiltration blind pipe.Insulation layer has insulation effect, prevents that hardcore bed from freezing, to side slope seepage is discharged smoothly, mortar rubble masonry pavement plays the effect of protection cut slope.
Underground water cutting side slope that the utility model relates to insulation safeguard structure has advantages of that drainage effect is good, easy construction, cost are low, prevents that underground water from producing harm and impact to railway slope, firmly and stable has an important function to what guarantee roadbed.
Accompanying drawing explanation
Fig. 1 is the road structure schematic diagram that blind drain is set under the lateral sulcus platform of prior art;
Fig. 2 is the road structure schematic diagram of the side slope sewer of prior art;
Fig. 3 is the underground water cutting side slope insulation protection road structure schematic diagram that the utility model relates to;
Fig. 4 is the part-structure enlarged drawing of Fig. 3.
Description of symbols in figure:
1, stratum 2, phreatic line
3, mortar rubble masonry pavement 4, blind drain
5, infiltration blind pipe 6, hardcore bed
7, insulation layer 8, side slope sewer
The specific embodiment
Below in conjunction with accompanying drawing, the technical solution of the utility model is described further.Fig. 3 and Fig. 4 show that the underground water cutting side slope that the utility model relates to is incubated the basic structure of protecting, as shown in the figure, the underground water cutting side slope insulation safeguard structure that the utility model relates to, for excavating the cut slope of moulding, comprises mortar rubble masonry pavement 3, blind drain 4, infiltration blind pipe 5, hardcore bed 6 and insulation layer 7.Under cut slope lateral sulcus platform, blind drain 4 is set, on cut slope, arrange and lay infiltration blind pipe 5, on infiltration blind pipe 5, lay hardcore bed 6, on hardcore bed 6, lay insulation layer 7, infiltration blind pipe 5 is communicated with the blind drain 4 under lateral sulcus platform, and mortar rubble masonry pavement 3 is arranged on insulation layer 7.
Infiltration blind pipe 5 adopts plastic filter pipe, is covered with infiltration micropore, to be layed on cut slope perpendicular to roadbed line direction is alternate on pipe.The spacing of infiltration blind pipe 5 is 3-5m, and the lower end of infiltration blind pipe 5 connects blind drain 4.Infiltration blind pipe 5, hardcore bed 6 and blind drain 4 form drainage channel, and the underground water oozing out enters blind drain 4, then discharges cut slope through hardcore bed 6, infiltration blind pipe 5.Insulation layer 7 has insulation effect, prevents that hardcore bed 6 from freezing, to side slope seepage is discharged smoothly, mortar rubble masonry pavement 3 plays the effect of protection cut slope.
The underground water cutting side slope insulation safeguard structure work progress that the utility model relates to: first lay infiltration blind pipe 5 by certain spacing distance horizontal path direction on smooth-going cut slope, then lay hardcore bed 6 thereon, ram bat closely knit, infiltration blind pipe 5 and hardcore bed 6 are communicated with the blind drain 4 having arranged, on hardcore bed 6, lay insulation layer 7, mortar rubble masonry pavement 3 is set on insulation layer 7, forms underground water cutting side slope insulation safeguard structure.
Claims (2)
1. a underground water cutting side slope insulation safeguard structure, for excavating the cut slope of moulding, it is characterized in that: comprise mortar rubble masonry pavement (3), blind drain (4), infiltration blind pipe (5), hardcore bed (6) and insulation layer (7), blind drain (4) is set under cut slope lateral sulcus platform, on cut slope, arrange and lay infiltration blind pipe (5), the upper hardcore bed (6) of laying of infiltration blind pipe (5), the upper insulation layer (7) of laying of hardcore bed (6), infiltration blind pipe (5) is communicated with the blind drain (4) under lateral sulcus platform, mortar rubble masonry pavement (3) is arranged on insulation layer (7).
2. underground water cutting side slope insulation safeguard structure according to claim 1, it is characterized in that: described infiltration blind pipe (5) adopts plastic filter pipe, on pipe, be covered with infiltration micropore, to be layed on cut slope perpendicular to roadbed line direction is alternate, the lower end of infiltration blind pipe (5) connects blind drain (4); The spacing of infiltration blind pipe (5) is 3-5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320800693.3U CN203594039U (en) | 2013-12-05 | 2013-12-05 | Underground water cut slope heat preservation protection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320800693.3U CN203594039U (en) | 2013-12-05 | 2013-12-05 | Underground water cut slope heat preservation protection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203594039U true CN203594039U (en) | 2014-05-14 |
Family
ID=50674936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320800693.3U Expired - Lifetime CN203594039U (en) | 2013-12-05 | 2013-12-05 | Underground water cut slope heat preservation protection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203594039U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104696011A (en) * | 2015-04-01 | 2015-06-10 | 广东安元矿业勘察设计有限公司 | Improved method of underground flat drainage system of coal mine middle section |
CN106592346A (en) * | 2017-01-22 | 2017-04-26 | 中铁二院工程集团有限责任公司 | Head chute separated type ballastless track cutting bed structure for middle-strong salinized soil areas |
CN106948832A (en) * | 2017-03-14 | 2017-07-14 | 中铁隧道集团二处有限公司 | A kind of tunnel in cold regions heat-insulating water outlet construction method |
CN107090759A (en) * | 2017-06-22 | 2017-08-25 | 谢金钊 | Two-stage road slope ditch component and two-stage road slope ditch structure |
CN109853595A (en) * | 2019-03-28 | 2019-06-07 | 中交第二公路勘察设计研究院有限公司 | Cut slope salivary flow ice safeguard structure and method |
-
2013
- 2013-12-05 CN CN201320800693.3U patent/CN203594039U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104696011A (en) * | 2015-04-01 | 2015-06-10 | 广东安元矿业勘察设计有限公司 | Improved method of underground flat drainage system of coal mine middle section |
CN106592346A (en) * | 2017-01-22 | 2017-04-26 | 中铁二院工程集团有限责任公司 | Head chute separated type ballastless track cutting bed structure for middle-strong salinized soil areas |
CN106948832A (en) * | 2017-03-14 | 2017-07-14 | 中铁隧道集团二处有限公司 | A kind of tunnel in cold regions heat-insulating water outlet construction method |
CN106948832B (en) * | 2017-03-14 | 2019-03-29 | 中铁隧道集团二处有限公司 | A kind of tunnel in cold regions heat-insulating water outlet construction method |
CN107090759A (en) * | 2017-06-22 | 2017-08-25 | 谢金钊 | Two-stage road slope ditch component and two-stage road slope ditch structure |
CN109853595A (en) * | 2019-03-28 | 2019-06-07 | 中交第二公路勘察设计研究院有限公司 | Cut slope salivary flow ice safeguard structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203594039U (en) | Underground water cut slope heat preservation protection structure | |
CN101956355B (en) | Subgrade structure for preventing and controlling road damage in seasonal frozen regions | |
CN103510441B (en) | Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof | |
CN102071607B (en) | Railroad bed repair method without affecting existing running conditions | |
CN202926388U (en) | Drainage facility for road surface bubbling water of highway tunnel | |
CN102996178B (en) | A kind of drainage system of tunnel in cold regions | |
CN204356594U (en) | Non-fragment orbit expensive soil cutting-bedding construction | |
CN203741666U (en) | Roadbed structure for preventing cut-fill section of highway in cold region from frost boiling | |
CN201738208U (en) | Roadbed structure for preventing road damage in seasonally frozen ground area | |
CN203498721U (en) | Three-dimensional drainage roadbed structure preventing damage by water of road in cold region | |
CN101403209B (en) | Fast water-permeable brick for stopping pad and laying method | |
CN204112305U (en) | Existing railway line excavation section weak subgrade is reinforced and is used multi-functional lobby water system | |
CN103266546B (en) | Frozen ground regions non-fragment orbit high-speed railway embankment foundation bed structure | |
CN106088115A (en) | The method increasing Stability of Soil of High Side Slopes | |
CN102425175B (en) | Reinforcement protective structure of large spoil disposal area in mountainous area | |
CN205035768U (en) | Enrockment concrete permeable dike | |
CN203716161U (en) | Underground water cut slope protection structure in severe cold area | |
CN203335089U (en) | Protruding type environment-friendly tunnel portal with supports | |
CN201099920Y (en) | Heat preservation collecting well | |
CN205775687U (en) | Alpine meadow region heavy cut insulation infiltration combined type covered conduit | |
CN204898465U (en) | Ecological drainage facility of permafrost region dish | |
CN106758892A (en) | A kind of Seasonal freezing areas Freeway draining means of defence | |
CN104929081A (en) | Enrockment concrete permeable dike and construction method thereof | |
CN102031742A (en) | roadbed longitudinal crack treatment method based on convex tenon type cement grouting geomembrane belt | |
KR101062732B1 (en) | Freeze prevention structure for rail roadbed and this construction technique |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300142 Hebei District, Zhongshan Road, No. 10, Patentee after: CHINA RAILWAY DESIGN Corp. Address before: 300142 Hebei District, Zhongshan Road, No. 10, Patentee before: THE THIRD RAILWAY SURVEY AND DESIGN INSTITUTE Group Corp. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140514 |